CN112446606A - Construction project quality information management method and data management system - Google Patents
Construction project quality information management method and data management system Download PDFInfo
- Publication number
- CN112446606A CN112446606A CN202011320173.3A CN202011320173A CN112446606A CN 112446606 A CN112446606 A CN 112446606A CN 202011320173 A CN202011320173 A CN 202011320173A CN 112446606 A CN112446606 A CN 112446606A
- Authority
- CN
- China
- Prior art keywords
- information
- data
- construction
- raw material
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 238000013523 data management Methods 0.000 title claims abstract description 27
- 238000007726 management method Methods 0.000 title claims abstract description 12
- 239000002994 raw material Substances 0.000 claims abstract description 32
- 239000000463 material Substances 0.000 claims abstract description 20
- 238000012545 processing Methods 0.000 claims abstract description 17
- 238000013500 data storage Methods 0.000 claims description 10
- 238000012544 monitoring process Methods 0.000 claims description 8
- 238000004891 communication Methods 0.000 claims description 6
- 238000007639 printing Methods 0.000 claims description 6
- 238000000034 method Methods 0.000 claims 1
- 238000001514 detection method Methods 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013329 compounding Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a construction project quality information management method and a data management system, which comprises the following steps: step 1: uploading and storing the construction data in a data management system, and step 2: acquiring building information from a construction site, wherein the building information comprises a building part name and actual raw material information corresponding to the building part; and step 3: checking the actual raw material information acquired in the step 2 with the raw material information in the data management system, generating a material comparison list according to the checking result and storing the material comparison list in the data management system; the construction data are uploaded in advance, the data acquired at the construction site are compared with the preset construction data, and the comparison list is acquired, so that the processing material can be monitored timely and accurately, the raw material can be pre-checked, spot-checked and checked conveniently, the detection and acceptance efficiency of engineering construction is improved, the pipe shrinkage arching is facilitated, the construction efficiency is improved, and the quality of the engineering is ensured.
Description
Technical Field
The invention relates to the technical field of engineering management, in particular to a construction engineering quality information management method and a data management system.
Background
In engineering construction, correct material consumption is the premise of ensuring engineering quality. In engineering construction, the needed materials are many and complicated, if the traditional mode of manual checking is recorded by all pictures and texts, the problem of information transmission faults is easy to occur, the working efficiency is low, and the office cost is high.
Disclosure of Invention
Aiming at the defects in the background technology, the invention provides a construction engineering quality information management method and a data management system.
The technical scheme adopted by the invention is as follows: a construction project quality information management method and a data management system comprise the following steps:
step 1: uploading construction data and storing the construction data in a data management system, wherein the construction data at least comprises a building part name and raw material information corresponding to the building part name;
step 2: acquiring building information from a construction site, wherein the building information comprises a building part name and actual raw material information corresponding to the building part;
and step 3: checking the actual raw material information acquired in the step 2 with the raw material information in the data management system, generating a material comparison list according to the checking result and storing the material comparison list in the data management system;
and 4, step 4: and (4) sending the material comparison list generated in the step (4) to a printing device and printing.
Furthermore, a building mark is arranged on a building of the construction site, and the building mark is a two-dimensional code with building information.
Further, the building information at least includes a building name and actual raw material information.
The engineering quality information data management system comprises an information acquisition module, a data processing module and a data storage module, wherein the information acquisition module and the data processing module are in communication connection with the data storage module.
Furthermore, the information acquisition module is a mobile two-dimensional code scanning device and is used for acquiring and transmitting acquired data to the data storage module.
Furthermore, the data processing module is used for comparing the raw material information on the construction data with the actual raw material information acquired by the information acquisition module, and generating a material comparison list according to a comparison result.
And the quality monitoring terminal is in communication connection with the data processing module, and when the raw material information and the actual raw material information are input and output, the input and output information is sent to the quality monitoring terminal.
The invention has the beneficial effects that: the construction data are uploaded in advance, the data acquired at the construction site are compared with the preset construction data, and the comparison list is acquired, so that the processing material can be monitored timely and accurately, the raw material can be pre-checked, spot-checked and checked conveniently, the detection and acceptance efficiency of engineering construction is improved, the pipe shrinkage arching is facilitated, the construction efficiency is improved, and the quality of the engineering is ensured.
In addition to the objects, features and advantages described above, other objects, features and advantages of the present invention are also provided.
The present invention will be described in further detail below with reference to the drawings.
Drawings
FIG. 1 is a block diagram of a data management system.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a construction project quality information management method and a data management system. The construction project quality information management method and the data management system comprise the following steps:
step 1: uploading construction data and storing the construction data in a data management system, wherein the construction data at least comprises a building part name and raw material information corresponding to the building part name;
step 2: acquiring building information from a construction site, wherein the building information comprises a building part name and actual raw material information corresponding to the building part;
and step 3: checking the actual raw material information acquired in the step 2 with the raw material information in the data management system, generating a material comparison list according to the checking result and storing the material comparison list in the data management system;
and 4, step 4: and (4) sending the material comparison list generated in the step (4) to a printing device and printing.
Among the above-mentioned technical scheme, through compounding the construction data of regulation in advance and uploading, then compare the data that the job site acquireed with the construction data of preset and acquire the contrast list, can be timely accurate monitor the processing material, be convenient for to the preliminary examination of raw and other materials, the selective examination and check to improve the detection and the acceptance rate of engineering construction, help the contracted pipe hunch-up, guarantee the quality of engineering when improving construction efficiency.
Specifically, a building mark is arranged on a building of the construction site, and the building mark is a two-dimensional code with building information; the building information includes at least a building name and actual raw material information.
Among the above-mentioned technical scheme, utilize the two-dimensional code as information transmission medium, collect information convenient and fast, it is with low costs.
The engineering quality information data management system comprises an information acquisition module, a data processing module and a data storage module, wherein the information acquisition module and the data processing module are in communication connection with the data storage module; the information acquisition module is a mobile two-dimensional code scanning device and is used for acquiring and transmitting acquired data to the data storage module.
The information acquisition module acquires the required building information and stores the building information in the data storage module, wherein the information acquisition module can be mobile two-dimensional code scanning equipment such as a mobile phone.
Specifically, the data processing module is configured to compare raw material information on the construction data with actual raw material information acquired by the information acquisition module, and generate a material comparison list according to a comparison result. And the data processing module compares the collected information with the pre-stored construction information and generates a list.
The quality monitoring terminal is in communication connection with the data processing module, and when the raw material information and the actual raw material information are input and output, the input and output information is sent to the quality monitoring terminal.
Under the information check of the data processing module, when the information is found to be abnormal, the information is presented to an operator on duty or a supervision engineer through the quality monitoring terminal, and the operator on duty or the supervision engineer makes an adjustment response by the technology, so that the real-time monitoring effect is achieved, and the engineering quality is improved.
The skilled person should understand that: although the invention has been described in terms of the above specific embodiments, the inventive concept is not limited thereto and any modification applying the inventive concept is intended to be included within the scope of the patent claims.
Claims (7)
1. A construction project quality information management method is characterized in that: the method comprises the following steps:
step 1: uploading construction data and storing the construction data in a data management system, wherein the construction data at least comprises a building part name and raw material information corresponding to the building part name;
step 2: acquiring building information from a construction site, wherein the building information comprises a building part name and actual raw material information corresponding to the building part;
and step 3: checking the actual raw material information acquired in the step 2 with the raw material information in the data management system, generating a material comparison list according to the checking result and storing the material comparison list in the data management system;
and 4, step 4: and (4) sending the material comparison list generated in the step (4) to a printing device and printing.
2. The construction work quality information management method according to claim 1, characterized in that: the building of the construction site is provided with a building identification which is a two-dimensional code with building information.
3. The construction work quality information management method according to claim 2, characterized in that: the building information includes at least a building name and actual raw material information.
4. A project quality information data management system is characterized in that: the system comprises an information acquisition module, a data processing module and a data storage module, wherein the information acquisition module and the data processing module are in communication connection with the data storage module.
5. The project quality information data management system of claim 4, wherein: the information acquisition module is a mobile two-dimensional code scanning device and is used for acquiring and transmitting acquired data to the data storage module.
6. The project quality information data management system of claim 5, wherein: the data processing module is used for comparing the raw material information on the construction data with the actual raw material information acquired by the information acquisition module, and generating a material comparison list according to a comparison result.
7. The project quality information data management system of claim 6, wherein: the quality monitoring terminal is in communication connection with the data processing module, and when the raw material information and the actual raw material information enter and exit, the entering and exiting information is sent to the quality monitoring terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011320173.3A CN112446606A (en) | 2020-11-23 | 2020-11-23 | Construction project quality information management method and data management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011320173.3A CN112446606A (en) | 2020-11-23 | 2020-11-23 | Construction project quality information management method and data management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112446606A true CN112446606A (en) | 2021-03-05 |
Family
ID=74738655
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011320173.3A Pending CN112446606A (en) | 2020-11-23 | 2020-11-23 | Construction project quality information management method and data management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112446606A (en) |
-
2020
- 2020-11-23 CN CN202011320173.3A patent/CN112446606A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111307823B (en) | System and method for detecting typical visual defects of power transformation equipment based on edge cloud cooperation | |
CN107168294B (en) | Unmanned inspection monitoring method for thermal power water system equipment | |
CN106815681B (en) | Transformer substation secondary equipment closed-loop management platform based on two-dimensional code and management system thereof | |
CN110472858B (en) | Construction engineering supervision information management method | |
CN103544739A (en) | B/S (Browser/Server) architecture-based polling method of visual subway equipment polling management system | |
CN110807460B (en) | Transformer substation intelligent patrol system based on image recognition and application method thereof | |
CN111161445A (en) | Electric power inspection system | |
CN210348563U (en) | Wireless inspection system | |
CN116245735B (en) | Print control instrument operation supervision system based on data analysis | |
CN110855781B (en) | Engineering monitoring method, engineering monitoring device, computer equipment and storage medium | |
CN115562143B (en) | Valve remote fault monitoring method and system based on Internet of things | |
CN113821242B (en) | Intelligent firmware matching method and system | |
CN112832782B (en) | Method and system for improving working efficiency of shield tunneling | |
CN113421355A (en) | Industrial field short-distance data transmission system and inspection method | |
CN112446606A (en) | Construction project quality information management method and data management system | |
CN117474565A (en) | Carbon accounting digital twin energy management system | |
CN108415387A (en) | A kind of safety control system and method for controlling security | |
CN107758458B (en) | Thing networking elevator encoder system | |
CN110888782A (en) | Device processing method, system, electronic device and computer readable storage medium | |
CN111079954A (en) | Communication equipment overhaul management system based on big data | |
CN213461825U (en) | Equipment remote diagnosis system based on handheld terminal | |
CN115334119A (en) | Safety monitoring system and method for thermal power plant | |
CN107332718A (en) | A kind of power communication is with matching somebody with somebody electric terminal real-time linkage Fault Locating Method | |
CN113779125A (en) | Construction safety information management method and system | |
CN109635967A (en) | A kind of method and apparatus lifting machine overhauling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |