CN112431607B CN202011381505.9A CN202011381505A CN112431607B CN 112431607 B CN112431607 B CN 112431607B CN 202011381505 A CN202011381505 A CN 202011381505A CN 112431607 B CN112431607 B CN 112431607B
Authority
CN
China
Prior art keywords
tunnel
section
excavation
section tunnel
excavating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011381505.9A
Other languages
Chinese (zh)
Other versions
CN112431607A (en
Inventor
王岩
李金会
赵耀
张立强
任利军
瞿晗
吴鸿
马龙祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN202011381505.9A priority Critical patent/CN112431607B/en
Publication of CN112431607A publication Critical patent/CN112431607A/en
Application granted granted Critical
Publication of CN112431607B publication Critical patent/CN112431607B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Abstract

The invention discloses a construction method of a vertical cross tunnel suitable for mountain construction, which comprises the following steps: determining excavation parameters according to the site working conditions and measuring and setting out; excavating a temporary channel from the small-section tunnel to the large-section tunnel, and arranging a tunnel support to an excavation contour line of the large-section tunnel; turning and excavating along the temporary channel to ensure that the temporary channel is superposed with the central axis of the large-section tunnel to form a pilot tunnel, and climbing along the pilot tunnel to excavate to the vault of the large-section tunnel; after the center line and the vault of the pilot tunnel and the large-section tunnel are superposed, gradually expanding and digging to the contour line of the side wall of the tunnel from two sides of the large-section tunnel in the three circulating footings; and (5) expanding and excavating the pilot tunnel transition section to the section of the large-section tunnel, reversely excavating, and distributing points to carry out primary support monitoring. According to the construction method provided by the invention, the pilot tunnel is excavated to be superposed with the central line and the vault of the large-section tunnel, and the pilot tunnel is reversely expanded and excavated to the contour line of the large-section tunnel, so that the rapid and safe construction of the tunnel intersection is realized under the condition that the construction progress is not influenced.

Description

Vertical cross tunnel construction method suitable for mountain construction
Technical Field
The invention belongs to the technical field of building engineering, and relates to a construction method of a vertical cross tunnel suitable for mountain construction.
Background
With the acceleration of urban modern construction, underground space utilization becomes a trend hotspot. During tunnel design, cross tunnels often appear due to consideration of structural design or functional requirements, and tunnel intersection construction often has a large safety risk, so that the construction often adopts complicated construction modes such as a traditional straight line large-package method and a main tunnel continuous top-picking method, and the construction period is relatively short.
The traditional straight line large-package method and the main hole continuous top-lifting method have the condition exceeding the designed excavation contour line. In the process of expanding and excavating small holes into large holes, on one hand, the top-lifting excavation is limited to be completed in a short area, so that the expanded and excavated external inserting angle is increased, in addition, the operation space of a drill rod of the rock drill is limited, the external inserting angle is more difficult to control, the arch-top overexcavation is easy to occur in the continuous top-lifting excavation, personnel are difficult to observe the surrounding rock situation above the top of the head, and if the block falling situation occurs, the object striking potential safety hazard is easy to occur; on the other hand, when the traditional construction method is used, because the expanding excavation direction is consistent with the excavation direction of the face, the face has almost no footage when expanding excavation.
Therefore, it is necessary to design a method suitable for mountain construction of a vertical cross tunnel to solve the technical problems in the prior art.
Disclosure of Invention
The invention aims to solve at least part of technical problems in the prior art to a certain extent, and provides a vertical cross tunnel construction method suitable for mountain construction, which has a reasonable structure, and realizes quick and safe construction of a tunnel intersection without influencing the construction progress by excavating a pilot tunnel to ensure that the pilot tunnel is superposed with a central line and a vault of a large-section tunnel and reversely expanding and excavating to a contour line of the large-section tunnel.
In order to solve the technical problem, the invention provides a vertical cross tunnel construction method suitable for mountain construction, which comprises the following steps:
step one, determining excavation parameters according to site working conditions and measuring and setting out;
secondly, excavating a temporary channel from the small-section tunnel to the large-section tunnel, and arranging a tunnel support to an excavation contour line of the large-section tunnel;
thirdly, turning and excavating along the temporary channel to enable the temporary channel to be overlapped with the central axis of the large-section tunnel to form a pilot tunnel, and climbing along the pilot tunnel to excavate to the vault of the large-section tunnel;
after the center line and the vault of the pilot tunnel and the large-section tunnel are superposed, gradually expanding and excavating to the contour lines of the side walls of the tunnel from two sides of the large-section tunnel in the three circulating footings;
and fifthly, excavating reversely along the large-section tunnel and distributing points to carry out primary support monitoring.
As a preferred embodiment, I-shaped steel supports are arranged at the intersection of the small-section tunnel and the large-section tunnel for reinforcement.
In the third step, a supporting structure is excavated and erected along the slope of the pilot tunnel.
As a preferred embodiment, excavation is carried out along the direction of the pilot tunnel by adopting a step method, and after the section of the step is formed, the supporting structure of the part needing excavation is dismantled.
As a preferred embodiment, the pilot tunnel climbing excavation, the gradual-change expanding excavation and the reverse excavation are carried out in a designed excavation contour line.
As a preferred embodiment, when the pilot tunnel climbs and excavates, the climbing angle is 5-15 degrees.
In a preferred embodiment, when the pilot tunnel is used for climbing and excavating, the climbing angle is 9 degrees.
As a preferred embodiment, the i-steel support comprises a transverse support and an inclined support, the transverse support is arranged on the upper side of the intersection of the small-section tunnel and the large-section tunnel, and the inclined support is arranged on the lower side of the transverse support and symmetrically arranged on two sides of the small-section tunnel.
As a preferred embodiment, the i-steel support further comprises an arc-shaped beam, the arc-shaped beam is arranged at the intersection of the small-section tunnel and the large-section tunnel, and the oblique supports are tangentially arranged on two sides of the arc-shaped beam.
In a preferred embodiment, the temporary passage is a traffic passage, the cross-sectional dimension of which is matched with that of the transport vehicle.
The invention has the beneficial effects that:
the vertical cross tunnel construction method suitable for mountain construction is reasonable in structure, the pilot tunnel is excavated to be overlapped with the central line and the vault of the large-section tunnel, and the contour line of the large-section tunnel is reversely expanded and excavated, so that the rapid and safe construction of the tunnel intersection is realized under the condition that the construction progress is not influenced.
Drawings
The above advantages of the present invention will become more apparent and more readily appreciated from the detailed description set forth below when taken in conjunction with the drawings, which are intended to be illustrative, not limiting, of the invention and in which:
FIG. 1 is a flow chart of a vertical cross tunnel construction method suitable for mountain construction according to the present invention;
FIG. 2 is a schematic diagram of construction positions corresponding to each construction process according to the present invention;
FIG. 3 is a schematic view of an I-steel support at the intersection of a small cross-section tunnel and a large cross-section tunnel according to the present invention;
FIG. 4 is a schematic view of the present invention for guiding tunnel climbing excavation;
fig. 5 is a schematic view of the pilot hole enlarging cross section according to the present invention.
In the drawings, the reference numerals denote the following components:
10. i-shaped steel support; 11. transversely supporting; 12. obliquely supporting; 13. an arc beam.
Detailed Description
Fig. 1 to 5 are related schematic diagrams of a vertical cross tunnel construction method suitable for mountain land construction according to the present application, and the present invention will be described in detail below with reference to specific embodiments and accompanying drawings.
The examples described herein are specific embodiments of the present invention, are intended to be illustrative and exemplary in nature, and are not to be construed as limiting the scope of the invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other embodiments that are obvious based on the disclosure of the claims and the specification herein, including those that employ any obvious substitutions and modifications to the embodiments described herein.
The drawings accompanying this specification are for the purpose of illustrating the concepts of the invention and are not necessarily to scale, the drawings being schematic representations of the shapes of the parts and their interrelationships. It is noted that the drawings are not necessarily to the same scale so as to clearly illustrate the structures of the various elements of the embodiments of the invention. Like reference numerals are used to denote like parts.
The invention relates to a flow chart of a vertical cross tunnel construction method suitable for mountain construction, as shown in figure 1, the vertical cross tunnel construction method suitable for mountain construction comprises the following steps:
step one, determining excavation parameters according to the site working conditions and measuring and setting out.
And step two, excavating a temporary channel from the small-section tunnel to the large-section tunnel, and setting a tunnel support to an excavation contour line of the large-section tunnel.
Thirdly, turning and excavating along the temporary channel to enable the temporary channel to be overlapped with the central axis of the large-section tunnel to form a pilot tunnel, and climbing along the pilot tunnel to excavate to the vault of the large-section tunnel; and in the third step, climbing along the pilot tunnel, excavating and erecting a supporting structure.
And step four, after the center lines and the vault of the pilot tunnel and the large-section tunnel are overlapped, gradually expanding and digging to the contour line of the side wall of the tunnel from the two sides of the large-section tunnel in the three circulating footage.
And fifthly, excavating reversely along the large-section tunnel and distributing points to carry out primary support monitoring.
According to the invention, simultaneous operation of tunnel face excavation and pilot tunnel expanding excavation is realized, and the construction efficiency is improved on the premise of ensuring the construction safety. The tunnel face in the field is a working face for continuously advancing the tunnel.
Fig. 2 is a schematic diagram of construction positions corresponding to each construction process in the invention, and a supporting structure is arranged for excavation construction according to the sequence in the construction process.
As an embodiment of the invention, an I-shaped steel support 10 is arranged at the intersection of the small-section tunnel and the large-section tunnel for reinforcement. As shown in fig. 3. The I-steel support 10 comprises a transverse support 11 and an inclined support 12, the transverse support 11 is arranged on the upper side of the intersection of the small-section tunnel and the large-section tunnel, and the inclined support 12 is arranged on the lower side of the transverse support 11 and symmetrically arranged on two sides of the small-section tunnel.
Further, the i-steel support 10 further comprises an arc-shaped beam 13, the arc-shaped beam 13 is arranged at the intersection of the small-section tunnel and the large-section tunnel, and the inclined supports 12 are tangentially arranged on two sides of the arc-shaped beam 13.
As an embodiment of the invention, the included angle between the oblique supports 12 and the transverse supports 11 is 30-60 degrees. Preferably, the angle between the diagonal support 12 and the lateral support 11 is 45 °.
As another embodiment of the present invention, the length of the lateral support 11 is not less than the horizontal dimension of the arc-shaped beam 13. Preferably, the length of the transverse support 11 is 200mm to 500mm greater than the horizontal dimension of the arc beam 13.
In the present invention, the arc beam 13 is cast from carbon steel and has a length of 100-300mm along the tunnel with a small cross section. It will be appreciated that the lateral supports 11 and diagonal supports 12 may also be made of channel steel or angle steel.
As an embodiment of the invention, the excavation is carried out along the pilot tunnel direction by adopting a step method, and after the step section is formed, the supporting structure of the part needing to be excavated is dismantled. And the guide tunnel climbing excavation, the gradual-change expanding excavation and the reverse excavation are carried out in a designed excavation contour line.
Fig. 4 is a schematic diagram of the guide tunnel climbing excavation of the invention, and when the guide tunnel climbing excavation is performed, the climbing angle θ is 5-15 °. Preferably, when the pilot tunnel climbs the slope and excavates, the climbing angle is 9.
According to the invention, the pilot tunnel climbing excavation is enabled to be superposed with the center line and the vault of the large-section tunnel, the length of the flip-top excavation section is effectively increased, and the extrapolation angle of vault excavation is effectively controlled, so that the vault over-excavation amount is reduced.
Fig. 5 is a schematic diagram of the enlarged tunnel excavation cross section of the invention, and the enlarged tunnel excavation needs to gradually progress to the contour line of the side wall of the tunnel from two sides of the large-section tunnel in three circulation footings. According to the invention, through reverse expanding excavation, the influence on the working of the tunnel face is reduced to the greatest extent, the normal excavation working of the tunnel face is ensured, namely the simultaneous working of tunnel face excavation and pilot tunnel expanding excavation is realized, and the pressure of the construction period is reduced.
In the invention, the temporary channel is a vehicle running channel, and the section size of the temporary channel is matched with that of a transport vehicle.
According to the method, the pilot tunnel climbing excavation is carried out in the designed excavation contour line, so that the pilot tunnel climbing excavation is superposed with the central line and the vault of the large-section tunnel, and the extrapolation angle of the vault excavation is effectively controlled, so that the vault excavation excess is reduced, the normal excavation operation of a tunnel face is ensured through reverse expanding excavation, and the construction period pressure is reduced. According to the comparison of the on-site construction arrangement, the construction method can save labor cost, cost caused by vault over-excavation and the like, effectively shorten the construction period and reduce the excavation safety risk.
Compared with the defects and shortcomings of the prior art, the vertical cross tunnel construction method suitable for mountain construction is reasonable in structure, and the whole excavation process is within the designed excavation contour line through the modes of pilot tunnel climbing excavation and reverse expanding excavation. The climbing excavation can be effectively prolonged by the length of the top-picking excavation section, the external inserting angle is effectively controlled, convenience is brought to operators, reverse expanding excavation is carried out after the center line of the small pilot tunnel and the large tunnel coincides with the vault, the influence on the working of the tunnel face can be reduced to the greatest extent, normal excavation of the tunnel is guaranteed, the construction period can be effectively shortened under the condition of guaranteeing safety, smooth implementation of engineering is guaranteed, and reference and guidance are provided for similar engineering.
The present invention is not limited to the above embodiments, and any other various products can be obtained by anyone in light of the present invention, but any changes in shape or structure thereof, which have the same or similar technical solutions as the present application, fall within the protection scope of the present invention.

Claims (6)

1. A vertical cross tunnel construction method suitable for mountain construction is characterized by comprising the following steps:
step one, determining excavation parameters according to field working conditions and measuring and setting out;
secondly, excavating a temporary channel from the small-section tunnel to the large-section tunnel, and arranging a tunnel support to an excavation contour line of the large-section tunnel;
thirdly, turning and excavating along the temporary channel to enable the temporary channel to be overlapped with the central axis of the large-section tunnel to form a pilot tunnel, and climbing along the pilot tunnel to excavate to the vault of the large-section tunnel;
after the center line and the vault of the pilot tunnel and the large-section tunnel are superposed, gradually expanding and excavating to the contour lines of the side walls of the tunnel from two sides of the large-section tunnel in the three circulating footings;
fifthly, excavating reversely along the large-section tunnel and distributing points to carry out primary support monitoring;
arranging an I-shaped steel support at the intersection of the small-section tunnel and the large-section tunnel for reinforcement; the transverse support is arranged on the upper side of the intersection of the small-section tunnel and the large-section tunnel, and the inclined supports are arranged on the lower side of the transverse support and symmetrically arranged on two sides of the small-section tunnel; in the third step, climbing along the pilot tunnel and excavating and building a supporting structure; excavating along the direction of the pilot tunnel by adopting a step method, and removing a supporting structure of a part needing excavating after a step section is formed.
2. The method of claim 1, wherein the pilot tunnel climbing excavation, the gradual enlarging excavation and the reverse excavation are performed within a design excavation profile.
3. The vertical cross tunnel construction method suitable for mountain construction according to claim 2, wherein the climbing angle is 5-15 ° when the pilot tunnel is excavated in a climbing mode.
4. The vertical cross tunnel construction method suitable for mountain construction according to claim 3, wherein the guide tunnel is excavated while climbing a slope with a climbing angle of 9 °.
5. The method for constructing the vertical cross tunnel suitable for the mountain construction as claimed in claim 1, wherein the I-shaped steel supports further comprise arc-shaped beams, the arc-shaped beams are arranged at the intersection of the small-section tunnel and the large-section tunnel, and the oblique supports are tangentially arranged at two sides of the arc-shaped beams.
6. The vertical cross tunnel construction method for mountain construction according to claim 1, wherein the temporary pathway is a traffic pathway having a sectional size matched to a transportation vehicle.
CN202011381505.9A 2020-12-01 2020-12-01 Vertical cross tunnel construction method suitable for mountain construction Active CN112431607B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011381505.9A CN112431607B (en) 2020-12-01 2020-12-01 Vertical cross tunnel construction method suitable for mountain construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011381505.9A CN112431607B (en) 2020-12-01 2020-12-01 Vertical cross tunnel construction method suitable for mountain construction

Publications (2)

Publication Number Publication Date
CN112431607A CN112431607A (en) 2021-03-02
CN112431607B true CN112431607B (en) 2023-02-03

Family

ID=74699351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011381505.9A Active CN112431607B (en) 2020-12-01 2020-12-01 Vertical cross tunnel construction method suitable for mountain construction

Country Status (1)

Country Link
CN (1) CN112431607B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102996133A (en) * 2012-07-02 2013-03-27 中铁二十三局集团第四工程有限公司 Construction method applicable to intersection between inclined shaft and slant hole of weak surrounding rock tunnel
CN106869944A (en) * 2017-02-14 2017-06-20 中国电建集团华东勘测设计研究院有限公司 The extra small clear-distance tunnel construction method in underground interchange intersection under complex environment
CN109113757A (en) * 2018-08-13 2019-01-01 中铁十九局集团第六工程有限公司 Tunnel cross mouth rapid constructing method
CN111472790A (en) * 2020-05-03 2020-07-31 中交哈尔滨地铁投资建设有限公司 Construction structure and construction method for controlling settlement of shallow-buried underground excavation large-section tunnel
CN111502675A (en) * 2020-04-29 2020-08-07 中国矿业大学(北京) Supporting method for construction of high-ground-stress weak broken surrounding rock large-section tunnel intersection

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102996133A (en) * 2012-07-02 2013-03-27 中铁二十三局集团第四工程有限公司 Construction method applicable to intersection between inclined shaft and slant hole of weak surrounding rock tunnel
CN106869944A (en) * 2017-02-14 2017-06-20 中国电建集团华东勘测设计研究院有限公司 The extra small clear-distance tunnel construction method in underground interchange intersection under complex environment
CN109113757A (en) * 2018-08-13 2019-01-01 中铁十九局集团第六工程有限公司 Tunnel cross mouth rapid constructing method
CN111502675A (en) * 2020-04-29 2020-08-07 中国矿业大学(北京) Supporting method for construction of high-ground-stress weak broken surrounding rock large-section tunnel intersection
CN111472790A (en) * 2020-05-03 2020-07-31 中交哈尔滨地铁投资建设有限公司 Construction structure and construction method for controlling settlement of shallow-buried underground excavation large-section tunnel

Also Published As

Publication number Publication date
CN112431607A (en) 2021-03-02

Similar Documents

Publication Publication Date Title
CN109707399B (en) Tunnel exit supporting structure and construction method thereof
CN110242305B (en) Construction process method for constructing main tunnel by inclined shaft entering single side wall pit guiding method
CN108868834B (en) Temporary support device for tunnel arch wall primary support intrusion limit arch changing construction
CN110486036B (en) Construction method for expanding arch foot primary support arch cover method
CN110578536A (en) Excavation support reinforcing method for underground excavation section of subway to penetrate existing street crossing channel
CN110985042A (en) Urban comprehensive pipe gallery and underground shallow-buried underground tunnel combined supporting system and process
CN111396062B (en) Non-span-reduction construction method for super-large section loess tunnel through operation railway under close proximity
CN112431607B (en) Vertical cross tunnel construction method suitable for mountain construction
CN112065451B (en) Underground excavation method for underground passage
CN115977103A (en) Supporting structure for span of track section to be built on open-cut tunnel and construction method thereof
CN114607389A (en) Improved double-side-wall pilot tunnel construction method for urban super-large-section shallow-buried station
CN112901213B (en) Underground roof construction method based on pipe curtain support
CN110792449B (en) Rapid underground excavation construction method for large-span shallow tunnel
CN210622821U (en) Bias tunnel bow member and bias tunnel bow member top-raising structure
CN113464145A (en) Excavation construction method for weak surrounding rock large-section tunnel
CN110714765A (en) Construction method for post-construction air shaft of shield interval
CN111075453A (en) Excavation method for reducing tunnel deformation and mud inrush and water inrush
CN210829267U (en) Shield constructs interval back construction air shaft structure
CN213838626U (en) Construction supporting device for vertical cross tunnel
CN113309525B (en) Construction method for releasing core rock and soil in advance for ultra-large section underground excavation station
CN214832720U (en) In-situ protection structure for foundation pit pipeline at subway entrance and exit by open cut method
CN219509637U (en) Turning system in shield tunneling machine hole
CN114673181B (en) Construction method of interval tunnel at bridge-tunnel connection position near existing railway
CN217174856U (en) Special-shaped cover arch structure for oblique tunnel portal
CN218912908U (en) Construction structure of tunnel construction cross hole and main hole joint part in plateau area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant