CN112616490A - 一种促进桃树快速平稳生长的整形修剪方法 - Google Patents
一种促进桃树快速平稳生长的整形修剪方法 Download PDFInfo
- Publication number
- CN112616490A CN112616490A CN202011574824.1A CN202011574824A CN112616490A CN 112616490 A CN112616490 A CN 112616490A CN 202011574824 A CN202011574824 A CN 202011574824A CN 112616490 A CN112616490 A CN 112616490A
- Authority
- CN
- China
- Prior art keywords
- shoots
- main
- branch
- branches
- main branch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G7/00—Botany in general
- A01G7/06—Treatment of growing trees or plants, e.g. for preventing decay of wood, for tingeing flowers or wood, for prolonging the life of plants
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G17/00—Cultivation of hops, vines, fruit trees, or like trees
- A01G17/005—Cultivation methods
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Botany (AREA)
- Environmental Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Ecology (AREA)
- Forests & Forestry (AREA)
- Engineering & Computer Science (AREA)
- Wood Science & Technology (AREA)
- Cultivation Of Plants (AREA)
Abstract
本发明涉及植物栽培技术领域,尤其涉及一种促进桃树快速平稳生长的整形修剪方法。本发明要解决的技术问题是:针对自然开心形桃树树形成形慢,修剪复杂的问题,本发明提供一种促进桃树快速平稳生长的整形修剪方法,该方法在苗木定植当年,距离地面35厘米处定干,修剪保留合适角度的主枝,使其光照充足;第二年,当主枝的延长枝长到50厘米以上时,将主枝两侧萌发的副梢培养成侧枝作为结果枝;第三年,主枝两侧的侧枝成为结果枝和结果枝组,每年6月份及时对主枝背上萌发的徒长枝疏除,对主枝背上的萌发的新梢和顶端的竞争枝进行捻枝或摘心,桃树的修剪基本成型,这种修剪方法较为简单容易掌握,桃树树形成形快,3年左右就可以进入盛果期。
Description
技术领域
本发明涉及植物栽培技术领域,尤其涉及一种促进桃树快速平稳生长的整形修剪方法。
背景技术
桃树栽培在我国已经有3000多年的历史,近百年来逐渐发展成经济林果,为了提高桃树栽培的经济效益,逐步摸索出了各种整形修剪方法,桃树的自然开心形,光照充足,成型后的桃树,产量高,果品好,但是这种树形的前期产量低、树形一般需要4年左右成型,而且修剪方法较为复杂,果农很难掌握。
发明内容
本发明要解决的技术问题是:针对自然开心形桃树树形成形慢,修剪复杂的问题,本发明提供一种促进桃树快速平稳生长的整形修剪方法,这种修剪方法,较为简单容易掌握,桃树树形成形快,3年左右就可以进入盛果期,果树产量高,果品好。
本发明解决其技术问题所采用的技术方案是:
一种促进桃树快速平稳生长的整形修剪方法,包括以下步骤:
(1)苗木定植当年,在距离地面40-45厘米处定干,当新梢伸长到20 厘米时,选留5根壮梢,其余枝条全部剪掉,当新梢长到20厘米左右时,选留夹角在100-120之间的3个长势均衡的主枝,主枝与地面的开张角度为45~50°,在6月份去除主枝背上的徒长枝和长势旺盛的副梢,保留5-7 个副梢并摘心,冬季剪去主枝上的竞争枝,将主枝短截至外侧叶芽处,疏除主枝上背上的副梢和直立生长的徒长枝;
(2)第二年,当主枝的延长枝长到50厘米以上时,对主枝背上萌发的新梢和主枝顶端的竞争枝进行捻枝,抑制其生长,确保主枝的长势,主枝两侧萌发的副梢培养成侧枝作为结果枝,第一侧枝距离主干的间距为 20-30cm,侧枝在主枝上交叉分布,冬季对主枝延长枝短截1/3;
(3)第三年,主枝两侧的侧枝成为结果枝和结果枝组,每年6月份及时对主枝背上萌发的徒长枝疏除,对主枝背上的萌发的新梢和顶端的竞争枝进行捻枝或摘心,桃树的修剪基本成型;
步骤(1)中副梢在主枝上的间距为8-12cm;
步骤(2)中主枝上侧枝之间的夹角为80-100°。
本发明的有益效果是:
(1)本发明采用简单合理的修剪方法促进了桃树快速均衡的生长,使得桃树光照充足、长势旺盛,3年左右就进入盛果期,提高的果农的收益。
(2)本发明采用简单合理的修剪方法使得桃树树形不仅成形快,对主枝上结果枝组合理分布,保证了果品的质量。
(3)本发明采用修剪方法简单易学,果农容易掌握。
具体实施方式
现在对本发明作进一步详细的说明。
实施例1
(1)苗木定植当年,在距离地面40厘米处定干,当新梢伸长到20 厘米时,选留5根壮梢,其余枝条全部剪掉,当新梢长到20厘米左右时,选留夹角在100之间的3个长势均衡的主枝,主枝与地面的开张角度为 50°,在6月份去除主枝背上的徒长枝和长势旺盛的副梢,保留5个副梢并摘心,副梢在主枝上的间距为8cm,冬季剪去主枝上的竞争枝,将主枝短截至外侧叶芽处,疏除主枝上背上的副梢和直立生长的徒长枝;
(2)第二年,当主枝的延长枝长到50厘米以上时,对主枝背上萌发的新梢和主枝顶端的竞争枝进行捻枝,抑制其生长,确保主枝的长势,主枝两侧萌发的副梢培养成侧枝作为结果枝,第一侧枝距离主干的间距为20cm,主枝上侧枝之间的夹角为80°,侧枝在主枝上交叉分布,冬季对主枝延长枝短截1/3;
(3)第三年,主枝两侧的侧枝成为结果枝和结果枝组,每年6月份及时对主枝背上萌发的徒长枝疏除,对主枝背上的萌发的新梢和顶端的竞争枝进行捻枝或摘心,桃树的修剪基本成型。
实施例2
(1)苗木定植当年,在距离地面45厘米处定干,当新梢伸长到20 厘米时,选留5根壮梢,其余枝条全部剪掉,当新梢长到20厘米左右时,选留夹角在110之间的3个长势均衡的主枝,主枝与地面的开张角度为 50°,在6月份去除主枝背上的徒长枝和长势旺盛的副梢,保留7个副梢并摘心,冬季剪去主枝上的竞争枝,将主枝短截至外侧叶芽处,疏除主枝上背上的副梢和直立生长的徒长枝;
(2)第二年,当主枝的延长枝长到50厘米以上时,对主枝背上萌发的新梢和主枝顶端的竞争枝进行捻枝,抑制其生长,确保主枝的长势,主枝两侧萌发的副梢培养成侧枝作为结果枝,第一侧枝距离主干的间距为 30cm,侧枝在主枝上交叉分布,冬季对主枝延长枝短截1/3;
(3)第三年,主枝两侧的侧枝成为结果枝和结果枝组,每年6月份及时对主枝背上萌发的徒长枝疏除,对主枝背上的萌发的新梢和顶端的竞争枝进行捻枝或摘心,桃树的修剪基本成型;
步骤(1)中副梢在主枝上的间距为12cm;
步骤(2)中主枝上侧枝之间的夹角为100°。
实施例3
(1)苗木定植当年,在距离地面43厘米处定干,当新梢伸长到20 厘米时,选留5根壮梢,其余枝条全部剪掉,当新梢长到20厘米左右时,选留夹角在120之间的3个长势均衡的主枝,主枝与地面的开张角度为50°,在6月份去除主枝背上的徒长枝和长势旺盛的副梢,保留6个副梢并摘心,冬季剪去主枝上的竞争枝,将主枝短截至外侧叶芽处,疏除主枝上背上的副梢和直立生长的徒长枝;
(2)第二年,当主枝的延长枝长到50厘米以上时,对主枝背上萌发的新梢和主枝顶端的竞争枝进行捻枝,抑制其生长,确保主枝的长势,主枝两侧萌发的副梢培养成侧枝作为结果枝,第一侧枝距离主干的间距为 25cm,侧枝在主枝上交叉分布,冬季对主枝延长枝短截1/3;
(3)第三年,主枝两侧的侧枝成为结果枝和结果枝组,每年6月份及时对主枝背上萌发的徒长枝疏除,对主枝背上的萌发的新梢和顶端的竞争枝进行捻枝或摘心,桃树的修剪基本成型;
步骤(1)中副梢在主枝上的间距为8cm;
步骤(2)中主枝上侧枝之间的夹角为90°。
按照实施例1的种植方法,实施效果如下:
表1:不同品种桃树的3年生桃树的生长情况
表2不同品种桃树的3年生桃树(株行距3.5m,行距6m)的结果枝平均长(cm)。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。
