CN105350591B - Electric stringing engineering construction is digged pit specific purpose tool with electric pole - Google Patents

Electric stringing engineering construction is digged pit specific purpose tool with electric pole Download PDF

Info

Publication number
CN105350591B
CN105350591B CN201510812261.8A CN201510812261A CN105350591B CN 105350591 B CN105350591 B CN 105350591B CN 201510812261 A CN201510812261 A CN 201510812261A CN 105350591 B CN105350591 B CN 105350591B
Authority
CN
China
Prior art keywords
rod
digging
pole
earth
operating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510812261.8A
Other languages
Chinese (zh)
Other versions
CN105350591A (en
Inventor
王冠雄
张迎光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Hebei Electric Power Co Ltd, Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Hebei Electric Power Co Ltd
Priority to CN201510812261.8A priority Critical patent/CN105350591B/en
Publication of CN105350591A publication Critical patent/CN105350591A/en
Application granted granted Critical
Publication of CN105350591B publication Critical patent/CN105350591B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明提供一种电力架线工程施工用电杆挖坑专用工具,其包括:第一操作长杆,用于手持操作;第一挖土铲,连接于所述第一操作长杆下端,用于挖掘电杆坑;第二操作长杆,用于手持操作;第二挖土铲,连接于所述第二操作长杆下端,用于挖掘电杆坑,且所述第一挖土铲和第二挖土铲相对设置;连接架,与所述第一操作长杆和所述第一挖土铲的连接处、所述第二操作长杆和所述第二挖土铲的连接处铰接,使所述第一挖土铲、第二挖土铲能够靠近,以将电杆坑中的碎土取出。本发明可以使用较长的操作长杆伸入电杆坑中,土石开挖量大大减少,电杆树立其中之后,回填的土石量也很小,并且电杆的稳定性则明显提高。

The present invention provides a special tool for electric pole digging for electric power wiring engineering construction, which includes: a first long operating rod for hand-held operation; a first digging shovel connected to the lower end of the first long operating rod for for digging electric pole pits; the second operating long pole is used for hand-held operation; the second earth digging shovel is connected to the lower end of the second operating long pole for excavating electric pole pits, and the first earth digging shovel and The second digging shovel is oppositely arranged; the connecting frame is hinged with the joint of the first operating long rod and the first digging shovel, and the joint of the second operating long rod and the second digging shovel , so that the first earth-digging shovel and the second earth-digging shovel can approach to take out the crushed soil in the pole pit. The invention can use a long operating pole to extend into the pole pit, greatly reducing the amount of earth and rock excavation, and after the electric pole is erected, the amount of earth and rock backfilled is also very small, and the stability of the electric pole is obviously improved.

Description

电力架线工程施工用电杆挖坑专用工具Special tools for electric pole digging in electric power wiring engineering construction

本案为申请日为2014年05月26日,申请号为201410226751.5,名称为“电杆挖坑专用工具”的分案申请。This case is a divisional application with an application date of May 26, 2014, an application number of 201410226751.5, and a title of “Special Tool for Pole Digging”.

技术领域technical field

本发明涉及一种电力架线工程施工工具,具体而言,本发明特别涉及一种电力架线工程施工用电杆挖坑专用工具。The invention relates to a construction tool for electric power stringing engineering, in particular, the invention particularly relates to a special tool for digging pits with electric poles for electric power stringing engineering construction.

背景技术Background technique

在电力工程施工中,经常包括立杆架线的工作,立杆架线就必须挖掘电杆坑。挖电杆坑要有一定的深度,目前大多采用铁锨挖坑,而铁锨不能直接挖掘深坑,所以就必须挖开大面积土方以保证深度,这样就需要挖取大概1方半的土方量,耗费1小时15分钟,费力,费时,直接影响工程的速度;并且,等线杆立好后,回填的土方也会很大,并且没有原有土层牢固,对线杆的稳定性带来隐患。In the construction of electric power engineering, the work of erecting wires on poles is often included, and pole pits must be excavated for erecting poles. Digging pole pits must have a certain depth. At present, shovels are mostly used to dig pits, and shovels cannot directly dig deep pits, so a large area of earthwork must be dug to ensure the depth. It takes 1 hour and 15 minutes, which is laborious and time-consuming, which directly affects the speed of the project; moreover, after the poles are erected, the earthwork for backfilling will be large and not as firm as the original soil layer, which will bring hidden dangers to the stability of the poles .

发明内容Contents of the invention

本发明的目的在于提供一种电力架线工程施工用电杆挖坑专用工具,以解决现有技术存在的土方开挖量大、线杆稳定性差等问题。The object of the present invention is to provide a special tool for pole digging for electric power wiring engineering construction, so as to solve the problems existing in the prior art such as large amount of earthwork excavation and poor stability of poles.

为了解决上述问题,本发明提供一种电力架线工程施工用电杆挖坑专用工具,其技术方案如下:In order to solve the above problems, the present invention provides a special tool for electric pole digging for electric power wiring engineering construction, and its technical scheme is as follows:

一种电力架线工程施工用电杆挖坑专用工具,其包括:第一操作长杆,用于手持操作;第一挖土铲,连接于所述第一操作长杆下端,用于挖掘电杆坑;第二操作长杆,用于手持操作;第二挖土铲,连接于所述第二操作长杆下端,用于挖掘电杆坑,且所述第一挖土铲和第二挖土铲相对设置;连接架,与所述第一操作长杆和所述第一挖土铲的连接处、所述第二操作长杆和所述第二挖土铲的连接处铰接,使所述第一挖土铲、第二挖土铲能够靠近,以将电杆坑中的碎土取出。A special electric pole digging tool for electric power wiring engineering construction, which includes: a first operating long pole, used for hand-held operation; a first soil digging shovel, connected to the lower end of the first operating long pole, used pole pit; the second operating long pole is used for hand-held operation; the second earth digging shovel is connected to the lower end of the second operating long pole for excavating electric pole pits, and the first earth digging shovel and the second digging The earth shovels are arranged oppositely; the connecting frame is hinged with the connection between the first operation long rod and the first earth shovel, and the connection between the second operation long rod and the second earth shovel, so that all The first soil digging shovel and the second soil digging shovel can be approached to take out the crushed soil in the electric pole pit.

在上述电力架线工程施工用电杆挖坑专用工具的一种优选实施方式中,所述连接架包括:第一短柱,水平设置,一端连接于所述第一操作长杆和所述第一挖土铲的连接处;第二短柱,水平设置,一端连接于所述第二操作长杆和所述第二挖土铲的连接处;第一连杆,一端铰接于所述第一短柱的另一端;第二连杆,一端铰接于所述第二短柱的另一端;卡座,所述第一连杆的另一端、所述第二连杆的另一端对称地固定连接于所述卡座的两侧;钻杆,上下可移动地设于所述卡座中,用于破碎电杆坑中坚硬的土石块。In a preferred embodiment of the above-mentioned special tool for electric pole digging in electric power wiring engineering construction, the connecting frame includes: a first short column, which is arranged horizontally, and one end is connected to the first operating long pole and the second operating pole. A joint of a digging shovel; a second short column, arranged horizontally, with one end connected to the joint of the second operating rod and the second digging shovel; a first connecting rod, one end hinged to the first The other end of the short column; the second connecting rod, one end of which is hinged to the other end of the second short column; the card seat, the other end of the first connecting rod and the other end of the second connecting rod are symmetrically fixedly connected On both sides of the deck; the drill pipe is movably arranged in the deck up and down, and is used to break hard earth and rocks in the pole pit.

在上述电力架线工程施工用电杆挖坑专用工具的一种优选实施方式中,所述连接架还包括:上连杆,下端与所述钻杆的上端连接,下部一段为呈橄榄球形的卡紧段;所述卡座呈筒状,且在所述卡座内壁的上下两端分别设有多个弧形弹簧条,以在所述卡座内部形成一弹性可变空间,所述卡紧段嵌入所述弹性可变空间中,并能够从该弹性可变空间中移出。In a preferred embodiment of the above-mentioned special tool for electric pole digging in electric power wiring engineering construction, the connecting frame further includes: an upper connecting rod, the lower end of which is connected to the upper end of the drill pipe, and the lower section is rugby ball-shaped. Clamping section; the card seat is cylindrical, and a plurality of arc-shaped spring strips are respectively provided at the upper and lower ends of the inner wall of the card seat to form an elastic variable space inside the card seat, and the card seat The tight segment is embedded in the elastic variable space and can be removed from the elastic variable space.

在上述电力架线工程施工用电杆挖坑专用工具的一种优选实施方式中,所述第一操作长杆、第二操作长杆均为可拆卸的多段式结构。In a preferred embodiment of the above-mentioned special tool for pole digging in electric power wiring engineering construction, the first long operating rod and the second long operating rod are detachable multi-stage structures.

在上述电力架线工程施工用电杆挖坑专用工具的一种优选实施方式中,所述第一操作长杆包括上段杆、下段杆,所述上段杆的下端设有第一活动连接结构,所述下段杆的上端及所述上连杆的上端均设有第二活动连接结构,所述第一活动连接结构、第二活动连接结构可拆卸连接。In a preferred embodiment of the above-mentioned electric pole digging special tools for electric power wiring engineering construction, the first operating long pole includes an upper section pole and a lower section pole, and the lower end of the upper section pole is provided with a first movable connection structure, Both the upper end of the lower section rod and the upper end of the upper connecting rod are provided with a second movable connection structure, and the first movable connection structure and the second movable connection structure are detachably connected.

在上述电力架线工程施工用电杆挖坑专用工具的一种优选实施方式中,所述上段杆呈筒状,且所述上段杆的下端设有多个沿圆周方向分布的第一通孔;所述第一活动连接结构包括:拉绳,位于所述上段杆内部,并且上端从所述上段杆引出;短筒,固定于所述上段杆下端的内部,侧壁上设有多个沿圆周方向分布的第二通孔,所述第一通孔与所述第二通孔对应;卡块,呈柱形,一端插入所述第一通孔中,另一端连接于一弹簧的一端,所述弹簧的另一端连接于所述第二通孔的外侧周围;连接绳,一端连接于所述拉绳的下端,另一端穿过所述第二通孔、所述弹簧连接于所述卡块的另一端;所述第二活动连接结构包括:底座,呈筒状,侧壁上设有多个沿圆周方向分布的第三通孔,所述第三通孔与所述第一通孔对应,所述卡块的一端亦插入所述第三通孔中,以连接所述第一活动连接结构、所述第二活动连接结构。In a preferred embodiment of the above-mentioned special tool for electric pole digging in electric power wiring engineering construction, the upper pole is in a cylindrical shape, and the lower end of the upper pole is provided with a plurality of first through holes distributed along the circumferential direction The first flexible connection structure includes: a pull cord, located inside the upper rod, and the upper end is drawn from the upper rod; a short tube, fixed inside the lower end of the upper rod, and a plurality of edge The second through hole distributed in the circumferential direction, the first through hole corresponds to the second through hole; the block is cylindrical, one end is inserted into the first through hole, and the other end is connected to one end of a spring, The other end of the spring is connected to the outer periphery of the second through hole; the connecting rope is connected to the lower end of the pull cord at one end, and the other end passes through the second through hole, and the spring is connected to the card. The other end of the block; the second movable connection structure includes: a base, which is cylindrical, and a plurality of third through holes distributed along the circumferential direction are arranged on the side wall, and the third through holes are connected with the first through holes Correspondingly, one end of the locking block is also inserted into the third through hole to connect the first movable connection structure and the second movable connection structure.

在上述电力架线工程施工用电杆挖坑专用工具的一种优选实施方式中,所述短筒的内壁固定有多个分别位于所述第二通孔上方的定滑轮,所述连接绳嵌入所述定滑轮的边槽中。In a preferred embodiment of the above-mentioned special tools for electric pole digging in electric power wiring engineering, the inner wall of the short tube is fixed with a plurality of fixed pulleys respectively located above the second through holes, and the connecting ropes are embedded In the side groove of the fixed pulley.

在上述电力架线工程施工用电杆挖坑专用工具的一种优选实施方式中,所述上段杆的上部设有一便于旋转操作的手柄。In a preferred embodiment of the above-mentioned special tool for electric pole digging in electric power wiring engineering construction, a handle that is convenient for rotating operation is provided on the upper part of the upper pole.

分析可知,本发明可以使用较长的操作长杆伸入电杆坑中,换言之,利用本发明,电杆坑基本可以垂直开挖,形成一个圆柱形的深坑,土石开挖量大大减少,电杆树立其中之后,回填的土石量也很小,并且电杆的稳定性则明显提高。It can be seen from the analysis that the present invention can use a longer operating pole to extend into the electric pole pit. In other words, by using the present invention, the electric pole pit can be excavated substantially vertically, forming a cylindrical deep pit, and the excavation amount of earth and stone is greatly reduced. After the poles are erected, the amount of earth and rock backfilled is also small, and the stability of the poles is significantly improved.

附图说明Description of drawings

图1为本发明实施例的结构示意图;Fig. 1 is the structural representation of the embodiment of the present invention;

图2为本发明实施例的卡座及钻杆连接处的结构示意图;Fig. 2 is the schematic structural view of the clamping seat and the drill pipe joint of the embodiment of the present invention;

图3为本发明实施例的上段杆、下段杆连接部分的分解结构示意图。Fig. 3 is a schematic diagram of an exploded structure of the connecting part of the upper section rod and the lower section rod according to the embodiment of the present invention.

具体实施方式detailed description

下面结合附图和具体实施方式对本发明做进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

如图1所示,本发明实施例包括第一操作长杆1、具有上段杆23和下段杆24的第二操作长杆、第一挖土铲11、第二挖土铲21、位于第一操作长杆1和第二操作长杆之间的连接架。其中第一操作长杆1也为分段式结构,便于存放和运输,段与段之间可以采用螺纹连接,较为简单。As shown in Figure 1, the embodiment of the present invention comprises a first operating long rod 1, a second operating long rod having an upper segment rod 23 and a lower segment rod 24, a first soil digging shovel 11, a second soil digging blade 21, located at the first Operate the connecting frame between the long pole 1 and the second long pole. Wherein the first operating rod 1 is also a segmented structure, which is convenient for storage and transportation, and the segments can be connected by threads, which is relatively simple.

具体而言,第一操作长杆1、第二操作长杆均是用于手持操作。第一挖土铲11连接于第一操作长杆1下端,用于挖掘电杆坑。第二挖土铲21连接于第二操作长杆的下段杆24下端,用于挖掘电杆坑,且第一挖土铲11和第二挖土铲21相对设置。连接架与第一操作长杆1和第一挖土铲11的连接处、下段杆24和第二挖土铲21的连接处铰接。Specifically, both the first long operating rod 1 and the second long operating rod are used for handheld operation. The first earth digging shovel 11 is connected to the lower end of the first operating long pole 1, and is used for excavating electric pole pits. The second earth-digging shovel 21 is connected to the lower end of the lower section 24 of the second operating long pole, and is used for excavating the electric pole pit, and the first earth-digging shovel 11 and the second earth-digging shovel 21 are arranged oppositely. The connecting frame is hinged with the junction of the first operating long pole 1 and the first soil digging blade 11 , and the junction of the lower segment rod 24 and the second soil digging blade 21 .

应用时,工人双手分别手持第一操作长杆1上端、上段杆23上端,向下用力使第一挖土铲11、第二挖土铲21破碎电杆坑中的土层,双手撑开则能够两挖土铲靠近,这时向上提起两操作长杆即可将电杆坑中的碎土取出。During application, the workman's hands hold the upper end of the first operating long rod 1 and the upper end of the upper section rod 23 respectively, and force the first soil digging shovel 11 and the second soil digging shovel 21 to break the soil layer in the electric pole pit downwards, and the hands are stretched out. Two digging shovels can be close together, and at this moment, the two operating long rods can be lifted upwards to take out the broken soil in the electric pole pit.

优选地,连接架包括:第一短柱、第二短柱26、第一连杆、第二连杆35、卡座33、钻杆34。由于第一短柱、第二短柱26以及第一连杆、第二连杆35分别对称设置,因此第一短柱、第一连杆未进行标记。Preferably, the connecting frame includes: a first short column, a second short column 26 , a first connecting rod, a second connecting rod 35 , a clip 33 , and a drill rod 34 . Since the first short column, the second short column 26 and the first connecting rod and the second connecting rod 35 are symmetrically arranged respectively, the first short column and the first connecting rod are not marked.

详细而言,第一短柱水平设置,一端连接于第一操作长杆1和第一挖土铲11的连接处。第二短柱26水平设置,一端连接于下段杆24和第二挖土铲21的连接处。第一连杆的一端铰接于第一短柱的另一端。第二连杆35下端铰接于第二短柱26的另一端。第一连杆的另一端、第二连杆35的另一端对称地固定连接于卡座33的两侧。钻杆34的上端连接一上连杆32,上连杆32上下可移动地设于卡座33中。当电杆坑中的土层较硬,挖土铲无法破碎时,可以使钻杆34旋转,钻入较硬的土层,使之破碎。In detail, the first short column is arranged horizontally, and one end is connected to the joint between the first long operating rod 1 and the first earth excavating blade 11 . The second short column 26 is arranged horizontally, and one end is connected to the joint between the lower section rod 24 and the second soil digging blade 21 . One end of the first connecting rod is hinged to the other end of the first short column. The lower end of the second connecting rod 35 is hinged to the other end of the second short post 26 . The other end of the first connecting rod and the other end of the second connecting rod 35 are symmetrically fixedly connected to two sides of the card base 33 . The upper end of the drill rod 34 is connected with an upper connecting rod 32 , and the upper connecting rod 32 is movably arranged in the clamping seat 33 up and down. When the soil layer in the electric pole hole is harder, when the digging shovel cannot be broken, the drill rod 34 can be rotated to drill into the harder soil layer to make it broken.

如图1及如图2所示,在连接架中,上连杆32的下端与钻杆34的上端连接,下部一段为呈橄榄球形的卡紧段321。卡座33呈筒状,在卡座33内壁的上下两端分别设有多个弧形弹簧条331,两端的弧形弹簧条331使得卡座33内部形成一弹性可变空间,卡紧段321嵌入该弹性可变空间中。当需要使用钻杆34破碎较硬的土层时,可以用力向下推动上连杆32,使卡紧段321从该弹性可变空间中移出。As shown in FIG. 1 and FIG. 2 , in the connecting frame, the lower end of the upper connecting rod 32 is connected to the upper end of the drill pipe 34 , and the lower section is a football-shaped clamping section 321 . The card holder 33 is cylindrical, and a plurality of arc-shaped spring bars 331 are respectively arranged at the upper and lower ends of the inner wall of the card holder 33. The arc-shaped spring bars 331 at both ends make the inside of the card holder 33 form an elastic variable space, and the clamping section 321 Embedded in this elastic variable space. When the drill rod 34 needs to be used to break the hard soil layer, the upper connecting rod 32 can be pushed downwards forcefully, so that the clamping section 321 can be moved out of the elastic variable space.

为了便于拆卸第二操作长杆,同时便于上段杆23和上连杆32连接,上段杆23的下端设有第一活动连接结构,下段杆24的上端及上连杆32的上端均设有第二活动连接结构,第一活动连接结构、第二活动连接结构可拆卸连接。In order to facilitate the dismounting of the second operating rod, and to facilitate the connection between the upper rod 23 and the upper connecting rod 32, the lower end of the upper rod 23 is provided with a first movable connection structure, and the upper end of the lower rod 24 and the upper end of the upper connecting rod 32 are provided with a first movable connection structure. Two movable connection structures, the first movable connection structure and the second movable connection structure are detachably connected.

如图3所示,上段杆23呈筒状,且上段杆23的下端设有多个沿圆周方向分布的第一通孔230。第一活动连接结构包括:拉绳25、连接绳251、短筒27、卡块51、弹簧28。拉绳25位于上段杆23内部,并且上端从上段杆23引出(如图1)。短筒27固定于上段杆23下端底板的上方,侧壁上设有多个沿圆周方向分布的第二通孔270,第一通孔230与第二通孔270对应。卡块51呈柱形,一端插入第一通孔230中,另一端连接于弹簧28的一端,弹簧28的另一端连接于第二通孔270的外侧周围。连接绳251一端连接于拉绳25的下端,另一端穿过第二通孔270、弹簧28连接于卡块51的另一端。As shown in FIG. 3 , the upper rod 23 is cylindrical, and the lower end of the upper rod 23 is provided with a plurality of first through holes 230 distributed along the circumferential direction. The first movable connection structure includes: a pull cord 25 , a connecting cord 251 , a short tube 27 , a block 51 , and a spring 28 . The stay cord 25 is located inside the upper section rod 23, and the upper end is drawn out from the upper section rod 23 (as shown in FIG. 1 ). The short tube 27 is fixed above the lower bottom plate of the upper rod 23 , and the side wall is provided with a plurality of second through holes 270 distributed along the circumferential direction, and the first through holes 230 correspond to the second through holes 270 . The block 51 is cylindrical, one end is inserted into the first through hole 230 , the other end is connected to one end of the spring 28 , and the other end of the spring 28 is connected to the outer periphery of the second through hole 270 . One end of the connecting rope 251 is connected to the lower end of the pull rope 25 , the other end passes through the second through hole 270 , and the spring 28 is connected to the other end of the locking block 51 .

下段杆24上端的第二活动连接结构包括底座4,其呈筒状,侧壁上设有多个沿圆周方向分布的第三通孔40,第三通孔40与第一通孔230对应,卡块51的一端亦插入第三通孔40中,以连接第一活动连接结构、第二活动连接结构。The second movable connection structure at the upper end of the lower rod 24 includes a base 4, which is cylindrical, and a plurality of third through holes 40 distributed along the circumferential direction are arranged on the side wall, and the third through holes 40 correspond to the first through holes 230, One end of the locking block 51 is also inserted into the third through hole 40 to connect the first movable connection structure and the second movable connection structure.

与下段杆24上端的第二活动连接结构相同的是,上连杆32上的第二活动连接结构包括底座31,底座31的周围设有通孔310。Same as the second movable connection structure on the upper end of the lower rod 24 , the second movable connection structure on the upper link 32 includes a base 31 , and a through hole 310 is formed around the base 31 .

为了防止连接绳251磨损过快,短筒27的内壁固定有多个分别位于第二通孔270上方的定滑轮29,连接绳251嵌入定滑轮29的边槽中。In order to prevent the connecting rope 251 from wearing out too quickly, the inner wall of the short tube 27 is fixed with a plurality of fixed pulleys 29 respectively located above the second through hole 270 , and the connecting rope 251 is embedded in the side grooves of the fixed pulley 29 .

在应用时,若电杆坑中的土层较软,则用两挖土铲顺利挖土即可。若土层较硬,则可以向上拉动拉绳25,使卡块51从第一通孔230中脱离,然后将上段杆23从底座4拔出。插入上连杆32上端的底座31中,放松拉绳25,卡块51插入通孔310中,使上段杆23和上连杆32连接为一体。接着用力下压,使卡紧段321从卡座33中脱离,此时,即可旋转上段杆23,将钻杆34钻入较硬的土层了。为了便于操作,上段杆23的上部设有一便于旋转操作的手柄22。In application, if the soil layer in the pole pit is soft, just use two digging shovels to dig the soil smoothly. If the soil layer is relatively hard, the pull rope 25 can be pulled upwards to disengage the clamping block 51 from the first through hole 230 , and then the upper rod 23 can be pulled out from the base 4 . Insert in the base 31 of the upper end of the upper link 32, loosen the stay cord 25, and insert the block 51 into the through hole 310, so that the upper section bar 23 and the upper link 32 are connected as one. Press down firmly then, make clamping section 321 break away from deck 33, at this moment, can rotate upper section rod 23, drill rod 34 has been drilled into harder soil layer. In order to facilitate operation, a handle 22 is provided on the upper part of the upper section rod 23 for easy rotation operation.

另外,还可以在两个操作长杆刻画深度线,便于实时了解电杆坑的深度。In addition, it is also possible to draw depth lines on the two long operating poles, which is convenient for real-time understanding of the depth of the pole pit.

经过实际验证,之前为了埋电线杆需要完成挖坑,要挖取的土方量为1方半、用时1小时15分钟,现在采用本实用新型的电力架线工程施工用电杆挖坑专用工具来挖坑时,需要挖取的土方量只有半方多一点就够,用时只需要25分钟就可以完成,只需1个人来工作就可以,为工程施工节省了时间,大大提高了工作效率。After actual verification, it was necessary to complete the digging in order to bury the electric poles. The amount of earth to be excavated was 1.5 square meters and took 1 hour and 15 minutes. Now the utility model is used for electric pole digging. When digging a pit, the amount of earthwork that needs to be excavated is only a little more than half a square meter, and it only takes 25 minutes to complete, and only one person is required to work, which saves time for engineering construction and greatly improves work efficiency.

综上所述,本发明可以减少电杆坑的土石开挖量,提高作业效率。同时,对于较硬的土层,本发明还可以先用钻杆钻破,然后再用挖土铲进行挖土作业。利用本发明挖掘的电杆坑为一个圆柱形的深坑,电杆插入、树立之后,回填土石较少,并且稳定好。To sum up, the present invention can reduce the excavation amount of earth and rock in the pole pit, and improve the operation efficiency. Simultaneously, for harder soil layers, the present invention can also be broken with drill rod earlier, and then carry out excavation operation with digging shovel. The electric pole pit excavated by the invention is a cylindrical deep pit, and after the electric pole is inserted and erected, less soil and rocks are backfilled and the stability is good.

由技术常识可知,本发明可以通过其它的不脱离其精神实质或必要特征的实施方案来实现。因此,上述公开的实施方案,就各方面而言,都只是举例说明,并不是仅有的。所有在本发明范围内或在等同于本发明的范围内的改变均被本发明包含。It can be known from common technical knowledge that the present invention can be realized through other embodiments without departing from its spirit or essential features. Accordingly, the above-disclosed embodiments are, in all respects, illustrative and not exclusive. All changes within the scope of the present invention or within the scope equivalent to the present invention are embraced by the present invention.

Claims (7)

1.一种电力架线工程施工用电杆挖坑专用工具,其特征在于,包括:1. A special tool for electric pole digging for electric power wiring engineering construction, characterized in that it includes: 第一操作长杆,用于手持操作;The first operating rod is used for hand-held operation; 第一挖土铲,连接于所述第一操作长杆下端,用于挖掘电杆坑;The first digging shovel is connected to the lower end of the first operating long pole and is used for digging pole pits; 第二操作长杆,用于手持操作;The second operating rod is used for hand-held operation; 第二挖土铲,连接于所述第二操作长杆下端,用于挖掘电杆坑,且所述第一挖土铲和第二挖土铲相对设置;A second earth-digging shovel, connected to the lower end of the second operating long pole, is used for excavating the electric pole pit, and the first earth-digging shovel and the second earth-digging shovel are arranged opposite to each other; 连接架,与所述第一操作长杆和所述第一挖土铲的连接处、所述第二操作长杆和所述第二挖土铲的连接处铰接,使所述第一挖土铲、第二挖土铲能够靠近,以将电杆坑中的碎土取出;The connecting frame is hinged with the connection between the first operation long rod and the first soil digging shovel, and the connection between the second operation long rod and the second soil excavation blade, so that the first soil digging The shovel and the second digging shovel can be approached to take out the broken soil in the pole pit; 所述第一操作长杆包括上段杆、下段杆,所述上段杆的下端设有第一活动连接结构,所述下段杆的上端及所述连接架的上连杆的上端均设有第二活动连接结构,所述第一活动连接结构、第二活动连接结构可拆卸连接。The first operating long rod includes an upper rod and a lower rod, the lower end of the upper rod is provided with a first movable connection structure, and the upper end of the lower rod and the upper end of the upper link of the connecting frame are provided with a second The movable connection structure, the first movable connection structure and the second movable connection structure are detachably connected. 2.根据权利要求1所述的电力架线工程施工用电杆挖坑专用工具,其特征在于,所述连接架包括:2. The special tool for electric pole digging for electric power wiring engineering construction according to claim 1, wherein the connecting frame comprises: 第一短柱,水平设置,一端连接于所述第一操作长杆和所述第一挖土铲的连接处;The first short column is arranged horizontally, and one end is connected to the connection between the first operating long rod and the first earth digging blade; 第二短柱,水平设置,一端连接于所述第二操作长杆和所述第二挖土铲的连接处;The second short column is arranged horizontally, and one end is connected to the joint between the second operating long rod and the second earth digging shovel; 第一连杆,一端铰接于所述第一短柱的另一端;a first connecting rod, one end of which is hinged to the other end of the first short column; 第二连杆,一端铰接于所述第二短柱的另一端;a second connecting rod, one end of which is hinged to the other end of the second short post; 卡座,所述第一连杆的另一端、所述第二连杆的另一端对称地固定连接于所述卡座的两侧;The deck, the other end of the first connecting rod and the other end of the second connecting rod are symmetrically fixedly connected to both sides of the deck; 钻杆,上下可移动地设于所述卡座中,用于破碎电杆坑中坚硬的土石块。The drill pipe is movably arranged in the deck up and down, and is used for crushing hard earth and rocks in the electric pole pit. 3.根据权利要求1所述的电力架线工程施工用电杆挖坑专用工具,其特征在于,所述连接架还包括:3. The special tool for electric pole digging for electric power wiring engineering construction according to claim 1, wherein the connecting frame further comprises: 所述连接架的上连杆的下端与钻杆的上端连接,下部一段为呈橄榄球形的卡紧段;The lower end of the upper connecting rod of the connecting frame is connected with the upper end of the drill pipe, and the lower section is a football-shaped clamping section; 卡座呈筒状,且在所述卡座内壁的上下两端分别设有多个弧形弹簧条,以在所述卡座内部形成一弹性可变空间,所述卡紧段嵌入所述弹性可变空间中,并能够从该弹性可变空间中移出。The card seat is cylindrical, and a plurality of arc-shaped spring strips are respectively provided at the upper and lower ends of the inner wall of the card seat to form an elastic variable space inside the card seat, and the clamping section is embedded in the elastic In the variable space, and can move out of the elastic variable space. 4.根据权利要求1所述的电力架线工程施工用电杆挖坑专用工具,其特征在于,所述第一操作长杆、第二操作长杆均为可拆卸的多段式结构。4. The special tool for electric pole digging for electric power wiring engineering construction according to claim 1, characterized in that, both the first long operating rod and the second long operating rod are detachable multi-stage structures. 5.根据权利要求1所述的电力架线工程施工用电杆挖坑专用工具,其特征在于,所述上段杆呈筒状,且所述上段杆的下端设有多个沿圆周方向分布的第一通孔;5. The special tool for electric pole digging for electric power wiring engineering construction according to claim 1, characterized in that, the upper section of the pole is cylindrical, and the lower end of the upper section of the pole is provided with a plurality of holes distributed along the circumferential direction. first through hole; 所述第一活动连接结构包括:The first active connection structure includes: 拉绳,位于所述上段杆内部,并且上端从所述上段杆引出;a pull cord located inside the upper rod, and the upper end is led out from the upper rod; 短筒,固定于所述上段杆下端的内部,侧壁上设有多个沿圆周方向分布的第二通孔,所述第一通孔与所述第二通孔对应;The short tube is fixed inside the lower end of the upper rod, and the side wall is provided with a plurality of second through holes distributed along the circumferential direction, and the first through holes correspond to the second through holes; 卡块,呈柱形,一端插入所述第一通孔中,另一端连接于一弹簧的一端,所述弹簧的另一端连接于所述第二通孔的外侧周围;The block is cylindrical, one end is inserted into the first through hole, the other end is connected to one end of a spring, and the other end of the spring is connected to the outer periphery of the second through hole; 连接绳,一端连接于所述拉绳的下端,另一端穿过所述第二通孔、所述弹簧连接于所述卡块的另一端;A connecting rope, one end is connected to the lower end of the pull cord, the other end passes through the second through hole, and the spring is connected to the other end of the clamping block; 所述第二活动连接结构包括:The second active connection structure includes: 底座,呈筒状,侧壁上设有多个沿圆周方向分布的第三通孔,所述第三通孔与所述第一通孔对应,所述卡块的一端亦插入所述第三通孔中,以连接所述第一活动连接结构、所述第二活动连接结构。The base is cylindrical, and the side wall is provided with a plurality of third through holes distributed along the circumferential direction. The third through holes correspond to the first through holes, and one end of the clamping block is also inserted into the third through holes. through holes to connect the first movable connection structure and the second movable connection structure. 6.根据权利要求5所述的电力架线工程施工用电杆挖坑专用工具,其特征在于,所述短筒的内壁固定有多个分别位于所述第二通孔上方的定滑轮,所述连接绳嵌入所述定滑轮的边槽中。6. The special tool for electric pole digging for electric power wiring engineering construction according to claim 5, characterized in that, the inner wall of the short tube is fixed with a plurality of fixed pulleys respectively located above the second through hole, so The connecting rope is embedded in the side groove of the fixed pulley. 7.根据权利要求5-6任一所述的电力架线工程施工用电杆挖坑专用工具,其特征在于,所述上段杆的上部设有一便于旋转操作的手柄。7. The special tool for electric pole digging for electric power wiring engineering construction according to any one of claims 5-6, characterized in that, the upper part of the upper pole is provided with a handle for easy rotation operation.
CN201510812261.8A 2014-05-26 2014-05-26 Electric stringing engineering construction is digged pit specific purpose tool with electric pole Active CN105350591B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510812261.8A CN105350591B (en) 2014-05-26 2014-05-26 Electric stringing engineering construction is digged pit specific purpose tool with electric pole

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510812261.8A CN105350591B (en) 2014-05-26 2014-05-26 Electric stringing engineering construction is digged pit specific purpose tool with electric pole
CN201410226751.5A CN104018538B (en) 2014-05-26 2014-05-26 Special tools for pole digging

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410226751.5A Division CN104018538B (en) 2014-05-26 2014-05-26 Special tools for pole digging

Publications (2)

Publication Number Publication Date
CN105350591A CN105350591A (en) 2016-02-24
CN105350591B true CN105350591B (en) 2017-08-29

Family

ID=51435510

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410226751.5A Active CN104018538B (en) 2014-05-26 2014-05-26 Special tools for pole digging
CN201510812261.8A Active CN105350591B (en) 2014-05-26 2014-05-26 Electric stringing engineering construction is digged pit specific purpose tool with electric pole

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201410226751.5A Active CN104018538B (en) 2014-05-26 2014-05-26 Special tools for pole digging

Country Status (1)

Country Link
CN (2) CN104018538B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002940A (en) * 2015-07-20 2015-10-28 柳州一合科技有限公司 Digging device for building buried rod
CN105064429A (en) * 2015-07-20 2015-11-18 柳州一合科技有限公司 Excavating device capable of being held by hand conveniently
CN106088192B (en) * 2016-08-17 2018-03-02 国网江苏省电力公司扬州供电公司 A kind of electric pole is dug a hole instrument
CN106088193B (en) * 2016-08-17 2018-01-30 国网江苏省电力公司扬州供电公司 A kind of adjustable electric pole dibble
CN106120932B (en) * 2016-08-17 2018-01-30 国网江苏省电力公司扬州供电公司 A kind of electric pole is dug a hole device

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2663254B2 (en) * 1995-08-31 1997-10-15 小宮工機株式会社 Digging tool
US7290814B2 (en) * 2003-04-08 2007-11-06 Fiskars Brands, Inc. Post hole digger
US7461881B2 (en) * 2006-04-07 2008-12-09 Ames True Temper, Inc. Consumer post hole digger
KR101351994B1 (en) * 2011-11-16 2014-01-16 서강대학교산학협력단 Semi automatic shovel
CN202627050U (en) * 2012-05-28 2012-12-26 成都电业局 Portable round-rod and straight-hole excavator
CN102808430A (en) * 2012-08-17 2012-12-05 安徽电力天长供电有限责任公司 Electric pole hole digging device
CN202767141U (en) * 2012-08-27 2013-03-06 泰州市华骏机械设备制造有限公司 Multifunctional excavator
CN203296089U (en) * 2013-06-27 2013-11-20 国家电网公司 Vertical hole digging tool
CN203846550U (en) * 2014-05-26 2014-09-24 国家电网公司 Electric pole digging special tool

Also Published As

Publication number Publication date
CN104018538B (en) 2016-04-20
CN105350591A (en) 2016-02-24
CN104018538A (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN105350591B (en) Electric stringing engineering construction is digged pit specific purpose tool with electric pole
CN105332376B (en) Hydraulic mechanical hand-lifting stake clamping device and pile-drawing machine
CN103234776B (en) Undisturbed soil column and root digging device
CN106245985A (en) Hydraulic pressure electric pole pole erecting vehicle
CN206554077U (en) A kind of stake holes cleaning equipment
CN206801460U (en) A kind of rectangle friction pile drilling construction device
CN201896577U (en) Wire pole pit boring machine
CN102140888B (en) Excavating drilling machine
CN204327107U (en) The TBM of a kind of fragmented rock body hole section tunnels structure
CN203846550U (en) Electric pole digging special tool
CN103850248A (en) Construction process and device of end-bearing pile hole
CN203285332U (en) Pit digging tool for electric pole
CN102808430A (en) Electric pole hole digging device
CN204002555U (en) A kind of pitting machine
CN105027795A (en) Chinese yam harvesting machine
CN207011221U (en) A kind of portable device of digging
CN203049636U (en) Concrete pole foundation excavation tool
CN203878639U (en) Electric pole foundation excavating device convenient to use
CN205171490U (en) Machinery digs special stamp hammer of backfilling in pole hole
CN105156019A (en) Spiral rod pit digging device
CN218283846U (en) Drilling device for processing coal mine top beam
CN203463021U (en) Drill bit for excavating electric pole foundation pit in winter
CN206862681U (en) A kind of cutting ring device for exempting from shoveling collection soil column
CN205277298U (en) Electrical pillar buries frozen soil drilling machine immediately
CN202417301U (en) Telegraph pole foundation pit excavating machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant