CN112554054A - Combined bridge deck structure of large-span bridge and construction method thereof - Google Patents

Combined bridge deck structure of large-span bridge and construction method thereof Download PDF

Info

Publication number
CN112554054A
CN112554054A CN202011563928.2A CN202011563928A CN112554054A CN 112554054 A CN112554054 A CN 112554054A CN 202011563928 A CN202011563928 A CN 202011563928A CN 112554054 A CN112554054 A CN 112554054A
Authority
CN
China
Prior art keywords
steel
transverse
deck structure
bridge
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011563928.2A
Other languages
Chinese (zh)
Inventor
彭旭民
郭福宽
周尚猛
肖昌量
郝聪龙
崔冰
王朝
王伟
王岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Bridge Science Research Institute Ltd
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
China Railway Bridge Science Research Institute Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, China Railway Bridge Science Research Institute Ltd filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN202011563928.2A priority Critical patent/CN112554054A/en
Publication of CN112554054A publication Critical patent/CN112554054A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本申请涉及一种大跨径桥梁的组合桥面结构及其施工方法,涉及桥梁施工技术领域,包括:正交异性板;铺设在正交异性板上的超高性能混凝土层;埋设于超高性能混凝土层中的连接组件,其包括:多个沿横桥向间隔分布的钢板组,每个钢板组包括多个沿顺桥向间隔分布的钢板,钢板的底部固连于正交异性板上,顶部开设有多个沿顺桥向间隔分布的开口槽;若干个剪力钉,剪力钉竖直设置在正交异性板上;单层的钢筋网,包括多个第一横向钢筋和多个纵向钢筋,第一横向钢筋与纵向钢筋纵横交错布置,且第一横向钢筋搁置在开口槽中。本申请既能改善正交异性板的局部力学性能和整体力学性能,且不明显增加组合桥面结构重量,还提高组合桥面结构的跨越能力。

Figure 202011563928

The application relates to a composite deck structure of a long-span bridge and a construction method thereof, and relates to the technical field of bridge construction, including: an orthotropic slab; an ultra-high-performance concrete layer laid on the orthotropic slab; A connection assembly in a performance concrete layer, which includes: a plurality of steel plate groups spaced along the transverse bridge direction, each steel plate group includes a plurality of steel plates spaced along the bridge direction, and the bottom of the steel plate is fixed on the orthotropic plate , the top is provided with a plurality of open grooves spaced along the bridge direction; a number of shear nails, the shear nails are vertically arranged on the orthotropic plate; the single-layer steel mesh includes a plurality of first transverse steel bars and a plurality of There are longitudinal reinforcement bars, the first transverse reinforcement bars and the longitudinal reinforcement bars are arranged in a crisscross pattern, and the first transverse reinforcement bars are placed in the opening grooves. The present application can not only improve the local mechanical properties and the overall mechanical properties of the orthotropic plate, but not significantly increase the weight of the composite bridge deck structure, but also improve the spanning capacity of the composite bridge deck structure.

Figure 202011563928

Description

Combined bridge deck structure of large-span bridge and construction method thereof
Technical Field
The application relates to the technical field of bridge construction, in particular to a combined bridge deck structure of a large-span bridge and a construction method thereof.
Background
The main beam form of the large-span bridge generally adopts a composite structure of a steel box girder and an orthotropic plate, and the orthotropic bridge deck has low rigidity and is variable, so that the phenomena of fatigue cracking and pavement layer damage are easy to occur.
In the related art, a steel-ultrahigh performance concrete combined bridge deck structure with a short reinforcing steel bar shear-resistant structure is disclosed, and the combined bridge deck structure comprises a steel bridge deck layer and an ultrahigh performance concrete layer poured above the steel bridge deck layer, wherein the steel bridge deck layer is fixedly connected with the short reinforcing steel bar shear-resistant structure, the short reinforcing steel bar shear-resistant structure comprises a plurality of short reinforcing steel bars fixedly connected to the upper surface of the steel bridge deck layer, the short reinforcing steel bars are horizontally arranged along the bridge direction, and the short reinforcing steel bar shear-resistant structure is embedded in the ultrahigh performance concrete layer. The combined bridge deck structure can reduce the thickness of the ultra-high performance concrete layer and reduce the dead weight of the bridge deck, and the shear key structure is small in size and simple in construction process, and is suitable for large-span flexible bridges sensitive to the dead weight of the bridges.
The arrangement of the short steel bars in the related technology improves the local rigidity of the orthotropic bridge deck, and can relieve the fatigue cracking problem to a certain extent, however, the technical scheme can not solve the problem of the overall rigidity of the orthotropic slab. Although the overall rigidity of the steel-concrete composite beam is high, the weight of the steel-concrete composite beam is also high, and the spanning capability is influenced to a certain extent.
Disclosure of Invention
The embodiment of the application provides a combined bridge deck structure of a large-span bridge and a construction method thereof, and aims to solve the problem that the whole rigidity of the combined bridge deck structure cannot be ensured and the weight cannot be increased remarkably in the related technology.
In a first aspect, there is provided a composite deck structure for a large span bridge, comprising:
an orthotropic plate;
an ultra-high performance concrete layer laid on the orthotropic plate;
the coupling assembling of burying in ultra high performance concrete layer, it includes:
the steel plate groups are distributed at intervals along the transverse bridge direction, each steel plate group comprises a plurality of steel plates distributed at intervals along the bridge direction, the bottoms of the steel plates are fixedly connected to the orthotropic plates, and the tops of the steel plates are provided with a plurality of open grooves distributed at intervals along the bridge direction;
the shear nails are vertically arranged on the orthotropic plates;
the single-layer reinforcing mesh comprises a plurality of first transverse reinforcing steel bars and a plurality of longitudinal reinforcing steel bars, wherein the first transverse reinforcing steel bars and the longitudinal reinforcing steel bars are arranged in a criss-cross mode, and the first transverse reinforcing steel bars are placed in the open grooves.
In some embodiments, the opening groove includes a circular through hole and an opening above the circular through hole, the opening is communicated with the circular through hole, and a diameter of the opening is smaller than a diameter of the circular through hole.
In some embodiments, the ultra-high performance concrete layer comprises steel fibers, and the length of the steel fibers is no more than 12 mm; meanwhile, the caliber of the opening is larger than the diameter of the first transverse steel bar by 2-4 mm, and the diameter of the circular through hole is 25-35 mm.
In some embodiments, the mesh reinforcement further comprises:
the second transverse steel bars and the longitudinal steel bars are arranged in a criss-cross mode, and at least one second transverse steel bar is arranged between every two adjacent steel plates.
In some embodiments, the orthotropic plate includes a deck plate and a plurality of longitudinal stiffeners spaced apart along a transverse bridge direction on a lower surface of the deck plate.
In some embodiments, the longitudinal stiffeners are U-shaped ribs, I-shaped ribs, or inverted T-shaped ribs.
In some embodiments, all the shear nails are divided into a plurality of shear nail groups distributed at intervals in the transverse bridge direction, each shear nail group comprises a plurality of shear nails distributed at intervals in the bridge direction, and the shear nails are vertically arranged on the upper surface of the bridge deck.
In some embodiments, at least one of the steel plate sets is disposed between two adjacent longitudinal stiffeners.
In some embodiments, the shear nails are the same height as the steel plate.
In a second aspect, there is provided a construction method of the composite deck structure of the large-span bridge, the construction method comprising the steps of:
a plurality of open slots which are longitudinally distributed at intervals are formed in each steel plate in advance;
erecting an orthotropic plate;
marking the positions of a steel plate to be installed and a shear nail on the orthotropic plate, and correspondingly installing the steel plate and the shear nail;
transversely placing each first transverse steel bar in the open slot, and connecting longitudinal steel bars on the first transverse steel bars to form a single-layer steel bar mesh;
and installing a template at the boundary of the reinforcing mesh, pouring ultra-high performance concrete in the template, and forming an ultra-high performance concrete layer after the ultra-high performance concrete is hardened.
The beneficial effect that technical scheme that this application provided brought includes: the composite bridge deck structure has the advantages that the local mechanical property of the orthotropic plates can be improved, the overall mechanical property of the orthotropic plates can be guaranteed, the weight of the composite bridge deck structure can not be obviously increased, and the spanning capacity of the composite bridge deck structure is improved.
The embodiment of the application provides a combined bridge deck structure of a large-span bridge and a construction method thereof, wherein a connecting assembly is arranged on an orthotropic plate, the connecting assembly comprises a plurality of steel plates, a plurality of shear nails and a layer of reinforcing mesh, the steel plates are vertically and horizontally dispersed on the orthotropic plate, first transverse reinforcing steel bars are placed in open slots on the steel plates to connect the steel plates which are distributed at intervals along the transverse bridge direction, the steel plates and the first transverse reinforcing steel bars form a PBL shear key structure, the orthotropic plate and an ultrahigh-performance concrete layer are effectively and reliably connected, the shear force generated by the integral stress of the combined bridge deck structure can be borne, the integral rigidity of the combined bridge deck structure is improved, the integral stress performance of the combined bridge deck structure is improved, meanwhile, the plurality of shear nails on the orthotropic plate can improve the local rigidity of the combined bridge deck structure, and the thinner ultrahigh-performance concrete layer can ensure that the stress performance of the combined bridge deck structure, therefore, the combined bridge deck structure has lighter self weight and is more suitable for being applied to bridges with larger spans.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic view of a composite deck structure of a first large-span bridge according to an embodiment of the present application;
FIG. 2 is a schematic view of a combined deck structure (between poured ultra-high performance concrete) of a first large-span bridge according to an embodiment of the present application; (ii) a
FIG. 3 is a schematic view of a steel plate;
FIG. 4 is a schematic view of a second composite deck structure of a large-span bridge according to an embodiment of the present application;
FIG. 5 is a schematic view of a third composite deck structure for a large span bridge according to an embodiment of the present application;
in the figure: 1. an orthotropic plate; 11. a bridge deck; 12. a longitudinal stiffener; 2. an ultra-high performance concrete layer; 3. a connecting assembly; 31. a steel plate; 310. an open slot; 3101. a circular through hole; 3102. an opening; 32. shear nails; 33. a reinforcing mesh; 331. a first transverse reinforcement bar; 332. longitudinal reinforcing steel bars; 333. a second transverse reinforcement.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The embodiment of the application provides a combined bridge deck structure of a large-span bridge, which can improve the local mechanical property of an orthotropic plate, ensure the overall mechanical property of the orthotropic plate, and improve the spanning capacity of the combined bridge deck structure without obviously increasing the weight of the combined bridge deck structure.
As shown in fig. 1, an embodiment of the present application provides a composite deck structure of a large-span bridge, including:
an orthotropic plate 1;
an ultra-high performance concrete layer 2 laid on the orthotropic plate 1;
a connection assembly 3 embedded in the ultra-high performance concrete layer 2, comprising:
the steel plate groups are distributed at intervals along the transverse bridge direction, each steel plate group comprises a plurality of steel plates 31 distributed at intervals along the bridge direction, the bottoms of the steel plates 31 are fixedly connected to the orthotropic plates 1, and the tops of the steel plates are provided with a plurality of open grooves 310 distributed at intervals along the bridge direction;
the shear nails 32 are vertically arranged on the orthotropic plate 1;
the single-layered mesh reinforcement 33 includes a plurality of first transverse reinforcing bars 331 and a plurality of longitudinal reinforcing bars 332, the first transverse reinforcing bars 331 are arranged to be criss-cross with the longitudinal reinforcing bars 332, and the first transverse reinforcing bars 331 are rested in the open slots 310.
The embodiment of the application provides a combined bridge deck structure of a large-span bridge, which comprises an orthotropic plate 1, an ultrahigh-performance concrete layer 2 and a connecting assembly 3 embedded in the ultrahigh-performance concrete layer 2, wherein the ultrahigh-performance concrete layer 2 is laid on the orthotropic plate 1 and is connected with the orthotropic plate 1 through the connecting assembly 3, and the connecting assembly 3 comprises a steel plate 31, a shear nail 32 and a reinforcing mesh 33; wherein the shear nails 32 are vertically arranged on the upper surface of the orthotropic plate 1, and the plurality of shear nails 32 on the orthotropic plate 1 can improve the local rigidity of the combined bridge deck structure; meanwhile, the reinforcing mesh 33 comprises first transverse reinforcing bars 331 and longitudinal reinforcing bars 332 which are arranged in a criss-cross manner, and the first transverse reinforcing bars 331 are arranged in the open slots 310 in the steel plates 31 in a penetrating manner to form a PBL shear key structure, so that the orthotropic plates 1 and the ultrahigh-performance concrete layer 2 are effectively and reliably connected, and the shear force generated by the integral stress of the combined bridge deck structure can be borne, the integral rigidity of the combined bridge deck structure is improved, and the integral stress performance of the combined bridge deck structure is improved; and moreover, the ultra-high performance concrete is adopted as the paving part on the orthotropic plate 1, and the single-layer reinforcing mesh 33 can be arranged, so that the thickness of the ultra-high performance concrete layer 2 is smaller, and the stress performance of the combined bridge deck structure can meet the requirement, therefore, the combined bridge deck structure has lighter self weight, and is more suitable for being applied to bridges with larger spans.
In this embodiment, each a plurality of steel sheets 31 in the steel sheet group are along following the bridge to interval distribution, adopt the steel sheet 31 that has open slot 310, can solve the difficult problem of perforation when laying reinforcing bar net 33, simultaneously, along following bridge to interval distribution a plurality of steel sheets 31 and avoiding the round hole mistake hole problem that rectangular steel sheet welded fastening warp and arouse, the construction is more convenient.
Specifically, the opening groove 310 includes a circular through hole 3101 and an opening 3102 above the circular through hole 3101, the opening 3102 is in communication with the circular through hole 3101, and the aperture of the opening 3102 is smaller than the diameter of the circular through hole 3101. In this embodiment, the circular through hole 3101 is further provided with an opening 3102, so that the first transverse steel bar 331 is conveniently arranged on the plurality of steel plates 31 arranged along the transverse bridge direction in a penetrating manner, and the steel plates 31 and the first transverse steel bar 331 can form a PBL shear key through rapid construction, so that the overall force transmission performance is more reliable.
In this embodiment, the distance between the steel plates 31 along the transverse bridge direction is 550-650 mm, and the clear distance along the bridge direction is 100-200 mm. Meanwhile, the thickness of the steel plate 31 is 8-12 mm, the height is 45-60 mm, and the length is 400-600 mm.
Specifically, the ultra-high performance concrete layer 2 comprises steel fibers, and the length of the steel fibers is not more than 12 mm; meanwhile, the aperture of the opening 3102 is 2-4 mm larger than the diameter of the first transverse steel bar 331, and the aperture of the circular through hole 3101 is 25-35 mm.
In this embodiment, when the length of the steel fiber in the ultra-high performance concrete is not more than 12mm, the length of the steel fiber can be matched with the size of the first transverse steel bar 331 and the size of the open slot 310 on the steel plate 31, meanwhile, the diameter of the circular through hole 3101 is 25-35 mm, the diameter of the opening 3102 is larger than the diameter of the first transverse steel bar 331 by 2-4 mm, and the hole pitch of the circular through hole 3101 is 50-100 mm, so that the ultra-high performance concrete layer 2 meets the compactness of the combined bridge deck structure, and the combined bridge deck structure is determined to have good mechanical properties.
More specifically, the thickness of the ultrahigh-performance concrete layer 2 is 60-100 mm, the combined bridge deck structure can meet the design requirement at the thickness, if the thickness is less than 60mm, the combined bridge deck structure belongs to a light combined bridge deck structure, the shearing requirement can be met by only adopting shear nails generally, PBL shear keys are not needed, but the problems of fatigue cracking and insufficient integral rigidity of orthotropic plates cannot be thoroughly solved by the light combined bridge deck structure; if the thickness exceeds 100mm, the thickness is too thick, and the self weight of the combined bridge deck structure is too large. And in order to ensure that the quality of the ultra-high performance concrete layer 2 in the combined bridge deck structure meets the requirement of the structural stress performance, the ultra-high performance concrete with expansibility of more than 600mm, compressive strength of more than 100MPa, flexural strength of more than 20MPa and steam curing-free property is adopted.
Further, the mesh reinforcement 33 further includes:
and a plurality of second transverse reinforcing bars 333, wherein the second transverse reinforcing bars 333 are arranged in a criss-cross manner with the longitudinal reinforcing bars 332, and at least one second transverse reinforcing bar 333 is arranged between two adjacent steel plates 31.
In this embodiment, the first transverse reinforcement 331, the second transverse reinforcement 333, and the longitudinal reinforcement 332 are arranged in a criss-cross manner, and the reinforcement mesh 33 is only disposed on one layer of the ultra-high performance concrete layer 2 to meet the design requirement, and the structure is simple and the laying efficiency is high. If the common steel fiber concrete is adopted, the strength is lower, and the reinforcement content has to be increased to increase the crack resistance.
In this embodiment, according to the design requirement of the combined bridge deck structure, preferably, the steel bars in the steel bar mesh 33 are all arranged in a full length, the steel bar spacing is 50-100 mm, and the diameter is 8-12 mm.
Further, the orthotropic plate 1 comprises a bridge deck 11 and a plurality of longitudinal stiffeners 12, and the plurality of longitudinal stiffeners 12 are distributed on the lower surface of the bridge deck 11 at intervals along the transverse bridge direction. In this embodiment, the orthotropic plate 1 further comprises a transverse stiffener, and the structure and arrangement of the transverse stiffener can adopt any one of the prior art, and will not be described in detail herein.
Preferably, the longitudinal stiffeners 12 are U-shaped, I-shaped, or inverted T-shaped. In this embodiment, the ultra-high performance concrete layer 2 and the connecting assembly 3 on the orthotropic plate 1 have good mechanical properties in terms of overall strength and local strength, so that a plurality of different types of longitudinal stiffening ribs can be used, and the longitudinal stiffening ribs are preferably U-shaped ribs, I-shaped ribs or inverted T-shaped ribs. As shown in FIG. 1, in this embodiment, the longitudinal stiffeners 12 are U-shaped ribs; as shown in FIG. 4, in this embodiment, the longitudinal stiffeners 12 are I-shaped ribs; as shown in fig. 5, in this embodiment, the longitudinal stiffeners 12 are inverted T-shaped ribs.
Preferably, all the shear nails 32 are divided into a plurality of shear nail groups distributed at intervals along the transverse bridge direction, each shear nail group comprises a plurality of shear nails 32 distributed at intervals along the bridge direction, and the shear nails 32 are vertically arranged on the upper surface of the bridge deck 11.
In this embodiment, the shear nails 32 are cylindrical head weld nails, and are flexible shear keys, the shear force of the shear nails is weak, and the local mechanical property of the combined bridge deck structure is mainly improved, so that the shear nails 32 are arranged in order vertically and horizontally, on one hand, the construction can be performed quickly, on the other hand, the local stress can be improved in order, and in order to meet the design requirement, the space between the plurality of shear nails 32 distributed at intervals along the bridge direction is 200-400 mm.
Further, at least one steel plate group is arranged between two adjacent longitudinal stiffeners 12. In this embodiment, adjacent two be equipped with one between the vertical stiffening rib 12 steel sheet group, and be equipped with a shear force nail group between two adjacent steel sheet group, its coupling assembling 3's structural design is reasonable, can guarantee the atress performance on whole and part, need not closely can reach the designing requirement with coupling assembling 3's internal structure design, has reduced the construction consumptive material, has improved economic benefits.
Further, the shear pins 32 are the same height as the steel plate 31. In the embodiment, the height of the shear nail 32 is 45-60 mm, and the diameter can be 13, 16 or 19 mm.
The embodiment of the application also provides a construction method of the combined bridge deck structure of the large-span bridge, which comprises the following steps:
a plurality of open grooves 310 which are longitudinally distributed at intervals are formed in each steel plate 31 in advance;
erecting an orthotropic plate 1;
marking the positions of steel plates 31 to be installed and shear nails 32 on the orthotropic plate 1, and correspondingly installing the steel plates 31 and the shear nails 32, so that all the steel plates 31 are distributed on the orthotropic plate 1 in a longitudinal and transverse manner, and the shear nails 32 are dispersedly arranged to improve the local shear resistance;
transversely placing each first transverse bar 331 in the open slot 310 and connecting the longitudinal bars 332 on the first transverse bars 331 to form a single-layer bar mesh 33;
and installing a template at the boundary of the reinforcing mesh 33, pouring ultra-high performance concrete into the template, and forming the ultra-high performance concrete layer 2 after the ultra-high performance concrete is hardened.
In the embodiment, the method is easy to implement, and the combined bridge deck structure manufactured by the construction method can improve the mechanical properties on the whole and the part on the premise of not improving the weight of the combined bridge deck structure.
Furthermore, in the process of forming the single-layer reinforcing mesh 33, firstly placing cushion blocks on the orthotropic plate 1, installing first transverse reinforcing steel bars 331 in the steel plates 31 distributed along the transverse bridge direction, then placing second transverse reinforcing steel bars 333 between two adjacent steel plates 31 along the bridge direction, finally placing longitudinal reinforcing steel bars along the bridge direction, and binding by binding wires to form the criss-cross reinforcing mesh 33.
Furthermore, in the process of pouring the ultrahigh-performance concrete, vibration leveling operation is also carried out, the ultrahigh-performance concrete layer is guaranteed to be compact and free of holes, the surface is collected and leveled in time, a health-preserving film is covered, and moisture preservation and maintenance are carried out.
In the description of the present application, it should be noted that the terms "upper", "lower", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are only for convenience in describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and operate, and thus, should not be construed as limiting the present application. Unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are intended to be inclusive and mean, for example, that they may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
It is noted that, in the present application, relational terms such as "first" and "second", and the like, are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The above description is merely exemplary of the present application and is presented to enable those skilled in the art to understand and practice the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1.一种大跨径桥梁的组合桥面结构,其特征在于,包括:1. the composite deck structure of a long-span bridge, is characterized in that, comprises: 正交异性板(1);Orthotropic plate (1); 铺设在所述正交异性板(1)上的超高性能混凝土层(2);an ultra-high performance concrete layer (2) laid on the orthotropic panel (1); 埋设于所述超高性能混凝土层(2)中的连接组件(3),其包括:The connecting assembly (3) embedded in the ultra-high performance concrete layer (2), comprising: 多个沿横桥向间隔分布的钢板组,每个钢板组包括多个沿顺桥向间隔分布的钢板(31),所述钢板(31)的底部固连于所述正交异性板(1)上,顶部开设有多个沿顺桥向间隔分布的开口槽(310);A plurality of steel plate groups distributed at intervals along the transverse bridge direction, each steel plate group comprising a plurality of steel plates (31) spaced along the bridge direction, the bottoms of the steel plates (31) being fastened to the orthotropic plate (1) ), the top is provided with a plurality of open slots (310) spaced along the bridge direction; 若干个剪力钉(32),所述剪力钉(32)竖直设置在所述正交异性板(1)上;a plurality of shear nails (32), the shear nails (32) being vertically arranged on the orthotropic plate (1); 单层的钢筋网(33),包括多个第一横向钢筋(331)和多个纵向钢筋(332),所述第一横向钢筋(331)与所述纵向钢筋(332)纵横交错布置,且所述第一横向钢筋(331)搁置在所述开口槽(310)中。A single-layer reinforcement mesh (33), comprising a plurality of first transverse reinforcement bars (331) and a plurality of longitudinal reinforcement bars (332), the first transverse reinforcement bars (331) and the longitudinal reinforcement bars (332) are arranged in a crisscross pattern, and The first transverse reinforcement bar (331) rests in the open slot (310). 2.如权利要求1所述的大跨径桥梁的组合桥面结构,其特征在于,所述开口槽(310)包括圆形通孔(3101)和该圆形通孔(3101)上方的开口(3102),所述开口(3102)与所述圆形通孔(3101)导通,且所述开口(3102)的口径小于所述圆形通孔(3101)的直径。2 . The composite deck structure of a long-span bridge according to claim 1 , wherein the opening groove ( 310 ) comprises a circular through hole ( 3101 ) and an opening above the circular through hole ( 3101 ). 3 . (3102), the opening (3102) communicates with the circular through hole (3101), and the diameter of the opening (3102) is smaller than the diameter of the circular through hole (3101). 3.如权利要求2所述的大跨径桥梁的组合桥面结构,其特征在于,所述超高性能混凝土层(2)包括钢纤维,且所述钢纤维的长度不超过12mm;同时,所述开口(3102)的口径大于所述第一横向钢筋(331)直径2~4mm,所述圆形通孔(3101)的孔径为25~35mm。3. The composite deck structure of a long-span bridge as claimed in claim 2, wherein the ultra-high performance concrete layer (2) comprises steel fibers, and the length of the steel fibers does not exceed 12 mm; at the same time, The diameter of the opening (3102) is larger than the diameter of the first transverse reinforcement bar (331) by 2-4 mm, and the diameter of the circular through hole (3101) is 25-35 mm. 4.如权利要求1所述的大跨径桥梁的组合桥面结构,其特征在于,所述钢筋网(33)还包括:4. The composite deck structure of a large-span bridge as claimed in claim 1, wherein the steel mesh (33) further comprises: 多个第二横向钢筋(333),所述第二横向钢筋(333)与所述纵向钢筋(332)纵横交错布置,且相邻的两个所述钢板(31)之间至少设有一个所述第二横向钢筋(333)。A plurality of second transverse steel bars (333), the second transverse steel bars (333) and the longitudinal steel bars (332) are arranged in a crisscross pattern, and at least one of the two adjacent steel plates (31) is provided. Describe the second transverse reinforcement (333). 5.如权利要求1所述的大跨径桥梁的组合桥面结构,其特征在于,所述正交异性板(1)包括桥面板(11)和多个纵向加劲肋(12),多个所述纵向加劲肋(12)沿横桥向间隔分布于所述桥面板(11)的下表面上。5. The composite deck structure of a long-span bridge according to claim 1, wherein the orthotropic plate (1) comprises a deck (11) and a plurality of longitudinal stiffeners (12), a plurality of The longitudinal stiffening ribs (12) are distributed on the lower surface of the bridge deck (11) at intervals along the transverse bridge direction. 6.如权利要求5所述的大跨径桥梁的组合桥面结构,其特征在于,所述纵向加劲肋(12)为U型肋、I型肋或倒T型肋。6. The composite deck structure of a long-span bridge according to claim 5, wherein the longitudinal stiffening rib (12) is a U-shaped rib, an I-shaped rib or an inverted T-shaped rib. 7.如权利要求5所述的大跨径桥梁的组合桥面结构,其特征在于,所有所述剪力钉(32)划分为多个沿横桥向间隔分布的的剪力钉组,且每个所述剪力钉组包括多个沿顺桥向间隔分布的剪力钉(32),所述剪力钉(32)竖直设在所述桥面板(11)的上表面。7. The composite deck structure of a long-span bridge according to claim 5, wherein all the shear studs (32) are divided into a plurality of shear stud groups distributed at intervals along the transverse bridge direction, and Each of the shear stud groups includes a plurality of shear studs (32) spaced along the bridge direction, and the shear studs (32) are vertically arranged on the upper surface of the bridge deck (11). 8.如权利要求7所述的大跨径桥梁的组合桥面结构,其特征在于,相邻的两个所述纵向加劲肋(12)之间至少设有一个所述钢板组。8. The composite deck structure of a long-span bridge according to claim 7, characterized in that, at least one steel plate group is provided between two adjacent longitudinal stiffeners (12). 9.如权利要求7所述的大跨径桥梁的组合桥面结构,其特征在于,所述剪力钉(32)与所述钢板(31)的高度相同。9 . The composite deck structure of a long-span bridge according to claim 7 , wherein the shear nails ( 32 ) and the steel plates ( 31 ) have the same height. 10 . 10.一种如权利要求1~9任意一项所述的大跨径桥梁的组合桥面结构的施工方法,其特征在于,所述施工方法包括步骤:10. A construction method for a composite deck structure of a long-span bridge according to any one of claims 1 to 9, wherein the construction method comprises the steps of: 预先在各个钢板(31)上开设纵向间隔分布的多个开口槽(310);A plurality of open grooves (310) distributed longitudinally at intervals are provided on each steel plate (31) in advance; 架设正交异性板(1);erecting an orthotropic plate (1); 在所述正交异性板(1)上标记待安装的钢板(31)和剪力钉(32)的位置,并对应安装所述钢板(31)和所述剪力钉(32);Mark the positions of the steel plate (31) and the shear nail (32) to be installed on the orthotropic plate (1), and install the steel plate (31) and the shear nail (32) correspondingly; 横向放置各个第一横向钢筋(331)在开口槽(310)中,并在所述第一横向钢筋(331)上连接纵向钢筋(332)以形成单层的钢筋网(33);transversely placing each first transverse reinforcement bar (331) in the opening groove (310), and connecting longitudinal reinforcement bars (332) on the first transverse reinforcement bar (331) to form a single-layer reinforcement mesh (33); 在所述钢筋网(33)边界安装模板,并在所述模板中浇注超高性能混凝土,待所述超高性能混凝土硬化后,形成超高性能混凝土层(2)。A formwork is installed on the boundary of the reinforcing mesh (33), and ultra-high-performance concrete is poured into the formwork, and after the ultra-high-performance concrete is hardened, an ultra-high-performance concrete layer (2) is formed.
CN202011563928.2A 2020-12-25 2020-12-25 Combined bridge deck structure of large-span bridge and construction method thereof Withdrawn CN112554054A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011563928.2A CN112554054A (en) 2020-12-25 2020-12-25 Combined bridge deck structure of large-span bridge and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011563928.2A CN112554054A (en) 2020-12-25 2020-12-25 Combined bridge deck structure of large-span bridge and construction method thereof

Publications (1)

Publication Number Publication Date
CN112554054A true CN112554054A (en) 2021-03-26

Family

ID=75032406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011563928.2A Withdrawn CN112554054A (en) 2020-12-25 2020-12-25 Combined bridge deck structure of large-span bridge and construction method thereof

Country Status (1)

Country Link
CN (1) CN112554054A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113846558A (en) * 2021-08-03 2021-12-28 天津城建大学 Orthotropic UHPC composite bridge deck using steel ribs and construction method
CN114351572A (en) * 2022-01-26 2022-04-15 山东省交通规划设计院集团有限公司 Bridge system for small-angle crossing of operation road without interrupting traffic construction
CN115506237A (en) * 2022-10-21 2022-12-23 中铁大桥勘测设计院集团有限公司 A full-life durable ballastless track steel bridge deck
CN119465775A (en) * 2024-10-30 2025-02-18 中铁第一勘察设计院集团有限公司 Steel-UHPC composite bridge deck based on composite tenon connector and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113846558A (en) * 2021-08-03 2021-12-28 天津城建大学 Orthotropic UHPC composite bridge deck using steel ribs and construction method
CN114351572A (en) * 2022-01-26 2022-04-15 山东省交通规划设计院集团有限公司 Bridge system for small-angle crossing of operation road without interrupting traffic construction
CN115506237A (en) * 2022-10-21 2022-12-23 中铁大桥勘测设计院集团有限公司 A full-life durable ballastless track steel bridge deck
CN119465775A (en) * 2024-10-30 2025-02-18 中铁第一勘察设计院集团有限公司 Steel-UHPC composite bridge deck based on composite tenon connector and its construction method

Similar Documents

Publication Publication Date Title
CN112554054A (en) Combined bridge deck structure of large-span bridge and construction method thereof
CN110468707B (en) Super-high-performance concrete combined bridge with stiffening templates
CN106049732A (en) Honeycomb pore profiled steel sheet bidirectional overlapped floor slab
CN214194138U (en) Combined bridge deck structure of large-span bridge
CN114704024A (en) Novel laminated beam plate and preparation method thereof
CN114351564A (en) Non-prestressed corrugated steel web composite box girder bridge structure and construction method
CN120425851B (en) A ribbed prestressed concrete composite floor slab and its design method
CN112982161B (en) A steel-concrete composite deck structure and bridge
CN115874552A (en) Structural steel stiffened corrugated steel-concrete combined arch shell structure
CN108560796A (en) A kind of concrete T type rib Covered with Angles prefabricated panel and its superimposed sheet of making
CN221608604U (en) Prefabricated bridge deck and composite beam hogging moment area structure
CN214992702U (en) Light railway track plate structure
CN113089392B (en) Construction method of light railway track
CN108930349B (en) Low-deflection profiled steel plate concrete composite board
CN118148016A (en) A composite light bridge deck and construction method thereof
CN115613439B (en) Ultra-light composite beam bridge and construction method thereof
CN202208984U (en) A lightweight composite floor
CN217579708U (en) Non-prestressed corrugated steel web combined box girder bridge structure
CN211446601U (en) Inverted rib orthotropic composite bridge deck steel bridge
CN115961539A (en) Steel-concrete combined section
CN212714468U (en) Combined beam structure of UHPC (ultra high performance polycarbonate) honeycomb prefabricated plate-steel box girder
CN211872630U (en) Inclined prestressed bridge deck paving structure
CN210002232U (en) A folded UHPC roof-corrugated steel web composite box girder bridge
CN1959023A (en) Large span, quadrate structure of house cover prepared from plane reinforcing steel bar concrete in open web interlayer and double arch flat web shell
CN113186822A (en) Corrugated steel web I-shaped composite beam for steel-concrete composite bridge deck

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210326