CN112510642A - Method for rapidly testing relay protection basic logic function of distribution network automation terminal - Google Patents
Method for rapidly testing relay protection basic logic function of distribution network automation terminal Download PDFInfo
- Publication number
- CN112510642A CN112510642A CN202011540961.3A CN202011540961A CN112510642A CN 112510642 A CN112510642 A CN 112510642A CN 202011540961 A CN202011540961 A CN 202011540961A CN 112510642 A CN112510642 A CN 112510642A
- Authority
- CN
- China
- Prior art keywords
- protection
- current
- phase
- test
- breaker
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/006—Calibration or setting of parameters
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00036—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00036—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers
- H02J13/0004—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers involved in a protection system
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The invention provides a method for rapidly testing the basic logic function of the relay protection of a distribution network automation terminal, which does not need to handle power failure procedures, and uses a simulated circuit breaker to replace a field switch, thereby ensuring the equipment safety and the personal safety of operation and maintenance personnel; after a relay protection parameter template provided by a manufacturer is imported in advance, parameters of relay protection devices of various types can be directly read in a working site, and the working efficiency of the site is improved; the wiring is simple, provides "a key test" function, need not to carry out artifical setting, simplifies work flow, improves work efficiency.
Description
Technical Field
The invention relates to the field of power systems, in particular to a method for quickly testing a basic logic function of relay protection of a distribution network automation terminal.
Background
The distribution automation terminal is an important component of distribution automation, can collect and control information of a distribution switch, complete remote measurement of switch equipment and remote signaling data collection, perform switching-on and switching-off operations on the switch, and realize fault identification and isolation of a feeder switch and recovery power supply of a non-fault section. For a long time, when the automatic switch breaks down, an effective and quick field detection means is lacked, and the logic test of the protection function can be carried out only after the power failure procedure is handled and the switch is dismantled.
In the current stage, a relay protection tester is used for performing a protection function logic test on site, different connecting wires are adopted to connect the output end of the relay protection tester with a current node, a voltage node and a control point on the secondary side of a distribution automation terminal, and a current voltage value and a control signal are manually input to verify the correctness of data, the control point and the function of the distribution automation terminal.
The prior art uses a relay protection tester to perform a protection function logic test, and has the following defects:
(1) the field switch equipment is in a live running state, and the direct switching-on and switching-off operation has great safety risk and needs to handle power failure application;
(2) if the analog circuit breaker is used for replacing field switch equipment, the settings of control, output and the like of the analog circuit breaker are complex, a large amount of time is spent on wiring, and the logic test of the protection function is debugged item by item, so that the efficiency is very low;
(3) the relay protection devices manufactured by different manufacturers have different protection configuration parameters and protection logics, and operation and maintenance personnel need to spend time to be familiar with the operation flow of each model, so that the training time is long.
Disclosure of Invention
The invention provides a method for rapidly testing the basic logic function of the relay protection of a distribution network automation terminal, which simplifies the testing process and steps and improves the efficiency of on-site acceptance testing.
In order to achieve the technical effects, the technical scheme of the invention is as follows:
a method for rapidly testing the relay protection basic logic function of a distribution network automation terminal comprises the following steps:
s1: acquiring protection parameters of an automatic terminal to be tested;
s2: reading the protection constant value: overcurrent I-stage current constant value I1Time limit t of overcurrent I section1Constant current I in over-current II stage2Over-current II period time t2Zero sequence current constant value I0Zero sequence time limit t0;
S3: disconnecting the original wiring of a protection trip module loop of the protection measurement and control unit, and connecting the wiring of the analog circuit breaker to the protection trip module loop of the protection measurement and control unit FDR;
s4: disconnecting the original wiring of a current protection module loop of a protection measurement and control unit (FDR) and short-circuiting the original wiring to the ground; respectively connecting the current wiring of the A phase, the B phase and the C phase of the current generator to a current protection module loop of a protection measurement and control unit FDR; connecting the grounding wire to the current protection module loop;
s5: disconnecting the original wiring on the zero-sequence current protection module loop of the protection measurement and control unit FDR, and connecting the zero-sequence current wiring of the current generator to the zero-sequence current protection module loop of the protection measurement and control unit FDR; connecting a grounding wire to a zero sequence current protection module loop;
s6: testing the ABC three-phase protection of the overcurrent I section and the ABC three-phase protection and the zero-sequence current protection of the overcurrent II section respectively according to the sequence, if the simulation breaker does not act correctly under the current of 0.95 times and acts reliably under the current of 1.05 times and 1.2 times, the test is passed, and the protection logic is correct; otherwise, outputting the item which fails the test.
Further, in step S6, the process of testing the protection logic of the phase a of the overcurrent phase includes:
output phase A overcurrent I section test current IA(1)=0.95·I1Duration from 0s to (t)2-0.1) s, recording the on-off condition of the analog circuit breaker, and if the analog circuit breaker does not act q is 1, the condition is correct; otherwise, the test is not passed; resetting the analog circuit breaker;
wherein, the current I output by the current generator is setx(y)Simulating the on-off condition q and the action time t of the circuit breakerk(ii) a x is A, B, C, 0 and represents A phase, B phase, C phase and zero sequence; y is 1, 2, 0 and representsA current I section, a current II section and a zero sequence; q is 0 and 1, and represents a state that the opening q of the analog circuit breaker is 0 and the closing q is 1.
Further, the process of testing the protection logic of the phase a of the overcurrent phase i further includes:
output phase A overcurrent I section test current IA(1)'=1.05·I1Duration from 0s to (t)2-0.1) s, recording the on-off condition of the simulated breaker if the simulated breaker is at tk=t1If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed; and resetting the analog circuit breaker.
Further, the process of testing the protection logic of the phase a of the overcurrent phase i further includes:
output phase A overcurrent I section test current IA(1)”=1.2·I1Duration from 0s to (t)2-0.1) s, recording the on-off condition of the simulated breaker if the simulated breaker is at tk=t1If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed;
further, the process of testing the protection logic of the phase A of the overcurrent phase II comprises the following steps:
output phase A overcurrent II section test current IA(2)=0.95·I2Duration from 0s to (t)2+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker does not act q is 1, the operation is correct; otherwise, the test is not passed; and resetting the analog circuit breaker.
Further, the process of testing the protection logic of the phase a of the overcurrent phase ii further includes:
output phase A overcurrent II section test current IA(2)'=1.05·I2Duration from 0s to (t)2+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t2If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed; and resetting the analog circuit breaker.
Further, the process of testing the protection logic of the phase a of the overcurrent phase ii further includes:
output phase A overcurrent II section test current IA(2)”=1.2·I2Duration from 0s to (t)2+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t2If the time action is on the opening q is 0, the operation is correct; otherwise the test fails.
Further, the test process of the protection logic for the zero sequence current comprises the following steps:
output zero sequence current I0(0)=0.95·I0Duration from 0s to (t)0+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker does not act q is 1, the operation is correct; otherwise, the test is not passed; resetting the analog circuit breaker;
further, the test process of the protection logic for the zero-sequence current further comprises the following steps:
output zero sequence current I0(0)'=1.05·I0Duration from 0s to (t)0+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t0If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed; and resetting the analog circuit breaker.
Further, the test process of the protection logic for the zero-sequence current further comprises the following steps:
output zero sequence current I0(0)”=1.2·I0Duration from 0s to (t)0+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t0If the time action is on the opening q is 0, the operation is correct; otherwise the test fails.
Compared with the prior art, the technical scheme of the invention has the beneficial effects that:
according to the invention, the power failure procedure is not needed to be handled, and the simulated circuit breaker is used for replacing a field switch, so that the equipment safety and the personal safety of operation and maintenance personnel are ensured; after a relay protection parameter template provided by a manufacturer is imported in advance, parameters of relay protection devices of various types can be directly read in a working site, and the working efficiency of the site is improved; the wiring is simple, provides "a key test" function, need not to carry out artifical setting, simplifies work flow, improves work efficiency.
Drawings
FIG. 1 is a flow chart of the method of the present invention;
FIG. 2 is a flow chart of protection logic test for overcurrent phase I;
FIG. 3 is a flow chart of protection logic test for overcurrent phase II;
fig. 4 is a flow chart of the zero sequence current protection logic test.
Detailed Description
The drawings are for illustrative purposes only and are not to be construed as limiting the patent;
for the purpose of better illustrating the embodiments, certain features of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product;
it will be understood by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted.
The technical solution of the present invention is further described below with reference to the accompanying drawings and examples.
As shown in fig. 1, a method for quickly testing a basic logic function of a distribution network automation terminal relay protection includes the following steps:
s1: acquiring protection parameters of an automatic terminal to be tested;
s2: reading the protection constant value: overcurrent I-stage current constant value I1Time limit t of overcurrent I section1Constant current I in over-current II stage2Over-current II period time t2Zero sequence current constant value I0Zero sequence time limit t0;
S3: disconnecting the original wiring of a protection trip module loop of the protection measurement and control unit, and connecting the wiring of the analog circuit breaker to the protection trip module loop of the protection measurement and control unit FDR;
s4: disconnecting the original wiring of a current protection module loop of a protection measurement and control unit (FDR) and short-circuiting the original wiring to the ground; respectively connecting the current wiring of the A phase, the B phase and the C phase of the current generator to a current protection module loop of a protection measurement and control unit FDR; connecting the grounding wire to the current protection module loop;
s5: disconnecting the original wiring on the zero-sequence current protection module loop of the protection measurement and control unit FDR, and connecting the zero-sequence current wiring of the current generator to the zero-sequence current protection module loop of the protection measurement and control unit FDR; connecting a grounding wire to a zero sequence current protection module loop;
s6: testing the ABC three-phase protection of the overcurrent I section and the ABC three-phase protection and the zero-sequence current protection of the overcurrent II section respectively according to the sequence, if the simulation breaker does not act correctly under the current of 0.95 times and acts reliably under the current of 1.05 times and 1.2 times, the test is passed, and the protection logic is correct; otherwise, outputting the item which fails the test.
As shown in fig. 2, in the step S6, the procedure of testing the protection logic of the phase a of the overcurrent phase i is as follows:
1) output phase A overcurrent I section test current IA(1)=0.95·I1Duration from 0s to (t)2-0.1) s, recording the on-off condition of the analog circuit breaker, and if the analog circuit breaker does not act q is 1, the condition is correct; otherwise, the test is not passed; resetting the analog circuit breaker;
2) output phase A overcurrent I section test current IA(1)'=1.05·I1Duration from 0s to (t)2-0.1) s, recording the on-off condition of the simulated breaker if the simulated breaker is at tk=t1If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed; resetting the analog circuit breaker;
3) output phase A overcurrent I section test current IA(1)”=1.2·I1Duration from 0s to (t)2-0.1) s, recording the on-off condition of the simulated breaker if the simulated breaker is at tk=t1If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed;
wherein, the current I output by the current generator is setx(y)Simulating the on-off condition q and the action time t of the circuit breakerk(ii) a x is A, B, C, 0 and represents A phase, B phase, C phase and zero sequence; y is 1, 2 and 0 and represents an overcurrent I section, an overcurrent II section and a zero sequence; q is 0 and 1, and represents a state that the opening q of the analog circuit breaker is 0 and the closing q is 1.
As shown in fig. 3, the test procedure of the protection logic for the phase a of the overcurrent phase ii is as follows:
1) output phase A overcurrent II section test current IA(2)=0.95·I2Duration from 0s to (t)2+0.1) s, recording the on-off of the analog circuit breakerIn case of failure, if q is 1, the operation is correct; otherwise, the test is not passed; resetting the analog circuit breaker;
2) output phase A overcurrent II section test current IA(2)'=1.05·I2Duration from 0s to (t)2+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t2If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed; resetting the analog circuit breaker;
3) output phase A overcurrent II section test current IA(2)”=1.2·I2Duration from 0s to (t)2+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t2If the time action is on the opening q is 0, the operation is correct; otherwise the test fails.
As shown in fig. 4, the test procedure of the protection logic for the zero-sequence current is:
1) output zero sequence current I0(0)=0.95·I0Duration from 0s to (t)0+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker does not act q is 1, the operation is correct; otherwise, the test is not passed; resetting the analog circuit breaker;
2) output zero sequence current I0(0)'=1.05·I0Duration from 0s to (t)0+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t0If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed; resetting the analog circuit breaker;
3) output zero sequence current I0(0)”=1.2·I0Duration from 0s to (t)0+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t0If the time action is on the opening q is 0, the operation is correct; otherwise the test fails.
All test results are output as follows:
TABLE-1 results of the tests
Test items | Test results |
Overcurrent I section protection logic test (A phase) | Go/no-go |
Overcurrent I section protection logic test (B phase) | Go/no-go |
Overcurrent I section protection logic test (C phase) | Go/no-go |
Overcurrent II section protection logic test (A phase) | Go/no-go |
Overcurrent II section protection logic test (B phase) | Go/no-go |
Overcurrent II section protection logic test (C phase) | Go/no-go |
Zero sequence current protection logic test | Go/no-go |
The same or similar reference numerals correspond to the same or similar parts;
the positional relationships depicted in the drawings are for illustrative purposes only and are not to be construed as limiting the present patent;
it should be understood that the above-described embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.
Claims (10)
1. A method for rapidly testing the relay protection basic logic function of a distribution network automation terminal is characterized by comprising the following steps:
s1: acquiring protection parameters of an automatic terminal to be tested;
s2: reading the protection constant value: overcurrent I-stage current constant value I1Time limit t of overcurrent I section1Constant current I in over-current II stage2Over-current II period time t2Zero sequence current constant value I0Zero sequence time limit t0;
S3: disconnecting the original wiring of a protection trip module loop of the protection measurement and control unit, and connecting the wiring of the analog circuit breaker to the protection trip module loop of the protection measurement and control unit FDR;
s4: disconnecting the original wiring of a current protection module loop of a protection measurement and control unit (FDR) and short-circuiting the original wiring to the ground; respectively connecting the current wiring of the A phase, the B phase and the C phase of the current generator to a current protection module loop of a protection measurement and control unit FDR; connecting the grounding wire to the current protection module loop;
s5: disconnecting the original wiring on the zero-sequence current protection module loop of the protection measurement and control unit FDR, and connecting the zero-sequence current wiring of the current generator to the zero-sequence current protection module loop of the protection measurement and control unit FDR; connecting a grounding wire to a zero sequence current protection module loop;
s6: testing the ABC three-phase protection of the overcurrent I section and the ABC three-phase protection and the zero-sequence current protection of the overcurrent II section respectively according to the sequence, if the simulation breaker does not act correctly under the current of 0.95 times and acts reliably under the current of 1.05 times and 1.2 times, the test is passed, and the protection logic is correct; otherwise, outputting the item which fails the test.
2. The method for rapidly testing the basic logic function of the network automation terminal relay protection according to claim 1, wherein in the step S6, the test procedure of the protection logic of the phase a of the overcurrent phase i includes:
output phase A overcurrent I section test current IA(1)=0.95·I1Duration from 0s to (t)2-0.1) s, recording the on-off condition of the analog circuit breaker, and if the analog circuit breaker does not act q is 1, the condition is correct; otherwise, the test is not passed; resetting the analog circuit breaker;
wherein, the current I output by the current generator is setx(y)Simulating the on-off condition q and the action time t of the circuit breakerk(ii) a x is A, B, C, 0 and represents A phase, B phase, C phase and zero sequence; y is 1, 2 and 0 and represents an overcurrent I section, an overcurrent II section and a zero sequence; q is 0 and 1, and represents a state that the opening q of the analog circuit breaker is 0 and the closing q is 1.
3. The method for rapidly testing the basic logic function of the relay protection of the distribution network automation terminal as claimed in claim 2, wherein the process of testing the protection logic of the phase a of the overcurrent phase i further comprises:
output phase A overcurrent I section test current IA(1)'=1.05·I1Duration from 0s to (t)2-0.1) s, recording the on-off condition of the simulated breaker if the simulated breaker is at tk=t1If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed; and resetting the analog circuit breaker.
4. The method for rapidly testing the basic logic function of the distribution network automation terminal relay protection according to claim 3, wherein the process of testing the protection logic of the phase A of the overcurrent phase I further comprises:
output phase A overcurrent I section test current IA(1)”=1.2·I1Duration from 0s to (t)2-0.1) s, recording the on-off condition of the simulated breaker if the simulated breaker is at tk=t1If the time action is on the opening q is 0, the operation is correct; otherwise the test fails.
5. The method for rapidly testing the basic logic function of the distribution network automation terminal relay protection according to claim 4, wherein the test process of the protection logic of the phase A of the overcurrent phase II comprises the following steps:
output phase A overcurrent II section test current IA(2)=0.95·I2Duration from 0s to (t)2+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker does not act q is 1, the operation is correct; otherwise, the test is not passed; and resetting the analog circuit breaker.
6. The method for rapidly testing the basic logic function of the distribution network automation terminal relay protection according to claim 5, wherein the process of testing the protection logic of the phase A of the overcurrent phase II further comprises:
output phase A overcurrent II section test current IA(2)'=1.05·I2Duration from 0s to (t)2+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t2If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed; and resetting the analog circuit breaker.
7. The method for rapidly testing the basic logic function of the distribution network automation terminal relay protection according to claim 5, wherein the process of testing the protection logic of the phase A of the overcurrent phase II further comprises:
output phase A overcurrent II section test current IA(2)”=1.2·I2Duration from 0s to (t)2+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t2If the time action is on the opening q is 0, the operation is correct; otherwise the test fails.
8. The method for rapidly testing the basic logic function of the distribution network automation terminal relay protection according to claim 7, wherein the test process of the protection logic of the zero-sequence current comprises:
output zero sequence current I0(0)=0.95·I0Duration from 0s to (t)0+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker does not act q is 1, the operation is correct; otherwise, the test is not passed; and resetting the analog circuit breaker.
9. The method for rapidly testing the basic logic function of the distribution network automation terminal relay protection according to claim 8, wherein the test process of the protection logic of the zero-sequence current further comprises:
output zero sequence current I0(0)'=1.05·I0Duration from 0s to (t)0+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t0If the time action is on the opening q is 0, the operation is correct; otherwise, the test is not passed; and resetting the analog circuit breaker.
10. The method for rapidly testing the basic logic function of the distribution network automation terminal relay protection according to claim 9, wherein the test process of the protection logic for the zero-sequence current further comprises:
output zero sequence current I0(0)”=1.2·I0Duration from 0s to (t)0+0.1) s, recording the on-off condition of the analog breaker, and if the analog breaker is at tk=t0If the time action is on the opening q is 0, the operation is correct; otherwise the test fails.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011540961.3A CN112510642B (en) | 2020-12-23 | 2020-12-23 | Method for rapidly testing relay protection basic logic function of distribution network automation terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011540961.3A CN112510642B (en) | 2020-12-23 | 2020-12-23 | Method for rapidly testing relay protection basic logic function of distribution network automation terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112510642A true CN112510642A (en) | 2021-03-16 |
CN112510642B CN112510642B (en) | 2023-04-28 |
Family
ID=74923193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011540961.3A Active CN112510642B (en) | 2020-12-23 | 2020-12-23 | Method for rapidly testing relay protection basic logic function of distribution network automation terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112510642B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11205996A (en) * | 1998-01-19 | 1999-07-30 | Hitachi Ltd | Breaker control and protective relay device |
US20020173927A1 (en) * | 2001-05-21 | 2002-11-21 | Benton Vandiver | System for testing of intelligent electronic devices with digital communications |
CN101207280A (en) * | 2007-11-30 | 2008-06-25 | 上海市电力公司超高压输变电公司 | Method and device of intelligent calibration for power system relay protection |
CN102087527A (en) * | 2010-11-25 | 2011-06-08 | 河南省电力公司洛阳供电公司 | Backup auto-switching logic testing method for checking changeover manner of power transmission line |
CN102487245A (en) * | 2010-12-06 | 2012-06-06 | 上海宝钢工业检测公司 | Simulation system of microcomputer relay protection logical test signal system |
CN105823940A (en) * | 2015-01-09 | 2016-08-03 | 国家电网公司 | Relay protection testing system and method |
CN109100586A (en) * | 2018-06-25 | 2018-12-28 | 广东电网有限责任公司 | A kind of relay protection function test method for intelligent distribution network self-healing control system |
CN110988532A (en) * | 2019-11-29 | 2020-04-10 | 广西电网有限责任公司电力科学研究院 | Protection logic test system of distribution automation terminal |
CN210775706U (en) * | 2019-09-29 | 2020-06-16 | 广州思泰信息技术有限公司 | Feeder automation action logic testing device |
-
2020
- 2020-12-23 CN CN202011540961.3A patent/CN112510642B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11205996A (en) * | 1998-01-19 | 1999-07-30 | Hitachi Ltd | Breaker control and protective relay device |
US20020173927A1 (en) * | 2001-05-21 | 2002-11-21 | Benton Vandiver | System for testing of intelligent electronic devices with digital communications |
CN101207280A (en) * | 2007-11-30 | 2008-06-25 | 上海市电力公司超高压输变电公司 | Method and device of intelligent calibration for power system relay protection |
CN102087527A (en) * | 2010-11-25 | 2011-06-08 | 河南省电力公司洛阳供电公司 | Backup auto-switching logic testing method for checking changeover manner of power transmission line |
CN102487245A (en) * | 2010-12-06 | 2012-06-06 | 上海宝钢工业检测公司 | Simulation system of microcomputer relay protection logical test signal system |
CN105823940A (en) * | 2015-01-09 | 2016-08-03 | 国家电网公司 | Relay protection testing system and method |
CN109100586A (en) * | 2018-06-25 | 2018-12-28 | 广东电网有限责任公司 | A kind of relay protection function test method for intelligent distribution network self-healing control system |
CN210775706U (en) * | 2019-09-29 | 2020-06-16 | 广州思泰信息技术有限公司 | Feeder automation action logic testing device |
CN110988532A (en) * | 2019-11-29 | 2020-04-10 | 广西电网有限责任公司电力科学研究院 | Protection logic test system of distribution automation terminal |
Non-Patent Citations (1)
Title |
---|
韩民畴等: "智能变电站继电保护自动测试系统研究", 《智能电网》 * |
Also Published As
Publication number | Publication date |
---|---|
CN112510642B (en) | 2023-04-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108982996B (en) | Outdoor scene substitution type extra-high voltage direct current protection field testing device | |
CN105388416B (en) | The distant check system of having a try of intelligent substation relay protection | |
CN104020761A (en) | Automatic feeder testing system free of networking | |
CN104020762A (en) | Automatic feeder testing method free of networking | |
CN112540266A (en) | Distribution network feeder automation field test system | |
CN111580011A (en) | Method, device and equipment for locating disconnection fault of circuit breaker control circuit | |
CN102636768A (en) | Online check method for online monitor of lightning arrester | |
CN113394779A (en) | Virtual power distribution terminal model based on in-place FA logic | |
CN112067985A (en) | Moving die test device of high-voltage direct-current circuit breaker and transient fault simulation method | |
CN109149534B (en) | Method for rapidly diagnosing topological fault of power grid model based on DTS virtual switch | |
CN113884787B (en) | Method and system for testing tripping and closing verification function of intelligent recorder | |
Chen | Dynamic contingency re-definition in power system security analysis | |
CN112510642A (en) | Method for rapidly testing relay protection basic logic function of distribution network automation terminal | |
CN102520303A (en) | Detector and detection method for alternating-current loops of wind generation set | |
CN115808587A (en) | Linkage locking logic test method of virtual measurement and control device | |
CN111030038A (en) | Power system relay protection setting value checking method | |
CN113541093B (en) | Intelligent distributed feeder automation function test method for power distribution terminal | |
CN106959426B (en) | A kind of anti-ground fault of electric energy meter inhibits test and accuracy joint survey device | |
CN115906350A (en) | Micro-grid fault positioning and diagnosing method | |
CN113671300A (en) | Batch test system and test method for relay protection devices | |
CN109598996B (en) | Load cutting training system for distribution transformer area | |
CN203870470U (en) | Feeder automation test system without network | |
CN106709158B (en) | Performance improvement method of power grid feeder automation system | |
CN219456985U (en) | Low-voltage component verification training equipment and system | |
Seyedi et al. | A Research Testbed for Protection, Automation, and Cyber-Security of Digital Substations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |