CN112431632B - Construction method of electric power tunnel - Google Patents

Construction method of electric power tunnel Download PDF

Info

Publication number
CN112431632B
CN112431632B CN202011377332.3A CN202011377332A CN112431632B CN 112431632 B CN112431632 B CN 112431632B CN 202011377332 A CN202011377332 A CN 202011377332A CN 112431632 B CN112431632 B CN 112431632B
Authority
CN
China
Prior art keywords
tunnel
pipe
ball
transition
pipe body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011377332.3A
Other languages
Chinese (zh)
Other versions
CN112431632A (en
Inventor
孙海明
王元山
肖建飞
王国永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yuanyang Xinsheng Power Engineering Co ltd
Original Assignee
Beijing Yuanyang Xinsheng Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yuanyang Xinsheng Power Engineering Co ltd filed Critical Beijing Yuanyang Xinsheng Power Engineering Co ltd
Priority to CN202011377332.3A priority Critical patent/CN112431632B/en
Publication of CN112431632A publication Critical patent/CN112431632A/en
Application granted granted Critical
Publication of CN112431632B publication Critical patent/CN112431632B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/04Distributing means for power supply in mines
    • E21F17/06Distributing electric power; Cable networks; Conduits for cables
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F23/00Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
    • G01F23/30Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by floats
    • G01F23/64Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by floats of the free float type without mechanical transmission elements
    • G01F23/66Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by floats of the free float type without mechanical transmission elements using mechanically actuated indicating means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K7/00Arrangements for handling mechanical energy structurally associated with dynamo-electric machines, e.g. structural association with mechanical driving motors or auxiliary dynamo-electric machines
    • H02K7/06Means for converting reciprocating motion into rotary motion or vice versa

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Power Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Sewage (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The application relates to a power tunnel construction method, relates to the field of power construction, and is characterized by comprising the following steps: 1) excavating the tunnel body; 2) a water collecting tank positioned below the tunnel body is embedded underground, so that a connecting pipe connected with the water collecting tank extends out of the bottom surface of the tunnel body, and meanwhile, an installation pipe connected with the water collecting tank extends out of the ground and is connected with a water suction pump; 3) the installation pipe comprises a first pipe body, a second pipe body and a transition ball body installed between the first pipe body and the second pipe body, a floating ball blocking the joint of the transition ball body and the first pipe body is arranged in the transition ball body, so that a connecting wire is fixed on the side wall of the floating ball, a connecting hole is formed in the side wall of the upper end of the second pipe body, the upper end of the connecting wire extends out of the connecting hole, and then a bright color is coated on the part, in the connecting hole, of the connecting wire to form an identification section; 4) and a drainage groove communicated with the connecting pipe is dug at the bottom of the tunnel body. This application has the effect that ponding condition takes place in reducing the electric power tunnel.

Description

Construction method of electric power tunnel
Technical Field
The application relates to the field of electric power construction, in particular to a construction method of an electric power tunnel.
Background
The electric power tunnel is widely applied in developed countries abroad, is greatly popularized in developed areas such as coastal areas of China, and along with the change of economic growth modes of China, the standard of urban planning is higher and higher, the foresight is more and more prominent, and the construction of a comprehensive pipe gallery and the electric power tunnel is more and more. And the old city district does not possess utility tunnel's construction condition because peripheral building and municipal facilities have been built, more is fit for constructing the electric power tunnel.
The traditional Chinese patent with publication number CN111255464A discloses a shallow-buried underground excavation construction method for an electric power tunnel in an egg stone stratum, wherein an upper supporting structure and a lower supporting structure are fastened and connected together to form a primary supporting structure, and then waterproof and secondary lining are performed, so that on one hand, an arch top can be quickly supported and protected, on the other hand, steel supports and engineering plastic supports are effectively integrated together, and the fastening and connecting parts adopt a bolt fastening mode, so that the connecting strength can be ensured, the mounting efficiency can be improved, and drainage ditches are arranged in the tunnel.
For the above related art, the inventor thinks that drainage mechanism is comparatively simple among the related art, and drainage effect is general, can cause the inside ponding problem of electric power tunnel when running into heavy rain.
Disclosure of Invention
In order to reduce the occurrence of the condition of water accumulation in the electric power tunnel, the application provides an electric power tunnel construction method.
The electric power tunnel construction method provided by the application adopts the following technical scheme:
a construction method of an electric power tunnel is characterized by comprising the following steps:
1) excavating the tunnel body;
2) a water collecting tank positioned below the tunnel body is embedded underground, so that a connecting pipe connected with the water collecting tank extends out of the bottom surface of the tunnel body, and meanwhile, an installation pipe connected with the water collecting tank extends out of the ground and is connected with a water suction pump;
3) the installation pipe comprises a first pipe body, a second pipe body and a transition ball body installed between the first pipe body and the second pipe body, a floating ball blocking the joint of the transition ball body and the first pipe body is arranged in the transition ball body, so that a connecting wire is fixed on the side wall of the floating ball, a connecting hole is formed in the side wall of the upper end of the second pipe body, the upper end of the connecting wire extends out of the connecting hole, and then a bright color is coated on the part, in the connecting hole, of the connecting wire to form an identification section;
4) and a drainage groove communicated with the connecting pipe is dug at the bottom of the tunnel body.
By adopting the technical scheme, when a small amount of water is accumulated in the tunnel body, the water enters the water collecting tank along the drainage groove and the connecting pipe to be collected; when the accumulated water in the tunnel body is excessive and the water collected in the water collecting tank is more, the water in the water collecting tank enters the transition sphere along the first pipe body, so that a floating ball in the transition sphere is impacted, and the floating ball floats upwards under the action of the buoyancy of the water so as to be separated from the connection part of the transition sphere and the first pipe body; float ball upward movement and drive connecting wire upward movement, so drive the sign section and stretch out the connecting hole, the staff observes the sign section and stretches out the connecting hole this moment, starts the suction pump, extracts the ponding in the header tank and this internal ponding in tunnel, is convenient for reduce the emergence of the interior ponding condition of electric power tunnel.
Preferably, the following steps are added after step 4): 5) the tunnel body is internally provided with a lead screw which is rotationally connected with the top wall of the tunnel body, the lead screw is connected with a plurality of vertically arranged supporting plates in a threaded manner, and the upper end of the lead screw is fixedly connected with an output shaft of a driving motor.
By adopting the technical scheme, when the staff observe that the identification section extends out of the connecting hole, the situation that accumulated water in the tunnel body is more and is likely to continue increasing is explained; at this moment, the driving motor is started, the driving motor drives the lead screw to rotate so as to drive the supporting plate to ascend, so that the supporting plate for placing the cables is far away from the bottom surface of the tunnel body, the possibility that the cables in the supporting plate contact rainwater is reduced, and the protection of the cables is facilitated.
Preferably, the following steps are added after step 5): 6) the upper end opening part of the water drainage groove is clamped with the filter plate, and the filter plate is connected with the lower end of the screw rod in a threaded mode.
Through adopting above-mentioned technical scheme, the filter can filter the rainwater that gets into water drainage tank, reduces impurity and blocks up the possibility of water drainage tank and connecting pipe junction, and when the rainwater was too much, thereby start driving motor and drive the lead screw and rotate and drive the filter and break away from water drainage tank for the speed that the tunnel body got into water drainage tank is very fast, the inside quick drainage of tunnel body of being convenient for.
Preferably, every all horizontal sliding connection has the carriage in the backup pad, and the one end that the backup pad was kept away from to every carriage all with the vertical sliding connection of lateral wall of tunnel body.
By adopting the technical scheme, the cable can be placed on the sliding frame, so that the cable can be placed in more positions in the tunnel body; and when the backup pad goes up and down, the backup pad drives the carriage and can slides to the direction of being close to the backup pad or keeping away from the backup pad, and the carriage slides with the lateral wall of tunnel body is vertical simultaneously, so make the backup pad can be comparatively smooth drive the carriage and go up and down.
Preferably, the sliding frame comprises connecting rods which are respectively connected with two side walls of the supporting plate in a sliding manner, and an annular rod is fixed between one ends, far away from the supporting plate, of the two connecting rods.
Through adopting above-mentioned technical scheme, when the carriage to the direction lateral sliding who is close to or keeps away from the backup pad, connecting rod and backup pad relative slip, thereby the annular rod accomplishes the lift of carriage with tunnel body relative slip simultaneously, and the annular rod reduces the in-process that the carriage goes up and down and takes place the emergence of the condition of colliding with the tunnel body for the annular rod is difficult for the lift production of many carriages, backup pad to obstruct.
Preferably, a separation net is fixedly connected in the transition ball body, and the floating ball is located on one side of the separation net close to the first pipe body.
Through adopting above-mentioned technical scheme, at the in-process that the floater rises by buoyancy, when the floater contact spacer grid, the floater is difficult to continue to rise, thereby the spacer grid restriction floater continuously rises to block up the junction of transition spheroid and second body, the normal pump water of suction pump of being convenient for.
Preferably, the connecting wire is fixed with a mounting ball positioned below the identification section, and the diameter of the mounting ball is not smaller than that of the connecting hole.
Through adopting above-mentioned technical scheme, when the sign section stretches out the connecting hole, thereby the installation ball contradicts the inner wall of second body and makes the installation ball block up the connecting hole, and the pump that so can be better outwards draws water, reduces the emergence of the condition of leaking taking place in connecting hole department.
Preferably, the transition sphere is not higher than the support plate connected to the screw rod and located at the lowermost end.
Through adopting above-mentioned technical scheme, when this internal ponding of tunnel did not submerge the backup pad of below, the staff can be timely take place the inside ponding of tunnel and start suction pump and driving motor.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the staff observes that the identification section extends out of the connecting hole, starts the water suction pump, and extracts the accumulated water in the water collecting tank and the tunnel body, so that the accumulated water in the electric power tunnel can be reduced conveniently;
2. the driving motor drives the screw rod to rotate so as to drive the supporting plate to ascend, so that the supporting plate for placing the cable is far away from the bottom surface of the tunnel body, the possibility that the cable on the supporting plate is contacted with rainwater is reduced, and the cable is protected;
3. thereby it keeps rising to separate the net restriction floating ball and blocks up the junction of transition spheroid and second body, and the normal pump water of suction pump of being convenient for.
Drawings
Fig. 1 is a schematic diagram of an overall structure of a tunnel body according to an embodiment of the present application.
Fig. 2 is a schematic structural diagram illustrating a connection relationship between a support plate and a sliding frame according to an embodiment of the present application.
Fig. 3 is a schematic structural view of the second tube according to the embodiment of the present application.
Description of reference numerals: 1. a tunnel body; 11. a water discharge tank; 12. a filter plate; 13. a sliding groove; 2. a water collection tank; 21. a connecting pipe; 22. installing a pipe; 221. a first pipe body; 222. a second tube body; 223. a transition sphere; 224. connecting holes; 23. a water pump; 3. a drive mechanism; 31. a lead screw; 32. a drive motor; 4. a support plate; 41. a strip-shaped groove; 5. a carriage; 51. a connecting rod; 511. connecting blocks; 52. an annular rod; 521. a slider; 6. a separation net; 7. a floating ball; 8. connecting wires; 81. a limiting ball; 82. identifying a segment; 83. and (5) mounting the ball.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses a construction method of an electric power tunnel. Referring to fig. 1, electric power tunnel includes tunnel body 1, and water drainage tank 11 has been seted up to tunnel body 1's bottom, and water drainage tank 11's bottom intercommunication has connecting pipe 21, and connecting pipe 21 keeps away from the fixed and intercommunication of water drainage tank 11's one end and has header tank 2, and header tank 2 is located tunnel body 1's below and pre-buried underground. The upper end opening part joint of water drainage tank 11 has filter 12, is connected with the actuating mechanism 3 that drives the lift of filter 12 on filter 12.
A mounting pipe 22 is fixed on one side wall of the water collecting tank 2 and communicated with the water collecting tank, and one end of the mounting pipe 22, far away from the water collecting tank 2, extends out of the ground and is connected with a water suction pump 23.
When water is accumulated in the tunnel body 1, the accumulated water in the tunnel body 1 enters the water collecting tank 2 along the drainage groove 11 and the connecting pipe 21, and the accumulated water is collected in the water collecting tank 2; when meetting heavy rain weather and probably leading to the inside ponding of tunnel body 1 when more, thereby start actuating mechanism 3 and drive filter 12 and rise and break away from water drainage tank 11, the inside ponding of tunnel body 1 this moment can be quick pass water drainage tank 11, in connecting pipe 21 gets into header tank 2, start suction pump 23 simultaneously and make the inside water of header tank 2 along installation pipe 22 discharge header tank 2, so can guarantee the quick discharge of the inside ponding of tunnel body 1.
Actuating mechanism 3 includes lead screw 31 and driving motor 32, and the vertical direction setting of lead screw 31 is inside tunnel body 1, and in the lower extreme of lead screw 31 and filter 12 threaded connection stretched into water drainage tank 11, the upper end of lead screw 31 rotated with tunnel body 1's top surface and is connected, and the upper end of lead screw 31 runs through tunnel body 1 and stretches out ground fixedly connected with driving motor 32's output shaft. The drive motor 32 has a forward and reverse rotation.
When the driving motor 32 is started to drive the screw rod 31 to rotate, the screw rod rotates to drive the filter plates 12 to move towards or away from the drainage groove 11. When the filter plate 12 is clamped with the drainage groove 11, the filter plate 12 is difficult to continue to move towards the direction close to the drainage groove 11, i.e. the filter plate 12 is not easy to separate from the screw rod 31. The lead screw 31 is generally referred to as a ball screw 31 so that the filter plate 12 can be lifted without being guided.
Referring to fig. 1 and 2, a plurality of support plates 4 arranged in the vertical direction are screwed on the screw rod 31, preferably three support plates 4 in the embodiment, and the support plates 4 are used for placing and supporting cables inside the tunnel body 1. And two ends of each supporting plate 4 are respectively connected with a sliding frame 5 in a sliding mode, and the sliding frames 5 can also provide support for the cables. The carriage 5 is movable relative to the support plate 4 in a direction away from the support plate 4 or closer to the support plate 4. Every carriage 5 keeps away from the equal fixedly connected with sliding block 521 of one end of backup pad 4, all sets up the sliding tray 13 of vertical setting on the both sides wall of tunnel body 1, and every sliding block 521 all with corresponding sliding tray 13 sliding connection.
When the lead screw 31 rotates to drive the filter plate 12 to ascend, the accumulated water in the tunnel body 1 is more and the possibility of increasing the accumulated water continuously is realized, and the lead screw 31 rotates to drive the support plate 4 to ascend so that the cable on the support plate 4 is far away from the bottom surface of the tunnel body 1, so that the possibility that the cable on the support plate 4 contacts the accumulated water is reduced.
Simultaneously backup pad 4 rises and makes carriage 5 slide to the direction of keeping away from backup pad 4 to sliding block 521 slides along sliding tray 13 simultaneously, thereby can make backup pad 4 smooth drive carriage 5 rise, so also can reduce the possibility of the cable contact ponding on the carriage 5, the better cable on protection backup pad 4, the carriage 5.
Strip-shaped groove 41 has been seted up respectively to the both sides wall of backup pad 4, and carriage 5 is including being located the connecting rod 51 of backup pad 4 both sides respectively, still including being located two connecting rods 51 and keeping away from the annular rod 52 between the one end of bracing piece, and one side and sliding block 521 fixed connection of backup pad 4 are kept away from to annular rod 52, and one side that every connecting rod 51 is close to strip-shaped groove 41 is fixed with respectively and is connected connecting block 511 with strip-shaped groove 41 sliding connection.
When the support plate 4 is lifted, the connection block 511 slides in the bar-shaped groove 41, thereby driving the sliding frame 5 to move toward or away from the support plate 4. The annular rod 52 can reduce the possibility that the sliding frame 5 collides with the side wall of the tunnel body 1 in the lifting process of the sliding frame 5, so that the sliding frame 5 can be smoothly lifted.
Referring to fig. 1 and 3, the installation pipe 22 includes a first pipe 221 connected to the water collection tank 2, and further includes a second pipe 222 located above the first pipe 221, a transition sphere 223 having a hollow structure is connected between the first pipe 221 and the second pipe 222, and the transition sphere 223 is respectively communicated with the first pipe 221 and the second pipe 222. The diameter of the transition sphere 223 is greater than the diameter of the first tube 221, and the diameter of the transition sphere 223 is greater than the diameter of the second tube 222. The middle part of the transition sphere 223 is fixedly connected with a separation net 6 arranged in the horizontal direction, and the separation net 6 divides the transition sphere 223 into an upper part and a lower part.
The floating ball 7 is arranged inside the separating ball body, and the floating ball 7 is located at one side of the separating plate close to the first pipe body 221 and abuts against the joint of the transition ball body 223 and the first pipe body 221. The side wall of the floating ball 7 is fixedly connected with a connecting wire 8 made of rigid material, the top wall of the part of the second pipe body 222 exposed out of the ground is provided with a connecting hole 224, and the connecting wire 8 penetrates through the separation net 6 and vertically upwards penetrates through the connecting hole 224. Connecting wire 8 is including arranging sign section 82 inside connecting hole 224 in and arranging the outside spacing ball 81 of second body 222 in, and the material of spacing ball 81 is lighter, and sign section 82 adopts the bright-colored pigment of colour to paint, and sign section 82 paints red pigment in this embodiment.
When the inside water of header tank 2 is more when water gets into transition spheroid 223 along first body 221 inside, float ball 7 upwards showy under the effect of water buoyancy, so float ball 7 and drive connecting wire 8 and rise, observe when sign section 82 stretches out connecting hole 224 when the staff, start suction pump 23 and draw water and start driving motor 32 simultaneously, float ball 7 this moment and break away from the junction of transition spheroid 223 with first body 221, the suction pump 23 of being convenient for is normally drawn water. The separation net 6 restricts the floating ball 7 from floating upward to block the junction of the transition ball 223 and the second tube 222.
One end fixedly connected with installation ball 83 that spacing ball 81 was kept away from to sign section 82, when sign section 82 stretches out connecting hole 224, thereby installation ball 83 contradicts the inner wall of second body 222 and makes installation ball 83 block up connecting hole 224, and the suction pump can draw water better like this.
Referring to fig. 1, the position of the transition sphere 223 is not lower than the lowest support plate 4 connected with the screw rod 31, so that when the accumulated water in the tunnel body 1 does not submerge the lowest support plate 4, a worker can timely accumulate the water in the tunnel body 1 and start the water suction pump 23 and the driving motor 32.
The construction method of the electric power tunnel comprises the following steps:
1. excavating the tunnel body 1;
2. the water collecting tank 2 is embedded underground, the water collecting tank 2 is located below the tunnel body 1, so that a connecting pipe 21 connected with the water collecting tank 2 extends out of the bottom surface of the tunnel body 1, meanwhile, an installation pipe 22 extends out of the ground, and one end, extending out of the ground, of the installation pipe 22 is connected with a water suction pump 23;
3. the mounting pipe 22 comprises a first pipe body 221, a second pipe body 222 and a transition ball body 223 mounted between the first pipe body 221 and the second pipe body 222, a floating ball 7 blocking the connection part of the transition ball body 223 and the first pipe body 221 is arranged in the transition ball body 223, so that a connecting wire 8 is fixed on the side wall of the floating ball 7, a connection hole 224 is formed in the side wall of the upper end of the second pipe body 222, the upper end of the connecting wire 8 extends out of the connection hole 224 and extends out of the ground, and then a bright color is coated on the connecting wire 8 for the part in the connection hole 224 to form an identification section 82;
4. digging a drainage groove 11 at the bottom of the tunnel body 1, and communicating the bottom of the drainage groove 11 with a connecting pipe 21;
5. a screw rod 31 which is rotatably connected with the top wall of the tunnel body 1 is arranged in the tunnel body 1, a plurality of vertically arranged support plates 4 are connected to the screw rod 31 in a threaded manner, and the upper end of the control screw rod 31 extends out of the ground and is fixedly connected with an output shaft of a driving motor 32;
6. the upper end opening of the drainage groove 11 is clamped with the filter plate 12, and the filter plate 12 is in threaded connection with the lower end of the screw rod 31;
7. the support plate 4 screwed on the screw rod 31 is rotated to enable the lowest support plate 4 to be positioned above the transition sphere 223;
8. the two sliding frames 5 respectively slide on each support plate 4 transversely, a sliding block 521 is fixed at one end of each sliding frame 5, which is far away from the support plate 4, a vertically arranged sliding groove 13 is formed in the side wall of the tunnel body 1, and each sliding frame 5 is pulled towards the direction far away from the support plate 4, so that the sliding block 521 extends into the sliding groove 13 and is connected with the sliding groove 13 in a sliding manner;
9. and (5) handing over and checking.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (4)

1. A construction method of an electric power tunnel is characterized by comprising the following steps:
1) excavating the tunnel body (1);
2) the method comprises the following steps that a water collecting tank (2) located below a tunnel body (1) is embedded underground, so that a connecting pipe (21) connected with the water collecting tank (2) extends out of the bottom surface of the tunnel body (1), and meanwhile, an installation pipe (22) connected with the water collecting tank (2) extends out of the ground and is connected with a water suction pump (23);
3) the installation pipe (22) comprises a first pipe body (221), a second pipe body (222) and a transition ball body (223) installed between the first pipe body (221) and the second pipe body (222), a floating ball (7) blocking the connection position of the transition ball body (223) and the first pipe body (221) is arranged in the transition ball body (223), a connecting wire (8) is fixed on the side wall of the floating ball (7), a connecting hole (224) is formed in the side wall of the upper end of the second pipe body (222), the upper end of the connecting wire (8) extends out of the connecting hole (224), and then a bright color is coated on the part, in the connecting hole (224), of the connecting wire (8) to form an identification section (82);
4) a drainage groove (11) communicated with the connecting pipe (21) is dug at the bottom of the tunnel body (1);
5) a screw rod (31) rotatably connected with the top wall of the tunnel body (1) is arranged in the tunnel body (1), a plurality of vertically arranged support plates (4) are connected to the screw rod (31) in a threaded manner, and an output shaft of a driving motor (32) is fixedly connected to the upper end of the screw rod (31);
the transition sphere (223) is not higher than the support plate (4) which is connected with the screw rod (31) and is positioned at the lowest end;
a separation net (6) is fixedly connected in the transition ball body (223), and the floating ball (7) is positioned on one side of the separation net (6) close to the first pipe body (221);
and an installation ball (83) positioned below the identification section (82) is fixed on the connecting wire (8), and the diameter of the installation ball (83) is not less than that of the connecting hole (224).
2. The method for constructing the electric power tunnel according to claim 1, wherein the following steps are added after the step 5):
6) the upper end opening of the drainage groove (11) is clamped with the filter plate (12), and the filter plate (12) is connected with the lower end of the screw rod (31) in a threaded manner.
3. An electric tunnel construction method according to claim 2, characterized in that a sliding frame (5) is transversely slidably connected to each support plate (4), and one end of each sliding frame (5) far away from the support plate (4) is vertically slidably connected to the side wall of the tunnel body (1).
4. A method as claimed in claim 3, wherein the carriage (5) comprises connecting rods (51) slidably connected to two side walls of the support plate (4), respectively, and wherein a ring-shaped rod (52) is fixed between ends of the two connecting rods (51) remote from the support plate (4).
CN202011377332.3A 2020-11-30 2020-11-30 Construction method of electric power tunnel Active CN112431632B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011377332.3A CN112431632B (en) 2020-11-30 2020-11-30 Construction method of electric power tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011377332.3A CN112431632B (en) 2020-11-30 2020-11-30 Construction method of electric power tunnel

Publications (2)

Publication Number Publication Date
CN112431632A CN112431632A (en) 2021-03-02
CN112431632B true CN112431632B (en) 2022-09-20

Family

ID=74697602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011377332.3A Active CN112431632B (en) 2020-11-30 2020-11-30 Construction method of electric power tunnel

Country Status (1)

Country Link
CN (1) CN112431632B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115929399B (en) * 2023-02-07 2024-01-23 中交四航局第一工程有限公司 Construction protection device and construction protection method for electric power tunnel

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100438794B1 (en) * 2002-11-22 2004-07-07 (주)현이앤씨 Construction method for three arch excavation tunnel
CN108035770B (en) * 2017-12-10 2019-11-26 周铁 A kind of power tunnel construction method
CN210507498U (en) * 2019-07-31 2020-05-12 傲乐科学仪器(上海)有限公司 Underground pipe gallery waterproof environment monitoring devices
CN111059039A (en) * 2019-12-13 2020-04-24 南京工程学院 Urban traffic drainage intelligent control system
CN111490512B (en) * 2020-05-25 2021-03-19 安徽省飞龙新型材料有限公司 Protection structure for preventing water and soil erosion of cable in cable groove and production method thereof

Also Published As

Publication number Publication date
CN112431632A (en) 2021-03-02

Similar Documents

Publication Publication Date Title
CN202249014U (en) Flood control board of underground garage
CN112431632B (en) Construction method of electric power tunnel
CN112482391B (en) Inner supporting structure for foundation pit
CN202298746U (en) An automatic drainage device for impounded roofs
CN206706952U (en) Sewer automates drainage system
CN107366347A (en) A kind of underpass flood reverse-filling drainage system
CN215564852U (en) Underground garage waterproof equipment
CN213772788U (en) Pavement structure
CN113622377B (en) Intelligent control siphon drainage and flexible stilling basin system for check dam
CN112663645B (en) Foundation pit construction drainage system
CN112832291A (en) Inspection well and construction method thereof
CN117080888B (en) Waterproof power distribution cabinet
CN219261291U (en) Cover plate convenient to disassemble
CN218667786U (en) Basement is waterproof, resists floating pressure release retrieval and utilization device
CN218292171U (en) Automatic drainage device for cable trench of transformer substation
CN218322944U (en) Software rainwater collection cellar open skylight
CN221072692U (en) Deep foundation pit pumping device
CN220888696U (en) Foundation pit water pumping and draining equipment
CN212715274U (en) Well cover of drainage well
CN221001094U (en) Dewatering device for sand layer geology of elevator shaft
CN214883777U (en) Foundation pit or foundation trench dewatering system applied to building construction
CN220415454U (en) Automatic drainage device of air pump
CN212295004U (en) Road escape canal is with blocking dirty device
CN113585186B (en) Water conservancy is plug intercepting device for irrigation canals and ditches
CN218346128U (en) Automatic recovery unit of wisdom water sanitation surface of water floater

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant