CN112482595A - Building thermal-insulated siding wall that building engineering field was used - Google Patents
Building thermal-insulated siding wall that building engineering field was used Download PDFInfo
- Publication number
- CN112482595A CN112482595A CN202011389463.3A CN202011389463A CN112482595A CN 112482595 A CN112482595 A CN 112482595A CN 202011389463 A CN202011389463 A CN 202011389463A CN 112482595 A CN112482595 A CN 112482595A
- Authority
- CN
- China
- Prior art keywords
- field
- building
- groove
- wall
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005096 rolling process Methods 0.000 claims abstract description 46
- 239000003292 glue Substances 0.000 claims abstract description 24
- 238000009413 insulation Methods 0.000 claims abstract description 18
- 238000010276 construction Methods 0.000 claims abstract description 11
- 239000000725 suspension Substances 0.000 claims abstract description 7
- 230000005611 electricity Effects 0.000 claims description 4
- 239000012530 fluid Substances 0.000 claims description 2
- 210000005056 cell body Anatomy 0.000 claims 1
- 238000003466 welding Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 13
- 230000006698 induction Effects 0.000 abstract description 11
- 239000007788 liquid Substances 0.000 abstract description 8
- 239000007787 solid Substances 0.000 abstract description 5
- 238000001125 extrusion Methods 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000007599 discharging Methods 0.000 description 7
- 239000011248 coating agent Substances 0.000 description 3
- 238000000576 coating method Methods 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 238000010073 coating (rubber) Methods 0.000 description 2
- 239000012774 insulation material Substances 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000011120 plywood Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/06—Implements for applying plaster, insulating material, or the like
- E04F21/08—Mechanical implements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Acoustics & Sound (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
Abstract
The invention relates to the technical field of construction engineering and discloses a building heat insulation board wall used in the field of building engineering. This building thermal-insulated siding wall passes through the round brush when contacting with the wall, relative roll can take place, the turning force of this rolling force cooperation axis of rotation, can make the round brush roll fast, lead to the glue solution to come out and not reach and wall even contact, the round brush of fast rotation drives the guide arm and rotates this moment, then the guide arm cuts magnetic induction linear motion in the magnetic field that the electromagnetism ring formed, induced-current production, the round brush rotational speed is the faster the induced-current that then produces is big more, thereby the electromagnetism piece with connect the electric block contact, the circular telegram board circular telegram, then suspension becomes the solid by liquid, thereby the extrusion sliding plate, survey the contact in sliding plate and the round brush, thereby the effect of slowing down can be realized.
Description
Technical Field
The invention relates to the field of constructional engineering, in particular to a building heat insulation board wall used in the field of constructional engineering.
Background
The building engineering refers to an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation of lines, pipelines and equipment of the construction of the auxiliary facilities, and along with the development of building materials, a heat insulation board wall can be added in a cavity, so that the heat insulation effect can be achieved.
When constructors add heat insulation materials, glue liquid is often required to be smeared on mortar, and the heat insulation materials are added on the glue liquid, so that the wall body can play a heat insulation effect.
In view of the above-mentioned problems, there is an urgent need for a building heat insulation panel wall used in the field of construction engineering.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a building heat insulation board wall used in the field of building engineering, which has the advantages of convenience in glue solution coating, uniform coating and the like, and solves the problems that in the prior art, when glue solution is coated at high altitude, labor is wasted and the glue solution cannot be coated uniformly.
(II) technical scheme
In order to realize the purposes of conveniently and uniformly coating the glue solution, the invention provides the following technical scheme: a building heat insulation board wall used in the field of building engineering comprises a support frame, wherein rolling brushes are movably mounted inside the support frame, uniformly distributed groove bodies are fixedly mounted inside the rolling brushes, rubber plates are movably mounted inside the groove bodies, a reset spring is fixedly mounted between the rubber plates and the groove bodies, fixed wheels are fixedly connected inside the rolling brushes, uniformly distributed groove cavities are formed inside the fixed wheels, sliding plates are slidably connected inside the groove cavities through connecting springs distributed in the groove cavities, fixed grooves are formed inside the fixed wheels, electricity-receiving blocks are fixedly mounted inside the fixed grooves, electromagnetic blocks are slidably connected on the end faces, far away from the fixed grooves, of the electricity-receiving blocks through moving springs, rotating shafts are rotatably connected inside the fixed wheels, and movable connecting rods are fixedly mounted on the end faces, close to the fixed wheels, of the rubber plates, the inner part of the movable connecting rod is fixedly provided with an air bag, the rear end of the groove body is fixedly provided with a guide rod, and the end surface of the fixed wheel close to the rolling brush is fixedly provided with an electromagnetic ring.
Preferably, the connection relationship between the rolling brush and the rotating shaft is fixed connection, the lower end of the support frame is fixedly provided with a containing box, glue solution can be pumped from the containing box to the inside of the glue discharging plate through the suction effect of the air bag, and then the glue solution is brushed onto the wall body through the glue discharging hole.
Preferably, go out the outer end of offset plate and offer evenly distributed's play gluey hole, go out for the intercommunication relation between gluey hole and the gasbag, rotate through the axis of rotation, drive the round brush motion, the round brush is direct and wall contact, because it is higher than outstanding in the round brush surface to go out the offset plate, when the round brush takes place the extrusion with the wall, can cooperate the gasbag to be extruded, then is being brushed on the wall body through going out gluey hole to automatic rubber coating's effect has been realized, the manpower has been saved.
Preferably, the fixed wheel and the rolling brush are connected in a relative sliding manner, an electrorheological fluid suspension is loaded in the groove cavity, and when the rolling brush is in contact with a wall surface, the relative rolling occurs, the rolling force is matched with the rotating force of the rotating shaft, so that the rolling brush can rapidly roll, the glue solution is not in uniform contact with the wall surface, the rolling brush which rapidly rotates drives the guide rod to rotate, then the guide rod performs cutting magnetic induction line motion in a magnetic field formed by an electromagnetic ring to generate induction current, the induction current generated when the rotating speed of the rolling brush is higher, so that the electromagnetic block is in contact with the electricity connection block, the electricity conduction plate is electrified, the suspension is changed into solid from liquid, the sliding plate is extruded, and the sliding plate is in inner side contact with the rolling brush, so that the speed reduction effect can be.
Preferably, the left end and the right end of the slot cavity are fixedly provided with a power-on plate, and the power-on plate is connected with the power-on block and the electromagnetic block through a control center.
Preferably, a buffer spring is fixedly arranged between the air bag and the movable connecting rod.
Preferably, the outer end of the guide rod is wound with a connecting lead, and the guide rod is electrically connected with the electromagnetic block in a connecting relationship.
Preferably, the rubber plates of the air bag are communicated.
(III) advantageous effects
Compared with the prior art, the invention provides a building heat insulation board wall used in the field of constructional engineering, which has the following beneficial effects:
1. this building thermal-insulated siding wall that building engineering field was used, when contacting through the round brush with the wall, relative roll can take place, the turning force of this rolling force cooperation axis of rotation, can make the round brush roll fast, lead to the glue solution to come out and not reach with wall even contact, the round brush of fast rotation drives the guide arm and rotates this moment, then the guide arm cuts magnetic induction linear motion in the magnetic field that the electromagnetism ring formed, produce induced-current, the induced-current that the round brush rotational speed is fast then produced is big more, thereby the electromagnetism piece contacts with connecing the electric plate, the circular telegram board circular telegram, then suspension becomes the solid by liquid, thereby extrude the sliding plate, the contact is surveyed in sliding plate and the round brush, thereby the effect of slowing down can be.
2. This building thermal-insulated siding wall that building engineering field was used rotates through the axis of rotation, drives the round brush motion, and the round brush is direct and wall contact because it is higher than outstanding in the round brush surface to go out the plywood, when the extrusion takes place with the wall at the round brush, can cooperate the gasbag to be extruded, then is being brushed on the wall body through going out gluey hole to automatic rubber coating's effect has been realized, the manpower has been saved.
Drawings
FIG. 1 is a schematic front view of the overall structure of the present invention;
FIG. 2 is a schematic view of the rolling brush structure of the present invention;
FIG. 3 is a schematic view of a guide bar according to the present invention;
FIG. 4 is a schematic view of a retaining ring according to the present invention;
FIG. 5 is an enlarged view of the structure A of FIG. 3 according to the present invention;
FIG. 6 is an enlarged view of the structure B in FIG. 4 according to the present invention.
In the figure: 1. a support frame; 2. rolling and brushing; 3. a trough body; 4. discharging the rubber plate; 5. a return spring; 6. a fixed wheel; 7. a slot cavity; 8. a connecting spring; 9. a sliding plate; 10. fixing grooves; 11. a power connection block; 12. a movable spring; 13. an electromagnetic block; 14. a rotating shaft; 15. a movable connecting rod; 16. an air bag; 17. a guide bar; 18. an electromagnetic ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, a building thermal insulation panel wall for the field of building engineering, comprising a support frame 1, a rolling brush 2 movably mounted inside the support frame 1, a fixed connection between the rolling brush 2 and a rotation shaft 14, a containing box fixedly mounted at the lower end of the support frame 1, a glue solution pumped from the containing box into the inside of a glue-discharging plate 4 by the suction action of an air bag 16, and then the glue solution is brushed on a wall through glue-discharging space, uniformly distributed groove bodies 3 fixedly mounted inside the rolling brush 2, the glue-discharging plate 4 movably mounted inside the groove bodies 3, a return spring 5 fixedly mounted between the glue-discharging plate 4 and the groove bodies 3, a fixed wheel 6 fixedly connected inside the rolling brush 2, uniformly distributed groove cavities 7 formed inside the fixed wheel 6, a sliding plate 9 slidably connected inside the groove cavities 7 through connecting springs 8, a fixed groove 10 formed inside the fixed wheel 6, fixed slot 10's inside fixed mounting connects electric block 11, connect electric block 11 to keep away from on the terminal surface of fixed slot 10 through moving spring 12 sliding connection have electromagnetic block 13, go out the outer end of offset plate 4 and set up evenly distributed's play gluey hole, it is the intercommunication relation to go out between gluey hole and the gasbag 16, rotate through axis of rotation 14, drive round brush 2 motion, round brush 2 is direct and wall contact, because it is higher than outstanding in round brush 2 surfaces to go out offset plate 4, when round brush 2 takes place the extrusion with the wall, can cooperate gasbag 16 to be extruded, then be brushed on the wall body through going out gluey hole, thereby realized automatic rubber coated effect, the manpower has been saved.
The inside of the fixed wheel 6 is rotatably connected with a rotating shaft 14, the left end and the right end of the slot cavity 7 are both fixedly provided with an electrifying plate, the electrifying plate is connected with an electrifying block 11 and an electromagnetic block 13 through a control center, the end surfaces of the glue outlet plates 4 close to the fixed wheel 6 are both fixedly provided with movable connecting rods 15, the inside of each movable connecting rod 15 is fixedly provided with an air bag 16, the glue outlet plates 4 of the air bags 16 are in a communicated design, a buffer spring is fixedly arranged between each air bag 16 and the corresponding movable connecting rod 15, the rear end of the slot body 3 is fixedly provided with a guide rod 17, the outer end of each guide rod 17 is wound with a connecting lead, the connecting relation between each guide rod 17 and the corresponding electromagnetic block 13 is electrically connected, the end surfaces of the fixed wheel 6 close to the rolling brush 2 are fixedly provided with an electromagnetic ring 18, the connecting relation between the fixed wheel 6 and the rolling brush 2, the relative rolling can occur, the rolling force is matched with the rotating force of the rotating shaft 14, the rolling brush 2 can roll rapidly, the glue solution can not be in contact with the wall uniformly, the rolling brush 2 rotating rapidly drives the guide rod 17 to rotate at the moment, then the guide rod 17 cuts magnetic induction lines in a magnetic field formed by the electromagnetic ring 18 to move, induction current is generated, the induction current generated is larger when the rotating speed of the rolling brush 2 is higher, so that the electromagnetic block 13 is in contact with the power-on block 11, the power-on plate is electrified, then the suspension is changed into solid from liquid, the sliding plate 9 is extruded, the sliding plate 9 is in contact with the inner side of the rolling brush 2, and the speed reduction effect can be achieved.
The working principle is as follows: when the building heat insulation panel wall is used, the rolling brush 2 is driven to move by rotating the rotating shaft 14, the rolling brush 2 is directly contacted with the wall surface, the glue outlet plate 4 is higher than the surface protruding out of the rolling brush 2, when the rolling brush 2 is extruded with the wall surface, the air bag 16 can be extruded in a matched mode, and then the rolling brush 2 is brushed on the wall body through the glue outlet hole, so that the effect of automatic gluing is achieved, and the labor is saved; when the rolling brush 2 is in contact with the wall surface, relative rolling can occur, the rolling force is matched with the rotating force of the rotating shaft 14, the rolling brush 2 can roll fast, glue liquid can not be in contact with the wall surface uniformly, the rolling brush 2 rotating fast at the moment drives the guide rod 17 to rotate, then the guide rod 17 cuts magnetic induction line movement in a magnetic field formed by the electromagnetic ring 18, induction current is generated, the higher the rotating speed of the rolling brush 2 is, the larger the generated induction current is, the electromagnetic block 13 is in contact with the electrifying block 11, the electrifying plate is electrified, then suspension liquid is changed into solid, the sliding plate 9 is extruded, the sliding plate 9 is in contact with the rolling brush 2, and the speed reduction effect can be achieved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. The utility model provides a building thermal-insulated siding wall that building engineering field was used, includes support frame (1), its characterized in that: the rubber plate type electric welding machine is characterized in that a rolling brush (2) is movably mounted inside the support frame (1), uniformly distributed groove bodies (3) are fixedly mounted inside the rolling brush (2), rubber plates (4) are movably mounted inside the groove bodies (3), a reset spring (5) is fixedly mounted between each rubber plate (4) and each groove body (3), a fixed wheel (6) is fixedly connected inside each rolling brush (2), uniformly distributed groove cavities (7) are formed inside each fixed wheel (6), a sliding plate (9) is slidably connected inside each groove cavity (7) through connecting springs (8) distributed to the groove cavities, a fixed groove (10) is formed inside each fixed wheel (6), an electricity connecting block (11) is fixedly mounted inside each fixed groove (10), and an electromagnetic block (13) is slidably connected onto the end face, far away from the fixed groove (10), of each electricity connecting block (11) through a movable spring (12), the inside of tight pulley (6) is rotated and is connected with axis of rotation (14), go out equal fixed mounting on offset plate (4) are close to the terminal surface of tight pulley (6) and have movable connecting rod (15), the inside fixed mounting of movable connecting rod (15) has gasbag (16), the rear end fixed mounting of cell body (3) has guide arm (17), fixed mounting has electromagnetic ring (18) on the terminal surface that tight pulley (6) are close to round brush (2).
2. A building insulation panel wall for use in the field of construction engineering as claimed in claim 1, wherein: the connection relation between the rolling brush (2) and the rotating shaft (14) is fixed connection, and the lower end of the support frame (1) is fixedly provided with a containing box.
3. A building insulation panel wall for use in the field of construction engineering as claimed in claim 1, wherein: the outer end of the glue outlet plate (4) is provided with glue outlet holes which are uniformly distributed, and the glue outlet holes are communicated with the air bag (16).
4. A building insulation panel wall for use in the field of construction engineering as claimed in claim 1, wherein: the fixed wheel (6) and the rolling brush (2) are connected in a relative sliding manner, and an electrorheological fluid suspension is loaded in the groove cavity (7).
5. A building insulation panel wall for use in the field of construction engineering as claimed in claim 1, wherein: the left end and the right end of the groove cavity (7) are fixedly provided with a power-on plate, and the power-on plate is connected with the power-on block (11) and the electromagnetic block (13) through a control center.
6. A building insulation panel wall for use in the field of construction engineering as claimed in claim 1, wherein: and a buffer spring is fixedly arranged between the air bag (16) and the movable connecting rod (15).
7. A building insulation panel wall for use in the field of construction engineering as claimed in claim 1, wherein: the outer end of the guide rod (17) is wound with a connecting lead, and the guide rod (17) is electrically connected with the electromagnetic block (13).
8. A building insulation panel wall for use in the field of construction engineering as claimed in claim 1, wherein: the air bag (16) and the rubber outlet plate (4) are communicated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011389463.3A CN112482595A (en) | 2020-12-02 | 2020-12-02 | Building thermal-insulated siding wall that building engineering field was used |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011389463.3A CN112482595A (en) | 2020-12-02 | 2020-12-02 | Building thermal-insulated siding wall that building engineering field was used |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112482595A true CN112482595A (en) | 2021-03-12 |
Family
ID=74938713
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011389463.3A Pending CN112482595A (en) | 2020-12-02 | 2020-12-02 | Building thermal-insulated siding wall that building engineering field was used |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112482595A (en) |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208608137U (en) * | 2018-09-08 | 2019-03-15 | 上海聚仁电力科技有限公司 | A kind of adjustable time-delay relay of leakage current |
CN110863581A (en) * | 2019-11-27 | 2020-03-06 | 北京鼎翰科技有限公司 | Building thermal-insulated siding wall that building engineering field was used |
CN111992110A (en) * | 2020-08-31 | 2020-11-27 | 广州卓佰贸易有限公司 | Cosmetic production stall control's auxiliary device |
CN112405063A (en) * | 2020-11-19 | 2021-02-26 | 宁波启航船业有限公司 | Stall protection auxiliary device with adjustable rotating speed limit for machining cutting machine tool |
CN112477367A (en) * | 2020-11-26 | 2021-03-12 | 孙汇杰 | Glue discharging and bonding device for effective pressure control of corrugated paper |
CN112503128A (en) * | 2020-12-09 | 2021-03-16 | 杭州讯樊机械科技有限公司 | Resistance detection auxiliary device of shock absorber on automobile suspension system |
CN112570107A (en) * | 2020-11-10 | 2021-03-30 | 厦门瓯耶烨纺织机械有限公司 | Auxiliary device for textile cloth smashing process |
CN112682813A (en) * | 2020-12-24 | 2021-04-20 | 贺茂凤 | Staged starting type low-grade fuel waste product reducing device |
CN112754861A (en) * | 2020-12-21 | 2021-05-07 | 贵港赫迪信息科技有限公司 | Bionic medical rehabilitation training device for legs based on automatic protection |
CN112850340A (en) * | 2020-12-31 | 2021-05-28 | 成都程鑫泰达机械有限公司 | Winding device based on protection of winding speed of optical fiber cable |
CN112895940A (en) * | 2021-01-14 | 2021-06-04 | 贾建亨 | New energy automobile fills electric pile wire winding retarder based on frictional force effect |
CN112922281A (en) * | 2021-01-29 | 2021-06-08 | 贺州市乾创建材贸易有限公司 | A device that is used for high-efficient whitewash of indoor emulsion paint of building |
CN112922180A (en) * | 2021-01-28 | 2021-06-08 | 深圳市金鑫华建设集团有限公司 | Construction method of heat-preservation noise-reduction building outer wall |
CN113107165A (en) * | 2021-04-15 | 2021-07-13 | 杭州瑾亿空间设计有限公司 | Indoor energy-concerving and environment-protective type wall body coating brush device that uses |
CN113152847A (en) * | 2021-03-03 | 2021-07-23 | 宿州市骏阳装饰工程有限公司 | Go out even building wall rolling device of lacquer |
CN113175186A (en) * | 2021-04-26 | 2021-07-27 | 尹广宁 | Self-stirring type anti-solidification wall painting device based on rotation of roller |
CN113211181A (en) * | 2021-04-27 | 2021-08-06 | 张舒 | Milling machine processing main shaft stall self-locking device |
CN213894523U (en) * | 2020-12-16 | 2021-08-06 | 中山市钜沣精密机械制造有限公司 | Double-end material frame of steerable rotational speed |
CN113211716A (en) * | 2021-05-12 | 2021-08-06 | 开平市百汇模具科技有限公司 | Quick die change device for injection molding |
-
2020
- 2020-12-02 CN CN202011389463.3A patent/CN112482595A/en active Pending
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208608137U (en) * | 2018-09-08 | 2019-03-15 | 上海聚仁电力科技有限公司 | A kind of adjustable time-delay relay of leakage current |
CN110863581A (en) * | 2019-11-27 | 2020-03-06 | 北京鼎翰科技有限公司 | Building thermal-insulated siding wall that building engineering field was used |
CN111992110A (en) * | 2020-08-31 | 2020-11-27 | 广州卓佰贸易有限公司 | Cosmetic production stall control's auxiliary device |
CN112570107A (en) * | 2020-11-10 | 2021-03-30 | 厦门瓯耶烨纺织机械有限公司 | Auxiliary device for textile cloth smashing process |
CN112405063A (en) * | 2020-11-19 | 2021-02-26 | 宁波启航船业有限公司 | Stall protection auxiliary device with adjustable rotating speed limit for machining cutting machine tool |
CN112477367A (en) * | 2020-11-26 | 2021-03-12 | 孙汇杰 | Glue discharging and bonding device for effective pressure control of corrugated paper |
CN112503128A (en) * | 2020-12-09 | 2021-03-16 | 杭州讯樊机械科技有限公司 | Resistance detection auxiliary device of shock absorber on automobile suspension system |
CN213894523U (en) * | 2020-12-16 | 2021-08-06 | 中山市钜沣精密机械制造有限公司 | Double-end material frame of steerable rotational speed |
CN112754861A (en) * | 2020-12-21 | 2021-05-07 | 贵港赫迪信息科技有限公司 | Bionic medical rehabilitation training device for legs based on automatic protection |
CN112682813A (en) * | 2020-12-24 | 2021-04-20 | 贺茂凤 | Staged starting type low-grade fuel waste product reducing device |
CN112850340A (en) * | 2020-12-31 | 2021-05-28 | 成都程鑫泰达机械有限公司 | Winding device based on protection of winding speed of optical fiber cable |
CN112895940A (en) * | 2021-01-14 | 2021-06-04 | 贾建亨 | New energy automobile fills electric pile wire winding retarder based on frictional force effect |
CN112922180A (en) * | 2021-01-28 | 2021-06-08 | 深圳市金鑫华建设集团有限公司 | Construction method of heat-preservation noise-reduction building outer wall |
CN112922281A (en) * | 2021-01-29 | 2021-06-08 | 贺州市乾创建材贸易有限公司 | A device that is used for high-efficient whitewash of indoor emulsion paint of building |
CN113152847A (en) * | 2021-03-03 | 2021-07-23 | 宿州市骏阳装饰工程有限公司 | Go out even building wall rolling device of lacquer |
CN113107165A (en) * | 2021-04-15 | 2021-07-13 | 杭州瑾亿空间设计有限公司 | Indoor energy-concerving and environment-protective type wall body coating brush device that uses |
CN113175186A (en) * | 2021-04-26 | 2021-07-27 | 尹广宁 | Self-stirring type anti-solidification wall painting device based on rotation of roller |
CN113211181A (en) * | 2021-04-27 | 2021-08-06 | 张舒 | Milling machine processing main shaft stall self-locking device |
CN113211716A (en) * | 2021-05-12 | 2021-08-06 | 开平市百汇模具科技有限公司 | Quick die change device for injection molding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103909036B (en) | The coating machine of lithium-ion-power cell | |
CN104941935A (en) | Plane cleaning device and method | |
CN112482595A (en) | Building thermal-insulated siding wall that building engineering field was used | |
CN109772639B (en) | Rolling type driving environment-friendly resin tile production equipment | |
CN111975881B (en) | Wood processing equipment that archaize building used | |
CN110080502B (en) | Automatic machine of wipeing wall of environmental protection formula | |
CN203448324U (en) | Quick disassembling type rolling brush mechanism on roll type thin-film cleaning machine | |
CN214377943U (en) | Photovoltaic double-split transformer | |
CN112090812A (en) | Cleaning device for automatic robot that cleans of photovoltaic board | |
CN110416631B (en) | Stop sticky tape rubberizing device | |
CN210614196U (en) | Long service life's automation equipment of gluing | |
CN219773517U (en) | Epoxy is from leveling device is paintd with dilute hydrochloric acid to ground construction | |
CN208014805U (en) | It is a kind of to smear uniform lead accumulator production lead material application device | |
CN219470543U (en) | Environment-friendly synthetic leather strickle device | |
CN211385583U (en) | Closed gluing device for steel structure wall | |
CN217616267U (en) | Novel brush lug of encapsulating machine | |
CN215357170U (en) | Direct current motor magnetic shoe assembly machine | |
CN214760850U (en) | A glass face cleaning device for building decoration | |
CN220662285U (en) | New energy automobile fills electric pile heat abstractor | |
CN221503631U (en) | Impeller structure of adhesive-coated double-screw pump | |
CN221046498U (en) | Geomembrane coating equipment | |
CN218583691U (en) | Raw material belt drying device | |
CN210389607U (en) | Humidifying device for standard curing room | |
CN218486352U (en) | Cylinder reciprocating mechanism of spraying and repeating machine | |
CN210995665U (en) | Air pipe cleaning robot |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20210312 |