CN112571633A - Drilling device for secondary structure bar planting - Google Patents

Drilling device for secondary structure bar planting Download PDF

Info

Publication number
CN112571633A
CN112571633A CN202011378873.8A CN202011378873A CN112571633A CN 112571633 A CN112571633 A CN 112571633A CN 202011378873 A CN202011378873 A CN 202011378873A CN 112571633 A CN112571633 A CN 112571633A
Authority
CN
China
Prior art keywords
operating handle
square pipe
pipe
drilling
upright
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011378873.8A
Other languages
Chinese (zh)
Inventor
蒋少军
田飞
孙勇
尹土军
蒋悦帆
余伟伟
罗匡懿
方冬艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202011378873.8A priority Critical patent/CN112571633A/en
Publication of CN112571633A publication Critical patent/CN112571633A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • B28D7/02Accessories specially adapted for use with machines or devices of the preceding groups for removing or laying dust, e.g. by spraying liquids; for cooling work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a secondary structure bar planting drilling device which comprises a mortise and tenon joint structure and a drilling mechanism, wherein the mortise and tenon joint structure is fixedly connected with the drilling mechanism; the mortise and tenon joint structure is including steady tray, first pole setting support side's pipe, second pole setting support side's pipe, first operating handle side's pipe, second operating handle side's pipe, first pole setting supports side's pipe below and is fixed with steady tray, the preceding end-to-end connection that first pole setting supported side's pipe is provided with the one end of first operating handle side's pipe, and first pole setting supports side's pipe, second pole setting support side's pipe and first operating handle side's pipe, second operating handle side's pipe and constitutes the movable support system of whole device, connects with the pivot between the side's pipe, keeps both linking to each other but mobile state between each side's pipe, makes things convenient for the light nimble operation of.

Description

Drilling device for secondary structure bar planting
Technical Field
The invention belongs to the technical field of building construction, and relates to a drilling device for secondary structure bar planting.
Background
In the building construction process, after the reinforced concrete structure is constructed, the construction of the tie bars can be carried out before the construction of the filler wall masonry. Compared with the prior art, the construction of the steel bar can be realized in two modes, namely steel bar pre-embedding and drilling and inserting steel bars, and the concrete is not required to be chiseled for finding an embedded part for welding the tie bar in the latter mode, so that the appearance quality of the surface of the concrete structure can be ensured, and civilized construction can be realized; the method has the advantages of simple and convenient construction operation, reliable drawknot quality, high speed and high efficiency; the method can simplify the construction process, reduce the labor intensity of workers, has low requirement on the operation technical level of the workers, and can effectively solve the problem that the positions of the tie bars and the horizontal mortar joints are consistent. The tie bars of the filler wall are constructed by using a bar planting method, the tie bars are accurately positioned, and the wall body and the constructional columns are conveniently and fully tied. The tie bar is not directly embedded, embedded parts do not need to be arranged in a reinforced concrete structure column (wall) in advance, the position can be arranged according to the modulus of the building blocks, compared with an embedding method, the bar penetrating through the holes of the template is not needed, and the problems that when the concrete is constructed, the position of the embedded parts is inaccurate due to vibration and other reasons, the chiseling is too deep or the area is too large, the main bar protective layer is influenced, the section size of the concrete structure is weakened and the like are solved.
The process flow of drilling and bar planting comprises the following steps: elastic thread positioning → drilling → cleaning hole → steel bar derusting → glue preparation → glue injection → steel bar planting → inspection and acceptance. In the drilling construction step, a drilling tool needs to be manually carried on the operating platform for drilling, and meanwhile, the existing drilling tool can generate a large amount of dust in the using process, is inconvenient to use under the condition of no protective measures and has strong limitation; dust generated in the use process of the drilling tool may contain a large amount of toxic substances, and when the flashlight drill is used for a long time, a human body inhales the dust, so that the health is reduced; and required manual work, material are comparatively complicated, need set up operation platform, and the workman is worked on from top to bottom, and the operation flow is complicated, wastes time and energy and the potential safety hazard is great.
Disclosure of Invention
The invention aims to provide a floor type control device for a drilling process in a drilling and bar planting process, which utilizes a tenon-and-mortise structure to set a batten as a flexible support, fixes a drilling machine and the end of an aluminum alloy square tube at the upper part, connects a switch of the drilling machine with a rope, enables a worker to pull the rope to open the drilling machine, synchronously pushes the aluminum alloy square tube at the lower end downwards to push the drilling machine upwards so as to complete the whole drilling process, and solves the following technical problems:
1. first pole setting support side's pipe, second pole setting support side's pipe and first operating handle side's pipe, second operating handle side's pipe constitute the movable support system of whole device, connect with the pivot between the side's pipe, keep not only linking to each other but also mobile state between each side's pipe, make things convenient for the staff to easily carry out the drilling operation in a flexible way.
2. The drilling machine switch on the drilling machine body is connected with the switch opening rope, so that a worker can conveniently open and close the device.
3. The drilling machine can be conveyed upwards to a required position by arranging the first operating handle square tube and the second operating handle square tube, the drilling can be started by pulling the switch starting rope, and workers do not need to go up and down an operating surface or move a heavy operating surface for multiple times; set up residue material fill simultaneously around the drilling machine body, produced waste material residue can be collected when can will driling to avoid polluting the surrounding environment, carry out the secondary and clear up, the residue of hopper collection can move to the below after the construction at every turn and clear up in unison, has improved work efficiency.
4. Through setting up transparent dust cover ring, the drilling machine is sealed at the in-process dust that uses in transparent dust cover ring and can not spill, and the dirt resistance is higher, and is better to the health's protectiveness, and the sealing ring has guaranteed that drilling machine body and wall or object tightly laminate simultaneously, and the dust is sealed completely in transparent dust cover ring-nose, has guaranteed dustless effect, is fit for promoting.
5. The wood beam is arranged into a flexible support by utilizing the tenon-and-mortise structure, the drilling machine and the first vertical rod supporting square tube end are fixed at the upper part, the switch of the drilling machine is connected with the rope, a worker can pull the rope to open the drilling machine, the first operating handle square tube at the lower end and the second operating handle square tube at the lower end are synchronously pressed down to push the drilling machine upwards, the whole drilling process is completed, the drilling operation can be easily and flexibly carried out, and the secondary structure bar planting drilling is more flexible and convenient.
The purpose of the invention can be realized by the following technical scheme:
a secondary structure bar planting drilling device comprises a mortise and tenon structure and a drilling mechanism, wherein the mortise and tenon structure is fixedly connected with the drilling mechanism;
the tenon-and-mortise structure comprises a stable tray, a first vertical rod supporting square pipe, a second vertical rod supporting square pipe, a first operating handle square pipe and a second operating handle square pipe, wherein the stable tray is fixed below the first vertical rod supporting square pipe, the front end face of the first vertical rod supporting square pipe is connected with one end provided with the first operating handle square pipe, the first operating handle square pipe is movably connected with the first vertical rod supporting square pipe through a first rotating shaft, the rear end face of the first vertical rod supporting square pipe is connected with one end provided with the second operating handle square pipe, and the second operating handle square pipe is movably connected with the first vertical rod supporting square pipe through a second rotating shaft; the second operating handle square tube is positioned above the first operating handle square tube; the first upright rod supporting square tube, the second upright rod supporting square tube, the first operating handle square tube and the second operating handle square tube form a movable supporting system of the whole device, the square tubes are connected through a rotating shaft, the square tubes are kept in a connected and movable state, and workers can conveniently and flexibly drill holes;
the front end face of one end, away from the first upright support square tube, of the second operating handle square tube is connected with the middle rear end face of the second upright support square tube, the second upright support square tube is movably connected with the second operating handle square tube through a third rotating shaft, and the front end face of the lower end of the second upright support square tube is movably connected with the rear end face of one end, away from the first upright support square tube, of the first operating handle square tube through a fourth rotating shaft;
a drilling mechanism is arranged above the first vertical rod supporting square tube and comprises a drilling machine body, a fixed steel wire, a residue material hopper and a drill bit; residue material hopper bottom is provided with the through-hole, first pole setting support side pipe is worn to establish behind the through-hole through fixed steel wire with the lower part fixed connection of drilling machine body, the upper portion of drilling machine body sets up the drill bit, sets up the flitch into a nimble support through utilizing tenon fourth of the twelve earthly branches structure, and upper portion is fixed drilling machine and first pole setting support side pipe end, and is associative with the switch and the rope of drilling machine, the workman can stimulate the rope and open the drilling machine, and the first operating handle side pipe of lower extreme, second operating handle side pipe can realize will make the propelling movement to the top of drilling machine to accomplish the drilling overall process, can easily carry out the drilling operation in a flexible way, make secondary structure bar planting drilling more nimble convenient.
As a further scheme of the invention: the first upright rod supporting square tube, the second upright rod supporting square tube, the first operating handle square tube and the second operating handle square tube are encircled to form a movable quadrangle.
As a further scheme of the invention: the residue material fill is opening tubaeform up, sets up the residue material fill around the drilling machine body, can collect the produced waste material residue when drilling to avoid polluting the surrounding environment, carry out the secondary clearance, the residue of collecting in the hopper can move to the below after the construction at every turn and unify the clearance, has improved work efficiency.
As a further scheme of the invention: the drilling machine body is fixedly provided with a drilling machine switch which is fixedly connected with the switch opening rope, and the drilling machine switch on the drilling machine body is connected with the switch opening rope so that a worker can conveniently open and close the operating device.
As a further scheme of the invention: the utility model discloses a drilling bit, including drill bit, transparent dust cover ring, stopper, limiting groove, stopper top, limiting spring, stopper below joint support pole, the drill bit periphery is fixed with transparent dust cover ring, transparent dust cover ring top is provided with the sealing ring, the sealing ring with transparent dust cover ring fixed connection, be provided with the spacing groove in the lateral wall of transparent dust cover ring, the spacing inslot bottom is fixed with the stopper, the stopper top is fixed with limiting spring, the stopper below joint support pole's upper end, the lower extreme of bracing piece with residue hopper fixed connection.
As a further scheme of the invention: transparent dust cover ring is soft material, and through setting up transparent dust cover ring, the drilling machine is sealed at transparent dust cover intra-annular and can not spill at the in-process dust that uses, and the dirt proofness is higher, and is better to the health's protectiveness, and the sealing ring has guaranteed that drilling machine body and wall or object tightly laminate simultaneously, and the dust is sealed completely at transparent dust cover intra-annular, has guaranteed dustless effect, is fit for promoting.
As a further scheme of the invention: the specific working method of the secondary structure bar planting drilling device comprises the following steps:
the method comprises the following steps: fixedly connecting a first upright supporting square tube with a stable tray, connecting the first upright supporting square tube with a first operating handle square tube and a second operating handle square tube, and connecting the second upright supporting square tube with the first operating handle square tube and the second operating handle square tube; the wood beam is arranged into a flexible support by utilizing the tenon-and-mortise structure, the drilling machine and the end of the first upright supporting square tube are fixed at the upper part, the switch of the drilling machine is connected with the rope, a worker can pull the rope to open the drilling machine, and the first operating handle square tube at the lower end and the second operating handle square tube at the lower end are synchronously pressed down to push the drilling machine upwards so as to complete the whole drilling process, so that the drilling operation can be easily and flexibly carried out, and the bar planting drilling of the secondary structure is more flexible and convenient;
step two: fixing the drilling machine body and the second upright rod supporting square pipe by using a fixing steel wire above the second upright rod supporting square pipe, and fixing a residue material hopper at the outer side; connecting a drilling machine switch on the drilling machine body with a switch opening rope; connecting a drilling machine switch on the drilling machine body with a switch opening rope so as to facilitate the opening and closing of a worker operation device;
step three: pulling the left end of the first operating handle square pipe or the second operating handle square pipe, enabling the drilling machine body to be conveyed upwards to a position needing to be drilled, pulling a switch to open a rope to open a drill hole, when the drilling machine body is used, attaching a sealing ring to a wall body or an object, aligning a drill bit to the position needing to be drilled after being observed through a transparent dust cover ring, enabling the drilling machine body to be conveyed upwards, enabling a limiting spring to shrink in a limiting groove, enabling the drill bit to extend out of the upper end of the transparent dust cover ring to perform drilling work, aligning the drill bit to the position needing to be drilled after being observed through the transparent dust cover ring, pressing the drilling machine body, enabling the limiting spring to shrink in a telescopic groove, achieving the purpose that the drill bit protrudes out of the left end of the transparent dust cover ring to smoothly work, arranging a residue hopper around the drilling machine body, and collecting; the secondary cleaning is carried out to avoid polluting the surrounding environment, and the residues collected by the hopper can be moved to the lower part to be cleaned uniformly after each construction, so that the working efficiency is improved.
The invention has the beneficial effects that:
1. first pole setting support side's pipe, second pole setting support side's pipe and first operating handle side's pipe, second operating handle side's pipe constitute the movable support system of whole device, connect with the pivot between the side's pipe, keep not only linking to each other but also mobile state between each side's pipe, make things convenient for the staff to easily carry out the drilling operation in a flexible way.
2. The drilling machine switch on the drilling machine body is connected with the switch opening rope, so that a worker can conveniently open and close the device.
3. The drilling machine can be conveyed upwards to a required position by arranging the first operating handle square tube and the second operating handle square tube, the drilling can be started by pulling the switch starting rope, and workers do not need to go up and down an operating surface or move a heavy operating surface for multiple times; set up residue material fill simultaneously around the drilling machine body, produced waste material residue can be collected when can will driling to avoid polluting the surrounding environment, carry out the secondary and clear up, the residue of hopper collection can move to the below after the construction at every turn and clear up in unison, has improved work efficiency.
4. Through setting up transparent dust cover ring, the drilling machine is sealed at the in-process dust that uses in transparent dust cover ring and can not spill, and the dirt resistance is higher, and is better to the health's protectiveness, and the sealing ring has guaranteed that drilling machine body and wall or object tightly laminate simultaneously, and the dust is sealed completely in transparent dust cover ring-nose, has guaranteed dustless effect, is fit for promoting.
5. The wood beam is arranged into a flexible support by utilizing the tenon-and-mortise structure, the drilling machine and the first vertical rod supporting square tube end are fixed at the upper part, the switch of the drilling machine is connected with the rope, a worker can pull the rope to open the drilling machine, the first operating handle square tube at the lower end and the second operating handle square tube at the lower end are synchronously pressed down to push the drilling machine upwards, the whole drilling process is completed, the drilling operation can be easily and flexibly carried out, and the secondary structure bar planting drilling is more flexible and convenient.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings.
FIG. 1 is a schematic structural view of a secondary structure bar planting drilling device of the present invention;
FIG. 2 is a left side view of the drilling device for planting bars in a secondary structure of the invention;
FIG. 3 is a top view of the drilling mechanism of the present invention;
FIG. 4 is a schematic view of the connection of a first upright support square tube and a second operating handle square tube according to the present invention;
FIG. 5 is a schematic view of the connection of the switch opening cord to the drilling mechanism of the present invention;
FIG. 6 is a schematic view of the connection of the transparent dust shield ring of the present invention to the drilling mechanism.
In the figure: 1. a mortise and tenon joint structure; 2. a drilling mechanism; 3. stabilizing the tray; 4. the first vertical rod supports the square tube; 5. the second upright stanchion supports the square tube; 6. a first operating handle square tube; 7. a second operating handle square tube; 8. a first rotating shaft; 9. a second rotating shaft; 10. a third rotating shaft; 11. a fourth rotating shaft; 12. a drilling machine body; 13. fixing the steel wire; 14. a residue hopper; 15. a drill bit; 16. a through hole; 17. a drill switch; 18. the switch opens the rope; 19. a transparent dust shield ring; 20. a seal ring; 21. a limiting groove; 22. a limiting block; 23. a limiting spring; 24. a support rod.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, a secondary structure bar planting drilling device includes a mortise and tenon structure 1 and a drilling mechanism 2, wherein the mortise and tenon structure 1 is fixedly connected with the drilling mechanism 2;
the mortise and tenon joint structure 1 comprises a stable tray 3, a first upright rod supporting square pipe 4, a second upright rod supporting square pipe 5, a first operating handle square pipe 6 and a second operating handle square pipe 7, wherein the stable tray 3 is fixed below the first upright rod supporting square pipe 4, the front end face of the first upright rod supporting square pipe 4 is connected with one end provided with the first operating handle square pipe 6, the first operating handle square pipe 6 is movably connected with the first upright rod supporting square pipe 4 through a first rotating shaft 8, the rear end face of the first upright rod supporting square pipe 4 is connected with one end provided with the second operating handle square pipe 7, and the second operating handle square pipe 7 is movably connected with the first upright rod supporting square pipe 4 through a second rotating shaft 9; the second operating handle square pipe 7 is positioned above the first operating handle square pipe 6; the first upright rod supporting square tube 4, the second upright rod supporting square tube 5, the first operating handle square tube 6 and the second operating handle square tube 7 form a movable supporting system of the whole device, the square tubes are connected through a rotating shaft, the square tubes are kept in a connected and movable state, and workers can conveniently and flexibly drill holes;
the front end face of one end, away from the first upright support square pipe 4, of the second operating handle square pipe 7 is connected with the middle rear end face of the second upright support square pipe 5, the second upright support square pipe 5 is movably connected with the second operating handle square pipe 7 through a third rotating shaft 10, and the front end face of the lower end of the second upright support square pipe 5 is movably connected with the rear end face of one end, away from the first upright support square pipe 4, of the first operating handle square pipe 6 through a fourth rotating shaft 11;
a drilling mechanism 2 is arranged above the first upright rod supporting square tube 4, and the drilling mechanism 2 comprises a drilling machine body 12, a fixed steel wire 13, a residue material hopper 14 and a drill bit 15; 14 bottoms of residue material hopper is provided with through-hole 16, first pole setting support side pipe 4 wears to establish behind the through-hole 16 through fixed steel wire 13 with the lower part fixed connection of drilling machine body 12, the upper portion of drilling machine body 12 sets up drill bit 15, sets up the flitch into a nimble support through utilizing tenon fourth of the twelve earthly branches structure 1, and upper portion is fixed drilling machine and the 4 ends of first pole setting support side pipe, and is associative with the switch of drilling machine and rope, the workman can stimulate the rope and open the drilling machine, pushes down the first operating handle side pipe 6 of lower extreme in step, second operating handle side pipe 7 can realize pushing away the drilling machine to the top to accomplish the drilling overall process, can easily carry out the drilling operation in a flexible way, make secondary structure bar planting drilling more nimble convenient.
The first upright rod supporting square tube 4, the second upright rod supporting square tube 5, the first operating handle square tube 6 and the second operating handle square tube 7 are encircled to form a movable quadrangle.
Residue material hopper 14 is the tubaeform that the opening up, sets up residue material hopper 14 around drilling machine body 12, can collect the produced waste material residue when drilling to avoid polluting the surrounding environment, carry out the secondary and clear up, the residue of hopper collection can move to the below after the construction at every turn and clear up in unison, has improved work efficiency.
A drilling machine switch 17 is fixed on the drilling machine body 12, the drilling machine switch 17 is fixedly connected with a switch starting rope 18, and the drilling machine switch 17 on the drilling machine body 12 is connected with the switch starting rope 18 so that a worker can operate the device to be started and stopped.
The periphery of drill bit 15 is fixed with transparent dust cover ring 19, transparent dust cover ring 19 top is provided with sealing ring 20, sealing ring 20 with transparent dust cover ring 19 fixed connection, be provided with spacing groove 21 in the lateral wall of transparent dust cover ring 19, the bottom is fixed with spacing block 22 in the spacing groove 21, spacing block 22 top is fixed with spacing spring 23, the upper end of spacing block 22 below joint support pole 24, the lower extreme of bracing piece 24 with 14 fixed connection of residue material fill.
Transparent dust cover ring 19 is soft material, and through setting up transparent dust cover ring 19, the drilling machine is sealed in transparent dust cover ring 19 and can not spill at the in-process dust of using, and the dirt proofness is higher, and is better to the protectiveness of health, and sealing ring 20 has guaranteed that drilling machine body 12 and wall or object tightly laminate simultaneously, and the dust is sealed completely in transparent dust cover ring 19, has guaranteed dustless effect, is fit for promoting.
The specific working method of the secondary structure bar planting drilling device comprises the following steps:
the method comprises the following steps: fixedly connecting a first upright supporting square tube 4 with a stable tray 3, connecting the first upright supporting square tube 4 with a first operating handle square tube 6 and a second operating handle square tube 7, and connecting a second upright supporting square tube 5 with the first operating handle square tube 6 and the second operating handle square tube 7; the wood beam is arranged into a flexible support by the tenon-and-mortise structure 1, the drilling machine and the end of the first upright supporting square tube 4 are fixed at the upper part, the switch of the drilling machine is connected with the rope, a worker can pull the rope to open the drilling machine, and the first operating handle square tube 6 at the lower end and the second operating handle square tube 7 at the lower end are synchronously pressed down to push the drilling machine upwards so as to complete the whole drilling process, so that the drilling operation can be easily and flexibly carried out, and the bar-planting drilling of the secondary structure is more flexible and convenient;
step two: fixing the drilling machine body 12 and the second upright support square pipe 5 by using a fixing steel wire 13 above the second upright support square pipe 5, and fixing a residue material hopper 14 at the outer side; connecting a drill switch 17 on the drill body 12 with a switch opening rope 18; connecting a drill switch 17 on the drill body 12 with a switch opening rope 18 for the worker to operate the device to open and close;
step three: when the left end of the first operating handle square pipe 6 or the second operating handle square pipe 7 is pulled, the drilling machine body 12 can be conveyed upwards to a position where drilling is needed, the switch opening rope 18 is pulled to open drilling, when the drilling machine body 12 is used, the sealing ring 20 is attached to a wall body or an object, after the transparent dust cover ring 19 is observed, the drill bit 15 is aligned to the position needing drilling, the drilling machine body 12 is delivered upwards, the limiting spring 23 is contracted in the limiting groove 21, the drill bit 15 extends out of the upper end of the transparent dust cover ring 19, and then the drilling work can be carried out, after the transparent dust cover ring 19 is observed, the drill bit 15 is aligned to the position needing drilling, the drilling machine body 12 is pressed, the limit spring 23 is contracted in the telescopic groove, the purpose that the drill bit 15 protrudes out of the left end of the transparent dust cover ring 19 to work smoothly is achieved, a residue material hopper 14 is arranged around the drilling machine body 12, and can collect waste residues generated in drilling; the secondary cleaning is carried out to avoid polluting the surrounding environment, and the residues collected by the hopper can be moved to the lower part to be cleaned uniformly after each construction, so that the working efficiency is improved.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise forms disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (7)

1. The drilling device for the secondary structure bar planting is characterized by comprising a mortise and tenon structure (1) and a drilling mechanism (2), wherein the mortise and tenon structure (1) is fixedly connected with the drilling mechanism (2);
the tenon-and-mortise structure (1) comprises a stable tray (3), a first upright supporting square pipe (4), a second upright supporting square pipe (5), a first operating handle square pipe (6) and a second operating handle square pipe (7), wherein the stable tray (3) is fixed below the first upright supporting square pipe (4), the front end face of the first upright supporting square pipe (4) is connected with one end provided with the first operating handle square pipe (6), the first operating handle square pipe (6) is movably connected with the first upright supporting square pipe (4) through a first rotating shaft (8), the rear end face of the first upright supporting square pipe (4) is connected with one end provided with the second operating handle square pipe (7), and the second operating handle square pipe (7) is movably connected with the first upright supporting square pipe (4) through a second rotating shaft (9); the second operating handle square pipe (7) is positioned above the first operating handle square pipe (6);
the front end face of one end, away from the first upright support square pipe (4), of the second operating handle square pipe (7) is connected with the middle rear end face of the second upright support square pipe (5), the second upright support square pipe (5) is movably connected with the second operating handle square pipe (7) through a third rotating shaft (10), and the front end face of the lower end of the second upright support square pipe (5) is movably connected with the rear end face of one end, away from the first upright support square pipe (4), of the first operating handle square pipe (6) through a fourth rotating shaft (11);
a drilling mechanism (2) is arranged above the first upright rod supporting square pipe (4), and the drilling mechanism (2) comprises a drilling machine body (12), a fixed steel wire (13), a residue material hopper (14) and a drill bit (15); the bottom of the residue material hopper (14) is provided with a through hole (16), the first upright rod supporting square tube (4) penetrates through the through hole (16) and then is fixedly connected with the lower part of the drilling machine body (12) through a fixing steel wire (13), and the upper part of the drilling machine body (12) is provided with a drill bit (15).
2. The drilling device for planting steel bars into a secondary structure according to claim 1, wherein a movable quadrilateral is enclosed among the first upright supporting square pipe (4), the second upright supporting square pipe (5), the first operating handle square pipe (6) and the second operating handle square pipe (7).
3. A secondary structure bar planting drilling device according to claim 1, characterized in that the residue material hopper (14) is in the shape of a horn with an upward opening.
4. The secondary structure bar planting drilling device as claimed in claim 1, wherein a drill switch (17) is fixed on the drill body (12), and the drill switch (17) is fixedly connected with a switch opening rope (18).
5. The drilling device for the secondary structure bar planting according to claim 1, wherein a transparent dust cover ring (19) is fixed on the periphery of the drill bit (15), a sealing ring (20) is arranged above the transparent dust cover ring (19), the sealing ring (20) is fixedly connected with the transparent dust cover ring (19), a limiting groove (21) is formed in the side wall of the transparent dust cover ring (19), a limiting block (22) is fixed to the bottom in the limiting groove (21), a limiting spring (23) is fixed above the limiting block (22), the upper end of a supporting rod (24) is connected below the limiting block (22), and the lower end of the supporting rod (24) is fixedly connected with the residue material hopper (14).
6. A secondary structure bar-planting drilling device according to claim 5, characterized in that the transparent dust cover ring (19) is made of soft material.
7. The secondary structure bar planting drilling device according to any one of claims 1 to 6, wherein the specific working method of the secondary structure bar planting drilling device comprises the following steps:
the method comprises the following steps: fixedly connecting a first upright supporting square tube (4) with a stable tray (3), connecting the first upright supporting square tube (4) with a first operating handle square tube (6) and a second operating handle square tube (7), and connecting a second upright supporting square tube (5) with the first operating handle square tube (6) and the second operating handle square tube (7);
step two: a fixed steel wire (13) is used above the second upright support square pipe (5) to fix the drilling machine body (12) and the second upright support square pipe (5), and a residue material hopper (14) is fixed on the outer side; connecting a drilling machine switch (17) on the drilling machine body (12) with a switch opening rope (18);
step three: wrenching the left end of first operating handle side pipe (6) or second operating handle side pipe (7), can upwards deliver drilling machine body (12) to the position that needs punch, the rope (18) can be opened and the drilling can be opened in the pulling switch, during drilling machine body (12) use, sealing ring (20) laminating is on wall body or object, observe back through transparent dust cover ring (19) and aim at the position that needs to punch with drill bit (15), upwards deliver drilling machine body (12), spacing spring (23) shrink in spacing groove (21), make drill bit (15) stretch out transparent dust cover ring (19) upper end and can carry out the work of punching.
CN202011378873.8A 2020-11-30 2020-11-30 Drilling device for secondary structure bar planting Pending CN112571633A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011378873.8A CN112571633A (en) 2020-11-30 2020-11-30 Drilling device for secondary structure bar planting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011378873.8A CN112571633A (en) 2020-11-30 2020-11-30 Drilling device for secondary structure bar planting

Publications (1)

Publication Number Publication Date
CN112571633A true CN112571633A (en) 2021-03-30

Family

ID=75127857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011378873.8A Pending CN112571633A (en) 2020-11-30 2020-11-30 Drilling device for secondary structure bar planting

Country Status (1)

Country Link
CN (1) CN112571633A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113320023A (en) * 2021-04-25 2021-08-31 中铁十局集团第五工程有限公司 A auxiliary device that is used for house building engineering capital drilling bar planting muscle
CN113320024A (en) * 2021-05-27 2021-08-31 王骏 Convenient wall body perforating device of building engineering construction usefulness

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525755A (en) * 2014-09-29 2016-04-27 中国核工业第二二建设有限公司 Steel bar planting hole drilling mechanical hand
CN206854702U (en) * 2017-05-31 2018-01-09 北京城建六建设集团有限公司 A kind of construction drilling device for bonded rebar
CN208866454U (en) * 2018-07-15 2019-05-17 杭州永仁建设有限公司 It is a kind of from dust-proof top plate drilling device for bonded rebar
CN209062197U (en) * 2018-07-24 2019-07-05 云南省建设投资控股集团有限公司 A kind of constructional column drilling device for bonded rebar with slag ash device
CN110815584A (en) * 2019-11-19 2020-02-21 中冶天工集团天津有限公司 Masonry structure bar planting auxiliary device that punches
CN111702220A (en) * 2020-06-19 2020-09-25 中冶天工集团有限公司 Drilling device for high-altitude operation of building and operation method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525755A (en) * 2014-09-29 2016-04-27 中国核工业第二二建设有限公司 Steel bar planting hole drilling mechanical hand
CN206854702U (en) * 2017-05-31 2018-01-09 北京城建六建设集团有限公司 A kind of construction drilling device for bonded rebar
CN208866454U (en) * 2018-07-15 2019-05-17 杭州永仁建设有限公司 It is a kind of from dust-proof top plate drilling device for bonded rebar
CN209062197U (en) * 2018-07-24 2019-07-05 云南省建设投资控股集团有限公司 A kind of constructional column drilling device for bonded rebar with slag ash device
CN110815584A (en) * 2019-11-19 2020-02-21 中冶天工集团天津有限公司 Masonry structure bar planting auxiliary device that punches
CN111702220A (en) * 2020-06-19 2020-09-25 中冶天工集团有限公司 Drilling device for high-altitude operation of building and operation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113320023A (en) * 2021-04-25 2021-08-31 中铁十局集团第五工程有限公司 A auxiliary device that is used for house building engineering capital drilling bar planting muscle
CN113320024A (en) * 2021-05-27 2021-08-31 王骏 Convenient wall body perforating device of building engineering construction usefulness

Similar Documents

Publication Publication Date Title
CN112571633A (en) Drilling device for secondary structure bar planting
CN106014225A (en) Anti-pollution labor-saving fast perforation and installation multipurpose device for wall surface
CN213245623U (en) Garden construction plants integrative equipment of tree with digging pit
CN107335839A (en) A kind of accurate building wall drilling equipment
CN105350591B (en) Electric stringing engineering construction is digged pit specific purpose tool with electric pole
CN105332376B (en) Hydraulic mechanical hand-lifting stake clamping device and pile-drawing machine
CN213269773U (en) Drilling device for geological survey of mining area limestone mineral aggregate mining
CN212340709U (en) Geotechnical layering sampling device in geotechnical engineering
CN108385686A (en) A kind of cast-in-situ bored pile exempts from stripping and exempts from ring cutting to cut pile crown technique
CN207971457U (en) Top plate drilling combines yoke at a kind of superelevation
CN203403414U (en) Rapid ground anchor pile laying device for line operation
CN112208001A (en) Dustproof positioning device for punching in constructional engineering and use method thereof
CN208976901U (en) A kind of artificial geotome of portable multifunctional
CN211334046U (en) Drilling equipment that construction used
CN210178281U (en) Sampling drill bit for quality inspection of constructional engineering
CN209961515U (en) Geological exploration equipment
CN209085979U (en) A kind of heavy metal content in soil spot sampling device
CN206605072U (en) Portable top plate drilling device
CN208214376U (en) Double slide bar hand propelled electric drill tapping mechanisms
CN206457823U (en) A kind of device for clearing up Prefabricated hollow pile stake core
CN108839264B (en) Secondary structure pipeline secretly buries building block drilling equipment
CN211470700U (en) Percussion drill lifting device
CN210128854U (en) Civil engineering drilling soil sampling tool
CN204060577U (en) Manual clear soil working tool in the stake holes of a kind of building site
CN212988849U (en) Novel sand ware is got in ground reconnaissance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210330