Claims (3)
1.一种促进桃树快速平稳生长的整形修剪方法,其特征在于:包括以下步骤:
(1)苗木定植当年,在距离地面35厘米处定干,当新梢伸长到20厘米时,选留5根壮梢,其余枝条全部剪掉,当新梢长到40-45厘米左右时,选留夹角在100-120之间的3个长势均衡的主枝,主枝与地面的开张角度为45~50°,在6月份去除主枝背上的徒长枝和长势旺盛的副梢,保留5-7个副梢并摘心,冬季剪去主枝上的竞争枝,将主枝短截至外侧叶芽处,疏除主枝上背上的副梢和直立生长的徒长枝;
(2)第二年,当主枝的延长枝长到50厘米以上时,对主枝背上萌发的新梢和主枝顶端的竞争枝进行捻枝,抑制其生长,确保主枝的长势,主枝两侧萌发的副梢培养成侧枝作为结果枝,第一侧枝距离主干的间距为20-30cm,侧枝在主枝上交叉分布,冬季对主枝延长枝短截1/3;
(3)第三年,主枝两侧的侧枝成为结果枝和结果枝组,每年6月份及时对主枝背上萌发的徒长枝疏除,对主枝背上的萌发的新梢和顶端的竞争枝进行捻枝或摘心,桃树的修剪基本成型。
2.根据权利要求1所述的促进桃树快速平稳生长的整形修剪方法,其特征在于:步骤(1)中副梢在主枝上的间距为8-12cm。
3.根据权利要求1所述的促进桃树快速平稳生长的整形修剪方法,其特征在于:步骤(2)中主枝上侧枝之间的夹角为80-100°。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011574824.1A CN112616490A (zh) | 2020-12-28 | 2020-12-28 | 一种促进桃树快速平稳生长的整形修剪方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011574824.1A CN112616490A (zh) | 2020-12-28 | 2020-12-28 | 一种促进桃树快速平稳生长的整形修剪方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112616490A true CN112616490A (zh) | 2021-04-09 |
Family
ID=75325661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011574824.1A Pending CN112616490A (zh) | 2020-12-28 | 2020-12-28 | 一种促进桃树快速平稳生长的整形修剪方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112616490A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113692873A (zh) * | 2021-09-21 | 2021-11-26 | 湖北七仙红园区管理服务有限公司 | 一种多雨地区的桃树整形方法 |
CN115039617A (zh) * | 2022-02-18 | 2022-09-13 | 宁夏农林科学院园艺研究所(宁夏设施农业工程技术研究中心) | 一种梨树杯状自然树型修剪方法 |
CN115568372A (zh) * | 2022-09-29 | 2023-01-06 | 江苏天隆神怡生态农业园有限公司 | 桃树省力化树形整形栽培方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101341839A (zh) * | 2008-07-11 | 2009-01-14 | 镇江万山红遍农业园 | 桃树盘状整型修剪方法 |
CN104160906A (zh) * | 2014-07-25 | 2014-11-26 | 镇江万山红遍农业园 | 一种桃树整形修剪方法 |
CN108849027A (zh) * | 2018-08-14 | 2018-11-23 | 江苏丘陵地区镇江农业科学研究所 | 一种促进桃树平衡生长的整形修剪方法 |
-
2020
- 2020-12-28 CN CN202011574824.1A patent/CN112616490A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101341839A (zh) * | 2008-07-11 | 2009-01-14 | 镇江万山红遍农业园 | 桃树盘状整型修剪方法 |
CN104160906A (zh) * | 2014-07-25 | 2014-11-26 | 镇江万山红遍农业园 | 一种桃树整形修剪方法 |
CN108849027A (zh) * | 2018-08-14 | 2018-11-23 | 江苏丘陵地区镇江农业科学研究所 | 一种促进桃树平衡生长的整形修剪方法 |
Non-Patent Citations (2)
Title |
---|
金辉: "桃树三主枝自然开心形整形修剪技术", 《果树实用技术与信息》 * |
马文哲等: "桃树长放高光效修剪技术", 《烟台果树》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113692873A (zh) * | 2021-09-21 | 2021-11-26 | 湖北七仙红园区管理服务有限公司 | 一种多雨地区的桃树整形方法 |
CN113692873B (zh) * | 2021-09-21 | 2022-07-19 | 湖北七仙红园区管理服务有限公司 | 一种多雨地区的桃树整形方法 |
CN115039617A (zh) * | 2022-02-18 | 2022-09-13 | 宁夏农林科学院园艺研究所(宁夏设施农业工程技术研究中心) | 一种梨树杯状自然树型修剪方法 |
CN115568372A (zh) * | 2022-09-29 | 2023-01-06 | 江苏天隆神怡生态农业园有限公司 | 桃树省力化树形整形栽培方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112616490A (zh) | 一种促进桃树快速平稳生长的整形修剪方法 | |
CN107278786B (zh) | 一种梨树“梳状篱壁形”树形及其整形方法 | |
CN107996272B (zh) | 一种密植葡萄园稀植改造的稳产栽培方法 | |
CN111492881A (zh) | 一种桃树的整形修剪方法 | |
CN105248211A (zh) | 砂梨水平棚架单主枝联体“梳形”整形栽培方法 | |
CN111771564B (zh) | 一种温室蓝莓采后修剪方法 | |
CN108812019B (zh) | 一种密植、高产梨树树形的整形修剪方法 | |
CN112219636B (zh) | 一种二主枝自然开心形桃树树形及成形方法 | |
CN109699390A (zh) | 一种基于无主蔓扇形架改架y型架势的葡萄栽培改良方法 | |
CN110800539B (zh) | 一种苹果实生苗提早结果的枝条培养方法 | |
CN109328704B (zh) | 一种苹果树早果丰产砧木建园方法 | |
CN109156245B (zh) | 一种桃树一株多干篱壁形整形方法 | |
CN109566255B (zh) | 一种设施葡萄倒两茬延迟与促成两熟栽培方法 | |
CN113317112B (zh) | 一种樱桃树扇形整形方法 | |
CN113330976B (zh) | 一种矮砧苹果幼树快速成形的方法 | |
CN107593147B (zh) | 桃树树形及桃树栽后管理方法 | |
CN112616547A (zh) | 一种桃树南方避雨栽培快速成形的修剪方法 | |
CN112806204A (zh) | 一种利用水平中心干多直立主枝树形栽培桃的方法 | |
CN113994841A (zh) | 一种凤梨释迦高主干四主枝开心形树冠高产栽培方法 | |
CN113854031B (zh) | 一种蓝莓简化主干树形的培养方法 | |
CN111108946B (zh) | 一种回缩促壮架型改造技术 | |
CN113950975B (zh) | 一种提高北海道黄杨抗寒能力且快速成型的嫁接方法 | |
CN110622764B (zh) | 一种增加茶用桑芽尖、芽叶产量的方法 | |
CN110583347B (zh) | 一种高干樱花树的培育方法 | |
CN113728860B (zh) | 一种轻简化枸杞树形及其培养方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20210409 |