CN112523549A - Special integration post for flood prevention - Google Patents
Special integration post for flood prevention Download PDFInfo
- Publication number
- CN112523549A CN112523549A CN202011455270.3A CN202011455270A CN112523549A CN 112523549 A CN112523549 A CN 112523549A CN 202011455270 A CN202011455270 A CN 202011455270A CN 112523549 A CN112523549 A CN 112523549A
- Authority
- CN
- China
- Prior art keywords
- flood prevention
- integration
- door
- area
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 230000002265 prevention Effects 0.000 title claims abstract description 118
- 230000010354 integration Effects 0.000 title claims abstract description 63
- 239000000463 material Substances 0.000 claims abstract description 32
- 230000002093 peripheral effect Effects 0.000 claims abstract description 8
- 239000011810 insulating material Substances 0.000 claims abstract description 6
- 238000005096 rolling process Methods 0.000 claims description 15
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 230000004888 barrier function Effects 0.000 claims description 3
- 238000001914 filtration Methods 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000003292 glue Substances 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 14
- 238000000034 method Methods 0.000 abstract description 10
- 230000008569 process Effects 0.000 abstract description 9
- 238000011160 research Methods 0.000 abstract description 4
- 238000007689 inspection Methods 0.000 abstract description 3
- 238000005286 illumination Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- APTZNLHMIGJTEW-UHFFFAOYSA-N pyraflufen-ethyl Chemical compound C1=C(Cl)C(OCC(=O)OCC)=CC(C=2C(=C(OC(F)F)N(C)N=2)Cl)=C1F APTZNLHMIGJTEW-UHFFFAOYSA-N 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000003651 drinking water Substances 0.000 description 1
- 235000020188 drinking water Nutrition 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/06—Office buildings; Banks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Emergency Lowering Means (AREA)
Abstract
The invention discloses a flood prevention special integration place, wherein an integration place body consists of peripheral side walls, a sole floor and a ceiling, the peripheral side walls and the ceiling are made of insulating materials, and the sole floor is an insulating rubber mat; a lightning rod is arranged at the upper corner of one diagonal of the ceiling, and an illuminating lamp and/or a flag is arranged at the upper corner of the other diagonal; the flood prevention material area is positioned on the front side of the middle part of the integration station body and used for storing materials; the flood prevention equipment area is positioned on the left side of the integration station body and used for storing equipment; the work rest area is located the integration institute body right side and extends to integration institute body middle part rear side for flood prevention personnel work, rest. The device has a simple structure, is quick and convenient to disassemble, install and transport, can meet the requirements of timely in-place material transportation, allocation and transportation, continuous supply and nearby storage in the flood prevention and emergency rescue process, can ensure the high efficiency of inspection, research and emergency rescue work in the flood prevention and emergency rescue, and optimizes the rest and pause effect of personnel after long-time work.
Description
Technical Field
The invention relates to a flood prevention special integration place.
Background
The flood prevention and emergency rescue work is generally carried out orderly according to the following steps:
one is to find dangerous cases. Under high water level, the embankment must carry out 24 hours uninterrupted patrol, and particularly important patrol needs to be carried out on sections and culverts which are easy to go out of danger. The dangerous case can be found in time, which is the first task of emergency work.
Secondly, the dangerous case is researched and judged. To fully ask for the expert opinions of emergency rescue, major dangerous situations need to be studied seriously, considered comprehensively and made into emergency rescue decision schemes in time.
Thirdly, scientific emergency treatment. Aiming at the equipment of work conditions, dangerous conditions, emergency materials, force and the like, scientific and targeted emergency treatment can be carried out step by step according to the principle of first control and then emergency treatment.
Fourthly, monitoring and early warning. After the dangerous case is controlled, the personnel need to be stationed for continuous monitoring, and once the development of the dangerous case is found, the dangerous case is rapidly reported and early warned.
Fifthly, subsequent treatment. After the control of the dangerous case, the scientific design is carried out in time according to the conditions of water withdrawal and the like, the dangerous case treatment and the water damage repair are organized, and the original defense capacity is recovered and exceeded.
In the steps, materials and manpower are important supports and guarantees for flood prevention and emergency rescue. How to ensure the rapid and in-place transportation, continuous supply and nearby storage of goods and materials in the flood prevention and rescue process, and how to ensure the working efficiency of the personnel participating in the patrol, research and rescue in the flood prevention and rescue and the rest and pause effect after long-time work becomes an increasingly prominent problem in the existing flood prevention and rescue work.
Disclosure of Invention
The flood prevention special integration place has a simple structure, is quick and convenient to disassemble, install and transport, can meet the requirements of timely and in-place material transportation and allocation, continuous supply and nearby storage in the flood prevention and emergency rescue process, can ensure high efficiency of inspection, research and emergency rescue work in the flood prevention and emergency rescue, and optimizes the rest and pause effects of personnel after long-time work.
In order to achieve the purpose, the invention provides a flood prevention special integration place which comprises an integration place body, and a work rest area, a flood prevention material area and a flood prevention equipment area which are formed in the integration place body; wherein,
the integration station body consists of peripheral side walls, a sole floor and a ceiling, the peripheral side walls and the ceiling are made of insulating materials, and the sole floor is an insulating rubber mat;
lightning rods are arranged at two corners of the ceiling on one diagonal line, the lightning rods vertically extend for 1.5-2m, and illuminating lamps and/or flags are arranged at two corners of the other diagonal line;
the flood prevention material area is positioned on the front side of the middle part of the integration station body and used for storing materials used during flood prevention; the flood prevention equipment area is positioned on the left side of the integration station body and used for storing equipment used in flood prevention; the work rest area is located the integration institute body right side and extends to integration institute body middle part rear side for flood prevention personnel work, rest.
Preferably, the work rest area comprises a single door, an observation window is arranged opposite to the single door, an office table is arranged in front of the observation window, a folding bed chair is arranged in front of the office table, and the area of the work rest area, which is positioned at the rear side of the middle part of the integration station body, is provided with another folding bed chair;
at least five stools which can be stored in a superposed manner are arranged at the right side wall of the single-door entrance, and a flood prevention map is hung or pasted on the left side wall of the entrance;
the outside of the single-opening door is provided with an inserting type label.
Preferably, the office table is used for storing a loudspeaker, an electric kettle, a duty notebook and pens which are needed to be used in flood prevention.
Preferably, the ceiling of the area center of the work rest area on the right side of the integration station body is provided with one illuminating lamp, the ceiling of the area center of the work rest area on the rear side of the middle of the integration station body is provided with another illuminating lamp, and the two illuminating lamps are controlled by a lamp switch arranged on the side wall of the single-door access door and are simultaneously turned on or turned off.
Preferably, an air conditioner is also arranged in the work rest area.
Preferably, the flood prevention material area comprises a double door, devices such as a dam leakage stopping device and a reverse filtering surrounding well device are arranged opposite to the double door, multiple bags of bagged common stones, bagged large stones, bagged fine yellow sands and bagged coarse yellow sands are arranged in the left side area and the right side area of the double door, and the total weight of the bagged common stones, the bagged large stones, the bagged fine yellow sands and the bagged coarse yellow sands is more than 750 kg.
Preferably, a ceiling in the center of the flood prevention material area is provided with an illuminating lamp, and the illuminating lamp is controlled to be turned on or turned off by a lamp switch arranged on the side wall of the double-door entrance.
Preferably, the flood prevention equipment area comprises a sliding door or a rolling door, a flood prevention equipment rack is arranged opposite to the sliding door or the rolling door, and a plurality of flood prevention special bags, life jackets, rain boots, raincoats, working gloves, strong light flashlights and other equipment are stored on the flood prevention equipment rack; wherein, the working glove is a wire sleeve with glue.
Preferably, a plurality of flat shovels, pointed shovels and steel picks are hung on the right side of the entry door of the sliding door or the rolling door, and a barrier clearing mower and a hand-push two-wheeled vehicle are arranged on the left side of the entry door of the sliding door or the rolling door.
Preferably, a ceiling in the center of the flood prevention equipment area is provided with an illuminating lamp, and the illuminating lamp is controlled to be turned on or turned off by a lamp switch arranged on the side wall of the entry position of the sliding door or the rolling door.
According to the technical scheme, the interior of the integration station body is divided into a work rest area, a flood prevention material area and a flood prevention equipment area; the flood prevention material area is located the integration house body middle part front side for deposit the material that uses when flood prevention, can take the very first time when flood prevention emergency rescue like this. The flood prevention equipment area is located on the left side of the integration station body and used for storing equipment used during flood prevention, so that tools for flood prevention and rescue personnel can be provided, and the work efficiency of rescue is greatly improved. The work rest area is located the integration institute body right side and extends to integration institute body middle part rear side for flood prevention personnel work, rest, like this, after long-time heavy physical labor, flood prevention emergency personnel can recuperate in this region, clear thinking again, work on next step of rational overall arrangement, optimize flood prevention emergency effect. Further, for the convenience of this integration institute body dismantlement, installation and transport, save operating time and artifical physical demands, simultaneously, because this integration institute body uses under spacious open-air environment more, causes the casualties in order to prevent that thunderstorm weather from causing the thunderbolt, will all around lateral wall and ceiling be made by insulating material, and the sole floor is the insulating cushion. Therefore, the overall insulation effect can be greatly improved, and the personal safety is effectively guaranteed. Lightning rods are arranged at two corners of the ceiling on one diagonal line, the lightning rods vertically extend for 1.5-2m, and illuminating lamps and/or flags are arranged at two corners of the other diagonal line. By adopting the structure, the lightning protection effect is better, the external lighting environment can be optimized, the position of the integration is more obvious, and the directivity is stronger.
Additional features and advantages of the invention will be set forth in the detailed description which follows.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural diagram of a flood prevention dedicated integration station according to an embodiment of the present invention.
Description of the reference numerals
1-observation window
2-office desk
3-folding bed chair
4-stool
5-flood prevention map
6-flood prevention equipment rack
Detailed Description
The following detailed description of embodiments of the invention refers to the accompanying drawings. It should be understood that the detailed description and specific examples, while indicating the present invention, are given by way of illustration and explanation only, not limitation.
In the present invention, unless otherwise specified, the terms of orientation such as "left, right, front, rear, top, bottom" and the like included in the terms represent only the orientation of the terms in a conventional use state or are colloquially known by those skilled in the art, and should not be construed as limiting the terms.
Referring to fig. 1, the present invention provides a flood prevention special integrated station, including an integrated station body, and a work rest area, a flood prevention material area and a flood prevention equipment area formed inside the integrated station body; wherein,
the integration station body consists of peripheral side walls, a sole floor and a ceiling, the peripheral side walls and the ceiling are made of insulating materials, and the sole floor is an insulating rubber mat;
lightning rods are arranged at two corners of the ceiling on one diagonal line, the lightning rods vertically extend for 1.5-2m, and illuminating lamps and/or flags are arranged at two corners of the other diagonal line;
the flood prevention material area is positioned on the front side of the middle part of the integration station body and used for storing materials used during flood prevention; the flood prevention equipment area is positioned on the left side of the integration station body and used for storing equipment used in flood prevention; the work rest area is located the integration institute body right side and extends to integration institute body middle part rear side for flood prevention personnel work, rest.
According to the technical scheme, the interior of the integration station body is divided into a work rest area, a flood prevention material area and a flood prevention equipment area; the flood prevention material area is located the integration house body middle part front side for deposit the material that uses when flood prevention, can take the very first time when flood prevention emergency rescue like this. The flood prevention equipment area is located on the left side of the integration station body and used for storing equipment used during flood prevention, so that tools for flood prevention and rescue personnel can be provided, and the work efficiency of rescue is greatly improved. The work rest area is located the integration institute body right side and extends to integration institute body middle part rear side for flood prevention personnel work, rest, like this, after long-time heavy physical labor, flood prevention emergency personnel can recuperate in this region, clear thinking again, work on next step of rational overall arrangement, optimize flood prevention emergency effect. Further, for the convenience of this integration institute body dismantlement, installation and transport, save operating time and artifical physical demands, simultaneously, because this integration institute body uses under spacious open-air environment more, causes the casualties in order to prevent that thunderstorm weather from causing the thunderbolt, will all around lateral wall and ceiling be made by insulating material, and the sole floor is the insulating cushion. Therefore, the overall insulation effect can be greatly improved, and the personal safety is effectively guaranteed. Lightning rods are arranged at two corners of the ceiling on one diagonal line, the lightning rods vertically extend for 1.5-2m, and illuminating lamps and/or flags are arranged at two corners of the other diagonal line. By adopting the structure, the lightning protection effect is better, the external lighting environment can be optimized, the position of the integration is more obvious, and the directivity is stronger.
In this embodiment, in order to guarantee the high efficiency of work rest area work rest, preferred work rest area is including singly opening the door, and the light singly opens the door and more is fit for the frequent business turn over of personnel and uses. An observation window 1 is arranged opposite to the single-door, and the flood conditions outside can be observed in the first time through the observation window 1, so that the flood prevention working development condition can be mastered in time. A desk 2 is arranged in front of the observation window 1, a folding bed chair 3 is arranged in front of the desk 2, and another folding bed chair 3 is arranged in the region of the working rest area, which is positioned at the rear side of the middle part of the integration body; therefore, the folding bed chair 3 can be used for working in front of the office table 2, and can be unfolded to lie down to sleep, so that part of physical strength can be recovered in time after heavy physical labor. When a plurality of people need to carry out a flood prevention discussion meeting or a rest for a while in a house, at least five stools 4 which can be stacked and stored are arranged at the right side wall of the single-door access door, the stools 4 which are stacked are taken down one by one for separate use when the stools 4 need to be used, and the stools are stacked together again after the use is finished, so that precious office rest area space is saved. Hang or post flood prevention map 5 on the left side lateral wall of entering a door, the single outside of opening the door is equipped with formula sign of inserting, has realized good instruction, marking effect for flood prevention work develops more clearly and definitely, more smoothly, and the responsibility divides more accurately, more clearly.
Further, in order to facilitate the workers to take and place the portable tools as required in the flood prevention emergency rescue process, preferably, the office table 2 is used for storing a loudspeaker, an electric kettle, a duty notebook and a pen which are required to be used in flood prevention. The public address loudspeaker is used for wide and remote voice communication, the electric kettle is used for guaranteeing drinking water of people in a residence, the duty record book and the duty record pen are important tools of the staff on duty in the residence, and history and progress of flood prevention and emergency rescue work are recorded.
In order to obtain a better illumination effect during the movement of the personnel, preferably, a ceiling of the work rest area, which is located at the center of the area on the right side of the integration place body, is provided with an illuminating lamp, a ceiling of the work rest area, which is located at the center of the area on the rear side of the middle part of the integration place body, is provided with another illuminating lamp, and the two illuminating lamps are controlled by a lamp switch arranged on the side wall of the single-door access door and are simultaneously turned on or turned off.
Furthermore, once the people in the house gather more, the internal temperature naturally rises gradually, and in order to reduce the internal temperature, realize good air exchange between the inside and the outside of the house and reduce the discomfort of the workers and the rest personnel in the house, preferably, an air conditioner is also arranged in the work rest area.
In order to ensure that the goods and materials are quickly transported, distributed and continuously supplied and stored nearby in the flood prevention and rescue process, preferably, the flood prevention goods and materials area comprises a double door, devices such as a dam leakage stopping device and a reverse filtration surrounding well device are arranged on the front face and the back face of the double door, multiple bags of bagged general stones, bagged large stones, bagged fine yellow sands and bagged coarse yellow sands are arranged in the left side area and the right side area of the double door, and the total weight of the bagged general stones, the bagged large stones, the bagged fine yellow sands and the bagged coarse yellow sands is more than 750 kg. Adopt two opening doors, can increase the operating space of goods and materials transportation business turn over in-process, alleviateed working strength when guaranteeing the transportation smoothness nature.
Similarly, in order to obtain a better illumination effect in the process of the movement of the goods and materials transportation in and out of the flood prevention special integration, preferably, an illuminating lamp is arranged on a ceiling in the center of the flood prevention goods and materials area and is controlled to be turned on or off by a lamp switch arranged on the side wall of the double-door entrance.
In the flood prevention emergency rescue process, various flood prevention equipment are needed, and in order to neatly place and store various flood prevention equipment in a flood prevention special integration institute, the flood prevention equipment can be quickly and accurately taken and used in an emergency, and the working time is saved, preferably, a flood prevention equipment area comprises a sliding door or a rolling door, a flood prevention equipment rack 6 is arranged opposite to the sliding door or the rolling door, and a plurality of flood prevention special bags, life jackets, rain boots, raincoats, working gloves, hard lights and other electric lights are stored on the flood prevention equipment rack 6; wherein, the working gloves are provided with the rubber for the thread sleeves, the gloves are convenient to use and have long service life, and the cost is reduced in a phase-changing manner.
A plurality of flat shovels, pointed shovels and steel picks are hung on the right side of the sliding door or the rolling gate door, and a barrier clearing mower and a hand-push two-wheeled vehicle are arranged on the left side of the sliding door or the rolling gate door, so that the arrangement is clear at a glance, a worker can conveniently find target equipment and quickly take or return the target equipment, and the target equipment is well and orderly.
In addition, in order to obtain a better illumination effect in the process of taking and placing the equipment from the flood prevention special integration, a ceiling at the center of a flood prevention equipment area is preferably provided with an illuminating lamp, and the illuminating lamp is controlled to be turned on or turned off by a lamp switch arranged on the side wall at the door entry position of the sliding door or the rolling door.
Therefore, the flood prevention special integration place is simple in structure and rapid and convenient to detach, install and transport, can meet the requirements of timely in-place material transportation, allocation and transportation, continuous supply and nearby storage in the flood prevention and emergency rescue process, can ensure the high efficiency of inspection, research and emergency rescue work in the flood prevention and emergency rescue, and optimizes the rest and pause effects of personnel after long-time work.
The preferred embodiments of the present invention have been described in detail with reference to the accompanying drawings, however, the present invention is not limited to the specific details of the above embodiments, and various simple modifications can be made to the technical solution of the present invention within the technical idea of the present invention, and these simple modifications are within the protective scope of the present invention.
It should be noted that the various technical features described in the above embodiments can be combined in any suitable manner without contradiction, and the invention is not described in any way for the possible combinations in order to avoid unnecessary repetition.
In addition, any combination of the various embodiments of the present invention is also possible, and the same should be considered as the disclosure of the present invention as long as it does not depart from the spirit of the present invention.
Claims (10)
1. A flood prevention special integration post is characterized by comprising an integration post body, and a work rest area, a flood prevention material area and a flood prevention equipment area which are formed in the integration post body; wherein,
the integration station body consists of peripheral side walls, a sole floor and a ceiling, the peripheral side walls and the ceiling are made of insulating materials, and the sole floor is an insulating rubber mat;
lightning rods are arranged at two corners of the ceiling on one diagonal line, the lightning rods vertically extend for 1.5-2m, and illuminating lamps and/or flags are arranged at two corners of the other diagonal line;
the flood prevention material area is positioned on the front side of the middle part of the integration station body and used for storing materials used during flood prevention; the flood prevention equipment area is positioned on the left side of the integration station body and used for storing equipment used in flood prevention; the work rest area is located the integration institute body right side and extends to integration institute body middle part rear side for flood prevention personnel work, rest.
2. The flood prevention special integration post according to claim 1, wherein the work rest area comprises a single door, an observation window (1) is arranged opposite to the single door, an office table (2) is arranged in front of the observation window (1), a folding bed chair (3) is arranged in front of the office table (2), and another folding bed chair (3) is arranged in the area of the work rest area, which is located at the rear side of the middle part of the integration post body;
at least five stools (4) which can be stacked and stored are arranged at the right side wall of the single-door entrance, and a flood prevention map (5) is hung or pasted on the left side wall of the entrance;
the outside of the single-opening door is provided with an inserting type label.
3. The flood prevention special integrated station according to claim 2, wherein the office table (2) is used for storing a loudspeaker, an electric kettle, a duty notebook and a pen which are needed to be used in flood prevention.
4. The flood prevention special integration station according to claim 2, wherein one illuminating lamp is arranged on a ceiling of an area center of the working rest area, which is located on the right side of the integration station body, the other illuminating lamp is arranged on a ceiling of an area center of the working rest area, which is located on the rear side of the middle of the integration station body, and the two illuminating lamps are controlled by a lamp switch arranged on a side wall of a single-door opening access door and are turned on or off simultaneously.
5. The flood prevention special integrated station according to claim 2, wherein an air conditioner is further arranged in the work rest area.
6. The flood prevention special integrated station according to claim 1, wherein the flood prevention material area comprises a double door, a dam leakage stopping device and a reverse filtration surrounding well device are arranged opposite to the double door, multiple bags of bagged general stones, bagged large stones, bagged fine yellow sands and bagged coarse yellow sands are arranged in the left and right side areas of the double door, and the total weight of the bagged general stones, the bagged large stones, the bagged fine yellow sands and the bagged coarse yellow sands is more than 750 kg.
7. The flood prevention special integrated station according to claim 6, wherein a ceiling in the center of the flood prevention material area is provided with an illuminating lamp, and the illuminating lamp is controlled to be turned on or turned off by a lamp switch arranged on the side wall of the double-door entrance.
8. The flood prevention special integrated post according to claim 1, wherein the flood prevention equipment area comprises a sliding door or a rolling door, a flood prevention equipment rack (6) is arranged opposite to the sliding door or the rolling door, and a plurality of flood prevention special bags, life jackets, rain boots, raincoats, working gloves and hard light torches are stored on the flood prevention equipment rack (6); wherein, the working glove is a wire sleeve with glue.
9. The flood prevention special integrated station according to claim 8, wherein a plurality of flat shovels, pointed shovels and steel picks are hung on the right side of the entry door of the sliding door or the rolling door, and a barrier clearing mower and a hand-push two-wheeled vehicle are arranged on the left side of the entry door of the sliding door or the rolling door.
10. A flood prevention special integrated station according to claim 9, wherein a ceiling in the center of the flood prevention equipment area is provided with an illuminating lamp, and the illuminating lamp is controlled to be turned on or turned off by a lamp switch arranged on the side wall of the entry position of the sliding door or the rolling door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011455270.3A CN112523549A (en) | 2020-12-10 | 2020-12-10 | Special integration post for flood prevention |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011455270.3A CN112523549A (en) | 2020-12-10 | 2020-12-10 | Special integration post for flood prevention |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112523549A true CN112523549A (en) | 2021-03-19 |
Family
ID=74998988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011455270.3A Withdrawn CN112523549A (en) | 2020-12-10 | 2020-12-10 | Special integration post for flood prevention |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112523549A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113738162A (en) * | 2021-09-27 | 2021-12-03 | 王豹 | Comprehensive room with rescue facilities based on flood prevention guard |
-
2020
- 2020-12-10 CN CN202011455270.3A patent/CN112523549A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113738162A (en) * | 2021-09-27 | 2021-12-03 | 王豹 | Comprehensive room with rescue facilities based on flood prevention guard |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206903687U (en) | A kind of mine emergency survival capsule | |
CN112523549A (en) | Special integration post for flood prevention | |
CN202320027U (en) | Multifunctional mine emergency wrecking truck | |
CN101876211B (en) | Traffic officer open-air working platform | |
CN214874421U (en) | Intelligent control drainage vehicle | |
CN104149679B (en) | Mobile court car | |
CN105909304A (en) | Self-propelling type tunnel construction life-saving system | |
CN103742799A (en) | Movable lifting lighting lamp | |
CN112746756A (en) | Simple combined flood prevention special integration post | |
CN210944753U (en) | Electric well turnover plate type protection ladder frame | |
CN207714209U (en) | A kind of human and vehicle shunting safety barrier convenient for stretching | |
CN203960762U (en) | The stake of Stretchable light-emitting road | |
CN205666453U (en) | Convenient cubical switchboard that overhauls | |
CN210685501U (en) | Dangerous goods storeroom | |
CN204377022U (en) | A kind of 16 news road mobile television unit | |
CN105383359B (en) | A kind of large scale equipment repairing maintenance cart | |
CN108235638A (en) | A kind of Beidou navigation locating container microdata center | |
CN210764210U (en) | Lifting platform device for building construction | |
CN204367969U (en) | A kind of television relay service truck | |
CN211519357U (en) | Emergency communication vehicle | |
CN206617731U (en) | A kind of moveable video acquisition real-time cloth control lever | |
CN205376035U (en) | Solar energy signboard | |
CN110809333A (en) | Integrated communication base station | |
CN217256222U (en) | Rack that instrument of being convenient for was put for building engineering | |
CN205474986U (en) | Anticollision warning greenbelt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20210319 |