CN112570238A - Repairing method for special primer for MARK-III-fuel tank of LNG ship - Google Patents

Repairing method for special primer for MARK-III-fuel tank of LNG ship Download PDF

Info

Publication number
CN112570238A
CN112570238A CN202011185676.4A CN202011185676A CN112570238A CN 112570238 A CN112570238 A CN 112570238A CN 202011185676 A CN202011185676 A CN 202011185676A CN 112570238 A CN112570238 A CN 112570238A
Authority
CN
China
Prior art keywords
primer
coating
grade
repairing
mark
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011185676.4A
Other languages
Chinese (zh)
Inventor
刘涛
叶慧
杨小毅
陆君杰
赵微微
张晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Original Assignee
Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangnan Changxing Shipbuilding Co Ltd filed Critical Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Priority to CN202011185676.4A priority Critical patent/CN112570238A/en
Publication of CN112570238A publication Critical patent/CN112570238A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D7/00Processes, other than flocking, specially adapted for applying liquids or other fluent materials to particular surfaces or for applying particular liquids or other fluent materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/002Pretreatement

Abstract

The invention relates to a method for repairing a special primer for an MARK-III-bunker of an LNG ship, which is divided into 3 different grades of a first grade, a second grade and a third grade according to the damage degree of the primer, and adopts corresponding primer repairing methods aiming at the different grades, thereby avoiding the method that the primer in the area is completely removed and recoated by the traditional method, shortening the repairing period, saving manpower and material resources and improving the ship building efficiency.

Description

Repairing method for special primer for MARK-III-fuel tank of LNG ship
Technical Field
The invention relates to the field of ship coating construction, in particular to a method for repairing a special primer for an MARK-III-fuel tank of an LNG ship.
Background
The LNG ship is a special ship for transporting liquefied gas at a low temperature of-163 ℃, is a product with high technology, high difficulty and high added value, and is a marine super-freezing vehicle. The storage tank system of the prior liquefied natural gas carrier has two types of self-supporting and film type, the film type LNG carrier is superior to the self-supporting LNG carrier in the aspect of comprehensive performance, the prior MARK-III-fuel tank film type storage system is the most advanced and environment-friendly fuel tank maintenance system, and the insulating material of the storage tank is bonded with a fuel tank by using special resin, so that the special primer for the fuel tank is used as a transition layer between the steel surface of the fuel tank and the resin to ensure that the bonding force between the resin and the steel is strong enough.
In the ship construction, after special primer spraying construction is carried out in the fuel cabin segmentation stage, the fuel cabin is formed by being folded in the whole cabin in a period of 2.5 months, so that a damaged coating needs to be polished and repaired; the repairing needs to ensure that the coating quality of the fuel tank in the repairing area reaches the standard, and also needs to ensure that the coating film thickness of the adjacent area does not exceed the standard, so that the problem that the construction period is delayed and the quality is uncontrollable due to repeated reworking is avoided.
Disclosure of Invention
Aiming at the problems, the invention provides a method for repairing a special primer for an MARK-III-fuel tank of an LNG ship, which adopts different repairing methods aiming at different degrees of damage, shortens the repairing period and ensures that the repaired primer meets the quality requirement, and the technical aim of the invention is realized by the following technical scheme:
a method for repairing a special primer for a MARK-III-fuel tank of an LNG ship is characterized in that the primer is divided into different grades according to the damage degree of the primer, and corresponding primer repairing methods are adopted according to the different grades.
Further, the primer is divided into 3 grades of first grade, second grade and third grade according to the damage degree of the primer, wherein the first grade is that only the surface of the coating has scale and floating dust; the second level is coating damage and no coating bottom surface steel is seen; and the third level is coating damage visible coating bottom surface steel.
Further, the method comprises the steps of:
s1, after the fuel compartment carrying and folding are completed, carrying out grade evaluation on the damaged area of the primer according to the damage degree, and carrying out grade marking, wherein the grade comprises a first grade, a second grade and a third grade;
s2, taking repairing measures for the first-stage area, the second-stage area and the third-stage area respectively, and wiping off the scale and the floating dust on the surface of the coating in the first-stage area; polishing the coating in the secondary area to obtain a coating groove with the roughness of 40-75 μm, and then performing paint repair on the groove; in the tertiary zone, the coating is cleaned with a tool, with a treatment grade of SA2.5 or ST3, and paint repair is performed after cleaning.
Further, the environment temperature is 5-45 ℃ and the humidity is 50-85% RH when the primer is repaired; the surface temperature of the steel is at least 2.7 ℃ higher than the dew point temperature.
Further, in the primary area, a diluent is dipped to clean the surface of the coating, and the diluent is matched with the primer.
Further, in the secondary area, manual coating is adopted for paint repair, in the tertiary area, paint spraying is adopted for paint repair, and the periphery of the area is shielded during spraying.
Further, the dry film thickness of the repaired primer is 35-90 μm.
Compared with the prior art, the method has the advantages that the priming paint is divided into different grade areas according to the damage degree of the priming paint, corresponding repairing measures are taken aiming at the different areas, the traditional one-cut repairing mode is avoided, the repairing period is shortened, manpower and material resources are solved, the quality of the repaired priming paint can be guaranteed through the nozzle, the proportion control and the spraying pressure, and the thickness range cannot be exceeded.
Detailed Description
The technical solution of the present invention is further described below with reference to specific embodiments:
a method for repairing a primer dedicated to a MARK-iii-bunker of an LNG carrier, the method comprising:
1. after the special primer construction is carried out on the MARK-III-fuel cabin of the LNG ship in the stage of segmentation, the cabin surface of the MARK-III-fuel cabin of the LNG ship is subjected to coating protection by adopting three-proofing cloth, aluminum foil glue and the like.
2. After the MARK-III-fuel tank sections of the LNG ship are welded and assembled on the platform, the assembly of the sections is completed in a dock, and finally the complete fuel tank is formed.
3. And after the scaffold is erected inside the MARK-III-fuel tank of the LNG ship, arranging the primer repairing of the whole tank of the fuel tank.
4. Removing the coating protection, evaluating the primer coating, and dividing the primer coating into a first grade, a second grade and a third grade according to the damage degree of the primer coating, wherein the surface of the area corresponding to the first grade only has scale and floating dust; the area corresponding to the second level is coating bottom surface steel without coating damage; the third level is coating damage visible coating bottom surface steel; and classifying the damaged area according to the grade, and marking the damaged area, wherein the marking comprises the grade and the repair range.
5. According to the grade division, different repairing modes are adopted for different grade areas; in the first-level area, wiping and cleaning the scale and the floating dust by using a wiping cloth dipped with a diluent matched with the primer; manually polishing the area by using abrasive paper in a secondary area to polish a groove of a primer coating, wherein the roughness of the groove is 40-75 mu m, and then performing paint repair by using a roller or a brush to ensure that the thickness of a dry film of the coating is controlled at 35-90 mu m; cleaning the three-level area by adopting a sand blasting or grinding mode, wherein the treatment grade is required to reach SA2.5 grade or ST3 grade, then spraying paint, shielding the peripheral area during spraying, and controlling the thickness of a dry film of the primer coating to be 35-90 mu m; when the primer is repaired, the environment temperature is 5-45 ℃, and the humidity is 50-85% RH; the surface temperature of the steel is at least 2.7 ℃ higher than the dew point temperature.
When paint construction is carried out by adopting a spraying mode, a spraying pump is adopted for spraying, the pressure of the spraying pump is 0.15-0.25Mpa, the output pressure of the paint is 7.6-9.7Mpa, the spraying speed is 60-80cm/s, a nozzle of a spraying gun adopts a B-type nozzle, the B-type nozzle is a Changjiang river B-type nozzle of 14B25 type, the length of a belt of the spraying pump is 25-30m, a primer is formed by mixing and stirring a main agent of PTA paint and a curing agent of PTB paint according to a volume ratio of 4:1, 30% of diluent is added at the same time, the pressure of a pneumatic stirrer is controlled between 0.3-0.5Mpa, and the stirring process is carried out for 3 minutes, so that the paint is fully cured.
The present invention is further explained and not limited by the embodiments, and those skilled in the art can make various modifications as necessary after reading the present specification, but all the embodiments are protected by the patent law within the scope of the claims.

Claims (7)

1. The method for repairing the special primer for the MARK-III-fuel tank of the LNG ship is characterized in that the method divides the primer into different grades according to the damage degree of the primer, and adopts corresponding primer repairing methods aiming at the different grades.
2. The method of claim 1, wherein the primer is classified into three classes, i.e., first class, second class and third class according to the damage degree of the primer, wherein the first class is that the surface of the coating is only rusted and dusty; the second level is coating damage and no coating bottom surface steel is seen; and the third level is coating damage visible coating bottom surface steel.
3. The method of claim 2, comprising the steps of:
s1, after the fuel compartment carrying and folding are completed, carrying out grade evaluation on the damaged area of the primer according to the damage degree, and carrying out grade marking, wherein the grade comprises a first grade, a second grade and a third grade;
s2, taking repairing measures for the first-stage area, the second-stage area and the third-stage area respectively, and wiping off the scale and the floating dust on the surface of the coating in the first-stage area; polishing the coating in the secondary area to obtain a coating groove with the roughness of 40-75 μm, and then performing paint repair on the groove; in the tertiary zone, the coating is cleaned with a tool, with a treatment grade of SA2.5 or ST3, and paint repair is performed after cleaning.
4. The method for repairing a primer dedicated for MARK-III-bunkering of an LNG ship as claimed in any one of claims 1 to 3, wherein the primer is repaired while satisfying an ambient temperature of 5 to 45 ℃ and a humidity of 50 to 85% RH; the surface temperature of the steel is at least 2.7 ℃ higher than the dew point temperature.
5. The method of claim 3, wherein the diluent is dipped in the primary zone to clean the surface of the coating.
6. The method of claim 3, wherein the paint repair is performed by hand coating in the secondary region, and paint spray coating is performed in the tertiary region, and the periphery of the region is shielded during the paint spray coating.
7. The method of claim 3, wherein the dry film thickness of the repaired primer is 35-90 μm.
CN202011185676.4A 2020-10-30 2020-10-30 Repairing method for special primer for MARK-III-fuel tank of LNG ship Pending CN112570238A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011185676.4A CN112570238A (en) 2020-10-30 2020-10-30 Repairing method for special primer for MARK-III-fuel tank of LNG ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011185676.4A CN112570238A (en) 2020-10-30 2020-10-30 Repairing method for special primer for MARK-III-fuel tank of LNG ship

Publications (1)

Publication Number Publication Date
CN112570238A true CN112570238A (en) 2021-03-30

Family

ID=75120310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011185676.4A Pending CN112570238A (en) 2020-10-30 2020-10-30 Repairing method for special primer for MARK-III-fuel tank of LNG ship

Country Status (1)

Country Link
CN (1) CN112570238A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116273796A (en) * 2022-11-25 2023-06-23 沪东中华造船(集团)有限公司 MARKIII type fuel tank coating method for refitting dual-fuel container ship

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104785421A (en) * 2015-04-27 2015-07-22 上海外高桥造船有限公司 Method for preventing steel from corroding in hull block construction process
CN108334607A (en) * 2018-02-02 2018-07-27 中石油管道有限责任公司西部兰州输气分公司 A kind of buried pipeline external anti-corrosion layer breakage detection method and system
CN109731753A (en) * 2019-03-06 2019-05-10 北京市晨峰龙汽车修理有限责任公司 A kind of shaving repair technology of automobile inspection

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104785421A (en) * 2015-04-27 2015-07-22 上海外高桥造船有限公司 Method for preventing steel from corroding in hull block construction process
CN108334607A (en) * 2018-02-02 2018-07-27 中石油管道有限责任公司西部兰州输气分公司 A kind of buried pipeline external anti-corrosion layer breakage detection method and system
CN109731753A (en) * 2019-03-06 2019-05-10 北京市晨峰龙汽车修理有限责任公司 A kind of shaving repair technology of automobile inspection

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
化学工业部化工机械研究院, 化学工业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116273796A (en) * 2022-11-25 2023-06-23 沪东中华造船(集团)有限公司 MARKIII type fuel tank coating method for refitting dual-fuel container ship

Similar Documents

Publication Publication Date Title
CN103623987A (en) Coating technology of ship
CN103191858B (en) Spraying process of bullet train water system tanks
CN112570238A (en) Repairing method for special primer for MARK-III-fuel tank of LNG ship
CN109127333A (en) A kind of coating process of ship
CN102815371B (en) Ship manufacturing method for pre-mounting steering engine base in segmentation step
CN110238014A (en) A kind of construction method of ship fresh-water tank coating
CN112848417A (en) Crack repair method for carbon fiber composite product of hydrogen fuel cell automobile
CN105017954B (en) Automobile coating bottom is made up the difference agent and automobile finish restorative procedure
CN105400469A (en) Method for size renovation of aerospace parts
CN101829883B (en) Method for manufacturing sidewall panel of railway passenger vehicle
CN110938362A (en) Protection method for special primer for MARK _ III _ bunker of LNG ship
CN105109853B (en) Large-scale storage tank lining plastic anticorrosion process
CN102284409B (en) Method for repairing finish paint shrinkage cavity of car
CN105598011A (en) Method for rapidly repairing defect on outer surface of automobile through weathered stone
JP4435336B2 (en) How to paint a ship or steel structure
CN108031628A (en) A kind of ship water paint construction method
CN114904737A (en) Method for repairing pearlescent white paint surface
CN113182153A (en) Boiler steel structure outer surface defect repairing construction method
CN216684633U (en) Compound steel sheet structure and packing box
KR100622240B1 (en) Rapid-painting technology for removing a scar on trim of automobile
CN111097670A (en) Water-based coating and preparation method and application thereof
CN116278070A (en) Repairing method for carbon fiber tube surface
CN117160815A (en) Container surface treatment method and container
CN108943300B (en) Method for manufacturing special-shaped furniture
CN108622549B (en) Piece-by-piece assembled container and manufacturing process thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination