CN112467652B CN202011593134.0A CN202011593134A CN112467652B CN 112467652 B CN112467652 B CN 112467652B CN 202011593134 A CN202011593134 A CN 202011593134A CN 112467652 B CN112467652 B CN 112467652B
Authority
CN
China
Prior art keywords
seat
fixedly connected
pressing
main
buffer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202011593134.0A
Other languages
Chinese (zh)
Other versions
CN112467652A (en
Inventor
蔡圣本
蔡益宇
叶寅钢
杨亦琛
蔡显荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
You Haizhong
Original Assignee
Gu Shouquan
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gu Shouquan filed Critical Gu Shouquan
Priority to CN202011593134.0A priority Critical patent/CN112467652B/en
Publication of CN112467652A publication Critical patent/CN112467652A/en
Application granted granted Critical
Publication of CN112467652B publication Critical patent/CN112467652B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02—Details
    • H02G3/04—Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0456—Ladders or other supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

The invention discloses a cable fixing device for electric power engineering, which relates to the technical field of electric power installation and comprises a main installation seat, wherein the top of the main installation seat is fixedly connected with a main placing seat, a pressing top seat is arranged above the main placing seat, one end of the pressing top seat is fixedly connected with the main installation seat, a plurality of groups of buffering and pressing devices are arranged at the bottom in the pressing top seat, a plurality of groups of buffering and pressing devices corresponding to the buffering and pressing devices are arranged on the main placing seat, a transverse pushing groove and a vertical placing groove are arranged between the pressing top seat and the main placing seat, and the transverse pushing groove is communicated with the vertical placing groove. On the other hand can provide tension for the cable, and simple to operate is laborsaving, excellent in use effect.

Description

一种电力工程用的线缆固定装置A cable fixing device for power engineering

技术领域technical field

本发明涉及电力安装技术领域,具体是一种电力工程用的线缆固定装置。The invention relates to the technical field of electric power installation, in particular to a cable fixing device for electric power engineering.

背景技术Background technique

电力工程,即与电能的生产、输送、分配有关的工程,广义上还包括把电作为动力和能源在多种领域中应用的工程。同时可理解到送变电业扩工程,在电能输送的过程中,需要通过电缆,在电缆搭建时需要使用接线装置对电缆进行固定。Electric power engineering, that is, engineering related to the production, transmission, and distribution of electrical energy, in a broad sense, also includes engineering that uses electricity as power and energy in various fields. At the same time, it can be understood that in the power transmission and transformation industry expansion project, in the process of power transmission, it is necessary to pass the cable, and the cable needs to be fixed with a wiring device when the cable is built.

公开号为CN209823330U的中国实用新型专利文件中,公开了一种电力工程用的线缆固定装置,该装置在使用时,将每根线缆均卡在第二夹块的弧形部位处,转动转盘,使得丝杆转动,由于丝杆与螺纹套螺纹连接,从而使得螺纹套带动活动板向下移动,从而使得第一夹块向第二夹块靠近,从而对线缆进行夹紧,通过设置每根线缆对应每个夹块进行夹紧,该装置虽然能够安装多个电缆,但是在安装时容易产生阻碍,安装不便,且电缆安装后的耐张性能不足,有待于进一步的改进。In the Chinese utility model patent document with the publication number CN209823330U, a cable fixing device for electric power engineering is disclosed. When the device is in use, each cable is clamped at the arc-shaped part of the second clamping block and rotated. The turntable makes the lead screw rotate. Since the lead screw is threadedly connected with the threaded sleeve, the threaded sleeve drives the movable plate to move downward, so that the first clamping block approaches the second clamping block, thereby clamping the cable. Each cable is clamped corresponding to each clamping block. Although the device can install multiple cables, it is prone to obstruction during installation, which is inconvenient to install, and the cable has insufficient tensile performance after installation, which needs further improvement.

发明内容SUMMARY OF THE INVENTION

本发明提供一种电力工程用的线缆固定装置,解决了上述背景技术中所提出的问题。The present invention provides a cable fixing device for electric power engineering, which solves the problems raised in the above-mentioned background art.

为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

一种电力工程用的线缆固定装置,包括主安装座,所述主安装座的底端设有整体安装机构,主安装座的顶部固定连接有主放置座,主放置座的上方设有压紧顶座,压紧顶座的一端与主安装座固定连接,压紧顶座内的底部设有多组缓冲压紧装置,主放置座上设有多组与缓冲压紧装置相对应的缓冲放置装置,压紧顶座与主放置座之间设有横向推槽和竖向放置槽,横向推槽与竖向放置槽相连通。A cable fixing device for electric power engineering includes a main installation seat, the bottom end of the main installation seat is provided with an integral installation mechanism, the top of the main installation seat is fixedly connected with the main placement seat, and the upper part of the main placement seat is provided with a pressure The top seat is tightened, and one end of the top seat is fixedly connected to the main mounting seat. The bottom of the top seat is provided with multiple sets of buffer pressing devices, and the main placing seat is provided with multiple sets of buffers corresponding to the buffer pressing devices. The placement device is provided with a horizontal push slot and a vertical placement slot between the pressing top seat and the main placement seat, and the lateral push slot is communicated with the vertical placement slot.

作为本发明的一种优选技术方案,所述整体安装机构包括固定设置于主安装座底部两端的支脚,每个支脚上均螺纹连接有多个安装螺栓。As a preferred technical solution of the present invention, the integral mounting mechanism includes legs fixedly arranged at both ends of the bottom of the main mounting base, and each leg is threadedly connected with a plurality of mounting bolts.

作为本发明的一种优选技术方案,所述主放置座为L型,压紧顶座为倒立的L型,压紧顶座的顶部一端固定连接端部挡座,压紧顶座的顶部等距离开设有多个弧形顶槽。As a preferred technical solution of the present invention, the main placement seat is L-shaped, the pressing top seat is an inverted L-shaped, the top end of the pressing top seat is fixedly connected to the end stop, the top of the pressing top seat, etc. A plurality of arc-shaped top grooves are opened in the distance.

作为本发明的一种优选技术方案,所述缓冲放置装置包括设置于主放置座内的支放置座,支放置座的顶端设有缓冲腔,缓冲腔内的底端固定连接第一弹簧,第一弹簧的顶端固定连接下弹性垫。As a preferred technical solution of the present invention, the buffer placement device includes a support placement seat arranged in the main placement seat, the top end of the support placement seat is provided with a buffer cavity, and the bottom end of the buffer cavity is fixedly connected to the first spring; The top end of a spring is fixedly connected to the lower elastic pad.

作为本发明的一种优选技术方案,所述支放置座的两侧均固定连接有侧板,侧板远离支放置座的一侧设有侧座,侧座上开设有侧部滑槽,侧板上固定连接有与侧部滑槽相对应的滑座。As a preferred technical solution of the present invention, both sides of the support seat are fixedly connected with side plates, the side of the side plate away from the support seat is provided with a side seat, and a side chute is opened on the side seat. The board is fixedly connected with a sliding seat corresponding to the side sliding groove.

作为本发明的一种优选技术方案,所述侧座远离侧板的一端转动连接两个支杆,支杆远离侧座的一端转动连接移动块,两个移动块之间固定连接第二弹簧,主放置座内设有与移动块相对应的滑道。As a preferred technical solution of the present invention, one end of the side seat away from the side plate is rotatably connected to two struts, one end of the strut away from the side seat is rotatably connected to the moving block, and the second spring is fixedly connected between the two moving blocks, A slideway corresponding to the moving block is arranged in the main placing seat.

作为本发明的一种优选技术方案,所述缓冲压紧装置包括上压座,上压座的底端设有与缓冲腔相对应的上压腔,上压腔内的顶端固定连接第三弹簧,第三弹簧的底端固定连接上弹性垫。As a preferred technical solution of the present invention, the buffer pressing device includes an upper pressure seat, the bottom end of the upper pressure seat is provided with an upper pressure cavity corresponding to the buffer cavity, and the top end of the upper pressure cavity is fixedly connected to the third spring , the bottom end of the third spring is fixedly connected with an elastic pad.

作为本发明的一种优选技术方案,所述上压座的顶端固定连接升降顶杆,压紧顶座外的一端设有旋钮,旋钮同轴固定连接有驱动杆,驱动杆位于压紧顶座内,且驱动杆的外部固定连接有驱动套,驱动套的外部设有驱动齿,升降顶杆的侧边设有与驱动齿相对应的齿槽。As a preferred technical solution of the present invention, the top end of the upper pressing base is fixedly connected to the lifting top rod, the outer end of the pressing top base is provided with a knob, and the knob is coaxially fixedly connected with a driving rod, and the driving rod is located on the pressing top base A drive sleeve is fixedly connected to the outside of the drive rod, the outside of the drive sleeve is provided with drive teeth, and the side of the lifting top rod is provided with tooth slots corresponding to the drive teeth.

作为本发明的一种优选技术方案,所述驱动杆的外部开设有导槽,驱动套的内侧设有与导槽相对应的导向凸起,驱动杆位于旋钮一端的外部设有螺纹部,压紧顶座内部设有与螺纹部相对应的螺纹槽。As a preferred technical solution of the present invention, the outside of the drive rod is provided with a guide groove, the inside of the drive sleeve is provided with a guide protrusion corresponding to the guide groove, and the drive rod is provided with a threaded portion on the outside of one end of the knob. A thread groove corresponding to the thread portion is arranged inside the tight top seat.

本发明具有以下有益之处:本发明通过设置缓冲放置装置,能够实现多组线缆的安装,通过设置缓冲压紧装置能够实现对电缆的缓冲压紧,且缓冲放置装置和缓冲压紧装置能够实现电缆在上下和纵向的缓冲活动,一方面能够实现电缆的连接,另一方面能够为电缆提供张力,且安装方便省力,使用效果好。The present invention has the following advantages: the present invention can realize the installation of multiple groups of cables by setting the buffer placing device; The buffering movement of the cable in the up and down and longitudinal directions can be realized, on the one hand, the connection of the cable can be realized, and on the other hand, the cable can be provided with tension, and the installation is convenient and labor-saving, and the use effect is good.

附图说明Description of drawings

图1为电力工程用的线缆固定装置的结构示意图。FIG. 1 is a schematic structural diagram of a cable fixing device for power engineering.

图2为电力工程用的线缆固定装置中缓冲放置装置的结构示意图。FIG. 2 is a schematic structural diagram of a buffer placement device in a cable fixing device for power engineering.

图3为电力工程用的线缆固定装置中缓冲压紧装置的结构示意图。FIG. 3 is a schematic structural diagram of a buffer pressing device in a cable fixing device for electric power engineering.

图4为电力工程用的线缆固定装置中驱动杆的结构示意图。FIG. 4 is a schematic structural diagram of a drive rod in a cable fixing device for electric power engineering.

图中:1、主安装座;2、压紧顶座;3、横向推槽;4、主放置座;5、竖向放置槽;6、端部挡座;7、缓冲放置装置;8、缓冲压紧装置;9、支放置座;10、侧板;11、缓冲腔;12、下弹性垫;13、第一弹簧;14、侧座;15、支杆;16、移动块;17、第二弹簧;18、滑座;19、弧形顶槽;20、上压座;21、上弹性垫;22、第三弹簧;23、升降顶杆;24、驱动杆;25、驱动套;26、旋钮;27、支脚;28、安装螺栓;29、导槽;30、螺纹部。In the figure: 1. Main mounting seat; 2. Press the top seat; 3. Horizontal push groove; 4. Main placement seat; 5. Vertical placement groove; 6. End stop; 7. Buffer placement device; 8. Buffer pressing device; 9. Support seat; 10. Side plate; 11. Buffer cavity; 12. Lower elastic pad; 13. First spring; 14. Side seat; 15. Support rod; 16. Moving block; 17. The second spring; 18, the sliding seat; 19, the arc-shaped top groove; 20, the upper pressure seat; 21, the upper elastic pad; 22, the third spring; 23, the lifting ejector rod; 24, the driving rod; 25, the driving sleeve; 26, knob; 27, foot; 28, mounting bolt; 29, guide groove; 30, thread part.

具体实施方式Detailed ways

以下结合附图对本发明的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本发明,并不用于限定本发明。The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, but not to limit the present invention.

需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。It should be noted that the orientation or positional relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. Based on the orientation or positional relationship shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood to limit the present invention.

实施例1Example 1

请参阅图1-4,一种电力工程用的线缆固定装置,包括主安装座1,所述主安装座1的底端设有整体安装机构,主安装座1的顶部固定连接有主放置座4,主放置座4的上方设有压紧顶座2,压紧顶座2的一端与主安装座1固定连接,压紧顶座2内的底部设有多组缓冲压紧装置8,主放置座4上设有多组与缓冲压紧装置8相对应的缓冲放置装置7,压紧顶座2与主放置座4之间设有横向推槽3和竖向放置槽5,横向推槽3与竖向放置槽5相连通。Please refer to Figures 1-4, a cable fixing device for power engineering, including a main mounting base 1, the bottom end of the main mounting base 1 is provided with an integral mounting mechanism, and the top of the main mounting base 1 is fixedly connected with a main mounting base The seat 4, the top of the main placing seat 4 is provided with a pressing top seat 2, one end of the pressing top seat 2 is fixedly connected with the main mounting seat 1, and the bottom of the pressing top seat 2 is provided with multiple groups of buffer pressing devices 8, The main placing seat 4 is provided with a plurality of groups of buffer placing devices 7 corresponding to the buffer pressing device 8, and a horizontal pushing slot 3 and a vertical placing slot 5 are arranged between the pressing top seat 2 and the main placing seat 4. The slot 3 communicates with the vertical placement slot 5 .

所述整体安装机构包括固定设置于主安装座1底部两端的支脚27,每个支脚27上均螺纹连接有多个安装螺栓28。The integral mounting mechanism includes support feet 27 fixedly arranged at both ends of the bottom of the main mounting base 1 , and each support foot 27 is threadedly connected with a plurality of mounting bolts 28 .

所述主放置座4为L型,压紧顶座2为倒立的L型,压紧顶座2的顶部一端固定连接端部挡座6,压紧顶座2的顶部等距离开设有多个弧形顶槽19。The main placing seat 4 is L-shaped, the pressing top seat 2 is an inverted L-shaped, one end of the top of the pressing top seat 2 is fixedly connected to the end stopper 6, and the top of the pressing top seat 2 is equidistantly provided with a plurality of Arc top groove 19.

所述缓冲放置装置7包括设置于主放置座4内的支放置座9,支放置座9的顶端设有缓冲腔11,缓冲腔11内的底端固定连接第一弹簧13,第一弹簧13的顶端固定连接下弹性垫12。所述支放置座9的两侧均固定连接有侧板10,侧板10远离支放置座9的一侧设有侧座14,侧座14上开设有侧部滑槽,侧板10上固定连接有与侧部滑槽相对应的滑座18。所述侧座14远离侧板10的一端转动连接两个支杆15,支杆15远离侧座14的一端转动连接移动块16,两个移动块16之间固定连接第二弹簧17,主放置座4内设有与移动块16相对应的滑道。The buffer placement device 7 includes a support placement seat 9 arranged in the main placement seat 4, the top end of the support placement seat 9 is provided with a buffer cavity 11, and the bottom end of the buffer cavity 11 is fixedly connected to the first spring 13, and the first spring 13 The top end is fixedly connected to the lower elastic pad 12 . Both sides of the support seat 9 are fixedly connected with side plates 10 , the side plate 10 away from the support seat 9 is provided with a side seat 14 , the side seat 14 is provided with a side chute, and the side plate 10 is fixed on A sliding seat 18 corresponding to the side chute is connected. One end of the side seat 14 away from the side plate 10 is rotatably connected to two struts 15 , one end of the strut 15 away from the side seat 14 is rotatably connected to the moving block 16 , and the second spring 17 is fixedly connected between the two moving blocks 16 . The seat 4 is provided with a slideway corresponding to the moving block 16 .

所述缓冲压紧装置8包括上压座20,上压座20的底端设有与缓冲腔11相对应的上压腔,上压腔内的顶端固定连接第三弹簧22,第三弹簧22的底端固定连接上弹性垫21。The buffer pressing device 8 includes an upper pressure seat 20, the bottom end of the upper pressure seat 20 is provided with an upper pressure chamber corresponding to the buffer chamber 11, and the top end of the upper pressure chamber is fixedly connected to a third spring 22, and the third spring 22 The bottom end is fixedly connected to the elastic pad 21 .

实施例2Example 2

请参阅图1-4,一种电力工程用的线缆固定装置,包括主安装座1,所述主安装座1的底端设有整体安装机构,主安装座1的顶部固定连接有主放置座4,主放置座4的上方设有压紧顶座2,压紧顶座2的一端与主安装座1固定连接,压紧顶座2内的底部设有多组缓冲压紧装置8,主放置座4上设有多组与缓冲压紧装置8相对应的缓冲放置装置7,压紧顶座2与主放置座4之间设有横向推槽3和竖向放置槽5,横向推槽3与竖向放置槽5相连通。Please refer to Figures 1-4, a cable fixing device for power engineering, including a main mounting base 1, the bottom end of the main mounting base 1 is provided with an integral mounting mechanism, and the top of the main mounting base 1 is fixedly connected with a main mounting base The seat 4, the top of the main placing seat 4 is provided with a pressing top seat 2, one end of the pressing top seat 2 is fixedly connected with the main mounting seat 1, and the bottom of the pressing top seat 2 is provided with multiple groups of buffer pressing devices 8, The main placing seat 4 is provided with a plurality of groups of buffer placing devices 7 corresponding to the buffer pressing device 8, and a horizontal pushing slot 3 and a vertical placing slot 5 are arranged between the pressing top seat 2 and the main placing seat 4. The slot 3 communicates with the vertical placement slot 5 .

所述整体安装机构包括固定设置于主安装座1底部两端的支脚27,每个支脚27上均螺纹连接有多个安装螺栓28。The integral mounting mechanism includes support feet 27 fixedly arranged at both ends of the bottom of the main mounting base 1 , and each support foot 27 is threadedly connected with a plurality of mounting bolts 28 .

所述主放置座4为L型,压紧顶座2为倒立的L型,压紧顶座2的顶部一端固定连接端部挡座6,压紧顶座2的顶部等距离开设有多个弧形顶槽19。The main placing seat 4 is L-shaped, the pressing top seat 2 is an inverted L-shaped, one end of the top of the pressing top seat 2 is fixedly connected to the end stopper 6, and the top of the pressing top seat 2 is equidistantly provided with a plurality of Arc top groove 19.

所述缓冲放置装置7包括设置于主放置座4内的支放置座9,支放置座9的顶端设有缓冲腔11,缓冲腔11内的底端固定连接第一弹簧13,第一弹簧13的顶端固定连接下弹性垫12。所述支放置座9的两侧均固定连接有侧板10,侧板10远离支放置座9的一侧设有侧座14,侧座14上开设有侧部滑槽,侧板10上固定连接有与侧部滑槽相对应的滑座18。所述侧座14远离侧板10的一端转动连接两个支杆15,支杆15远离侧座14的一端转动连接移动块16,两个移动块16之间固定连接第二弹簧17,主放置座4内设有与移动块16相对应的滑道。The buffer placement device 7 includes a support placement seat 9 arranged in the main placement seat 4, the top end of the support placement seat 9 is provided with a buffer cavity 11, and the bottom end of the buffer cavity 11 is fixedly connected to the first spring 13, and the first spring 13 The top end is fixedly connected to the lower elastic pad 12 . Both sides of the support seat 9 are fixedly connected with side plates 10 , the side plate 10 away from the support seat 9 is provided with a side seat 14 , the side seat 14 is provided with a side chute, and the side plate 10 is fixed on A sliding seat 18 corresponding to the side chute is connected. One end of the side seat 14 away from the side plate 10 is rotatably connected to two struts 15 , one end of the strut 15 away from the side seat 14 is rotatably connected to the moving block 16 , and the second spring 17 is fixedly connected between the two moving blocks 16 . The seat 4 is provided with a slideway corresponding to the moving block 16 .

所述缓冲压紧装置8包括上压座20,上压座20的底端设有与缓冲腔11相对应的上压腔,上压腔内的顶端固定连接第三弹簧22,第三弹簧22的底端固定连接上弹性垫21。The buffer pressing device 8 includes an upper pressure seat 20, the bottom end of the upper pressure seat 20 is provided with an upper pressure chamber corresponding to the buffer chamber 11, and the top end of the upper pressure chamber is fixedly connected to a third spring 22, and the third spring 22 The bottom end is fixedly connected to the elastic pad 21 .

所述上压座20的顶端固定连接升降顶杆23,压紧顶座2外的一端设有旋钮26,旋钮26同轴固定连接有驱动杆24,驱动杆24位于压紧顶座2内,且驱动杆24的外部固定连接有驱动套25,驱动套25的外部设有驱动齿,升降顶杆23的侧边设有与驱动齿相对应的齿槽。所述驱动杆24的外部开设有导槽29,驱动套25的内侧设有与导槽29相对应的导向凸起,驱动杆24位于旋钮26一端的外部设有螺纹部30,压紧顶座2内部设有与螺纹部30相对应的螺纹槽。The top of the upper pressing base 20 is fixedly connected to the lifting and lowering mandrel 23, and the outer end of the pressing top base 2 is provided with a knob 26. The knob 26 is coaxially fixedly connected with a driving rod 24, and the driving rod 24 is located in the pressing top base 2. The outside of the drive rod 24 is fixedly connected with a drive sleeve 25 , the outside of the drive sleeve 25 is provided with drive teeth, and the side of the lift rod 23 is provided with tooth slots corresponding to the drive teeth. The outside of the drive rod 24 is provided with a guide groove 29, the inner side of the drive sleeve 25 is provided with a guide protrusion corresponding to the guide groove 29, and the outside of the drive rod 24 at one end of the knob 26 is provided with a threaded portion 30 to press the top seat 2. A thread groove corresponding to the thread portion 30 is provided inside.

本发明在实施过程中,利用支脚27和安装螺栓28将装置整体固定安装,然后将多个电缆放置在压紧顶座2的顶端,依次使各个电缆线进入竖向放置槽5内再进入横向推槽3内,将电缆推至最左部的缓冲放置装置7上,依次放置多个电缆线,然后转动旋钮26带动驱动杆24转动并移动,与此同时驱动套25转动带动升降顶杆23下降时缓冲压紧装置8下压将电缆线夹在与缓冲放置装置7之间,实现夹持安装,第一弹簧13和第二弹簧17能够对电缆线进行压紧缓冲,第三弹簧22和移动块16能够对电缆线提供张力缓冲。In the implementation process of the present invention, the device is integrally fixed and installed by using the feet 27 and the mounting bolts 28, and then a plurality of cables are placed on the top of the pressing top seat 2, and each cable is successively inserted into the vertical placement slot 5 and then into the horizontal direction. In the push groove 3, push the cable to the leftmost buffer placement device 7, place multiple cables in sequence, then turn the knob 26 to drive the drive rod 24 to rotate and move, and at the same time the drive sleeve 25 rotates to drive the lift mandrel 23 When descending, the buffer pressing device 8 presses down to clamp the cable between the buffer placement device 7 to realize clamping installation. The first spring 13 and the second spring 17 can press and buffer the cable, and the third spring 22 and The moving block 16 can provide tension buffering for the cables.

最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。Finally, it should be noted that the above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, the The technical solutions described in the foregoing embodiments may be modified, or some technical features thereof may be equivalently replaced. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.

Claims (3)

1.一种电力工程用的线缆固定装置,包括主安装座(1),其特征在于,所述主安装座(1)的底端设有整体安装机构,主安装座(1)的顶部固定连接有主放置座(4),主放置座(4)的上方设有压紧顶座(2),压紧顶座(2)的一端与主安装座(1)固定连接,压紧顶座(2)内的底部设有多组缓冲压紧装置(8),主放置座(4)上设有多组与缓冲压紧装置(8)相对应的缓冲放置装置(7),压紧顶座(2)与主放置座(4)之间设有横向推槽(3)和竖向放置槽(5),横向推槽(3)与竖向放置槽(5)相连通,所述缓冲放置装置(7)包括设置于主放置座(4)内的支放置座(9),支放置座(9)的顶端设有缓冲腔(11),缓冲腔(11)内的底端固定连接第一弹簧(13),第一弹簧(13)的顶端固定连接下弹性垫(12),所述支放置座(9)的两侧均固定连接有侧板(10),侧板(10)远离支放置座(9)的一侧设有侧座(14),侧座(14)上开设有侧部滑槽,侧板(10)上固定连接有与侧部滑槽相对应的滑座(18),所述侧座(14)远离侧板(10)的一端转动连接两个支杆(15),支杆(15)远离侧座(14)的一端转动连接移动块(16),两个移动块(16)之间固定连接第二弹簧(17),主放置座(4)内设有与移动块(16)相对应的滑道,所述缓冲压紧装置(8)包括上压座(20),上压座(20)的底端设有与缓冲腔(11)相对应的上压腔,上压腔内的顶端固定连接第三弹簧(22),第三弹簧(22)的底端固定连接上弹性垫(21),所述上压座(20)的顶端固定连接升降顶杆(23),压紧顶座(2)外的一端设有旋钮(26),旋钮(26)同轴固定连接有驱动杆(24),驱动杆(24)位于压紧顶座(2)内,且驱动杆(24)的外部固定连接有驱动套(25),驱动套(25)的外部设有驱动齿,升降顶杆(23)的侧边设有与驱动齿相对应的齿槽,所述驱动杆(24)的外部开设有导槽(29),驱动套(25)的内侧设有与导槽(29)相对应的导向凸起,驱动杆(24)位于旋钮(26)一端的外部设有螺纹部(30),压紧顶座(2)内部设有与螺纹部(30)相对应的螺纹槽。1. A cable fixing device for electric power engineering, comprising a main mounting seat (1), characterized in that the bottom end of the main mounting seat (1) is provided with an integral mounting mechanism, and the top of the main mounting seat (1) is provided with an integral mounting mechanism. A main placing seat (4) is fixedly connected, a pressing top seat (2) is arranged above the main placing seat (4), one end of the pressing top seat (2) is fixedly connected with the main mounting seat (1), and the pressing top seat (2) is fixedly connected. The bottom of the seat (2) is provided with a plurality of groups of buffer pressing devices (8), and the main placing seat (4) is provided with a plurality of groups of buffer placing devices (7) corresponding to the buffer pressing devices (8). A horizontal push slot (3) and a vertical placement slot (5) are arranged between the top seat (2) and the main placement seat (4), and the lateral push slot (3) is communicated with the vertical placement slot (5). The buffer placement device (7) comprises a support placement seat (9) arranged in the main placement seat (4), the top end of the support placement seat (9) is provided with a buffer cavity (11), and the bottom end in the buffer cavity (11) is fixed The first spring (13) is connected, and the top end of the first spring (13) is fixedly connected to the lower elastic pad (12). Both sides of the support seat (9) are fixedly connected with side plates (10). ) A side seat (14) is provided on the side away from the support seat (9), the side seat (14) is provided with a side chute, and the side plate (10) is fixedly connected with a slider corresponding to the side chute. A seat (18), one end of the side seat (14) away from the side plate (10) is rotatably connected to two struts (15), and one end of the strut (15) away from the side seat (14) is rotatably connected to the moving block (16) , a second spring (17) is fixedly connected between the two moving blocks (16), the main seat (4) is provided with a slideway corresponding to the moving block (16), and the buffer pressing device (8) includes The upper pressure seat (20), the bottom end of the upper pressure seat (20) is provided with an upper pressure chamber corresponding to the buffer chamber (11), and the top end in the upper pressure chamber is fixedly connected to a third spring (22), and the third spring ( The bottom end of 22) is fixedly connected to the upper elastic pad (21), the top end of the upper pressing seat (20) is fixedly connected to the lifting top rod (23), and the outer end of the pressing top seat (2) is provided with a knob (26), The knob (26) is coaxially and fixedly connected with a driving rod (24), the driving rod (24) is located in the pressing top seat (2), and a driving sleeve (25) is fixedly connected to the outside of the driving rod (24), and the driving sleeve ( 25) is provided with a drive tooth on the outside, the side of the lift rod (23) is provided with a tooth slot corresponding to the drive tooth, the outside of the drive rod (24) is provided with a guide groove (29), the drive sleeve (25) ) is provided with a guide protrusion corresponding to the guide groove (29), the drive rod (24) is provided with a threaded portion (30) on the outside of one end of the knob (26), and the pressing top seat (2) is internally provided with a threaded portion (30). The thread groove corresponding to the thread portion (30). 2.根据权利要求1所述的电力工程用的线缆固定装置,其特征在于,所述整体安装机构包括固定设置于主安装座(1)底部两端的支脚(27),每个支脚(27)上均螺纹连接有多个安装螺栓(28)。2 . The cable fixing device for electric power engineering according to claim 1 , wherein the integral installation mechanism comprises feet ( 27 ) fixedly arranged at both ends of the bottom of the main mounting seat ( 1 ), and each of the feet ( 27 ). ) are threadedly connected with a plurality of mounting bolts (28). 3.根据权利要求1所述的电力工程用的线缆固定装置,其特征在于,所述主放置座(4)为L型,压紧顶座(2)为倒立的L型,压紧顶座(2)的顶部一端固定连接端部挡座(6),压紧顶座(2)的顶部等距离开设有多个弧形顶槽(19)。3. The cable fixing device for electric power engineering according to claim 1, characterized in that, the main placing seat (4) is L-shaped, the pressing top seat (2) is an inverted L-shaped, and the pressing top is L-shaped. One end of the top of the seat (2) is fixedly connected to the end stopper (6), and a plurality of arc-shaped top grooves (19) are equidistantly opened on the top of the pressing top seat (2).
CN202011593134.0A 2020-12-29 2020-12-29 Cable fixing device that electric power engineering used Expired - Fee Related CN112467652B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011593134.0A CN112467652B (en) 2020-12-29 2020-12-29 Cable fixing device that electric power engineering used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011593134.0A CN112467652B (en) 2020-12-29 2020-12-29 Cable fixing device that electric power engineering used

Publications (2)

Publication Number Publication Date
CN112467652A CN112467652A (en) 2021-03-09
CN112467652B true CN112467652B (en) 2022-04-08

Family

ID=74802087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011593134.0A Expired - Fee Related CN112467652B (en) 2020-12-29 2020-12-29 Cable fixing device that electric power engineering used

Country Status (1)

Country Link
CN (1) CN112467652B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117937344B (en) * 2024-03-22 2024-06-04 国清环境发展有限公司 Photovoltaic board cable fixed mounting structure

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207664554U (en) * 2018-01-12 2018-07-27 詹晓丹 A kind of mobile cable frame in construction site
CN209389608U (en) * 2018-12-11 2019-09-13 成都瑞光涂装有限公司 A wire carding structure inside a rectifier
CN110247345A (en) * 2019-07-22 2019-09-17 广东电网有限责任公司 A kind of cable tray
CN210326843U (en) * 2019-10-15 2020-04-14 南昌春秋通信技术工程有限公司 Electric wire binding fixing device for communication equipment access network engineering
CN211405406U (en) * 2020-02-26 2020-09-01 张魁 Wire-resistant clamp equipment for electric power engineering
CN111740363A (en) * 2020-07-15 2020-10-02 国家电网有限公司 An electrical conduit installation bracket that can be adjusted according to different pipes
CN211701319U (en) * 2020-03-27 2020-10-16 王硕 Automatic spool protection device that exposes of using of electrical engineering
CN111917076A (en) * 2020-08-18 2020-11-10 镇江市神龙电器管件有限公司 Impact-resistant combined cable bridge
CN212063293U (en) * 2020-04-24 2020-12-01 张晔 Relay protection screen cable fixing device
CN212114612U (en) * 2020-06-23 2020-12-08 辽宁海蒂科技有限公司 Cable auxiliary fixing device for communication engineering

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100932015B1 (en) * 2007-07-04 2009-12-14 송암시스콤 주식회사 Cable assembly for cantilever
EP3139459A1 (en) * 2015-09-01 2017-03-08 Zurecon AG Cable installation device which continues to function in case of fire
CN108493856A (en) * 2018-05-07 2018-09-04 刘延昌 A kind of easy-to-mount electric power cable fixing device
CN209948339U (en) * 2019-07-17 2020-01-14 云南省能源研究院有限公司 Cable wire clamping device for plateau type environment-friendly gas switch equipment

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207664554U (en) * 2018-01-12 2018-07-27 詹晓丹 A kind of mobile cable frame in construction site
CN209389608U (en) * 2018-12-11 2019-09-13 成都瑞光涂装有限公司 A wire carding structure inside a rectifier
CN110247345A (en) * 2019-07-22 2019-09-17 广东电网有限责任公司 A kind of cable tray
CN210326843U (en) * 2019-10-15 2020-04-14 南昌春秋通信技术工程有限公司 Electric wire binding fixing device for communication equipment access network engineering
CN211405406U (en) * 2020-02-26 2020-09-01 张魁 Wire-resistant clamp equipment for electric power engineering
CN211701319U (en) * 2020-03-27 2020-10-16 王硕 Automatic spool protection device that exposes of using of electrical engineering
CN212063293U (en) * 2020-04-24 2020-12-01 张晔 Relay protection screen cable fixing device
CN212114612U (en) * 2020-06-23 2020-12-08 辽宁海蒂科技有限公司 Cable auxiliary fixing device for communication engineering
CN111740363A (en) * 2020-07-15 2020-10-02 国家电网有限公司 An electrical conduit installation bracket that can be adjusted according to different pipes
CN111917076A (en) * 2020-08-18 2020-11-10 镇江市神龙电器管件有限公司 Impact-resistant combined cable bridge

Also Published As

Publication number Publication date
CN112467652A (en) 2021-03-09

Similar Documents

Publication Publication Date Title
CN115815919A (en) High-low voltage distribution cabinet production welding jig
CN211957356U (en) Dry-type transformer convenient to installation
CN218526002U (en) Cable fixing device
CN211266617U (en) A base for motor installation
CN104998932A (en) Bending machine for busbar
CN220005762U (en) Hydraulic busbar bending machine capable of continuously bending
CN112467652A (en) Cable fixing device that electric power engineering used
CN218777150U (en) Flat pressing positioning device
CN216055988U (en) Electrical engineering location installation device
CN217156374U (en) Heat pipe power test fixture
CN210909268U (en) A device for grinding the inner surface of a shaft sleeve
CN209375062U (en) Cable hanger with clamping function
CN219030951U (en) a clamping device
CN218005782U (en) An engineering cable fixing frame
CN207937670U (en) A kind of electric power optical cable fixture
CN217823679U (en) Clamping equipment for processing electronic connecting wire
CN221978515U (en) Installation equipment for laying power engineering cables
CN219393175U (en) A magnetic core assembly equipment
CN219924388U (en) A busbar mechanism that can be bent and restored
CN219757979U (en) A material bending machine
CN211480599U (en) Low-voltage switch equipment convenient to disassemble
CN218611194U (en) Soft-packaged electrical core utmost point ear forming mechanism
CN218565031U (en) Silicon steel strip slitting line swing arm detection device for transformer production
CN221669774U (en) Photovoltaic panel roof connecting piece
CN223624884U (en) Primary and secondary integrated pole-mounted circuit breakers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20220308

Address after: 063000 No. 11, warm home, Cao Xueqin West Road, Fengrun Town, Fengrun District, Tangshan City, Hebei Province

Applicant after: Gu Shouquan

Address before: 317000 Room 501, unit 1, No. 71, Jinshan Middle Road, Gucheng street, Linhai City, Taizhou City, Zhejiang Province

Applicant before: Cai Shengben

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220613

Address after: 050011 No. 18, Zhonghua North Street, Qiaoxi District, Shijiazhuang City, Hebei Province

Patentee after: You Haizhong

Address before: 063000 No. 11, warm home, Cao Xueqin West Road, Fengrun Town, Fengrun District, Tangshan City, Hebei Province

Patentee before: Gu Shouquan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220408