CN112593921A - 一种页岩气开采过断层套管变化模拟方法 - Google Patents

一种页岩气开采过断层套管变化模拟方法 Download PDF

Info

Publication number
CN112593921A
CN112593921A CN202011476811.0A CN202011476811A CN112593921A CN 112593921 A CN112593921 A CN 112593921A CN 202011476811 A CN202011476811 A CN 202011476811A CN 112593921 A CN112593921 A CN 112593921A
Authority
CN
China
Prior art keywords
rock stratum
casing
fault
shale gas
hydraulic cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011476811.0A
Other languages
English (en)
Inventor
吕鑫
杨科
刘钦节
付强
王于
张寨男
韩运
方珏静
周鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN202011476811.0A priority Critical patent/CN112593921A/zh
Publication of CN112593921A publication Critical patent/CN112593921A/zh
Priority to FR2112179A priority patent/FR3117524B3/fr
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass

Abstract

本发明涉及一种试验模拟方法,具体涉及一种页岩气开采过断层套管变化模拟方法,其特征在于,包括装置调试、岩层装填、套管安装、压力施加四个步骤;通过计算机终端控制轴向恒压液压缸及侧向恒压液压缸进行伸缩,测试装置反应;控制承压板收缩并贴近周壁,将模拟岩层的相似材料进行搅拌并装填至固定架内,逐层进行人工夯实;晾晒至内部干燥,将装填门关闭牢固后,利用钻机从固定架顶部留设孔向内转至设计深度后,施工套管插入;启动计算机终端,控制轴向恒压液压缸及侧向恒压液压缸对模拟岩层进行施压。

Description

一种页岩气开采过断层套管变化模拟方法
技术领域:
本发明涉及一种试验模拟方法,具体涉及一种页岩气开采过断层套管变化模拟方法。
背景技术:
随着我国能源匮乏问题日益严峻,国内的油气供需平衡逐渐被破坏,且页岩气属于洁净能源的一种,利用页岩气进行生产和建设可以满足绿色发展的要求,大力发展页岩气开采工作是今后国家发展的必然趋势。但我国的页岩气开采工作尚处于起步阶段,许多问题有待解决,如在页岩气资源开发过程中,遇到一些断层的出现,在实际生产过程中往往受到地理环境、人力资源、项目资金等诸多因素限制,无法及时对断层的变化进行分析。因此需要在生产开始之前进行详细的大量的模拟实验来研究页岩气开采过断层套管变化情况,让开采工作得以安全高效的进行。
本发明一种页岩气开采过断层套管变化模拟方法,将用来模拟岩层的材料搅拌、装填、夯实、干燥后通过计算机控制液压缸,对模拟岩层进行施压,从而达到减少成本投入且减少人员工时,提高效率且能较好模拟实况的目的。
发明内容:
本发明针对现有页岩气开采方法进行改进,考虑过断层套管变化,对装置进行装填施压等,模拟岩层及施工套管的变化监测。
本发明通过以下技术方案实现:一种页岩气开采过断层套管变化模拟方法,其特征在于,包括装置调试、岩层装填、套管安装、压力施加四个步骤:
步骤一,打开装填门,将固定架内清理干净后,通过计算机终端控制轴向恒压液压缸及侧向恒压液压缸进行伸缩,测试装置反应;
步骤二,控制承压板收缩并贴近周壁,将模拟岩层的相似材料进行搅拌并装填至固定架内,逐层进行人工夯实,在遇断层处需采用与周围岩性不同的模拟材料进行充填,并注意断层角度;
步骤三,模拟岩层装填完毕后,进行晾晒至内部干燥,将装填门关闭牢固后,利用钻机从固定架顶部留设孔向内转至设计深度后,施工套管插入;
步骤四,启动计算机终端,控制轴向恒压液压缸及侧向恒压液压缸对模拟岩层进行施压,控制施压时间间隔、单次施压大小,直至完成整体设计施压过程。
具体的,装填模拟岩层过程中在选定位置埋入应变片。
具体的,模拟岩层的晾晒过程可根据模拟现场情况进行把控调节。
具体的,钻机钻孔直径应与施工套管相匹配,并且注意钻机施工速度及力度。
具体的,施工套管内外应贴设应变片。
具体的,恒压液压缸可采用恒力加载方式或恒速加载方式。
具体的,施压同时通过内部埋设的应变片进行模拟岩层及施工套管的变化监测。
附图说明
图1是实现本发明一种页岩气开采过断层套管变化模拟方法装置立体图。
图2是实现本发明一种页岩气开采过断层套管变化模拟方法装填图。
图中:1为轴向恒压液压缸;2为施工套管;3为固定架;4为承压板;5为装填门;6为侧向恒压液压缸;7为固定底座;8为模拟岩层;9为断层。
具体实施方式
下面结合附图对本发明作进一步详细的描述。
本发明通过以下技术方案实现:一种页岩气开采过断层套管变化模拟方法,其特征在于,包括装置调试、岩层装填、套管安装、压力施加四个步骤:
步骤一,打开装填门5,将固定架3内清理干净后,通过计算机终端控制轴向恒压液压缸1及侧向恒压液压缸6进行伸缩,测试装置反应;
步骤二,控制承压板4收缩并贴近周壁,将模拟岩层8的相似材料进行搅拌并装填至固定架3内,逐层进行人工夯实,在遇断层9处需采用与周围岩性不同的模拟材料进行充填,并注意断层角度;
步骤三,模拟岩层8装填完毕后,进行晾晒至内部干燥,将装填门5关闭牢固后,利用钻机从固定架3顶部留设孔向内转至设计深度后,施工套管2插入;
步骤四,启动计算机终端,控制轴向恒压液压缸1及侧向恒压液压缸6对模拟岩层8进行施压,控制施压时间间隔、单次施压大小,直至完成整体设计施压过程。
具体的,装填模拟岩层8过程中在选定位置埋入应变片。
具体的,模拟岩层8的晾晒过程可根据模拟现场情况进行把控调节。
具体的,钻机钻孔直径应与施工套管2相匹配,并且注意钻机施工速度及力度。
具体的,施工套管2内外应贴设应变片。
具体的,恒压液压缸6可采用恒力加载方式或恒速加载方式。
具体的,施压同时通过内部埋设的应变片进行模拟岩层8及施工套管2的变化监测。
当然,上述说明仅仅为本发明的较佳实施例,本发明并不限于上述的实施例,应当说明的是,任何熟悉本领域的技术人员在本说明书的教导下,所做出的所有等同替换、明显变形形式,均落在本说明书的实质范围之内,理应受到本发明的保护。

Claims (7)

1.一种页岩气开采过断层套管变化模拟方法,其特征在于,包括装置调试、岩层装填、套管安装、压力施加四个步骤:
步骤一,打开装填门,将固定架内清理干净后,通过计算机终端控制轴向恒压液压缸及侧向恒压液压缸进行伸缩,测试装置反应;
步骤二,控制承压板收缩并贴近周壁,将模拟岩层的相似材料进行搅拌并装填至固定架内,逐层进行人工夯实,在遇断层处需采用与周围岩性不同的模拟材料进行充填,并注意断层角度;
步骤三,模拟岩层装填完毕后,进行晾晒至内部干燥,将装填门关闭牢固后,利用钻机从固定架顶部留设孔向内转至设计深度后,施工套管插入;
步骤四,启动计算机终端,控制轴向恒压液压缸及侧向恒压液压缸对模拟岩层进行施压,控制施压时间间隔、单次施压大小,直至完成整体设计施压过程。
2.根据权利要求1所述一种页岩气开采过断层套管变化模拟方法,其特征在于,所述的步骤二中装填模拟岩层过程中在选定位置埋入应变片。
3.根据权利要求1所述一种页岩气开采过断层套管变化模拟方法,其特征在于,所述的步骤三中模拟岩层的晾晒过程可根据模拟现场情况进行把控调节。
4.根据权利要求1所述一种页岩气开采过断层套管变化模拟方法,其特征在于,所述的步骤三中钻机钻孔直径应与施工套管相匹配,并且注意钻机施工速度及力度。
5.根据权利要求1所述一种页岩气开采过断层套管变化模拟方法,其特征在于,所述的步骤三中施工套管内外应贴设应变片。
6.根据权利要求1所述一种页岩气开采过断层套管变化模拟方法,其特征在于,所述的步骤四中恒压液压缸可采用恒力加载方式或恒速加载方式。
7.根据权利要求1所述一种页岩气开采过断层套管变化模拟方法,其特征在于,所述的步骤四中施压同时通过内部埋设的应变片进行模拟岩层及施工套管的变化监测。
CN202011476811.0A 2020-12-15 2020-12-15 一种页岩气开采过断层套管变化模拟方法 Pending CN112593921A (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202011476811.0A CN112593921A (zh) 2020-12-15 2020-12-15 一种页岩气开采过断层套管变化模拟方法
FR2112179A FR3117524B3 (fr) 2020-12-15 2021-11-18 Procédé de simulation de changement de manchon a la couche de faille d’exploitation de gaz de schiste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011476811.0A CN112593921A (zh) 2020-12-15 2020-12-15 一种页岩气开采过断层套管变化模拟方法

Publications (1)

Publication Number Publication Date
CN112593921A true CN112593921A (zh) 2021-04-02

Family

ID=75195691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011476811.0A Pending CN112593921A (zh) 2020-12-15 2020-12-15 一种页岩气开采过断层套管变化模拟方法

Country Status (2)

Country Link
CN (1) CN112593921A (zh)
FR (1) FR3117524B3 (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2528467A1 (en) * 2005-11-02 2007-05-02 Darrell Clarry Klatt Magnetic separation in fluids
CN101725345A (zh) * 2009-11-10 2010-06-09 河北理工大学 地层作用下套管-水泥环损坏室内模拟试验装置
CN105332680A (zh) * 2014-07-01 2016-02-17 中国石油化工股份有限公司 用于模拟水平井压裂的装置及方法
US20180010429A1 (en) * 2015-01-23 2018-01-11 Schlumberger Technology Corporation Control system and method of flowback operations for shale reservoirs
CN108571313A (zh) * 2018-05-24 2018-09-25 中国石油天然气集团有限公司 一种井下套管形变模拟装置及方法
CN111141616A (zh) * 2020-01-08 2020-05-12 东北石油大学 一种模拟缝网改造地层套管变形的实验装置及实验方法
CN111596036A (zh) * 2020-06-23 2020-08-28 煤炭科学技术研究院有限公司 一种煤层开采中断层活化的实验模拟装置与方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2528467A1 (en) * 2005-11-02 2007-05-02 Darrell Clarry Klatt Magnetic separation in fluids
CN101725345A (zh) * 2009-11-10 2010-06-09 河北理工大学 地层作用下套管-水泥环损坏室内模拟试验装置
CN105332680A (zh) * 2014-07-01 2016-02-17 中国石油化工股份有限公司 用于模拟水平井压裂的装置及方法
US20180010429A1 (en) * 2015-01-23 2018-01-11 Schlumberger Technology Corporation Control system and method of flowback operations for shale reservoirs
CN108571313A (zh) * 2018-05-24 2018-09-25 中国石油天然气集团有限公司 一种井下套管形变模拟装置及方法
CN111141616A (zh) * 2020-01-08 2020-05-12 东北石油大学 一种模拟缝网改造地层套管变形的实验装置及实验方法
CN111596036A (zh) * 2020-06-23 2020-08-28 煤炭科学技术研究院有限公司 一种煤层开采中断层活化的实验模拟装置与方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
韩礼红;杨尚谕;魏风奇;叶新群;王建军;王航;潘志勇;张华礼;岳文翰;谢斌;舒振辉;张平;路彩虹;尹飞;: "复杂压裂页岩气井套管变形机制及控制方法", 石油管材与仪器, no. 04 *

Also Published As

Publication number Publication date
FR3117524B3 (fr) 2022-11-11
FR3117524A3 (fr) 2022-06-17

Similar Documents

Publication Publication Date Title
CN110186760A (zh) 一种考虑改变围压条件的土质锚杆拉拔测试方法
CN106522923A (zh) 油气井水泥环密封完整性测试装置及利用此装置进行评价的方法
CN203756119U (zh) 一种用于模拟胶结测试的套管组件
CN108106945A (zh) 一种套管非均匀外挤加载试验装置及套管形变计算方法
CN206233918U (zh) 油气井水泥环密封完整性测试装置
CN103953332B (zh) 模拟钻井液动态漏失与堵漏的实验装置及实验方法
CN106404557A (zh) 一种岩石空心圆柱扭剪仪
CN108571313A (zh) 一种井下套管形变模拟装置及方法
CN203756155U (zh) 一种固井胶结失效的评价装置
CN107269263A (zh) 一种蠕变地层定向井筒力学行为模拟实验装置与方法
CN112523746A (zh) 一种用于模拟真实地层界面条件的水泥环密封测试装置
CN104763407A (zh) 欠平衡钻井破岩模拟实验装置及其模拟实验方法
WO2021012371A1 (zh) 无框架岩石三轴实验仪及工作方法
Sim et al. Cyclic triaxial tests to aid offshore pile analysis and design
CN111287731A (zh) 一种固井水泥环完整性评价装置及方法
CN106644753A (zh) 一种提升扭矩施加精度的岩石空心圆柱扭剪仪
CN103806865A (zh) 一种模拟压力变化引起固井胶结失效的方法
CN110487640A (zh) 一种变径膨胀锥试验装置
Liu et al. Study on optimization design of permanent packer slip structure
CN112593921A (zh) 一种页岩气开采过断层套管变化模拟方法
CN206270179U (zh) 一种提升扭矩施加精度的岩石空心圆柱扭剪仪
CN110006742A (zh) 一种可模拟地下洞室和隧洞开挖卸荷及支护的三轴试验压力室
CN206554916U (zh) 水泥环环隙模拟测试系统
CN206583728U (zh) 一种岩石空心圆柱扭剪仪
CN206710188U (zh) 一种高精度扭矩反馈型岩石空心圆柱扭剪仪

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210402