CN112459449A - Chimney carriage for construction - Google Patents

Chimney carriage for construction Download PDF

Info

Publication number
CN112459449A
CN112459449A CN202011422452.0A CN202011422452A CN112459449A CN 112459449 A CN112459449 A CN 112459449A CN 202011422452 A CN202011422452 A CN 202011422452A CN 112459449 A CN112459449 A CN 112459449A
Authority
CN
China
Prior art keywords
chimney
carriage
construction
radiation beams
concrete wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011422452.0A
Other languages
Chinese (zh)
Inventor
王成
王维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xinda Gaokong Engineering Co ltd
Original Assignee
Jiangsu Xinda Gaokong Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xinda Gaokong Engineering Co ltd filed Critical Jiangsu Xinda Gaokong Engineering Co ltd
Priority to CN202011422452.0A priority Critical patent/CN112459449A/en
Publication of CN112459449A publication Critical patent/CN112459449A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/061Consoles; Brackets specially adapted for attachment to scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to the technical field of building construction, in particular to a chimney carriage for construction, which comprises a concrete wall cylinder and a radiant beam platform arranged above the concrete wall cylinder, wherein the middle part of the concrete wall cylinder is uniformly distributed with at least two steel pipes, each steel pipe is connected with a climbing jack, and a shell of each climbing jack is fixedly connected with the radiant beam platform. The steel pipe is arranged in the concrete wall cylinder, so that the structural stability of the chimney can be enhanced, and a sliding track can be provided for the climbing jack. After the corresponding concrete wall cylinder is poured, the climbing jack is started, and the concrete wall cylinder is continuously poured, so that the method is simple and convenient.

Description

Chimney carriage for construction
Technical Field
The invention relates to the technical field of building construction, in particular to a chimney carriage for construction.
Background
A chimney is a structure that provides ventilation for hot flue gases or fumes from a boiler, furnace, stove or fireplace. The chimney is usually vertical, or as close to vertical as possible, to ensure a smooth flow of gases, the intake air entering the so-called chimney combustion or chimney effect. The space within the chimney is called a flue. When the chimney is under construction, because the height generally is tens of meters or even hundreds of meters at least, the construction degree of difficulty is great, and the construction is hoisted through the loop wheel machine through setting up the platform now, and the cost is very big, and is very inconvenient.
Disclosure of Invention
In order to solve the technical problems in the prior art, the invention provides the chimney carriage for construction, a construction platform capable of being lifted is built, and the construction cost is well reduced.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the utility model provides a chimney balladeur train is used in construction, includes concrete wall section of thick bamboo and installs the radiant beam platform in concrete wall section of thick bamboo top, evenly distributed has the steel pipe that is not less than two in the middle part of concrete wall section of thick bamboo, is connected with the jack that climbs on every steel pipe, the casing and the radiant beam platform fixed connection of jack that climbs. The steel pipe is arranged in the concrete wall cylinder, so that the structural stability of the chimney can be enhanced, and a sliding track can be provided for the climbing jack. After the corresponding concrete wall cylinder is poured, the climbing jack is started, and the concrete wall cylinder is continuously poured, so that the method is simple and convenient.
Furthermore, the radiation beam platform comprises transverse radiation beams, longitudinal radiation beams, positioning sleeves and fastening bolts, wherein the transverse radiation beams are distributed in parallel, the longitudinal radiation beams are vertically distributed relative to the transverse radiation beams, the longitudinal radiation beams are fixedly connected with the transverse radiation beams through the fastening bolts, each transverse radiation beam is positioned through the positioning sleeves, each transverse radiation beam is distributed at even intervals, each longitudinal radiation beam is positioned through the positioning sleeves, and each longitudinal radiation beam is distributed at even intervals. Through setting up the radiation beam that is "well" font concatenation, structural stability greatly increased, then lay rubber slab or plank above the radiation beam for the workman walks freely, improves the efficiency of construction, dismantles also comparatively portably after the construction is accomplished, pulls down fastening bolt and can dismantle step by step.
Lower chord member and pole setting are installed to radiation beam platform below, lower chord member and pole setting splice into square steel construction after-fixing in radiation beam platform below, lower chord member and pole setting pass through the connecting block to be connected fixedly. Further reinforce radiation beam platform.
Preferably, the diagonal connecting block of the square steel structure formed by the lower chord and the vertical rod is fixedly connected through an inclined pull rod, and the connecting block is an angle steel structure with a fastening bolt.
Furthermore, the periphery of the radiation beam platform is fixedly provided with a hanging frame used for preventing objects from falling from high altitude, and the hanging frame is provided with a safety net.
Compared with the prior art, the invention has the beneficial effects that:
1. the chimney carriage for construction is used for building a construction platform capable of being lifted, so that the construction cost is well reduced.
2. The radiation beam platform is simple in design, installation and disassembly and high in stability, and construction safety is improved.
3. Through at radiant beam platform below installation bearing structure, further improve construction platform's stability.
Drawings
The invention is further illustrated with reference to the following figures and examples.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a detailed view of the radiation beam structure of the present invention;
figure 3 is a top view of the radiant beam platform of the present invention.
In the figure: 1. concrete wall cylinder, 2, radiant beam platform, 21, transverse radiant beam, 22, longitudinal radiant beam, 23, positioning sleeve, 24, fastening bolt, 3, steel pipe, 4, climbing jack, 5, guard rail, 6, lower chord, 7, vertical rod, 8, diagonal draw bar, 9, connecting block, 10, hanging rack, 11 and safety net.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention. In addition, unless otherwise defined, technical or scientific terms used herein shall have the ordinary meaning as understood by those of ordinary skill in the art to which this invention belongs. The use of "first," "second," and similar terms in the description and claims of the present application do not denote any order, quantity, or importance, but rather the terms are used to distinguish one element from another. Also, the use of the terms "a" or "an" and the like do not necessarily denote a limitation of quantity. The word "comprising" or "comprises", and the like, means that the element or item listed before the word covers the element or item listed after the word and its equivalents, but does not exclude other elements or items. The terms "connected" or "coupled" and the like are not restricted to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "upper", "lower", "left", "right", and the like are used merely to indicate relative positional relationships, and when the absolute position of the object being described is changed, the relative positional relationships may also be changed accordingly.
Example one
As shown in fig. 1, a chimney carriage for construction comprises a concrete wall cylinder 1 and a radiant beam platform 2 installed above the concrete wall cylinder, wherein at least two steel pipes 3 are uniformly distributed in the middle of the concrete wall cylinder 1, preferably eight steel pipes are used in the embodiment and uniformly distributed along the circumferential line of the wall cylinder, and the diameter of each steel pipe 3 is one third of the thickness of the wall cylinder.
Each steel pipe is connected with a climbing jack 4, a proper climbing jack is selected according to the outer diameter of the steel pipe 3, and a shell of each climbing jack 4 is fixedly connected with the radiant beam platform 2. The steel pipe 3 is arranged in the concrete wall cylinder, so that the structural stability of the chimney can be enhanced, and a sliding track can be provided for the climbing jack. After the corresponding concrete wall cylinder is poured, the climbing jack is started, and the concrete wall cylinder is continuously poured, so that the method is simple and convenient.
As shown in fig. 2-3, the radiation beam platform 2 includes a transverse radiation beam 21, a longitudinal radiation beam 22, a positioning sleeve 23 and a fastening bolt 24, wherein a plurality of the transverse radiation beams 21 are distributed in parallel, a plurality of the longitudinal radiation beams 22 are distributed in parallel, the longitudinal radiation beams 22 are distributed perpendicularly relative to the transverse radiation beams 21, the longitudinal radiation beams 22 are fixedly connected with the transverse radiation beams 21 through the fastening bolt 24, each transverse radiation beam 21 is positioned through the positioning sleeve 23, each transverse radiation beam 21 is distributed at an even interval, each longitudinal radiation beam 22 is positioned through the positioning sleeve 23, and each longitudinal radiation beam 22 is distributed at an even interval. Through setting up the radiation beam that is "well" font concatenation, structural stability greatly increased, then lay rubber slab or plank above the radiation beam for the workman walks freely, improves the efficiency of construction, dismantles also comparatively portably after the construction is accomplished, pulls down fastening bolt and can dismantle step by step.
Lower chord 6 and pole setting 7 are installed to radiation beam platform 2 below, lower chord 6 and pole setting 7 splice into square steel construction after-fixing in radiation beam platform 2 below, lower chord 6 and pole setting 7 are connected fixedly through connecting block 9. Further reinforce radiation beam platform.
Preferably, a diagonal connecting block 9 of a square steel structure formed by the lower chord 6 and the vertical rod 7 is fixedly connected through a diagonal draw bar 8, and the connecting block 9 is an angle steel structure with a fastening bolt.
Further, a hanging rack 10 for preventing objects from falling from high altitude is fixedly installed on the periphery of the radiation beam platform 2, and a safety net 11 is installed on the hanging rack 10.
Preferably, the safety net in the embodiment selects a nylon mesh fabric structure with a mesh size of 30mm, and is fixed on the corresponding hanger connecting points through the cable ties.
When this embodiment is actually implemented, begin to build the chimney balladeur train at concrete wall section of thick bamboo construction basic unit, every layer is pour and is accomplished the back, can drive the jack that climbs, carries out the wall section of thick bamboo of one deck down and pours, treat whole pouring accomplish the back, utilize the loop wheel machine dismantle the balladeur train can, because the structure is assembled to the balladeur train, dismantle comparatively simple and convenient.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. The chimney carriage for construction is characterized by comprising a concrete wall cylinder and a radiant beam platform arranged above the concrete wall cylinder, wherein no less than two steel pipes are uniformly distributed in the middle of the concrete wall cylinder, each steel pipe is connected with a climbing jack, and a shell of the climbing jack is fixedly connected with the radiant beam platform.
2. The chimney carriage for construction according to claim 1, wherein the radiation beam platform includes a plurality of transverse radiation beams, a plurality of longitudinal radiation beams, a plurality of positioning sleeves and a fastening bolt, the plurality of transverse radiation beams are distributed in parallel, the plurality of longitudinal radiation beams are distributed in parallel, the longitudinal radiation beams are distributed perpendicularly to the transverse radiation beams, and the longitudinal radiation beams are fixedly connected with the transverse radiation beams through the fastening bolt.
3. The construction chimney carriage according to claim 2, wherein each transverse radiant beam is positioned by a positioning sleeve, and each transverse radiant beam is evenly spaced.
4. The construction chimney carriage according to claim 2, characterized in that each longitudinal beam is positioned by a positioning sleeve, and each longitudinal beam is evenly spaced.
5. The chimney carriage for construction according to claim 1, wherein a lower chord and an upright are installed below the radiant beam platform, the lower chord and the upright are spliced into a square steel structure and then fixed below the radiant beam platform, and the lower chord and the upright are connected and fixed through a connecting block.
6. The chimney carriage for construction according to claim 5, wherein the diagonal connection block of square steel structure formed by the lower chord and the vertical rod is connected and fixed by a diagonal member.
7. The chimney carriage for construction according to claim 5 or 6, wherein the connection block is an angle steel structure with a fastening bolt.
8. The chimney carriage for construction according to claim 1, wherein a hanger for preventing objects from falling from high altitude is fixedly installed on the periphery of the radiation beam platform, and a safety net is installed on the hanger.
CN202011422452.0A 2020-12-08 2020-12-08 Chimney carriage for construction Pending CN112459449A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011422452.0A CN112459449A (en) 2020-12-08 2020-12-08 Chimney carriage for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011422452.0A CN112459449A (en) 2020-12-08 2020-12-08 Chimney carriage for construction

Publications (1)

Publication Number Publication Date
CN112459449A true CN112459449A (en) 2021-03-09

Family

ID=74800286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011422452.0A Pending CN112459449A (en) 2020-12-08 2020-12-08 Chimney carriage for construction

Country Status (1)

Country Link
CN (1) CN112459449A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535843A (en) * 2011-12-16 2012-07-04 马鞍山钢铁建设集团有限公司 Construction method of circular reinforced concrete chimney cylinder wall and hydraulic sliding mould device
US20140305070A1 (en) * 2012-06-11 2014-10-16 Zhejiang Construction Engineering Group Co., Ltd. Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN104420640A (en) * 2013-08-23 2015-03-18 湖南省第三工程有限公司 Heterosexual chimney construction platform
CN110206377A (en) * 2019-06-14 2019-09-06 江苏新大高空工程有限公司 Chimney hydraulic lifting apparatus
CN214272874U (en) * 2020-12-08 2021-09-24 江苏新大高空工程有限公司 Chimney carriage for construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535843A (en) * 2011-12-16 2012-07-04 马鞍山钢铁建设集团有限公司 Construction method of circular reinforced concrete chimney cylinder wall and hydraulic sliding mould device
US20140305070A1 (en) * 2012-06-11 2014-10-16 Zhejiang Construction Engineering Group Co., Ltd. Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN104420640A (en) * 2013-08-23 2015-03-18 湖南省第三工程有限公司 Heterosexual chimney construction platform
CN110206377A (en) * 2019-06-14 2019-09-06 江苏新大高空工程有限公司 Chimney hydraulic lifting apparatus
CN214272874U (en) * 2020-12-08 2021-09-24 江苏新大高空工程有限公司 Chimney carriage for construction

Similar Documents

Publication Publication Date Title
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN107902545B (en) Horse way air pipe hoisting construction device and construction method
CN109138452A (en) Heavy construction bolt sphere steel pipe rack entirety fast lifting construction technology
CN109208915B (en) Construction method for integrally lifting cooling tower system and steel gallery
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN214272874U (en) Chimney carriage for construction
CN109138431B (en) Super high-rise pump pipe bridge crossing device and construction method thereof
CN109162437B (en) Integral steel platform for multi-cylinder steel plate shear wall and construction method thereof
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN105952130B (en) A kind of suspension platform installation method for the construction of building cornice position
CN109881587A (en) King-tower upper beam bracket integral installation method under a kind of strong wind atmosphere
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN206158204U (en) Construction equipment of chimney shaft
CN112459449A (en) Chimney carriage for construction
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN202299362U (en) Erecting structure for suspension type scaffold of pipe rack
KR101220129B1 (en) Platform System for the Boiler Furnace Maintenance
CN205400087U (en) Group tears formula steel reinforcement cage mounting platform open
CN114439253A (en) Hanging construction method for wrapping concrete on peripheral part of steel beam
CN204531571U (en) The segmented cement electric pole of the pre-buried flange of a kind of cement electric pole and application thereof
CN112160582A (en) Assembling platform suitable for construction of spoke type cable membrane system
CN105926915B (en) Grow the construction method for workbench of encorbelmenting in Bailey beam high-altitude

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination