CN112561095B - State monitoring and asset management coordinated control method and device - Google Patents
State monitoring and asset management coordinated control method and device Download PDFInfo
- Publication number
- CN112561095B CN112561095B CN202011515674.7A CN202011515674A CN112561095B CN 112561095 B CN112561095 B CN 112561095B CN 202011515674 A CN202011515674 A CN 202011515674A CN 112561095 B CN112561095 B CN 112561095B
- Authority
- CN
- China
- Prior art keywords
- information
- equipment
- fault
- maintenance
- asset
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 115
- 238000000034 method Methods 0.000 title claims abstract description 90
- 238000012423 maintenance Methods 0.000 claims abstract description 199
- 238000011084 recovery Methods 0.000 claims abstract description 49
- 230000001360 synchronised effect Effects 0.000 claims abstract description 10
- 230000010365 information processing Effects 0.000 claims description 12
- 238000013507 mapping Methods 0.000 claims description 12
- 238000004590 computer program Methods 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 description 9
- 238000004891 communication Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 6
- 238000012545 processing Methods 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 230000001960 triggered effect Effects 0.000 description 2
- 230000000739 chaotic effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
- G05B19/0428—Safety, monitoring
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24024—Safety, surveillance
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Automation & Control Theory (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a state monitoring and asset management coordinated control method and device, wherein the method comprises the following steps: acquiring fault state information issued by a device state monitoring system, wherein the fault state information at least comprises fault alarm information and fault recovery information; performing semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, and matching the current equipment according to a semantic analysis result to obtain fault maintenance assignment information or asset change information of the current equipment; the fault maintenance assignment information or the asset change information of the current equipment is synchronized to the equipment asset management system, so that the equipment asset management system automatically fills work order information according to the fault maintenance assignment information of the current equipment or automatically updates equipment asset state according to the asset change information of the current equipment. The method can effectively realize real-time interconnection and linkage control of equipment state monitoring and equipment asset management.
Description
Technical Field
The invention relates to the technical field of rail transit industry, in particular to a state monitoring and asset management linkage control method and device.
Background
In the present informatization age, the related management system of the track traffic signal system (track traffic management system for short) has also fully entered the informatization stage, wherein important systems mainly include: the system comprises a device state monitoring system and a device asset management system (the device state monitoring system and the device asset management system can be understood as two subsystems in the rail transit management system), wherein the device state monitoring system is used for monitoring signal states generated in the working process of rail transit products, and the device asset management system is used for managing changes of device assets from the device asset management angle.
However, in the practical application process, it is necessary to perform informatization processing on two systems respectively, the equipment status monitoring system is used to perform receiving and checking of the fault, and the equipment asset management system is used to perform informatization of maintenance and replacement of the equipment asset, and the management mode often has the following defects:
1. The equipment state monitoring system and the equipment asset management system respectively and independently carry out management work, information cannot be communicated, and the information synchronization between the two systems is mainly carried out manually by means of manpower, so that the error is large, time and labor are consumed, and the cost is high;
2. the information transfer process between the equipment state monitoring system and the equipment asset management system belongs to an open loop process, and the information management is poor in relevance and chaotic.
Disclosure of Invention
Aiming at the problems existing in the prior art, the embodiment of the invention provides a state monitoring and asset management coordinated control method and device.
In a first aspect, an embodiment of the present invention provides a method for controlling status monitoring and asset management in a coordinated manner, including:
Acquiring fault state information issued by a device state monitoring system, wherein the fault state information at least comprises fault alarm information and fault recovery information;
performing semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, and matching current equipment according to semantic analysis results to obtain fault maintenance assignment information or asset change information of the current equipment;
and synchronizing the fault maintenance assignment information or the asset change information of the current equipment to the equipment asset management system so that the equipment asset management system can automatically report work order information according to the fault maintenance assignment information of the current equipment or automatically update equipment asset state according to the asset change information of the current equipment.
Further, the matching the current device according to the semantic analysis result and obtaining the fault maintenance assignment information or the asset change information of the current device specifically includes:
and matching the current equipment according to the semantic analysis result, inquiring fault maintenance assignment information of the current equipment corresponding to the fault alarm information from a pre-stored relational database, or matching the current equipment according to the semantic analysis result, and inquiring asset change information of the current equipment corresponding to the fault recovery information from the pre-stored relational database.
Further, the relational database stores rail transit equipment data, the rail transit equipment data comprising: a device name library, a device number comparison table, a vehicle number record table in which the device is located, a device department attribution comparison table, a device original manufacturer comparison table and a history maintenance record table; the history maintenance record table comprises history fault information, maintenance information and accessory replacement information;
Correspondingly, the fault alarm information comprises a fault equipment name, a fault equipment number, a fault position, a fault type and a fault time which have a mapping relation with the rail transit equipment data;
the fault maintenance assignment information comprises the number and the name of the current fault equipment with mapping relation with the rail transit equipment data, maintenance departments to be assigned, technical support data of a manufacturer, accessories or consumable materials required for maintenance and maintenance strategies.
Further, the step of synchronizing the fault maintenance assignment information or the asset change information of the current device to the device asset management system so that the device asset management system automatically reports work order information according to the fault maintenance assignment information of the current device or automatically updates the device asset state according to the asset change information of the current device specifically includes:
If the fault maintenance assignment information of the current equipment of the equipment asset management system is synchronized, further sending a work order information filling triggering instruction to the equipment asset management system so as to trigger the equipment asset management system to automatically fill work order information according to the fault maintenance assignment information of the current equipment;
And if the asset change information of the current equipment is synchronized to the equipment asset management system, further sending an equipment asset state update triggering instruction to the equipment asset management system so as to trigger the equipment asset management system to automatically update the equipment asset state according to the asset change information of the current equipment.
In a second aspect, an embodiment of the present invention provides a method for controlling status monitoring and asset management in a coordinated manner, including:
Acquiring work order state information of an equipment asset management system, wherein the work order state information at least comprises work order change state information and work order closing state information;
Performing semantic analysis on the work order change state information, the work order closing state information and the fault state information of the equipment state monitoring system based on a data matching algorithm, and matching current equipment according to semantic analysis results to obtain fault maintenance information of the current equipment;
and synchronizing the fault maintenance information of the current equipment to the equipment state monitoring system so that the equipment state monitoring system displays the fault maintenance progress according to the fault maintenance information of the current equipment or carries out fault recovery notification according to the fault maintenance information of the current equipment.
Further, the fault maintenance information at least includes fault maintenance progress information and fault maintenance completion information, and the matching of the current device according to the semantic analysis result and obtaining the fault maintenance information of the current device specifically includes:
According to semantic analysis results and based on the work order changing state information, matching current equipment and obtaining fault maintenance progress information of the current equipment;
and matching the current equipment according to the semantic analysis result and based on the work order closing state information, and obtaining the fault maintenance completion information of the current equipment.
In a third aspect, an embodiment of the present invention provides a status monitoring and asset management coordinated control apparatus, including:
the first acquisition module is used for acquiring fault state information issued by the equipment state monitoring system, wherein the fault state information at least comprises fault alarm information and fault recovery information;
The first information processing module is used for carrying out semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, matching current equipment according to semantic analysis results and obtaining fault maintenance assignment information or asset change information of the current equipment;
And the first linkage control module is used for synchronizing the fault maintenance assignment information or the asset change information of the current equipment to the equipment asset management system so that the equipment asset management system can automatically report the work order information according to the fault maintenance assignment information of the current equipment or automatically update the equipment asset state according to the asset change information of the current equipment.
In a fourth aspect, an embodiment of the present invention provides a status monitoring and asset management coordinated control device, including:
The second acquisition module is used for acquiring the work order state information of the equipment asset management system, wherein the work order state information at least comprises work order change state information and work order closing state information;
The second information processing module is used for carrying out semantic analysis on the work order change state information, the work order closing state information and the fault state information of the equipment state monitoring system based on a data matching algorithm, matching the current equipment according to semantic analysis results and obtaining fault maintenance information of the current equipment;
and the second linkage control module is used for synchronizing the fault maintenance information of the current equipment to the equipment state monitoring system so that the equipment state monitoring system can display the fault maintenance progress according to the fault maintenance information of the current equipment or can carry out fault recovery notification according to the fault maintenance information of the current equipment.
In a fifth aspect, an embodiment of the present invention provides an electronic device, including a memory, a processor, and a computer program stored on the memory and capable of running on the processor, where the processor implements the method for performing status monitoring and asset management coordinated control as described above when executing the computer program.
In a sixth aspect, embodiments of the present invention provide a non-transitory computer readable storage medium having stored thereon a computer program which, when executed by a processor, implements a state monitoring and asset management coordinated control method as described above.
The method and the device for controlling the state monitoring and the asset management in a linkage manner can effectively realize real-time interconnection and intercommunication of equipment state monitoring and equipment asset management, and control the two systems to work cooperatively, so that integrated linkage control and management can be carried out on rail transit equipment, the efficiency and the accuracy of control and management are improved, personal errors are avoided, the cost is reduced, and the control and management process is effectively formed into a closed loop process to completely control the whole process from fault occurrence to fault recovery of the rail transit equipment.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following description will make a brief description of the drawings required for the embodiments, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings may be obtained according to the drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic flow chart of a method for controlling status monitoring and asset management in a coordinated manner according to an embodiment of the present invention;
FIG. 2 is a schematic flow chart of another method for controlling status monitoring and asset management in a coordinated manner according to an embodiment of the present invention;
FIG. 3 is a schematic structural diagram of a coordinated control device for status monitoring and asset management according to an embodiment of the present invention;
FIG. 4 is a schematic diagram of another embodiment of a status monitoring and asset management coordinated control device;
fig. 5 is a schematic structural diagram of an electronic device according to an embodiment of the present invention.
Reference numerals:
301: a first acquisition module; 302: a first information processing module; 303: the first linkage control module;
401: a second acquisition module; 402: a second information processing module; 403: a second linkage control module;
501: a processor; 502: a communication interface; 503: a memory; 504: a communication bus.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are some embodiments of the present invention, but not all embodiments of the present invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
The embodiment of the invention provides a state monitoring and asset management coordinated control method and device, wherein the method comprises the following steps:
Acquiring fault state information issued by a device state monitoring system, wherein the fault state information at least comprises fault alarm information and fault recovery information;
performing semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, and matching current equipment according to semantic analysis results to obtain fault maintenance assignment information or asset change information of the current equipment;
and synchronizing the fault maintenance assignment information or the asset change information of the current equipment to the equipment asset management system so that the equipment asset management system can automatically report work order information according to the fault maintenance assignment information of the current equipment or automatically update equipment asset state according to the asset change information of the current equipment.
The state monitoring and asset management linkage control method provided by the embodiment of the invention can effectively realize real-time interconnection and intercommunication of equipment state monitoring and equipment asset management, and control the two systems to work cooperatively, so that integrated linkage control management can be carried out on rail transit equipment, the efficiency and the accuracy of control management are improved, personal errors are avoided, the cost is reduced, and the control management process is effectively formed into a closed loop process, so that the whole process from fault occurrence to fault recovery of the rail transit equipment is completely controlled.
The method provided by the embodiment of the invention is described in detail below with reference to the accompanying drawings.
In a first aspect, an embodiment of the present invention provides a state monitoring and asset management coordinated control method, and fig. 1 is a schematic flow chart of the state monitoring and asset management coordinated control method provided by the embodiment of the present invention, as shown in fig. 1, where the method includes:
S101, acquiring fault state information issued by a device state monitoring system, wherein the fault state information at least comprises fault alarm information and fault recovery information.
The equipment state monitoring system collects real-time state information of the track traffic equipment, and issues fault alarm information when the track traffic equipment fails or issues fault recovery information when the track traffic equipment recovers, and the fault state information is acquired at the moment.
The track traffic equipment can be a specific track traffic train, a carriage in the train or a specific part on the train, and is collectively called track traffic agency equipment herein.
S102, carrying out semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, and matching the current equipment according to a semantic analysis result to obtain fault maintenance assignment information or asset change information of the current equipment.
And carrying out semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, matching current equipment according to a semantic analysis result, and obtaining fault maintenance assignment information according to the fault alarm information of the current equipment or obtaining asset change information according to the fault recovery information of the current equipment.
The fault alarm information of the state monitoring system mainly describes the place where the fault alarm occurs and the content of the fault alarm, when the fault alarm information is transmitted to the asset management system, the equipment with the fault alarm and the asset equipment in the asset management system are effectively matched through a data matching algorithm, and a unique relation is determined, so that the fault state data of the state monitoring system and the data association of equipment asset information on the asset management system are opened. The data matching is specifically the accurate matching finally realized by carrying out semantic analysis on the data such as the place and the content where the fault alarm occurs, the equipment of the fault alarm, the asset registration content in the asset management system and the like through an algorithm.
S103, synchronizing the fault maintenance assignment information or the asset change information of the current equipment to the equipment asset management system so that the equipment asset management system can automatically report work order information according to the fault maintenance assignment information of the current equipment or automatically update equipment asset states according to the asset change information of the current equipment.
And synchronizing the fault maintenance assignment information or the asset change information of the current equipment determined in the step S102 to an equipment asset management system, so that the equipment asset management system automatically reports the fault maintenance assignment information of the current equipment to corresponding work order information of the current equipment, or automatically updates the equipment asset state of the current equipment according to the asset change information of the current equipment.
The steps S101, S102, and S103 may be performed through a first data linkage interface in a low-coupling working mode, where the first data linkage interface includes at least a fault alarm information transmission interface and a fault recovery information transmission interface.
The fault alarm information transmission interface acquires fault alarm information issued by the equipment state monitoring system, obtains fault maintenance assignment information of the current fault of the current rail transit equipment based on the fault alarm information, and synchronizes the fault maintenance assignment information to the equipment asset management system so that the equipment asset management system can automatically report work order information according to the fault maintenance assignment information.
The fault recovery information transmission interface acquires fault recovery information issued by the equipment state monitoring system, obtains asset change information of current track traffic equipment based on the fault recovery information, and synchronizes the asset change information to the equipment asset management system so that the equipment asset management system automatically updates equipment asset states according to the asset change information.
Besides automatically reporting the fault maintenance assignment information of the current equipment to the work order information, the equipment asset management system can display the fault alarm information, such as a work order information module, when the fault alarm information is synchronized to the equipment asset management system along with the fault maintenance assignment information, wherein specific display contents include a fault equipment name, a fault equipment number, a fault position, a fault type, a fault time and the like.
The state monitoring and asset management linkage control method provided by the embodiment of the invention can effectively realize real-time interconnection and intercommunication of equipment state monitoring and equipment asset management, and control the two systems to work cooperatively, so that integrated linkage control management can be carried out on rail transit equipment, the efficiency and the accuracy of control management are improved, personal errors are avoided, the cost is reduced, and the control management process is effectively formed into a closed loop process, so that the whole process from fault occurrence to fault recovery of the rail transit equipment is completely controlled.
Based on the above embodiment, in S102, the matching the current device according to the semantic analysis result and obtaining the fault maintenance assignment information or the asset change information of the current device specifically includes:
and matching the current equipment according to the semantic analysis result, inquiring fault maintenance assignment information of the current equipment corresponding to the fault alarm information from a pre-stored relational database, or matching the current equipment according to the semantic analysis result, and inquiring asset change information of the current equipment corresponding to the fault recovery information from the pre-stored relational database.
It can be understood that the corresponding query is performed from a preset relational database by a data table look-up method or a mapping relation matching method.
On the basis of the above embodiment, in step S102, the relational database stores track traffic equipment data, which includes: a device name library, a device number comparison table, a vehicle number record table in which the device is located, a device department attribution comparison table, a device original manufacturer comparison table and a history maintenance record table; the history maintenance record table comprises history fault information, maintenance information and accessory replacement information;
Correspondingly, the fault alarm information comprises a fault equipment name, a fault equipment number, a fault position, a fault type and a fault time which have a mapping relation with the rail transit equipment data;
the fault maintenance assignment information comprises the number and the name of the current fault equipment with mapping relation with the rail transit equipment data, maintenance departments to be assigned, technical support data of a manufacturer, accessories or consumable materials required for maintenance and maintenance strategies.
Furthermore, according to the current fault alarm information of the current rail transit equipment: the specific content of the fault maintenance assignment information is correspondingly and accurately determined based on the mapping relation preset before the fault alarm information, the fault maintenance assignment information and the track traffic equipment data, and the specific content comprises the following steps: the current fault equipment number A-0002 is named as a train 08 carriage, a maintenance department is assigned to a first maneuvering maintenance department of the train (which can be determined according to the attribution of equipment assets and who is responsible for maintenance, specific maintenance workers can be assigned according to the workers last time in a historical maintenance record, and the like), technical support data of the carriage original manufacturer at the moment can be found out and used as maintenance reference, or the most efficient and quick maintenance strategy is determined according to the historical maintenance record, and the equipment asset management system automatically reports the information into the work order information to generate a targeted maintenance document, so that related maintenance personnel maintain according to the maintenance document.
Meanwhile, the work order information state in the equipment asset management system is continuously and automatically updated along with the maintenance work, so that the whole fault maintenance process can be effectively managed. The whole fault maintenance process can be linked and synchronized to the equipment state monitoring system for display so as to intuitively monitor the whole fault maintenance process. And after the equipment is restored to normal, the equipment asset management system automatically performs the work order closing operation. After the asset management system automatically performs the work order closing operation, the asset management system can also generate one-time linkage with the equipment state monitoring system so that the equipment state monitoring system can release fault recovery information according to the work order closing information and eliminate fault alarm information.
Based on the above embodiment, S103 synchronizes the fault maintenance assignment information or the asset change information of the current device to the device asset management system, so that the device asset management system performs automatic report of the work order information according to the fault maintenance assignment information of the current device or performs automatic update of the device asset state according to the asset change information of the current device, and specifically includes:
S1031, if the fault maintenance assignment information of the current equipment of the equipment asset management system is synchronized, further sending a work order information filling triggering instruction to the equipment asset management system so as to trigger the equipment asset management system to automatically fill the work order information according to the fault maintenance assignment information of the current equipment.
And the equipment asset management system is triggered by the work order information filling triggering instruction, and the work order information is automatically filled according to the fault maintenance assignment information of the current equipment.
S1032, if the asset change information of the current equipment is synchronized to the equipment asset management system, further sending an equipment asset state update trigger instruction to the equipment asset management system so as to trigger the equipment asset management system to automatically update the equipment asset state according to the asset change information of the current equipment.
And the equipment asset management system is triggered by an equipment asset state update trigger instruction to automatically update the equipment asset state according to the asset change information of the current equipment.
In a second aspect, the present invention provides a method for controlling status monitoring and asset management in a coordinated manner, which can be understood as a reverse operation method of the method shown in fig. 1, and can also be said to form an effective closed loop processing procedure with the method shown in fig. 1. Fig. 2 is a flow chart of another method for controlling status monitoring and asset management linkage according to an embodiment of the present invention, as shown in fig. 2, the method includes:
S201, acquiring work order state information of the equipment asset management system, wherein the work order state information at least comprises work order change state information and work order closing state information.
The equipment asset management system dynamically changes the work order state information according to the change of the fault processing process in the whole fault maintenance process, namely can generate work order change state information in the fault maintenance process or generate work order closing state information after the fault maintenance is completed, and the information is acquired at the moment. The work order status information may be work order change status information and work order closing status information.
S202, carrying out semantic analysis on the work order change state information, the work order closing state information and the fault state information of the equipment state monitoring system based on a data matching algorithm, and matching out current equipment according to semantic analysis results to obtain fault maintenance information of the current equipment.
The method comprises the steps of obtaining specific work order changing state information and work order closing state information in the work order state information, carrying out semantic analysis on the work order changing state information and the work order closing state information and fault state information of a device state monitoring system based on a data matching algorithm, matching current device according to semantic analysis results and obtaining fault maintenance information of the current device, and certainly, realizing the method based on certain preset relation data, wherein the preset relation data is set according to specific requirements, and the method is not limited.
The work order status information of the equipment asset management system, including work order change status information and work order closing status information, mainly describes the situation of equipment management, especially the execution and closing situation of work orders related to maintenance, which is information associated with asset information change, and work order closing indicates that equipment asset change has been updated, etc. When the status information of the work order is transmitted to the status monitoring system, the equipment in the asset management system with the status change of the work order and the equipment in the status monitoring system are effectively matched through a data matching algorithm, and a unique relation is determined, so that the data association of the equipment asset information on the asset management system and the fault status data of the status monitoring system is opened. The data matching process at this time may be understood as the reverse matching process of the data matching in S102, and the two processes may refer to each other, which is not specifically limited herein.
S203, synchronizing the fault maintenance information of the current equipment to the equipment state monitoring system so that the equipment state monitoring system can display the fault maintenance progress according to the fault maintenance information of the current equipment or can carry out fault recovery notification according to the fault maintenance information of the current equipment.
And synchronizing the fault maintenance information of the current equipment determined in the step S202 to the equipment state monitoring system, so that the equipment state monitoring system displays the fault maintenance progress according to the fault maintenance information of the current equipment, or the equipment state monitoring system carries out fault recovery notification according to the fault maintenance information of the current equipment.
The steps S201, S202, and S203 may be performed through a second data linkage interface in the low-coupling working mode, where the second data linkage interface includes at least a work order change state information transmission interface and a work order closing state information transmission interface.
The work order change state information transmission interface is used for acquiring the work order change state information of the equipment asset management system, obtaining fault maintenance information based on the work order change state information, and synchronizing the fault maintenance information to the equipment state monitoring system so that the equipment state monitoring system can display fault maintenance progress according to the fault maintenance information.
The work order closing state information transmission interface is used for acquiring work order closing state information of the equipment asset management system, obtaining fault maintenance information based on the work order closing state information, and synchronizing the fault maintenance information to the equipment state monitoring system so that the equipment state monitoring system can carry out fault recovery notification according to the fault maintenance information.
The equipment state monitoring system can acquire the whole process of the change of the work order state information in the equipment asset management system in real time, actively track the work order information state, and display each maintenance progress and corresponding state change brought by maintenance. After the equipment is recovered to be normal, the equipment asset management system performs the operation of closing the work order information, namely generates work order closing state information, the work order closing state information transmission interface is used for acquiring fault maintenance information based on the work order closing state information, and when the fault maintenance information is synchronized to the equipment state monitoring system, the equipment state monitoring system actively eliminates initial fault alarm information and eliminates a fault alarm state besides performing fault recovery notification according to the information completed by the fault maintenance information.
The state monitoring and asset management linkage control method provided by the embodiment of the invention can effectively realize real-time interconnection and intercommunication of equipment state monitoring and equipment asset management, and control the two systems to work cooperatively, so that integrated linkage control management can be carried out on rail transit equipment, the efficiency and the accuracy of control management are improved, personal errors are avoided, the cost is reduced, and the control management process is effectively formed into a closed loop process, so that the whole process from fault occurrence to fault recovery of the rail transit equipment is completely controlled.
On the basis of the foregoing embodiment, in step S202, the fault maintenance information includes at least fault maintenance progress information and fault maintenance completion information, and the matching of the current device according to the semantic analysis result and obtaining the fault maintenance information of the current device specifically includes:
S2021, matching the current equipment according to the semantic analysis result and based on the work order change state information, and obtaining the fault maintenance progress information of the current equipment.
And obtaining fault maintenance progress information according to the semantic analysis result and based on the work order change state information, and further executing step S2031 to synchronize the fault maintenance progress information to a device state monitoring system so that the device state monitoring system displays the fault maintenance progress according to the fault maintenance information of the current device.
S2022, matching the current equipment according to the semantic analysis result and based on the work order closing state information, and obtaining the fault maintenance completion information of the current equipment.
And obtaining fault maintenance completion information according to the semantic analysis result and based on the work order closing state information, and further executing step S2031 to synchronize the fault maintenance completion information to the equipment state monitoring system so that the equipment state monitoring system carries out fault recovery notification according to the fault maintenance completion information of the current equipment.
In a third aspect, an embodiment of the present invention provides a device for performing coordinated control by using the method shown in fig. 1, where an application principle may refer to a description of a working process of the corresponding method, and details are not repeated herein. Fig. 3 is a schematic structural diagram of a status monitoring and asset management coordinated control device according to an embodiment of the present invention, as shown in fig. 3, where the device includes: a first acquisition module 301, a first information processing module 302, and a first linkage control module 303, each of which is connected to each other in sequence, wherein,
A first obtaining module 301, configured to obtain fault state information issued by the device state monitoring system, where the fault state information at least includes fault alarm information and fault recovery information;
The first information processing module 302 is configured to perform semantic analysis on the fault alarm information, the fault recovery information, and the equipment asset information of the equipment asset management system based on a data matching algorithm, and match the current equipment according to the semantic analysis result to obtain fault maintenance assignment information or asset change information of the current equipment;
And the first coordinated control module 303 is configured to synchronize the fault maintenance assignment information or the asset change information of the current device to the device asset management system, so that the device asset management system performs automatic report of work order information according to the fault maintenance assignment information of the current device or performs automatic update of the device asset state according to the asset change information of the current device.
According to the state monitoring and asset management linkage control device provided by the embodiment of the invention, the first acquisition module 301, the first information processing module 302 and the first linkage control module 303 work cooperatively, so that the equipment state monitoring system and the equipment asset management system effectively realize information real-time interconnection and intercommunication, and the two systems are controlled to work cooperatively, thereby being capable of carrying out integrated linkage control management on rail transit equipment, improving the efficiency and accuracy of control management, avoiding personal errors and reducing the cost.
In a fourth aspect, an embodiment of the present invention provides a device for performing coordinated control by using the method shown in fig. 2, where an application principle may refer to a description of a working process of the corresponding method, and details are not repeated herein. Fig. 4 is a schematic structural diagram of another status monitoring and asset management coordinated control device according to an embodiment of the present invention, as shown in fig. 4, where the device includes: a second acquisition module 401, a second information processing module 402 and said second linkage control module 403, which are connected to each other in sequence, wherein,
A second obtaining module 401, configured to obtain work order status information of the equipment asset management system, where the work order status information includes at least work order change status information and work order closing status information;
The second information processing module 402 is configured to perform semantic analysis on the work order change state information, the work order closing state information, and the fault state information of the equipment state monitoring system based on a data matching algorithm, and match the current equipment according to the semantic analysis result to obtain fault maintenance information of the current equipment;
And the second linkage control module 403 is configured to synchronize the fault maintenance information of the current device to the device state monitoring system, so that the device state monitoring system displays a fault maintenance schedule according to the fault maintenance information of the current device, or performs a fault recovery notification according to the fault maintenance information of the current device.
According to the state monitoring and asset management linkage control device provided by the embodiment of the invention, the second acquisition module 401, the second information processing module 402 and the second linkage control module 403 are mutually cooperated to enable the equipment state monitoring system and the equipment asset management system to effectively realize information real-time interconnection and intercommunication, and control the two systems to mutually cooperate, so that integrated linkage control management can be carried out on rail transit equipment, the efficiency and the accuracy of control management are improved, personal errors are avoided, the cost is reduced, and the device can effectively form a closed loop process in the control management process, and completely control the whole process from fault occurrence to fault recovery of the rail transit equipment.
In a third aspect, an embodiment of the present invention provides an electronic device, and fig. 5 is a schematic structural diagram of the electronic device provided in the embodiment of the present invention, as shown in fig. 5, where the electronic device includes: processor (processor) 501, communication interface (Communications Interface) 502, memory (memory) 503, and communication bus 504, wherein processor 501, communication interface 502, memory 503 complete communication with each other through communication bus 504. The processor 501 may call a computer program or logic instructions in the memory 503 to implement a status monitoring and asset management coordinated control method described below, the method comprising:
Acquiring fault state information issued by a device state monitoring system, wherein the fault state information at least comprises fault alarm information and fault recovery information;
performing semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, and matching current equipment according to semantic analysis results to obtain fault maintenance assignment information or asset change information of the current equipment;
and synchronizing the fault maintenance assignment information or the asset change information of the current equipment to the equipment asset management system so that the equipment asset management system can automatically report work order information according to the fault maintenance assignment information of the current equipment or automatically update equipment asset state according to the asset change information of the current equipment.
Or the following state monitoring and asset management linkage control method is realized, and the method comprises the following steps:
Acquiring work order state information of an equipment asset management system, wherein the work order state information at least comprises work order change state information and work order closing state information;
Performing semantic analysis on the work order change state information, the work order closing state information and the fault state information of the equipment state monitoring system based on a data matching algorithm, and matching current equipment according to semantic analysis results to obtain fault maintenance information of the current equipment;
and synchronizing the fault maintenance information of the current equipment to the equipment state monitoring system so that the equipment state monitoring system displays the fault maintenance progress according to the fault maintenance information of the current equipment or carries out fault recovery notification according to the fault maintenance information of the current equipment.
Further, the logic instructions in the memory 503 described above may be implemented in the form of software functional units and may be stored in a computer readable storage medium when sold or used as a stand alone product. Based on such understanding, the technical solution of the present invention may be embodied essentially or in a part contributing to the prior art or in a part of the technical solution, in the form of a software product stored in a storage medium, comprising several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the status monitoring and asset management coordinated control method according to the various embodiments of the present invention. And the aforementioned storage medium includes: a usb disk, a removable hard disk, a Read-Only Memory (ROM), a random access Memory (RAM, random Access Memory), a magnetic disk, or an optical disk, or other various media capable of storing program codes.
In a fourth aspect, embodiments of the present invention provide a non-transitory computer readable storage medium having stored thereon a computer program which, when executed by a processor, implements a method for controlling status monitoring and asset management in conjunction with the following, the method comprising:
Acquiring fault state information issued by a device state monitoring system, wherein the fault state information at least comprises fault alarm information and fault recovery information;
performing semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, and matching current equipment according to semantic analysis results to obtain fault maintenance assignment information or asset change information of the current equipment;
and synchronizing the fault maintenance assignment information or the asset change information of the current equipment to the equipment asset management system so that the equipment asset management system can automatically report work order information according to the fault maintenance assignment information of the current equipment or automatically update equipment asset state according to the asset change information of the current equipment.
Or the following state monitoring and asset management linkage control method is realized, and the method comprises the following steps:
Acquiring work order state information of an equipment asset management system, wherein the work order state information at least comprises work order change state information and work order closing state information;
Performing semantic analysis on the work order change state information, the work order closing state information and the fault state information of the equipment state monitoring system based on a data matching algorithm, and matching current equipment according to semantic analysis results to obtain fault maintenance information of the current equipment;
and synchronizing the fault maintenance information of the current equipment to the equipment state monitoring system so that the equipment state monitoring system displays the fault maintenance progress according to the fault maintenance information of the current equipment or carries out fault recovery notification according to the fault maintenance information of the current equipment.
The apparatus embodiments described above are merely illustrative, wherein the elements illustrated as separate elements may or may not be physically separate, and the elements shown as elements may or may not be physical elements, may be located in one place, or may be distributed over a plurality of network elements. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment. Those of ordinary skill in the art will understand and implement the present invention without undue burden.
From the above description of the embodiments, it will be apparent to those skilled in the art that the embodiments may be implemented by means of software plus necessary general hardware platforms, or of course may be implemented by means of hardware. Based on this understanding, the foregoing technical solution may be embodied essentially or in a part contributing to the prior art in the form of a software product, which may be stored in a computer readable storage medium, such as ROM/RAM, a magnetic disk, an optical disk, etc., including several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute the method described in the respective embodiments or some parts of the embodiments.
Finally, it should be noted that: the above embodiments are only for illustrating the technical solution of the present invention, and are not limiting; although the invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims (6)
1. A status monitoring and asset management coordinated control method, comprising:
Acquiring fault state information issued by a device state monitoring system, wherein the fault state information at least comprises fault alarm information and fault recovery information;
performing semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, and matching current equipment according to semantic analysis results to obtain fault maintenance assignment information or asset change information of the current equipment;
Synchronizing the fault maintenance assignment information or the asset change information of the current equipment to the equipment asset management system so that the equipment asset management system automatically fills work order information according to the fault maintenance assignment information of the current equipment or automatically updates equipment asset states according to the asset change information of the current equipment;
the method for matching the current equipment according to the semantic analysis result and obtaining the fault maintenance assignment information or the asset change information of the current equipment specifically comprises the following steps:
Matching current equipment according to a semantic analysis result, inquiring fault maintenance assignment information of the current equipment corresponding to the fault alarm information from a pre-stored relational database, or matching current equipment according to a semantic analysis result, and inquiring asset change information of the current equipment corresponding to the fault recovery information from a pre-stored relational database;
The relational database stores track traffic equipment data, the track traffic equipment data comprising: a device name library, a device number comparison table, a vehicle number record table in which the device is located, a device department attribution comparison table, a device original manufacturer comparison table and a history maintenance record table; the history maintenance record table comprises history fault information, maintenance information and accessory replacement information;
Correspondingly, the fault alarm information comprises a fault equipment name, a fault equipment number, a fault position, a fault type and a fault time which have a mapping relation with the rail transit equipment data;
The fault maintenance assignment information comprises the number and the name of the current fault equipment with mapping relation with the rail transit equipment data, maintenance departments to be assigned, technical support data of original manufacturers, accessories or consumable materials required for maintenance and maintenance strategies;
the method comprises the steps of matching current equipment according to semantic analysis results, and inquiring fault maintenance assignment information of the current equipment corresponding to the fault alarm information from a pre-stored relational database, wherein the fault maintenance assignment information comprises the following specific steps: determining fault maintenance assignment information based on the mapping relation of the fault alarm information, the fault maintenance assignment information and the rail transit equipment data;
the state monitoring and asset management coordinated control method further comprises the following steps:
Acquiring work order state information of an equipment asset management system, wherein the work order state information at least comprises work order change state information and work order closing state information;
Performing semantic analysis on the work order change state information, the work order closing state information and the fault state information of the equipment state monitoring system based on a data matching algorithm, and matching current equipment according to semantic analysis results to obtain fault maintenance information of the current equipment;
and synchronizing the fault maintenance information of the current equipment to the equipment state monitoring system so that the equipment state monitoring system displays the fault maintenance progress according to the fault maintenance information of the current equipment or carries out fault recovery notification according to the fault maintenance information of the current equipment.
2. The method for controlling status monitoring and asset management in conjunction with claim 1, wherein synchronizing the fault maintenance assignment information or the asset change information of the current device to the device asset management system so that the device asset management system performs automatic report of work order information according to the fault maintenance assignment information of the current device or performs automatic update of device asset status according to the asset change information of the current device, specifically comprises:
If the fault maintenance assignment information of the current equipment of the equipment asset management system is synchronized, further sending a work order information filling triggering instruction to the equipment asset management system so as to trigger the equipment asset management system to automatically fill work order information according to the fault maintenance assignment information of the current equipment;
And if the asset change information of the current equipment is synchronized to the equipment asset management system, further sending an equipment asset state update triggering instruction to the equipment asset management system so as to trigger the equipment asset management system to automatically update the equipment asset state according to the asset change information of the current equipment.
3. The method for controlling status monitoring and asset management according to claim 1, wherein the fault maintenance information at least includes fault maintenance progress information and fault maintenance completion information, and the matching the current device according to the semantic analysis result and obtaining the fault maintenance information of the current device specifically includes:
According to semantic analysis results and based on the work order changing state information, matching current equipment and obtaining fault maintenance progress information of the current equipment;
and matching the current equipment according to the semantic analysis result and based on the work order closing state information, and obtaining the fault maintenance completion information of the current equipment.
4. A condition monitoring and asset management coordinated control device, comprising:
the first acquisition module is used for acquiring fault state information issued by the equipment state monitoring system, wherein the fault state information at least comprises fault alarm information and fault recovery information;
The first information processing module is used for carrying out semantic analysis on the fault alarm information, the fault recovery information and the equipment asset information of the equipment asset management system based on a data matching algorithm, matching current equipment according to semantic analysis results and obtaining fault maintenance assignment information or asset change information of the current equipment;
The first linkage control module is used for synchronizing the fault maintenance assignment information or the asset change information of the current equipment to the equipment asset management system so that the equipment asset management system can automatically report work order information according to the fault maintenance assignment information of the current equipment or automatically update equipment asset state according to the asset change information of the current equipment;
the method for matching the current equipment according to the semantic analysis result and obtaining the fault maintenance assignment information or the asset change information of the current equipment specifically comprises the following steps:
Matching current equipment according to a semantic analysis result, inquiring fault maintenance assignment information of the current equipment corresponding to the fault alarm information from a pre-stored relational database, or matching current equipment according to a semantic analysis result, and inquiring asset change information of the current equipment corresponding to the fault recovery information from a pre-stored relational database;
The relational database stores track traffic equipment data, the track traffic equipment data comprising: a device name library, a device number comparison table, a vehicle number record table in which the device is located, a device department attribution comparison table, a device original manufacturer comparison table and a history maintenance record table; the history maintenance record table comprises history fault information, maintenance information and accessory replacement information;
Correspondingly, the fault alarm information comprises a fault equipment name, a fault equipment number, a fault position, a fault type and a fault time which have a mapping relation with the rail transit equipment data;
The fault maintenance assignment information comprises the number and the name of the current fault equipment with mapping relation with the rail transit equipment data, maintenance departments to be assigned, technical support data of original manufacturers, accessories or consumable materials required for maintenance and maintenance strategies;
the method comprises the steps of matching current equipment according to semantic analysis results, and inquiring fault maintenance assignment information of the current equipment corresponding to the fault alarm information from a pre-stored relational database, wherein the fault maintenance assignment information comprises the following specific steps: determining fault maintenance assignment information based on the mapping relation of the fault alarm information, the fault maintenance assignment information and the rail transit equipment data;
the state monitoring and asset management coordinated control device further comprises:
The second acquisition module is used for acquiring the work order state information of the equipment asset management system, wherein the work order state information at least comprises work order change state information and work order closing state information;
The second information processing module is used for carrying out semantic analysis on the work order change state information, the work order closing state information and the fault state information of the equipment state monitoring system based on a data matching algorithm, matching the current equipment according to semantic analysis results and obtaining fault maintenance information of the current equipment;
and the second linkage control module is used for synchronizing the fault maintenance information of the current equipment to the equipment state monitoring system so that the equipment state monitoring system can display the fault maintenance progress according to the fault maintenance information of the current equipment or can carry out fault recovery notification according to the fault maintenance information of the current equipment.
5. An electronic device comprising a memory, a processor, and a computer program stored on the memory and executable on the processor, wherein the processor implements the condition monitoring and asset management coordinated control method of any of claims 1 to 3 when the computer program is executed by the processor.
6. A non-transitory computer readable storage medium having a computer program stored thereon, wherein the computer program when executed by a processor implements the condition monitoring and asset management coordinated control method of any one of claims 1 to 3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011515674.7A CN112561095B (en) | 2020-12-21 | 2020-12-21 | State monitoring and asset management coordinated control method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011515674.7A CN112561095B (en) | 2020-12-21 | 2020-12-21 | State monitoring and asset management coordinated control method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112561095A CN112561095A (en) | 2021-03-26 |
CN112561095B true CN112561095B (en) | 2024-04-30 |
Family
ID=75030648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011515674.7A Active CN112561095B (en) | 2020-12-21 | 2020-12-21 | State monitoring and asset management coordinated control method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112561095B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113256073A (en) * | 2021-04-27 | 2021-08-13 | 北京城建设计发展集团股份有限公司 | BIM-based real-time fault alarm system and method |
CN117313983B (en) * | 2023-08-31 | 2024-09-03 | 华能核能技术研究院有限公司 | Method and system for managing equipment of nuclear power plant based on work order system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR970056354A (en) * | 1995-12-19 | 1997-07-31 | 양승택 | Failure Management Method in Management Agent System for Accessing ATM Switching System to Communication Management Network |
JP2015146088A (en) * | 2014-02-03 | 2015-08-13 | 三菱電機株式会社 | integrated maintenance management system |
CN107317718A (en) * | 2016-08-19 | 2017-11-03 | 北京市燃气集团有限责任公司 | A kind of O&M service management and management platform |
CN108899082A (en) * | 2018-06-22 | 2018-11-27 | 深圳倍佳医疗科技服务有限公司 | Maintenance service management method, system, terminal and computer readable storage medium |
CN110147431A (en) * | 2019-05-05 | 2019-08-20 | 中国银行股份有限公司 | Key word matching method, device, computer equipment and storage medium |
-
2020
- 2020-12-21 CN CN202011515674.7A patent/CN112561095B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR970056354A (en) * | 1995-12-19 | 1997-07-31 | 양승택 | Failure Management Method in Management Agent System for Accessing ATM Switching System to Communication Management Network |
JP2015146088A (en) * | 2014-02-03 | 2015-08-13 | 三菱電機株式会社 | integrated maintenance management system |
CN107317718A (en) * | 2016-08-19 | 2017-11-03 | 北京市燃气集团有限责任公司 | A kind of O&M service management and management platform |
CN108899082A (en) * | 2018-06-22 | 2018-11-27 | 深圳倍佳医疗科技服务有限公司 | Maintenance service management method, system, terminal and computer readable storage medium |
CN110147431A (en) * | 2019-05-05 | 2019-08-20 | 中国银行股份有限公司 | Key word matching method, device, computer equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN112561095A (en) | 2021-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112561095B (en) | State monitoring and asset management coordinated control method and device | |
CN108032876B (en) | Station transportation scheduling method and system | |
US9489325B2 (en) | Method and a system for polling and processing data | |
US20090265587A1 (en) | Knowledge-based failure recovery support system | |
CN103443725B (en) | The apparatus for diagnosis of abnormality of Servocontrol device and abnormity diagnostic system | |
AU2020309879B2 (en) | Failure probability assessment system and method therefor | |
US20130103794A1 (en) | System and method for monitoring tooling activities | |
CN109542499A (en) | A kind of distribution terminal software version management method and device | |
CN105915381A (en) | System for realizing monitoring system business logic online modification | |
CN104599064A (en) | Operation maintenance management system of data center | |
CN108537243A (en) | A kind of violation alarm method and device | |
CN113961393A (en) | Real-time database measuring point deletion recovery method, system, storage medium and server | |
CN100413257C (en) | Network element warning data obtaining method | |
CN109582666A (en) | Data major key generation method, device, electronic equipment and storage medium | |
CN110689137B (en) | Parameter determination method, system, medium, and electronic device | |
CN117474306A (en) | Production flow control method and device, electronic equipment and readable storage medium | |
CN103389698A (en) | Method for controlling production through standards | |
CN103455870B (en) | A kind of method with standard control design case | |
CN111709597A (en) | Power grid production domain operation monitoring system | |
CN111444281B (en) | Database parameter synchronization method and system | |
US20090063576A1 (en) | System and method for information management | |
CN115903720A (en) | Fault diagnosis system and method for rail transit, and storage medium | |
CN113822448A (en) | Automatic backfill method for fixed value execution result of remote distribution network and related device | |
CN113076216A (en) | Efficient processing method and system for online troubleshooting of information department | |
CN112527628A (en) | Configuration data synchronization method and device and electronic equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |