CN112620260B CN202011408138.7A CN202011408138A CN112620260B CN 112620260 B CN112620260 B CN 112620260B CN 202011408138 A CN202011408138 A CN 202011408138A CN 112620260 B CN112620260 B CN 112620260B
Authority
CN
China
Prior art keywords
concrete
pipeline
water
pipe
pressure air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011408138.7A
Other languages
Chinese (zh)
Other versions
CN112620260A (en
Inventor
王文爽
吕海明
王家海
周俊东
许建
陈建阳
余情园
浦川阳
王灵强
刘士杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
China Railway 19th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 19th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical China Railway 19th Bureau Group Co Ltd
Priority to CN202011408138.7A priority Critical patent/CN112620260B/en
Publication of CN112620260A publication Critical patent/CN112620260A/en
Application granted granted Critical
Publication of CN112620260B publication Critical patent/CN112620260B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • B08B9/0321Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/032Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
    • B08B9/0321Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
    • B08B9/0328Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid by purging the pipe with a gas or a mixture of gas and liquid

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Cleaning In General (AREA)
  • Nozzles (AREA)

Abstract

A backwashing method for a concrete pipeline of a spraying and mixing system relates to a method for cleaning the concrete pipeline of the spraying and mixing system. The invention mainly aims to solve the problem that the traditional method often causes the sediment in the pipeline to be incapable of being sprayed out from the mechanical arm spray head. The concrete in the hopper is pumped as completely as possible; filling water into the hopper of the jet pump, and ensuring that the hopper is connected with a water source; starting a pump, pushing the concrete in the pipeline by water, and conveying the concrete into a mixer of the manipulator through a concrete conveying pipeline; the mixer is connected with a high-pressure air pipe, and water and concrete residues are sent out under the action of the high-pressure air. The joint of the outlet of the jet pump and the concrete conveying pipeline is opened, a nozzle on the manipulator is removed, a plug is installed, a large amount of water is injected into the concrete conveying pipeline through a water pipe, high-pressure air is started, and water and residues in the pipe are flushed out through the high-pressure air. And cleaning the jet pump and the rest of the pipeline. The advantage can solve because of the unclean concrete injection pipeline that leads to of pipeline washing and leave the thing jam problem.

Description

Backwashing method for concrete pipeline of spraying and mixing system
The technical field is as follows:
the invention relates to a method for cleaning a concrete pipeline of a spray mixing system.
Background art:
the TBM cannot normally tunnel due to different faults in the operation process of the spraying and mixing system, and common faults can be divided into mechanical faults, hydraulic faults, electrical faults and other faults. Under normal conditions, the problem of mechanical failure is the main reason that the spraying and mixing system influences tunneling, and pipeline blockage in the mechanical failure can account for half of the proportion, so that the problem of pipe blockage is particularly important to be treated.
The traditional cleaning method often causes that some broken stones or other sediments in the pipeline can not be completely sprayed out of the mechanical arm spray head, when the delivery pump stops pumping water, the broken stone particles and the sediments fall back to the lower part of the pipeline or the bent part of the pipeline due to gravity, and when the pump pumps concrete again, the pipeline is easily blocked.
The invention content is as follows:
the technical problem to be solved by the invention is to provide a backwashing method for concrete pipelines of a spray mixing system, which can effectively solve the problem of blockage of concrete spray pipelines caused by incomplete pipeline cleaning in TBM tunnel construction, can greatly improve the cooperative working performance of the concrete spray system, a steel arch system and an anchor rod drilling system, and improve the tunnel supporting and tunneling efficiency of TBM construction.
The technical scheme adopted by the invention is as follows:
firstly, on the premise of ensuring no idle driving, the concrete in the hopper is pumped as far as possible;
filling water into the hopper of the jet pump, and ensuring that the hopper is connected with a water source;
thirdly, starting a pump, wherein the water pushes the concrete in the pipeline to flow into a mixer of the manipulator through a concrete conveying pipeline; and the mixer is connected with a high-pressure air pipe, and water and concrete residues are sent out under the action of the high-pressure air to finish primary cleaning.
Fourthly, releasing the pressure in the pipeline and cutting off the power supply after the reverse pump acts for several times;
fifthly, opening a discharge elbow and a discharge door, and thoroughly removing the residual concrete in the hopper, the distribution valve box body and the reducer pipe;
sixthly, opening a pipe clamp (closest to the jet pump) at the joint of the outlet of the jet pump and the concrete conveying pipeline, removing a spray head on a manipulator in the spray mixing system, installing a plug at the spray head of the manipulator and fixing the plug by the pipe clamp, inserting another water pipe into the concrete conveying pipeline from the mixer, injecting a large amount of water into the concrete conveying pipeline, starting high-pressure air, and flushing out the water and residues in the pipe by the high-pressure air. And finally, cleaning the jet pump and the rest of pipelines to finish secondary cleaning.
The invention has the advantages that: the method can effectively solve the problem of blockage of concrete injection pipelines due to incomplete pipeline cleaning in the TBM tunnel construction, can greatly improve the cooperative working performance of a concrete injection system, a steel arch system and an anchor rod drilling system, and improves the tunnel supporting and tunneling efficiency of the TBM tunnel construction.
Description of the drawings:
FIG. 1 is a schematic view showing the connection state of a jet pump, a concrete pipe and a robot in the present invention;
FIG. 2 is a schematic view showing the connection state of the jet pump, the concrete pipe and the robot at the time of the second backwashing in the present invention.
In the figure, 1 is a robot, 2 is a concrete pipe, 3 is a concrete residue, and 4 is a jet pump.
The specific implementation mode is as follows:
the invention is further described below in connection with fig. 1 and 2;
firstly, on the premise of ensuring no idle driving, the concrete in the hopper is pumped as far as possible;
filling water into a hopper of the injection pump, and ensuring that the hopper is connected with a water source;
thirdly, starting a pump, wherein the water pushes the concrete in the pipeline to flow into a mixer of the manipulator through a concrete conveying pipeline; the mixer is connected with a high-pressure air pipe, and water and concrete residues are sent out under the action of high-pressure air to finish primary cleaning.
Fourthly, releasing the pressure in the pipeline and cutting off the power supply after a few times of reverse pump action;
fifthly, opening a discharge elbow and a discharge door, and thoroughly removing the residual concrete in the hopper, the distribution valve box body and the reducer pipe;
sixthly, opening a pipe clamp (closest to the jet pump) at the joint of the outlet of the jet pump and the concrete conveying pipeline, removing a spray head on a manipulator in the spray mixing system, installing a plug at the spray head of the manipulator and fixing the plug by the pipe clamp, inserting another water pipe into the concrete conveying pipeline from the mixer, injecting a large amount of water into the concrete conveying pipeline, starting high-pressure air, and flushing out the water and residues in the pipe by the high-pressure air. And finally, cleaning the jet pump and the rest of pipelines to finish secondary cleaning.

Claims (1)

1. The backwashing method of the concrete pipeline of the spray mixing system is characterized by comprising the following steps:
firstly, on the premise of ensuring no idle driving, the concrete in the hopper is pumped as far as possible;
filling water into the hopper of the jet pump, and ensuring that the hopper is connected with a water source;
thirdly, starting a pump, wherein the water pushes the concrete in the pipeline to flow into a mixer of the manipulator through a concrete conveying pipeline; the mixer is connected with a high-pressure air pipe, and water and concrete residues are sent out under the action of high-pressure air to finish primary cleaning;
fourthly, releasing the pressure in the pipeline and cutting off the power supply after the reverse pump acts for several times;
fifthly, opening a discharge elbow and a discharge door, and thoroughly removing residual concrete in the hopper, the distribution valve box body and the reducer pipe;
sixthly, opening a pipe clamp at the joint of the outlet of the jet pump and the concrete conveying pipeline, removing a spray head on a manipulator in the jet mixing system, installing a plug at the spray head of the manipulator and fixing the plug by the pipe clamp, inserting another water pipe into the concrete conveying pipeline from the mixer, injecting a large amount of water into the concrete conveying pipeline, starting high-pressure air, and flushing out water and residues in the pipe by the high-pressure air; and finally, cleaning the jet pump and the rest of pipelines to finish secondary cleaning.
CN202011408138.7A 2020-12-05 2020-12-05 Backwashing method for concrete pipeline of spraying and mixing system Active CN112620260B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011408138.7A CN112620260B (en) 2020-12-05 2020-12-05 Backwashing method for concrete pipeline of spraying and mixing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011408138.7A CN112620260B (en) 2020-12-05 2020-12-05 Backwashing method for concrete pipeline of spraying and mixing system

Publications (2)

Publication Number Publication Date
CN112620260A CN112620260A (en) 2021-04-09
CN112620260B true CN112620260B (en) 2022-07-22

Family

ID=75308022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011408138.7A Active CN112620260B (en) 2020-12-05 2020-12-05 Backwashing method for concrete pipeline of spraying and mixing system

Country Status (1)

Country Link
CN (1) CN112620260B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115090623A (en) * 2022-07-01 2022-09-23 中交路桥建设有限公司 Cleaning device and cleaning method for concrete pouring guide pipe

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4106111A (en) * 1977-04-07 1978-08-08 Rose Leo J Improved concrete making and transmission
JPS6131676A (en) * 1984-07-25 1986-02-14 Kyokuto Kaihatsu Kogyo Co Ltd Cleaning of piston type concrete pump
CN102619525A (en) * 2012-02-15 2012-08-01 中铁隧道股份有限公司 Method for dredging blocked mud door of slurry shield by aid of backwash and system
CN204212788U (en) * 2014-11-12 2015-03-18 中铁六局集团有限公司 Grouting pipeline for shield machine rinse-system
CN110541713A (en) * 2019-09-30 2019-12-06 中交天和机械设备制造有限公司 TBM presses and annotates formula concrete grouting pipeline
CN110630291A (en) * 2019-09-30 2019-12-31 中交天和机械设备制造有限公司 Grouting device with opening, closing and pressing functions
CN111408583A (en) * 2020-04-30 2020-07-14 无锡华瀚能源装备科技有限公司 Dust collector of camera is washed in combination of wind and water under ore deposit

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4106111A (en) * 1977-04-07 1978-08-08 Rose Leo J Improved concrete making and transmission
JPS6131676A (en) * 1984-07-25 1986-02-14 Kyokuto Kaihatsu Kogyo Co Ltd Cleaning of piston type concrete pump
CN102619525A (en) * 2012-02-15 2012-08-01 中铁隧道股份有限公司 Method for dredging blocked mud door of slurry shield by aid of backwash and system
CN204212788U (en) * 2014-11-12 2015-03-18 中铁六局集团有限公司 Grouting pipeline for shield machine rinse-system
CN110541713A (en) * 2019-09-30 2019-12-06 中交天和机械设备制造有限公司 TBM presses and annotates formula concrete grouting pipeline
CN110630291A (en) * 2019-09-30 2019-12-31 中交天和机械设备制造有限公司 Grouting device with opening, closing and pressing functions
CN111408583A (en) * 2020-04-30 2020-07-14 无锡华瀚能源装备科技有限公司 Dust collector of camera is washed in combination of wind and water under ore deposit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
泵送混凝土洗、润管预防堵管技术;丁红春等;《水科学与工程技术》;20180823(第04期);第73-75页 *
混凝土湿喷机械手在成兰铁路的应用;贾小平;《建筑机械》;20160309(第03期);第29-31页 *

Also Published As

Publication number Publication date
CN112620260A (en) 2021-04-09

Similar Documents

Publication Publication Date Title
CN110130326B (en) High-pressure jet grouting pile construction method for building application
CN207086485U (en) Pipeline washing device and concrete conveying equipment
CN112620260B (en) Backwashing method for concrete pipeline of spraying and mixing system
CN203725448U (en) Pipe descaling device
CN206245263U (en) A kind of sweeper high-pressure solenoid valve water circuit system
CN115341849A (en) Hydraulic re-spraying type omnibearing high-pressure injection grouting porous drill rod and method
CN107605434B (en) Descaling system and descaling method for high-pressure water injection pipe of oil field
CN201486567U (en) Subway shield synchronous grouting and cleaning device
CN205168454U (en) Concrete mixing transport vechicle water supply installation
CN110130325B (en) Construction method for rock drilling and grouting
CN1290629C (en) Antiscaling treatment and purification method for water drain pipes
CN109277378A (en) A kind of Quick dredging underground filling pipe-line system
CN115306444A (en) Double-liquid grouting device, double-liquid grouting system for heading machine and heading machine
CN204163693U (en) Paraffin remover filling apparatus
CN218079457U (en) Underground portable slurry pipeline dredging device
CN215089484U (en) Efficient aqueous vapor belt cleaning device of two lining cloth pump lines in tunnel
CN111608673A (en) Washing system of slurry shield cutter head and construction method thereof
CN201155490Y (en) High pressure gas flushing pump tube device
CN216517877U (en) Tank truck chemical feeding device with pump
CN218467658U (en) Uninterrupted grouting secondary mixing drum and inter-pump slurry suction manifold arrangement system
CN210685985U (en) Shield constructs quick-witted blowdown and prevents stifled device
CN104190678A (en) Offshore oil platform cabin tank circulating stirring flushing method and stirring flushing system thereof
CN115095287B (en) Plugging construction process for broken well of sand-spitting sleeve
CN216714726U (en) Make things convenient for abluent sediment stuff pump of pipeline
CN220377500U (en) Flushing device of inverted siphon and inverted siphon device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant