CN112488521A - Asset management and control implementation method of energy consumption platform - Google Patents

Asset management and control implementation method of energy consumption platform Download PDF

Info

Publication number
CN112488521A
CN112488521A CN202011379021.0A CN202011379021A CN112488521A CN 112488521 A CN112488521 A CN 112488521A CN 202011379021 A CN202011379021 A CN 202011379021A CN 112488521 A CN112488521 A CN 112488521A
Authority
CN
China
Prior art keywords
meter
module
consumption
data acquisition
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011379021.0A
Other languages
Chinese (zh)
Inventor
刘娟丽
林艳
吴伟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Haosili Technology Co ltd
Original Assignee
Shenzhen Haosili Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Haosili Technology Co ltd filed Critical Shenzhen Haosili Technology Co ltd
Priority to CN202011379021.0A priority Critical patent/CN112488521A/en
Publication of CN112488521A publication Critical patent/CN112488521A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an asset management and control implementation method of an energy consumption platform, which comprises an energy consumption meter terminal, a printing terminal, a data acquisition unit, a data processing terminal, a background operation terminal and an alarm unit, wherein the energy consumption meter terminal comprises an electricity meter, a water meter and a gas meter, the invention encodes a user electricity meter, a water meter and a gas meter through a management operation module, the electricity meter, the water meter and the gas meter are respectively provided with a corresponding electricity consumption data acquisition module, a water consumption data acquisition module and a gas consumption data acquisition module, the electricity meter water meter and the gas meter are arranged in corresponding users for acquiring data of electricity consumption, water consumption and gas consumption, the acquired data are transmitted to the data processing terminal through a communication module for data storage and data processing, the working states of the electricity meter, the water meter and the gas meter are determined, and the management and control of energy consumption on the energy consumption platform and the monitoring of the working states of the energy consumption, and the asset management and control of the energy consumption platform are facilitated.

Description

Asset management and control implementation method of energy consumption platform
Technical Field
The invention relates to the technical field of asset management and control, in particular to an asset management and control implementation method of an energy consumption platform.
Background
In recent years, along with the development of economy, the construction industry in China develops rapidly, the construction energy consumption already occupies a large part of the total social energy consumption, and has a rising trend, meanwhile, China is in a period of relative shortage of energy, the high energy consumption condition of the construction increases the energy pressure in China, the sustainable development of the economy in China is restricted, and the energy saving of the construction is not slow enough, so that the energy consumption supervision and detection become an important content for the current energy saving of the construction, however, the realization of the functions needs to be based on accurate data sources.
With the rapid development of the internet of things and big data, the traditional energy sources are managed and monitored through a new generation of information technology, so that the management and control of the energy consumption service conditions of water, natural gas and electricity by personnel are particularly necessary, but the management and control of the energy consumption platform assets are inconvenient due to the fact that manual statistics and manual maintenance are carried out at present.
Disclosure of Invention
The invention aims to provide an asset management and control implementation method of an energy consumption platform, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
the asset management and control implementation method of the energy consumption platform comprises an energy consumption meter terminal, a printing terminal, a data acquisition unit, a data processing terminal, a background operation terminal and an alarm unit, wherein the energy consumption meter terminal comprises an electricity meter, a water meter and a gas meter, the data acquisition unit comprises an electricity consumption data acquisition module, a water consumption data acquisition module, a gas consumption data acquisition module and a communication module, the data processing terminal comprises a data storage module, a data processing module and a communication module, the background operation terminal comprises a management operation module, a data query module, a printing module and a communication module, and the alarm unit comprises a sound warning module, a character display module, a short message notification module and a communication module.
As a further scheme of the invention: the printing terminal is a printer, the data processing terminal is a server, and the background operation terminal is a mobile phone or a computer.
As a still further scheme of the invention: the electric quantity consumption data acquisition module, the water consumption data acquisition module and the gas consumption data acquisition module are in wired connection with a corresponding ammeter, a corresponding water meter and a corresponding gas meter through signal lines, the electric quantity consumption data acquisition module, the water consumption data acquisition module and the gas consumption data acquisition module are in wireless connection with the data processing terminal through the communication module, the data processing terminal is in wireless connection with the background operation terminal and the alarm unit through the communication module, and the background operation terminal is in wired connection with the printing terminal through a wire.
As a still further scheme of the invention: the electric quantity consumption data acquisition module is used for collecting the numerical value of the electric quantity used on the electric meter, the water consumption data acquisition module is used for collecting the numerical value of the water consumption on the water meter, and the gas consumption data acquisition module is used for collecting the numerical value of the gas consumption on the gas meter.
As a still further scheme of the invention: the data storage module is used for storing the data acquired by the data acquisition unit and the data processed by the data processing module, and the data processing module is used for processing the data and analyzing the data.
As a still further scheme of the invention: the management operation module is used for confirming authority of workers, login of background operation and management of a platform, the data query module is used for querying data of the data acquisition unit and querying electricity consumption, water consumption and gas consumption, and the printing module is matched with the printing terminal to print the processed data.
As a still further scheme of the invention: the voice warning module, the character display module and the short message notification module are matched with the data processing module and used for sending voice warning, character warning on the background operation terminal and sending short message warning to a worker.
The asset management and control method of the energy consumption platform comprises the following steps:
s1: the electricity meter, the water meter and the gas meter are numbered and installed in corresponding users according to the numbers, and the electricity meter, the water meter and the gas meter are wirelessly connected with a corresponding electricity consumption data acquisition module, a corresponding water consumption data acquisition module and a corresponding gas consumption data acquisition module through a communication module;
s2: the electric quantity consumption data acquisition module, the water quantity consumption data acquisition module and the gas consumption data acquisition module acquire data in a user electric meter, a water meter and a gas meter, and the data processing module calculates and analyzes the acquired data, determines the electric quantity, the water quantity and the gas quantity consumed by the user and determines the working states of the electric meter, the water meter and the gas meter;
s3: when the work of the electric meter, the water meter and the gas meter of the user is abnormal or the electric quantity, the water quantity and the gas quantity consumed by the user are abnormal, the alarm unit sends out corresponding warning, and a worker carries a corresponding maintenance tool and a corresponding meter to the abnormal user for maintenance.
Compared with the prior art, the invention has the beneficial effects that:
1. the management operation module is used for coding the user ammeter, the water meter and the gas meter, the ammeter, the water meter and the gas meter are respectively provided with the corresponding electricity consumption data acquisition module, the water consumption data acquisition module and the gas consumption data acquisition module, the ammeter water meter and the gas meter are arranged in corresponding users for data acquisition of electricity consumption, water consumption and gas consumption, the acquired data are transmitted to the data processing terminal through the communication module for data storage and data processing, the working states of the ammeter, the water meter and the gas meter are determined, the energy consumption on the energy consumption platform and the working state of the energy consumption meter terminal are controlled, and the asset control of the energy consumption platform is facilitated.
2. According to the invention, the energy consumption peak period of the user is determined by analyzing the energy consumption of the user through the data processing module in the data processing terminal, so that the energy consumption of the energy consumption platform can be conveniently adjusted, and the experience of the user is improved.
3. According to the invention, the sound warning module in the alarm unit sends out warning sound, the character display module sends out character warning at the background operation terminal, and the short message module sends out short message for warning, so that workers are warned in multiple forms, and the possibility of omission of platform warning by the workers is reduced
Drawings
Fig. 1 is a flowchart of an asset management and control implementation method of an energy consumption platform.
Fig. 2 is a module schematic diagram of an asset management and control implementation method of an energy consumption platform.
Fig. 3 is a schematic block diagram of an energy consumption meter terminal in an asset management and control implementation method of an energy consumption platform.
Fig. 4 is a schematic block diagram of a data acquisition unit in an asset management and control implementation method of an energy consumption platform.
Fig. 5 is a schematic block diagram of a data processing terminal in an asset management and control implementation method of an energy consumption platform.
Fig. 6 is a schematic module diagram of a background operation terminal in the asset management and control implementation method of the energy consumption platform.
FIG. 7 is a schematic block diagram of an alarm unit in an asset management implementation method of an energy consumption platform.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 7, in the embodiment of the present invention, an asset management and control implementation method of an energy consumption platform includes an energy consumption meter terminal, a printing terminal, a data acquisition unit, a data processing terminal, a background operation terminal and an alarm unit, where the energy consumption meter terminal includes an electricity meter, a water meter and a gas meter, the data acquisition unit includes an electricity consumption data acquisition module, a water consumption data acquisition module, a gas consumption data acquisition module and a communication module, the data processing terminal includes a data storage module, a data processing module and a communication module, the background operation terminal includes a management operation module, a data query module, a printing module and a communication module, and the alarm unit includes a sound warning module, a text display module, a short message notification module and a communication module.
The printing terminal is a printer, the data processing terminal is a server, the background operation terminal is a mobile phone or a computer, and the electric meter, the water meter and the gas meter are all connected to the electric wire and the pipeline of the house.
The electric quantity consumption data acquisition module, the water consumption data acquisition module and the gas consumption data acquisition module are in wired connection with corresponding electric meters and water meters and gas meters through signal lines, the electric quantity consumption data acquisition module, the water consumption data acquisition module and the gas consumption data acquisition module are in wireless connection with the data processing terminal through the communication module, the data processing terminal is in wireless connection with the background operation terminal and the alarm unit through the communication module, and the background operation terminal is in wired connection with the printing terminal through a wire.
The electric quantity consumption data acquisition module is used for acquiring the numerical value of the electric quantity of electricity consumption on the electricity meter, the water consumption data acquisition module is used for acquiring the numerical value of the water consumption on the water meter, the gas consumption data acquisition module is used for acquiring the numerical value of the gas consumption on the gas meter, and the acquired data are sent to the data processing unit through the communication module.
The data storage module is used for storing data acquired by the data acquisition unit and data processed by the data processing module, the data processing module is used for processing the data and analyzing the data, the data processing module screens users with abnormal energy consumption and transmits obtained results to the alarm unit through the communication module, and energy consumption peak periods of the users can be obtained through the data processing module, so that the adjustment of functions of an energy consumption platform is facilitated, and energy loss is reduced.
The management operation module is used for confirming the authority of workers and the login of background operation and the management of a platform, grouping codes are carried out on users, the written codes are printed out through the matching of the printing module and the printer and are pasted on a corresponding electric meter, a water meter and a corresponding gas meter, the data query module is used for querying the data of the data acquisition unit and querying the electricity consumption, the water consumption and the gas consumption, and the printing module is matched with the printing terminal to print the processed data.
The voice warning module, the character display module and the short message notification module are matched with the data processing module and used for sending voice warning, character warning on the background operation terminal and sending short message warning to workers, multiple prompts are given, and omission of the workers is avoided.
The asset management and control method of the energy consumption platform comprises the following steps:
s1: the electricity meter, the water meter and the gas meter are numbered and installed in corresponding users according to the numbers, and the electricity meter, the water meter and the gas meter are wirelessly connected with a corresponding electricity consumption data acquisition module, a corresponding water consumption data acquisition module and a corresponding gas consumption data acquisition module through a communication module;
s2: the electric quantity consumption data acquisition module, the water quantity consumption data acquisition module and the gas consumption data acquisition module acquire data in a user electric meter, a water meter and a gas meter, and the data processing module calculates and analyzes the acquired data, determines the electric quantity, the water quantity and the gas quantity consumed by the user and determines the working states of the electric meter, the water meter and the gas meter;
s3: when the work of the electric meter, the water meter and the gas meter of the user is abnormal or the electric quantity, the water quantity and the gas quantity consumed by the user are abnormal, the alarm unit sends out corresponding warning, and a worker carries a corresponding maintenance tool and a corresponding meter to the abnormal user for maintenance.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.

Claims (8)

1. The asset management and control implementation method of the energy consumption platform comprises an energy consumption meter terminal, a printing terminal, a data acquisition unit, a data processing terminal, a background operation terminal and an alarm unit, and is characterized in that: the energy consumption meter terminal comprises an electric meter, a water meter and a gas meter, the data acquisition unit comprises an electric quantity consumption data acquisition module, a water quantity consumption data acquisition module, a gas consumption data acquisition module and a communication module, the data processing terminal comprises a data storage module, a data processing module and a communication module, the background operation terminal comprises a management operation module, a data query module, a printing module and a communication module, and the alarm unit comprises a sound warning module, a character display module, a short message notification module and a communication module.
2. The asset management and control implementation method of the energy consumption platform according to claim 1, characterized in that: the printing terminal is a printer, the data processing terminal is a server, and the background operation terminal is a mobile phone or a computer.
3. The asset management and control implementation method of the energy consumption platform according to claim 1, characterized in that: the electric quantity consumption data acquisition module, the water consumption data acquisition module and the gas consumption data acquisition module are in wired connection with a corresponding ammeter, a corresponding water meter and a corresponding gas meter through signal lines, the electric quantity consumption data acquisition module, the water consumption data acquisition module and the gas consumption data acquisition module are in wireless connection with the data processing terminal through the communication module, the data processing terminal is in wireless connection with the background operation terminal and the alarm unit through the communication module, and the background operation terminal is in wired connection with the printing terminal through a wire.
4. The asset management and control implementation method of the energy consumption platform according to claim 1, characterized in that: the electric quantity consumption data acquisition module is used for collecting the numerical value of the electric quantity used on the electric meter, the water consumption data acquisition module is used for collecting the numerical value of the water consumption on the water meter, and the gas consumption data acquisition module is used for collecting the numerical value of the gas consumption on the gas meter.
5. The asset management and control implementation method of the energy consumption platform according to claim 1, characterized in that: the data storage module is used for storing the data acquired by the data acquisition unit and the data processed by the data processing module, and the data processing module is used for processing the data and analyzing the data.
6. The asset management and control implementation method of the energy consumption platform according to claim 1, characterized in that: the management operation module is used for confirming the authority of workers, the login of background operation and the management of a platform, and encoding a user, the data query module is used for querying the data of the data acquisition unit and querying the electricity consumption, the water consumption and the gas consumption, and the printing module is matched with the printing terminal to print the processed data.
7. The asset management and control implementation method of the energy consumption platform according to claim 1, characterized in that: the voice warning module, the character display module and the short message notification module are matched with the data processing module and used for sending voice warning, character warning on the background operation terminal and sending short message warning to a worker.
8. The asset management and control method of the energy consumption platform comprises the following steps:
s1: the electricity meter, the water meter and the gas meter are numbered and installed in corresponding users according to the numbers, and the electricity meter, the water meter and the gas meter are wirelessly connected with a corresponding electricity consumption data acquisition module, a corresponding water consumption data acquisition module and a corresponding gas consumption data acquisition module through a communication module;
s2: the electric quantity consumption data acquisition module, the water quantity consumption data acquisition module and the gas consumption data acquisition module acquire data in a user electric meter, a water meter and a gas meter, and the data processing module calculates and analyzes the acquired data, determines the electric quantity, the water quantity and the gas quantity consumed by the user and determines the working states of the electric meter, the water meter and the gas meter;
s3: when the work of the electric meter, the water meter and the gas meter of the user is abnormal or the electric quantity, the water quantity and the gas quantity consumed by the user are abnormal, the alarm unit sends out corresponding warning, and a worker carries a corresponding maintenance tool and a corresponding meter to the abnormal user for maintenance.
CN202011379021.0A 2020-11-30 2020-11-30 Asset management and control implementation method of energy consumption platform Withdrawn CN112488521A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011379021.0A CN112488521A (en) 2020-11-30 2020-11-30 Asset management and control implementation method of energy consumption platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011379021.0A CN112488521A (en) 2020-11-30 2020-11-30 Asset management and control implementation method of energy consumption platform

Publications (1)

Publication Number Publication Date
CN112488521A true CN112488521A (en) 2021-03-12

Family

ID=74937900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011379021.0A Withdrawn CN112488521A (en) 2020-11-30 2020-11-30 Asset management and control implementation method of energy consumption platform

Country Status (1)

Country Link
CN (1) CN112488521A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113391118A (en) * 2021-04-25 2021-09-14 常州大连理工大学智能装备研究院 Intelligent building energy consumption monitoring system
CN113820991A (en) * 2021-10-11 2021-12-21 海澜智云科技有限公司 Equipment system at key energy consumption unit energy consumption online monitoring end

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113391118A (en) * 2021-04-25 2021-09-14 常州大连理工大学智能装备研究院 Intelligent building energy consumption monitoring system
CN113820991A (en) * 2021-10-11 2021-12-21 海澜智云科技有限公司 Equipment system at key energy consumption unit energy consumption online monitoring end

Similar Documents

Publication Publication Date Title
CN111367241A (en) Enterprise comprehensive energy management and control system and method
CN109120464A (en) Secondary equipment of intelligent converting station configuration information remote online control device
CN104200323A (en) Electric energy quality monitoring and management system
CN201993809U (en) Integrated energy source management system
CN112488521A (en) Asset management and control implementation method of energy consumption platform
CN203165151U (en) Real time hydrological information automatic monitoring and disaster condition early warning alarm system
CN111193806A (en) Electromechanical device real-time monitoring system based on internet of things technology
CN203415084U (en) Remote monitoring system for heating boilers based on GPRS communication technology
CN105449846B (en) A kind of direct current on-line monitoring management system and management method
CN103533084A (en) Real-time DMS (device management system) of B/S (browser/server) framework and method thereof
CN106504115A (en) Water power production real-time information processing system and method based on mass data
CN104658220A (en) Water level remote monitoring system
CN102768051A (en) Remote monitoring and warning system and method for electromagnetic flow meter of tap water
CN101567581B (en) Universal intelligent low-voltage monitoring system
CN203132587U (en) Natural gas pressure-regulating room safety monitoring system
CN111273075B (en) Distribution network automatic current setting alarm method
CN203025851U (en) Multi-rate network electric power meter capable of displaying carbon emission amount
CN111355635B (en) Online detection method and detection system for product performance of Internet of things
CN107196295A (en) Low voltage power distribution network powers off intelligent alarm system
CN201188552Y (en) Novel low-voltage intelligent monitoring system
CN111786463A (en) Electric power energy-saving monitoring control system
CN107390592A (en) A kind of business electrical monitoring information and mobile phone interaction communication system
CN111343280A (en) Pressure alarm device and method based on NB-IOT
CN110672156A (en) Transformer state monitoring device with data acquisition and communication alarm functions
CN214748097U (en) Remote real-time biogas engineering operation parameter fog terminal monitoring and controlling equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210312