CN112580990B - 一种在役煤电厂中长期年发电小时数估算方法及系统 - Google Patents
一种在役煤电厂中长期年发电小时数估算方法及系统 Download PDFInfo
- Publication number
- CN112580990B CN112580990B CN202011537172.4A CN202011537172A CN112580990B CN 112580990 B CN112580990 B CN 112580990B CN 202011537172 A CN202011537172 A CN 202011537172A CN 112580990 B CN112580990 B CN 112580990B
- Authority
- CN
- China
- Prior art keywords
- coal
- service
- annual
- whole system
- power generation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000003245 coal Substances 0.000 title claims abstract description 103
- 238000010248 power generation Methods 0.000 title claims abstract description 94
- 238000000034 method Methods 0.000 title claims abstract description 35
- 230000007774 longterm Effects 0.000 title claims abstract description 16
- 230000005611 electricity Effects 0.000 claims description 19
- 229910052799 carbon Inorganic materials 0.000 claims description 17
- 230000009466 transformation Effects 0.000 claims description 17
- 238000010276 construction Methods 0.000 claims description 15
- 238000004364 calculation method Methods 0.000 claims description 9
- 230000015654 memory Effects 0.000 claims description 8
- 230000008569 process Effects 0.000 claims description 7
- 239000000126 substance Substances 0.000 claims description 6
- 239000000758 substrate Substances 0.000 claims 2
- 239000000203 mixture Substances 0.000 claims 1
- 239000002994 raw material Substances 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 8
- 238000004590 computer program Methods 0.000 description 7
- 230000006870 function Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000011234 economic evaluation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002427 irreversible effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Biodiversity & Conservation Biology (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011537172.4A CN112580990B (zh) | 2020-12-23 | 2020-12-23 | 一种在役煤电厂中长期年发电小时数估算方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011537172.4A CN112580990B (zh) | 2020-12-23 | 2020-12-23 | 一种在役煤电厂中长期年发电小时数估算方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112580990A CN112580990A (zh) | 2021-03-30 |
CN112580990B true CN112580990B (zh) | 2023-02-10 |
Family
ID=75139473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011537172.4A Active CN112580990B (zh) | 2020-12-23 | 2020-12-23 | 一种在役煤电厂中长期年发电小时数估算方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112580990B (zh) |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180078720A (ko) * | 2016-12-30 | 2018-07-10 | 오건수 | 하이브리드 발전 시스템 |
CN107171317A (zh) * | 2017-06-07 | 2017-09-15 | 国网山西省电力公司电力科学研究院 | 含有新能源发电的外送电网火电机组利用小时数预测方法 |
-
2020
- 2020-12-23 CN CN202011537172.4A patent/CN112580990B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN112580990A (zh) | 2021-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11314304B2 (en) | Datacenter power management using variable power sources | |
CN106570790B (zh) | 一种计及风速数据分段特性的风电场出力数据修复方法 | |
CN101425686A (zh) | 电力系统在线安全稳定评估预想故障集自适应筛选方法 | |
CN111555281A (zh) | 一种电力系统灵活性资源配置仿真方法及装置 | |
CN108009672B (zh) | 基于双层优化模型的水光互补电站日发电计划编制方法 | |
CN110428084B (zh) | 一种基于自适应双层优化的风电功率非参数区间预测方法 | |
CN105243502A (zh) | 一种基于径流区间预测的水电站调度风险评估方法及系统 | |
Liu et al. | Reliability evaluation of a wind-diesel hybrid power system with battery bank using discrete wind speed frame analysis | |
CN114204602B (zh) | 基于气象实时数据的风电制氢控制方法及系统 | |
CN112730938A (zh) | 一种基于用电采集大数据的窃电用户判断方法 | |
CN117578706A (zh) | 一种基于电网的多层级负荷管理系统及其方法 | |
CN112580990B (zh) | 一种在役煤电厂中长期年发电小时数估算方法及系统 | |
CN113642988A (zh) | 一种多工况多类型储能电站成本效益分析方法及定型系统 | |
CN117077978A (zh) | 一种跨区域新能源蓄能方法及系统 | |
CN112491080A (zh) | 一种新能源装机布局规划方法和系统 | |
CN109378857B (zh) | 一种负荷尖峰时刻风电预测可信度风险计算方法 | |
CN112016186A (zh) | 一种基于随机场景构建的年度弃风、弃光率计算方法 | |
CN116865327A (zh) | 一种新能源纳入电力平衡比例的确定方法及系统 | |
CN116565947A (zh) | 水电站日调峰能力确定方法及设备 | |
CN107292479B (zh) | 一种风电场能量损失自适应计算方法 | |
CN115204944A (zh) | 一种计及全寿命周期的储能最优峰谷价差测算方法及装置 | |
CN114254946A (zh) | 新能源发电等值年费用比较方法、系统、设备及存储介质 | |
CN114396385A (zh) | 一种基于泵站运行的调度控制方法 | |
CN113378102A (zh) | 一种用于短期负荷预测数据缺失预处理方法、介质及应用 | |
AU2020200492A1 (en) | Operation plan creating apparatus, operation plan creating method, and program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220507 Address after: 210006 Building 2, No. 19, Chengxin Avenue, Jiangning Economic and Technological Development Zone, Nanjing, Jiangsu Province Applicant after: NARI TECHNOLOGY Co.,Ltd. Applicant after: NARI Group Corp. Applicant after: CHINA HUANENG GROUP Co.,Ltd. Applicant after: Huaneng Group R&D Center Co., Ltd. Address before: No. 19, Jiangning District, Jiangning District, Nanjing, Jiangsu Applicant before: NARI TECHNOLOGY Co.,Ltd. Applicant before: NARI Group Corp. Applicant before: CHINA HUANENG GROUP Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |