CN112555511A CN202011385795.4A CN202011385795A CN112555511A CN 112555511 A CN112555511 A CN 112555511A CN 202011385795 A CN202011385795 A CN 202011385795A CN 112555511 A CN112555511 A CN 112555511A
Authority
CN
China
Prior art keywords
clamp
clamping sleeve
sleeve body
clamping
clamp body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011385795.4A
Other languages
Chinese (zh)
Inventor
李昕
卢敏
付宏程
张中刚
章志才
崔建维
高琦龙
任建华
朱俊峰
赵继杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jianghuai Automobile Group Corp
Original Assignee
Anhui Jianghuai Automobile Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jianghuai Automobile Group Corp filed Critical Anhui Jianghuai Automobile Group Corp
Priority to CN202011385795.4A priority Critical patent/CN112555511A/en
Publication of CN112555511A publication Critical patent/CN112555511A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/10Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
    • F16L3/1075Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing with two members, the two members being joined with a hinge on one side and fastened together on the other side
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/02Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening
    • F16B2/06Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action
    • F16B2/12Clamps, i.e. with gripping action effected by positive means other than the inherent resistance to deformation of the material of the fastening external, i.e. with contracting action using sliding jaws
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/222Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals having single supports directly connected together

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

The invention discloses a pipe clamp assembly and an automobile, the pipe clamp assembly comprises a pipe clamp body, an installation body and a clamping structure, wherein the pipe clamp body is provided with a clamping hole for a pipeline to penetrate through, the installation body is arranged at one end of the pipe clamp body, the installation body is provided with an installation stud extending back to the pipe clamp body, the end part of the installation stud is sleeved with a locking nut, the clamping structure comprises a first clamping sleeve body and a second clamping sleeve body which are oppositely arranged and arranged on the installation stud in a penetrating way, the pipeline is fixed through the pipe clamp body, the installation stud is inserted into the installation hole on a sheet metal part or a frame, the locking nut moves towards the pipe clamp body in a spiral way to abut against one of the first clamping sleeve body and the second clamping sleeve body to move towards the other, and clamp a sheet metal part or the frame arranged between the first clamping sleeve body and the second clamping sleeve body, so that the problem of poor reliability of the pipe clamp caused by, and the pipeline clamp assembly is suitable for sheet metal parts or frames with different thicknesses.

Description

Pipeline presss from both sides subassembly and car
Technical Field
The invention relates to the field of vehicle pipeline fixing, in particular to a pipeline clamp assembly and an automobile.
Background
Along with the increase of the functions of the whole automobile, the number of automobile pipelines is increased, and the safety and the reliability of the fixation of the automobile pipelines are of great importance to the electric safety of the whole automobile.
At present, after an automobile pipeline is clamped through a pipeline clamp, the pipeline clamp is fixed on a frame or a metal plate through a buckle, so that the problem that the reliability of the pipeline clamped and installed by the pipeline clamp is poor due to the fact that the pipeline clamp is easy to shake after the pipeline clamp is installed exists.
Disclosure of Invention
The invention mainly aims to provide a pipeline clamp assembly and an automobile, and aims to solve the problem that the reliability of a pipeline clamp for clamping a pipeline is poor due to the fact that the pipeline clamp is easy to shake after being installed.
To achieve the above object, the present invention provides a pipe clamp assembly, comprising:
the pipe clamp body is provided with a clamping hole for the pipeline to penetrate through;
the mounting body is arranged at one end of the pipe clamp body, a mounting stud extending back to the pipe clamp body is formed on the mounting body, and a locking nut is sleeved at the end part of the mounting stud; and the number of the first and second groups,
the clamping structure comprises a first clamping sleeve body and a second clamping sleeve body which are oppositely arranged and penetrate through the mounting stud;
the locking nut faces towards the pipe clamping body, moves spirally to abut against one of the first clamping sleeve body and the second clamping sleeve body, moves towards the other, adjusts the distance between the first clamping sleeve body and the second clamping sleeve body, and is used for clamping a sheet metal part or a frame between the first clamping sleeve body and the second clamping sleeve body.
Optionally, the pipe clamp body comprises a first clamp body and a second clamp body which are arranged oppositely, and one corresponding ends of the first clamp body and the second clamp body are rotatably connected, so that the other corresponding ends of the first clamp body and the second clamp body are buckled to form the clamping hole;
the mounting body comprises a first cylinder and a second main body which are oppositely arranged, and one end of each of the first cylinder and the second cylinder is fixed with the other end of the corresponding first clamp body and the other end of the corresponding second clamp body;
when the first clamp body and the second clamp body are buckled, the first cylinder and the second cylinder are buckled to form the mounting stud.
Optionally, the pipe clamp body includes a first clamp body and a second clamp body which are arranged oppositely, one ends of the first clamp body and the second clamp body which correspond to each other are connected into a whole, an elastic connection portion is arranged at a connection position of the first clamp body and the second clamp body, so that the first clamp body and the second clamp body are rotatably connected at the elastic connection portion, and the other ends of the first clamp body and the second clamp body which correspond to each other are buckled to form the clamping hole.
Optionally, a groove is formed in one side of the elastic connecting portion, which faces away from the mounting stud, so that the first clamp body and the second clamp body can move away from each other.
Optionally, the first clamping sleeve body and the mounting stud are integrally arranged; and/or the presence of a gas in the gas,
the second clamping sleeve body and the locking nut are integrally arranged.
Optionally, the inner ring of the first clamping sleeve body is fixed to the mounting stud, and the outer ring of the first clamping sleeve body is clamped between the inner ring of the first clamping sleeve body and the lock nut; and/or the presence of a gas in the gas,
the inner ring of the second clamping sleeve body is fixed on the lock nut, and the outer ring of the second clamping sleeve body is clamped between the inner ring of the second clamping sleeve body and the outer ring of the first clamping sleeve body.
Optionally, the first clamping sleeve body faces the surface of the locking nut and is convexly provided with a first convex rib, and the first convex rib is arranged along the radial extension of the mounting stud and is arranged along the circumferential interval of the mounting stud.
Optionally, the second clamping sleeve body faces the surface of the first clamping sleeve body and is convexly provided with a second convex rib, and the second convex rib is arranged along the radial extension of the mounting stud and is arranged along the circumferential interval of the mounting stud.
Optionally, the outer side wall of the clamping hole is provided with a threaded hole for being in threaded connection with a mounting stud of another pipeline clamp assembly.
To achieve the above object, the present invention also provides an automobile including a line clamp assembly, the line clamp assembly including:
the pipe clamp body is provided with a clamping hole for the pipeline to penetrate through;
the mounting body is arranged at one end of the pipe clamp body, a mounting stud extending back to the pipe clamp body is formed on the mounting body, and a locking nut is sleeved at the end part of the mounting stud; and the number of the first and second groups,
the clamping structure comprises a first clamping sleeve body and a second clamping sleeve body which are oppositely arranged and penetrate through the mounting stud;
the locking nut faces towards the pipe clamping body, moves spirally to abut against one of the first clamping sleeve body and the second clamping sleeve body, moves towards the other, adjusts the distance between the first clamping sleeve body and the second clamping sleeve body, and is used for clamping sheet metal parts arranged between the first clamping sleeve body and the second clamping sleeve body.
In the technical scheme provided by the invention, the pipeline is fixed through the pipe clamp body, the mounting stud is inserted into the mounting hole on the sheet metal part or the frame, because the end part of the mounting stud is sleeved with the locking nut which moves towards the pipe clamp body in a spiral way, so as to tightly abut against one of the first clamping sleeve body and the second clamping sleeve body and move towards the other to adjust the distance between the first clamping sleeve body and the second clamping sleeve body, the clamping device is used for clamping a sheet metal part or a frame arranged between the first clamping sleeve body and the second clamping sleeve body, so as to avoid the problem of poor reliability of pipeline clamping and assembling pipelines of the pipeline clamp due to easy shaking after the pipeline clamp assembly is installed, and the distance between the first clamping sleeve body and the second clamping sleeve body can be adjusted, so that the pipeline clamp assembly is suitable for sheet metal parts or frames with different thicknesses.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the structures shown in the drawings without creative efforts.
FIG. 1 is a perspective view of one embodiment of a wire clamp assembly provided by the present invention;
FIG. 2 is a schematic view of a first clamp body and a second clamp body of the wire clamp assembly shown in FIG. 1;
FIG. 3 is a schematic view of the open configuration of the first and second clamp bodies of the wire clamp assembly of FIG. 1;
FIG. 4 is a cross-sectional view of the wire clamp assembly of FIG. 1 mounted to a sheet metal part;
fig. 5 is a schematic structural view of a plurality of pipeline clamp assemblies assembled and mounted to a sheet metal part in fig. 1.
The reference numbers illustrate:
Figure BDA0002810180510000031
Figure BDA0002810180510000041
the implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that, if directional indications (such as up, down, left, right, front, and back … …) are involved in the embodiment of the present invention, the directional indications are only used to explain the relative positional relationship between the components, the movement situation, and the like in a specific posture (as shown in the drawing), and if the specific posture is changed, the directional indications are changed accordingly.
In addition, if there is a description of "first", "second", etc. in an embodiment of the present invention, the description of "first", "second", etc. is for descriptive purposes only and is not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, the meaning of "and/or" appearing throughout includes three juxtapositions, exemplified by "A and/or B" including either A or B or both A and B. In addition, technical solutions between various embodiments may be combined with each other, but must be realized by a person skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
Along with the increase of the functions of the whole automobile, the number of automobile pipelines is increased, and the safety and the reliability of the fixation of the automobile pipelines are of great importance to the electric safety of the whole automobile.
At present, after an automobile pipeline is clamped through a pipeline clamp, the pipeline clamp is fixed on a frame or a metal plate through a buckle, so that the problem that the reliability of the pipeline clamped and installed by the pipeline clamp is poor due to the fact that the pipeline clamp is easy to shake after the pipeline clamp is installed exists.
The invention provides a pipeline clamp assembly and an automobile, wherein fig. 1 to 5 are schematic structural diagrams of an embodiment of the pipeline clamp assembly provided by the invention.
Referring to fig. 1 to 3, the pipe clamp assembly 100 includes a pipe clamp body 1, a mounting body, and a clamping structure 3, the pipe clamp body 1 is formed with a clamping hole 11, for the pipeline to penetrate, the installation body is arranged at one end of the pipe clamp body 1, the installation body is formed with an installation stud 21 extending back to the pipe clamp body 1, the end part of the mounting stud 21 is sleeved with a locking nut 22, the clamping structure 3 comprises a first clamping sleeve body 31 and a second clamping sleeve body 32 which are oppositely arranged and penetrate through the mounting stud 21, the locking nut 22 spirally moves towards the pipe clamp body 1, so as to tightly abut against one of the first clamping sleeve body 31 and the second clamping sleeve body 32 and move towards the other to adjust the distance between the first clamping sleeve body 31 and the second clamping sleeve body 32, the clamping device is used for clamping a sheet metal part 1000 or a frame arranged between the first clamping sleeve body 31 and the second clamping sleeve body 32.
In the technical scheme provided by the invention, the pipeline is fixed through the pipe clamp body 1, the mounting stud 21 is inserted into the mounting hole on the sheet metal part 1000 or the frame, because the end of the mounting stud 21 is sleeved with a locking nut 22, the locking nut 22 is screwed towards the pipe clamp body 1, so as to tightly abut against one of the first clamping sleeve body 31 and the second clamping sleeve body 32 and move towards the other to adjust the distance between the first clamping sleeve body 31 and the second clamping sleeve body 32, is used for clamping the sheet metal part 1000 or the frame arranged between the first clamping sleeve body 31 and the second clamping sleeve body 32, avoids the problem that the pipeline clamp assembly 100 is easy to shake after being installed and causes poor reliability of pipeline clamping and installing, and because the distance between the first clamping sleeve body 31 and the second clamping sleeve body 32 can be adjusted, so that the clamp assembly 100 is suitable for sheet metal parts 1000 or frames of different thicknesses.
Referring to fig. 3, the pipe clamp 1 includes a first clamp 12 and a second clamp 13, which are opposite to each other, one end of the first clamp 12 corresponding to one end of the second clamp 13 is rotatably connected to the other end of the first clamp 12 corresponding to the other end of the second clamp 13 corresponding to the other end of the first clamp 11, the mounting member includes a first cylinder 23 and a second cylinder 24, which are opposite to each other, one end of the first cylinder 23 and one end of the second cylinder 24 are respectively fixed to the other end of the first clamp 12 corresponding to the other end of the second clamp 13, wherein when the first clamp 12 and the second clamp 13 are fastened, the first cylinder 23 and the second cylinder 24 are fastened to form the mounting stud 21, so as to facilitate mounting the pipe clamp assembly 100 to the mounting hole of the sheet metal part 1000 or the frame, and when the other ends of the first clamp 12 and the second clamp 13 are separated from each other, facilitating the mounting of the pipe to the clamping hole 11.
Specifically, in the embodiment of the present application, the pipe clamp 1 includes a first clamp 12 and a second clamp 13 that are disposed opposite to each other, corresponding ends of the first clamp 12 and the second clamp 13 are connected into a whole, and an elastic connection portion is disposed at a connection portion of the first clamp 12 and the second clamp 13, so that the first clamp 12 and the second clamp 13 are rotatably connected at the elastic connection portion, and corresponding other ends of the first clamp 12 and the second clamp 13 are fastened to form the clamping hole 11, so that the structure is simple.
Referring to fig. 3, in order to facilitate the separation of the other ends of the first clamp body 12 and the second clamp body 13, a groove 14 is formed on a side of the elastic connecting portion facing away from the mounting stud 21, so that the first clamp body 12 and the second clamp body 13 move away from each other, thereby facilitating the separation of the other ends of the first clamp body 12 and the second clamp body 13 for mounting the pipeline.
Specifically, in the embodiment of the present application, the first clamping sleeve body 31 and the mounting stud 21 are integrally disposed, so that the structure is simple, and the operation is simple when the sheet metal part 1000 or the frame is clamped.
Specifically, in the embodiment of the present application, the second clamping sleeve body 32 and the lock nut 22 are integrally disposed, so that the structure is simple, and the operation is simple when the sheet metal part 1000 or the frame is clamped.
Referring to fig. 4, the inner ring of the first clamping sleeve body 31 is fixed to the mounting stud 21, and the outer ring of the first clamping sleeve body 31 is clamped between the inner ring of the first clamping sleeve body 31 and the lock nut 22, so that the first clamping sleeve body 31 can be tightly abutted to the sheet metal part 1000 or the frame during installation, so that the pipeline clamp assembly 100 is stably installed and is not prone to shaking.
The inner ring of the second clamping sleeve body 32 is fixed to the lock nut 22, the outer ring of the second clamping sleeve body 32 is clamped between the inner ring of the second clamping sleeve body 32 and the outer ring of the first clamping sleeve body 31, and the second clamping sleeve body 32 is arranged in such a way that the second clamping sleeve body 32 can be tightly abutted to the sheet metal part 1000 or the frame when being installed, so that the pipeline clamp assembly 100 is stable to install and is not prone to shaking.
In order to avoid the pipeline presss from both sides the subassembly 100 installation back and rotates, first clamping sleeve body 31 orientation lock nut 22's the protruding first protruding muscle 311 that is equipped with in surface, first protruding muscle 311 is followed the radial extension of installation double-screw bolt 21 sets up and follows the circumference interval of installation double-screw bolt 21 sets up, so sets up, through first protruding muscle 311 with sheet metal component 1000 or frame contact have increased the pivoted resistance, thereby avoid the pipeline winding is led to in the rotation after the installation of pipeline presss from both sides subassembly 100.
In order to avoid the pipeline presss from both sides the installation back and rotates, the second clamping sleeve body 32 orientation the protruding muscle 321 that is equipped with of surface of the first clamping sleeve body 31, the protruding muscle 321 of second is followed the radial extension setting of installation double-screw bolt 21 just follows the circumference interval setting of installation double-screw bolt 21, so set up, through the protruding muscle 321 of second with sheet metal component 1000 or frame contact have increased the pivoted resistance, thereby avoid the pipeline winding is led to in the rotation after the installation of pipeline presss from both sides subassembly 100.
It should be noted that the first rib 311 and the second rib 321 may be present separately or simultaneously, and when the first rib 311 and the second rib 321 are present simultaneously, the rotation stopping effect on the pipe clamp assembly 100 is better.
Referring to fig. 5, the outer side wall of the clamping hole 11 is provided with a threaded hole 4, and the threaded hole 4 is used for being in threaded connection with the mounting stud 21 of another pipeline clamp assembly 100, so that the expansibility of the pipeline clamp assembly 100 is increased, one pipeline clamp assembly 100 can be assembled with a plurality of pipeline clamp assemblies 100, the problem that when the number of the mounting holes in the sheet metal part 1000 or the frame is limited, a plurality of pipelines can be simultaneously fixed is solved, and the effect is good.
In order to achieve the above object, the present invention further provides an automobile, where the automobile includes a pipeline clamp assembly 100, and the pipeline clamp assembly 100 adopts all the technical solutions of the above embodiments, so that the technical effects brought by the technical solutions of the above embodiments are also achieved, and are not described herein again.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention, and all modifications and equivalents of the present invention, which are made by the contents of the present specification and the accompanying drawings, or directly/indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (10)

1. A line clamp assembly, comprising:
the pipe clamp body is provided with a clamping hole for the pipeline to penetrate through;
the mounting body is arranged at one end of the pipe clamp body, a mounting stud extending back to the pipe clamp body is formed on the mounting body, and a locking nut is sleeved at the end part of the mounting stud; and the number of the first and second groups,
the clamping structure comprises a first clamping sleeve body and a second clamping sleeve body which are oppositely arranged and penetrate through the mounting stud;
the locking nut faces towards the pipe clamping body, moves spirally to abut against one of the first clamping sleeve body and the second clamping sleeve body, moves towards the other, adjusts the distance between the first clamping sleeve body and the second clamping sleeve body, and is used for clamping a sheet metal part or a frame between the first clamping sleeve body and the second clamping sleeve body.
2. The pipe clamp assembly of claim 1, wherein the pipe clamp body comprises a first clamp body and a second clamp body disposed opposite to each other, wherein corresponding ends of the first clamp body and the second clamp body are rotatably coupled to each other, such that the corresponding ends of the first clamp body and the second clamp body are engaged to form the clamping hole;
the mounting body comprises a first cylinder and a second main body which are oppositely arranged, and one end of each of the first cylinder and the second cylinder is fixed with the other end of the corresponding first clamp body and the other end of the corresponding second clamp body;
when the first clamp body and the second clamp body are buckled, the first cylinder and the second cylinder are buckled to form the mounting stud.
3. The pipe clamp assembly of claim 1, wherein the pipe clamp body comprises a first clamp body and a second clamp body that are disposed opposite to each other, wherein corresponding ends of the first clamp body and the second clamp body are integrally connected, and an elastic connection portion is disposed at a connection position of the first clamp body and the second clamp body, such that the first clamp body and the second clamp body are rotatably connected at the elastic connection portion, and corresponding other ends of the first clamp body and the second clamp body are fastened to form the clamping hole.
4. The line clamp assembly of claim 3, wherein a side of the resilient connecting portion facing away from the mounting stud is recessed to allow back movement of the first clamp body and the second clamp body.
5. The pipe clamp assembly of claim 1, wherein the first clamp sleeve body is integral with the mounting stud; and/or the presence of a gas in the gas,
the second clamping sleeve body and the locking nut are integrally arranged.
6. The pipe clamp assembly of claim 1, wherein an inner ring of the first clamping sleeve body is secured to the mounting stud and an outer ring of the first clamping sleeve body is clamped between the inner ring of the first clamping sleeve body and the lock nut; and/or the presence of a gas in the gas,
the inner ring of the second clamping sleeve body is fixed on the lock nut, and the outer ring of the second clamping sleeve body is clamped between the inner ring of the second clamping sleeve body and the outer ring of the first clamping sleeve body.
7. The pipe clamp assembly of claim 1, wherein a surface of the first clamp sleeve body facing the lock nut is provided with first ribs protruding therefrom, the first ribs extending radially of the mounting stud and being spaced circumferentially of the mounting stud.
8. The pipe clamp assembly of claim 1, wherein a second bead is disposed on a surface of the second clamping sleeve body facing the first clamping sleeve body, the second bead extending radially of the mounting stud and being spaced circumferentially of the mounting stud.
9. The pipe clamp assembly of claim 1, wherein an outer sidewall of the clamping bore is provided with a threaded bore for threaded connection with a mounting stud of another of the pipe clamp assemblies.
10. An automobile, comprising a pinch seal assembly as claimed in any one of claims 1 to 9.
CN202011385795.4A 2020-12-01 2020-12-01 Pipeline presss from both sides subassembly and car Pending CN112555511A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011385795.4A CN112555511A (en) 2020-12-01 2020-12-01 Pipeline presss from both sides subassembly and car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011385795.4A CN112555511A (en) 2020-12-01 2020-12-01 Pipeline presss from both sides subassembly and car

Publications (1)

Publication Number Publication Date
CN112555511A true CN112555511A (en) 2021-03-26

Family

ID=75047049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011385795.4A Pending CN112555511A (en) 2020-12-01 2020-12-01 Pipeline presss from both sides subassembly and car

Country Status (1)

Country Link
CN (1) CN112555511A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004150547A (en) * 2002-10-31 2004-05-27 Furukawa Electric Co Ltd:The Piping support member
CN101865331A (en) * 2010-06-18 2010-10-20 重庆长安汽车股份有限公司 Combined lathedog for fixing harnesses and pipelines
CN204592578U (en) * 2015-03-31 2015-08-26 上海汽车集团股份有限公司 The adjustable flexible pipe pipe clamp in combined type aperture
CN204986027U (en) * 2015-09-30 2016-01-20 安徽江淮汽车股份有限公司 Light truck and pipeline clamping device thereof
CN205090096U (en) * 2015-11-13 2016-03-16 上海汽车集团股份有限公司 Isolating device and vehicle of stem
CN106794812A (en) * 2014-10-17 2017-05-31 罗伯特·博世有限公司 The fixing device for wire in vehicle
CN206361258U (en) * 2016-12-28 2017-07-28 安徽江淮汽车集团股份有限公司 A kind of pipeline wire harness Duct fixing clamp component
CN206496087U (en) * 2017-01-22 2017-09-15 东风商用车有限公司 A kind of pipe clamp fixed for pipeline
CN208010818U (en) * 2018-01-03 2018-10-26 扬州凯润弹簧科技有限公司 A kind of flank of tooth preload disc spring
CN208348674U (en) * 2018-04-28 2019-01-08 宁波广优机械有限公司 One kind is easy to install to combine pipe clamp
WO2020208170A1 (en) * 2019-04-12 2020-10-15 Volkswagen Aktiengesellschaft Assembly clip and parking brake

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004150547A (en) * 2002-10-31 2004-05-27 Furukawa Electric Co Ltd:The Piping support member
CN101865331A (en) * 2010-06-18 2010-10-20 重庆长安汽车股份有限公司 Combined lathedog for fixing harnesses and pipelines
CN106794812A (en) * 2014-10-17 2017-05-31 罗伯特·博世有限公司 The fixing device for wire in vehicle
CN204592578U (en) * 2015-03-31 2015-08-26 上海汽车集团股份有限公司 The adjustable flexible pipe pipe clamp in combined type aperture
CN204986027U (en) * 2015-09-30 2016-01-20 安徽江淮汽车股份有限公司 Light truck and pipeline clamping device thereof
CN205090096U (en) * 2015-11-13 2016-03-16 上海汽车集团股份有限公司 Isolating device and vehicle of stem
CN206361258U (en) * 2016-12-28 2017-07-28 安徽江淮汽车集团股份有限公司 A kind of pipeline wire harness Duct fixing clamp component
CN206496087U (en) * 2017-01-22 2017-09-15 东风商用车有限公司 A kind of pipe clamp fixed for pipeline
CN208010818U (en) * 2018-01-03 2018-10-26 扬州凯润弹簧科技有限公司 A kind of flank of tooth preload disc spring
CN208348674U (en) * 2018-04-28 2019-01-08 宁波广优机械有限公司 One kind is easy to install to combine pipe clamp
WO2020208170A1 (en) * 2019-04-12 2020-10-15 Volkswagen Aktiengesellschaft Assembly clip and parking brake

Similar Documents

Publication Publication Date Title
JPH0342311Y2 (en)
US7887012B2 (en) Insert for tube retaining bracket
US8381368B2 (en) Vehicle clip centering device and method
CA2369309A1 (en) Running boards and methods of constructing a running board
US6435523B1 (en) Surrogate top tube
US6486843B2 (en) On-vehicle rod antenna device
US9639112B2 (en) Mounting assembly for electronic throttle control assembly
JP4371897B2 (en) Vehicle battery fixing structure
US20180320720A1 (en) Drive assembly for a vehicle accessory including a multipurpose coupler
CN112555511A (en) Pipeline presss from both sides subassembly and car
EP3038861B1 (en) Socket joint with integrated tube anchors
JP2516527Y2 (en) Wire harness grommet
CN210050401U (en) Pipeline fixing pipe clamp and vehicle with same
CN221049442U (en) Sealing buckle and vehicle
CN217232331U (en) Curtain wall decoration windmill and curtain wall
CN216215521U (en) Prevent trampling pencil structure
CN220382648U (en) Pipe hoop structure and vehicle
CN212556072U (en) Well accuse screen installing support and car
CN215752259U (en) Pipe clamp, wire harness assembly and automobile
CN219192105U (en) Mounting structure and vehicle of plaque in door
CN219427978U (en) A car seat that is used for car seat face cover buckle device and contains it
CN216406469U (en) Vehicle door limiter support and vehicle door limiter
CN219277300U (en) Fastening device for fixing and inserting automobile seat surface sleeve and automobile seat with fastening device
CN220505994U (en) Pipe clamp
CN211314363U (en) Vibration damping device for electronic water pump and vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210326