CN112523008A - Slurry-water isolation stone ballast track bed and construction method thereof - Google Patents

Slurry-water isolation stone ballast track bed and construction method thereof Download PDF

Info

Publication number
CN112523008A
CN112523008A CN202011353939.8A CN202011353939A CN112523008A CN 112523008 A CN112523008 A CN 112523008A CN 202011353939 A CN202011353939 A CN 202011353939A CN 112523008 A CN112523008 A CN 112523008A
Authority
CN
China
Prior art keywords
layer
stone
mixture
ballast
isolation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011353939.8A
Other languages
Chinese (zh)
Inventor
王恒
王关生
张廷波
廖柳强
李柳铁
潘治洲
薛锋
莫必强
吴清刚
贾志强
梁雨翔
肖正洪
黎有飞
郭忠
覃龙华
蔺春燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Liuzhou Iron and Steel Group Co Ltd
Original Assignee
Guangxi Liuzhou Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Liuzhou Iron and Steel Group Co Ltd filed Critical Guangxi Liuzhou Iron and Steel Group Co Ltd
Priority to CN202011353939.8A priority Critical patent/CN112523008A/en
Publication of CN112523008A publication Critical patent/CN112523008A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast

Abstract

The invention discloses a cement isolation stone ballast track bed and a construction method thereof, relating to the field of railway construction and comprising a stone ballast layer laid on a stratum foundation and a fixed sleeper laid with a steel rail and arranged on the stone ballast layer, wherein a mixture isolation layer is arranged between the stratum foundation and the stone ballast layer; the mixture isolating layer is composed of silicon dioxide, calcium oxide, aluminum oxide, magnesium oxide and other impurity fused mixture particle ingredients with the particle size of less than 6 meshes; the construction method of the slurry isolation stone ballast track bed comprises the following steps: 1. and 2, finishing a stratum foundation, 2, paving a mixture isolation layer, 3, paving a stone ballast layer, 4, paving a fixed sleeper and a steel rail according to the elevation and the gauge of the line technical requirement. The invention can solve the problem that the existing railway ballast bed of the factory railway is easy to cause railway diseases caused by local slurry turning and mud pumping.

Description

Slurry-water isolation stone ballast track bed and construction method thereof
Technical Field
The invention relates to the technical field of railway ballast track beds, in particular to a railway ballast track bed and a construction method thereof, which solve the problem of mud pumping problem of the railway track bed in a factory due to poor drainage system state and prevent the railway track bed from mud pumping due to the slurry pumping.
Background
In a factory railway construction site, due to the limitation of various objective conditions, a track bed foundation cannot be built according to the standards of a railway bureau, a drainage system of the track bed is incomplete, so that water is accumulated at the bottom of a part of railway track bed, the track panel is repeatedly vibrated in the repeated operation of a train on a steel rail to change a mud layer under the stone ballast track bed into slurry, the slurry splashes onto the stone ballast layer under the vibration of the track panel and the stone ballast and splashes out, stone ballast gaps are gradually filled, the stone ballast track bed is hardened and blocked, a vicious circle with continuously deteriorated drainage performance is formed, the mud layer foundation under the track bed is increasingly softened and sunken, the stone ballast bed and the steel rail surface are sunken, and the railway damage of local slurry dumping and mud pumping is formed. Particularly, the vibration caused by mutual dislocation of the ends of the two steel rails when the vehicle wheel pair passes through the steel rail joint is more violent and frequent, and the occurrence rate of the grout-turning and mud-pumping diseases at the steel rail joint is particularly high. On the premise of not being capable of fundamentally improving the drainage condition of the railway ballast bed, the mud pumping disease caused by slurry turning is difficult to be radically treated. There is a need to develop a technical method capable of effectively eliminating local mud pumping diseases on the premise that the drainage conditions near the railway ballast bed are not well improved.
Disclosure of Invention
The invention aims to solve the technical problem of providing a cement isolation stone ballast track bed and a construction method thereof, which can solve the problem that the existing cement isolation stone ballast track bed for the railway of a factory is easy to cause railway diseases caused by local slurry turning and mud pumping.
In order to solve the problems, the technical scheme of the invention is as follows: the cement isolation stone ballast track bed comprises a stone ballast layer laid on a stratum foundation and a fixed sleeper arranged on the stone ballast layer and provided with a steel rail, wherein a mixture isolation layer is arranged between the stratum foundation and the stone ballast layer.
In the above technical solution, a more specific solution is: the mixture isolating layer is composed of fused mixture particle ingredients with the particle size of below 6 meshes: 30-40% of silicon dioxide, 35-45% of calcium oxide, 10-20% of aluminum oxide, 6-10% of magnesium oxide and other impurities.
Further: the mixture isolating layer (2) is composed of fused mixture particles with the particle size of less than 6 meshes, such as 35% of silicon dioxide, 40% of calcium oxide, 15% of aluminum oxide, 8% of magnesium oxide and 2% of other impurities.
Further: the thickness of the stone ballast layer is more than or equal to 200 mm; the thickness of the mixture isolating layer is larger than or equal to 100 mm.
The construction method of the mud-water isolation stone ballast track bed as claimed in claims 1 to 3, which comprises the following construction steps:
the method comprises the following steps: and (3) finishing the stratum foundation:
1) excavating a ballast bed ditch, wherein the depth of the ditch is 750mm below the designed elevation of the steel rail surface, and the width of the ditch is more than or equal to the length of the rail sleeper plus 600 mm;
2) tamping a ballast bed ditch foundation;
step two: laying the mixture isolation layer, and compacting, wherein the thickness of the mixture isolation layer is 100-150 mm;
step three: paving a clean stone ballast layer on the mixture isolation layer, and ensuring that the thinnest part of the stone ballast layer is more than or equal to 200 mm;
step four: and paving the fixed sleepers and the steel rails on the stone ballast layer according to the elevation and the gauge of the technical line requirement.
Due to the adoption of the technical scheme, the invention has the following beneficial effects:
the compacted mixture isolation layer which takes the special mixture as the base material is added between the stone ballast layer and the earth foundation of the railway stone ballast track bed, and the physical and chemical characteristics of the special mixture are utilized to ensure that the special mixture forms a layer of bulk solid with integral rigidity and certain elasticity under the comprehensive conditions of compaction, compression and humidity, so that a protective layer with certain rigidity and elasticity, which can penetrate water and can separate slurry from rising is formed, the functions of buffering, permeating water and preventing slurry from rising are achieved, and the railway disease of local slurry dumping and mud bleeding of a railway of a factory is effectively solved.
Drawings
FIG. 1 is a schematic cross-sectional view of a prior art factory railway;
FIG. 2 is a schematic cross-sectional view taken along line B-B of FIG. 1;
FIG. 3 is a schematic cross-sectional structure of the present invention;
fig. 4 is a schematic cross-sectional view taken along line D-D of fig. 3.
The reference numbers in the figures denote:
1. a formation foundation; 2. a mixture isolation layer; 3. a stone ballast layer; 4. Fixing the sleeper; 5. Rail, 6, rail fastener assembly and anchor bolt.
Detailed Description
The invention is further illustrated with reference to the following figures and examples:
fig. 1 and fig. 2 are schematic structural diagrams of a conventional plant railway ballast track bed, and the defects of the conventional plant railway ballast track bed are already described in the background art and are not described herein again.
The mud-water isolation ballast track bed shown in fig. 3 and 4 comprises a ballast layer 3 laid on a stratum foundation 1 and a fixed sleeper 4 laid on the ballast layer 3, a steel rail 5 is fixed on the fixed sleeper 4 through a steel rail fastener assembly and an anchoring bolt 5, and a mixture isolation layer 2 is arranged between the stratum foundation 1 and the ballast layer 3.
The mixture isolating layer 2 is composed of the ingredients of the fused mixture particles with the particle size of below 6 meshes: the components are as follows: 30-40% of silicon dioxide, 35-45% of calcium oxide, 10-20% of aluminum oxide, 6-10% of magnesium oxide and other impurities.
In this example, the mix-separated layer 2 consists of particles of a molten mixture of 35% silicon dioxide having a particle size of 6 mesh or less, 40% calcium oxide, 15% aluminum oxide, 8% magnesium oxide and 2% other impurities.
The thickness of the stone ballast layer 3 is more than or equal to 200 mm; the thickness of the mixture isolating layer 2 is more than or equal to 100 mm.
The construction method of the slurry isolation stone ballast track bed comprises the following steps:
the method comprises the following steps: arranging a stratum foundation 1:
1) excavating a ballast bed ditch, wherein the depth of the ditch is 750mm below the designed elevation of the steel rail surface, and the width of the ditch is more than or equal to the length of the rail sleeper plus 600 mm;
2) tamping a ballast bed ditch foundation;
step two: laying a mixture isolating layer 2, compacting, wherein the thickness of the mixture isolating layer 2 is 100 mm-150 mm;
step three: paving a clean stone ballast layer 3 on the mixture isolation layer 2, and ensuring that the thinnest part of the stone ballast layer 3 is more than or equal to 200 mm;
step four: and paving a fixed sleeper 4 and a steel rail 5 on the stone ballast layer 3 according to the elevation and the gauge of the technical requirements of the line.
The working principle is as follows: the special mixture of appropriate thickness of one deck is spread additional between stone tiny fragments of stone, coal, etc. railway roadbed and earth foundation, because the physics and the chemical characteristic of this kind of special mixture self, special mixture granule pressurized can harden gradually and become the big solid that has good that the water permeability has a large amount of microgaps has whole rigidity and certain elasticity to form the one deck and have certain rigidity and elasticity and the water permeability is fine can separate the protective layer that keeps off the mud and scurry on, play similar for laying down to ooze worry cloth and prevent the effect that emits on the roadbed mud for railway roadbed.
The construction method of the slurry-isolation stone ballast track bed can be used for treating the road section with local slurry-overturning and mud-emitting:
the construction process for treating local slurry pumping comprises the following steps:
Figure 545411DEST_PATH_IMAGE001
hollowing out the slurry turning and rising section line according to the following dimensions: the depth of the sleeper is 300mm to 400mm, if the sleeper is dug to the required size and still has slurry, the slurry needs to be cleaned until the solid soil is exposed, and the outer sides of two ends of the sleeper are 200mm to 250 mm.
Figure 820535DEST_PATH_IMAGE002
And filling the special mixture at the hollowed part and tamping, wherein the surface of the special mixture is 200mm to 250mm away from the bottom of the sleeper, and the thinnest part of the special mixture layer is ensured to be more than or equal to 100 mm.
Figure 464006DEST_PATH_IMAGE003
And after the special mixed material layer is treated, a stone ballast layer is laid completely, and the thinnest part of the stone ballast layer is ensured to be larger than or equal to 200 mm.
Figure 736855DEST_PATH_IMAGE004
And adjusting the elevation and the track gauge of the technical requirement of restoring and renovating the partial line to the section of line.

Claims (5)

1. The utility model provides a stone tiny fragments of stone, coal, etc. railway bed is kept apart to muddy water, includes stone tiny fragments of stone, coal, etc. layer (3) of laying on stratum foundation (1) and establishes fixed sleeper (4) that stone tiny fragments of stone, coal, etc. layer (3) upper berth was equipped with rail (5), its characterized in that: and a mixture isolation layer (2) is arranged between the stratum foundation (1) and the stone ballast layer (3).
2. The mud-water isolation ballast track bed according to claim 1, characterized in that: the mixture isolating layer (2) is composed of fused mixture particle ingredients with the particle size of below 6 meshes: 30-40% of silicon dioxide, 35-45% of calcium oxide, 10-20% of aluminum oxide, 6-10% of magnesium oxide and other impurities.
3. The mud-water isolation ballast track bed according to claim 2, characterized in that: the mixture isolating layer (2) is composed of fused mixture particles with the particle size of less than 6 meshes, such as 35% of silicon dioxide, 40% of calcium oxide, 15% of aluminum oxide, 8% of magnesium oxide and 2% of other impurities.
4. The mud-water isolation ballast track bed according to claim 3, wherein: the thickness of the stone ballast layer (3) is more than or equal to 200 mm; the thickness of the mixture isolating layer (2) is more than or equal to 100 mm.
5. The construction method of the mud-water isolation stone ballast track bed as claimed in claims 1 to 3, which is characterized in that:
the method comprises the following steps: and (3) finishing the stratum foundation:
1) excavating a ballast bed ditch, wherein the depth of the ditch is 750mm below the designed elevation of the steel rail surface, and the width of the ditch is more than or equal to the length of the rail sleeper plus 600 mm;
2) tamping a ballast bed ditch foundation;
step two: laying the mixture isolation layer, and compacting, wherein the thickness of the mixture isolation layer is 100-150 mm;
step three: paving a clean stone ballast layer on the mixture isolation layer, wherein the thinnest part of the stone ballast layer is more than or equal to 200 mm;
step four: and paving the fixed sleepers and the steel rails on the stone ballast layer according to the elevation and the gauge of the technical line requirement.
CN202011353939.8A 2020-11-26 2020-11-26 Slurry-water isolation stone ballast track bed and construction method thereof Withdrawn CN112523008A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011353939.8A CN112523008A (en) 2020-11-26 2020-11-26 Slurry-water isolation stone ballast track bed and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011353939.8A CN112523008A (en) 2020-11-26 2020-11-26 Slurry-water isolation stone ballast track bed and construction method thereof

Publications (1)

Publication Number Publication Date
CN112523008A true CN112523008A (en) 2021-03-19

Family

ID=74994013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011353939.8A Withdrawn CN112523008A (en) 2020-11-26 2020-11-26 Slurry-water isolation stone ballast track bed and construction method thereof

Country Status (1)

Country Link
CN (1) CN112523008A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982044A (en) * 2021-03-24 2021-06-18 广西柳州钢铁集团有限公司 Construction process for quickly forming integral road bed of road junction

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002363903A (en) * 2001-06-05 2002-12-18 Sunstar Eng Inc Method for preventing mud-pumping under railroad
JP2005232846A (en) * 2004-02-20 2005-09-02 Railway Technical Res Inst Labor-saving track and method of constructing the same
CN102261081A (en) * 2011-04-25 2011-11-30 上海名呈无纺布有限公司 Anti-leakage geotextile for surface crack of building and manufacturing method thereof
CN103459770A (en) * 2011-03-29 2013-12-18 贝克休斯公司 High permeability frac proppant
CN203546550U (en) * 2013-09-27 2014-04-16 北京中铁润海科技有限公司 Novel geotechnical felt and road section using same
CN105839476A (en) * 2016-05-24 2016-08-10 固远晨通科技发展有限公司 Structure capable of preventing railroad bed mud pumping and paving method thereof
CN109626897A (en) * 2018-12-11 2019-04-16 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of injecting paste material and its technique for the regulation of ballastless track of high-speed railway roadbed grout
CN209538597U (en) * 2019-01-04 2019-10-25 厦门鹰派新材料科技有限公司 A kind of floor structure containing basalt fibre coating
CN110395955A (en) * 2019-08-01 2019-11-01 西安新意达建筑制品有限公司 A kind of impervious freeze thawing resistance self-compacting concrete and preparation method thereof
CN210394986U (en) * 2019-06-21 2020-04-24 新疆铁道勘察设计院有限公司 Device for preventing and treating slurry pumping of ballast railway track bed
CN111270566A (en) * 2020-03-24 2020-06-12 固远晨通科技发展有限公司 Railway roadbed drainage device, repair structure and slurry-turning mud-pumping remediation method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002363903A (en) * 2001-06-05 2002-12-18 Sunstar Eng Inc Method for preventing mud-pumping under railroad
JP2005232846A (en) * 2004-02-20 2005-09-02 Railway Technical Res Inst Labor-saving track and method of constructing the same
CN103459770A (en) * 2011-03-29 2013-12-18 贝克休斯公司 High permeability frac proppant
CN102261081A (en) * 2011-04-25 2011-11-30 上海名呈无纺布有限公司 Anti-leakage geotextile for surface crack of building and manufacturing method thereof
CN203546550U (en) * 2013-09-27 2014-04-16 北京中铁润海科技有限公司 Novel geotechnical felt and road section using same
CN105839476A (en) * 2016-05-24 2016-08-10 固远晨通科技发展有限公司 Structure capable of preventing railroad bed mud pumping and paving method thereof
CN109626897A (en) * 2018-12-11 2019-04-16 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of injecting paste material and its technique for the regulation of ballastless track of high-speed railway roadbed grout
CN209538597U (en) * 2019-01-04 2019-10-25 厦门鹰派新材料科技有限公司 A kind of floor structure containing basalt fibre coating
CN210394986U (en) * 2019-06-21 2020-04-24 新疆铁道勘察设计院有限公司 Device for preventing and treating slurry pumping of ballast railway track bed
CN110395955A (en) * 2019-08-01 2019-11-01 西安新意达建筑制品有限公司 A kind of impervious freeze thawing resistance self-compacting concrete and preparation method thereof
CN111270566A (en) * 2020-03-24 2020-06-12 固远晨通科技发展有限公司 Railway roadbed drainage device, repair structure and slurry-turning mud-pumping remediation method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘凯琳等: "土工合成材料的发展现状及趋势展望", 《纺织导报》 *
曾毅等: "《装甲防护材料技术》", 31 January 2014 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982044A (en) * 2021-03-24 2021-06-18 广西柳州钢铁集团有限公司 Construction process for quickly forming integral road bed of road junction
CN112982044B (en) * 2021-03-24 2023-01-06 广西柳州钢铁集团有限公司 Construction process for quickly forming integral road bed of road junction

Similar Documents

Publication Publication Date Title
CN209178724U (en) A kind of expansive soil foundation Ballast track high-speed railway embankment ruggedized construction
CN110093823B (en) Construction method of soft soil roadbed
CN107190602A (en) A kind of river degradation section pile formula foam concrete light road bank structure and construction method
CN107245912A (en) A kind of Foam lightweight soil railway bed structure and engineering method
CN110924254A (en) Construction process for filling carbonaceous shale roadbed
CN113123197A (en) Method and process for stabilizing macadam base with cement
CN211973067U (en) Road and bridge connection transition structure for preventing and treating vehicle bump at bridge head
CN104452510A (en) Immediate construction method of rural road
CN112523008A (en) Slurry-water isolation stone ballast track bed and construction method thereof
CN106592363A (en) Construction method for municipal soft soil roadbed
CN210529400U (en) Solidified building residue soil road structure
CN206736649U (en) A kind of light road bank structure
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
CN114855522A (en) Replacement and filling method for treating municipal road soft soil foundation
CN212294202U (en) Expansive soil field terrace embankment filling structure
CN207567572U (en) A kind of Foam lightweight soil railway bed structure
CN207017094U (en) River degradation section pile formula foam concrete light road bank structure
JP4060497B2 (en) Roadbed material and roadbed structure with excellent strength and water permeability
CN108166347B (en) Widening structure applied to mountain highway retaining wall section and construction method
CN110439014A (en) A kind of underground stratiform discharge structure and its construction method
CN114657827B (en) Ballastless track bed turning mud pumping prevention and control method based on bed packing particle grading
CN219951578U (en) Non-excavation reinforced structure of urban road collapsibility loess road bed
CN210238176U (en) Road subgrade settlement treatment device
CN113279290B (en) Construction method of railway waterproof roadbed structure in coastal high-water-level area
EP4001377A1 (en) A method of preparing a construction site and the prepared construction site

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20210319

WW01 Invention patent application withdrawn after publication