CN112421612A - Medium-voltage main line branch line analysis method based on distribution network operation state - Google Patents

Medium-voltage main line branch line analysis method based on distribution network operation state Download PDF

Info

Publication number
CN112421612A
CN112421612A CN202011212860.3A CN202011212860A CN112421612A CN 112421612 A CN112421612 A CN 112421612A CN 202011212860 A CN202011212860 A CN 202011212860A CN 112421612 A CN112421612 A CN 112421612A
Authority
CN
China
Prior art keywords
equipment
line
cut
remote signaling
branch line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011212860.3A
Other languages
Chinese (zh)
Other versions
CN112421612B (en
Inventor
马志斌
朱凯复
秦锋蕴
杨凤英
张小娇
伏睿
郭叶
李站
朱明明
李嘉威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kedong Electric Power Control System Co Ltd
State Grid Xinjiang Electric Power Co Ltd
Original Assignee
Beijing Kedong Electric Power Control System Co Ltd
State Grid Xinjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kedong Electric Power Control System Co Ltd, State Grid Xinjiang Electric Power Co Ltd filed Critical Beijing Kedong Electric Power Control System Co Ltd
Priority to CN202011212860.3A priority Critical patent/CN112421612B/en
Publication of CN112421612A publication Critical patent/CN112421612A/en
Application granted granted Critical
Publication of CN112421612B publication Critical patent/CN112421612B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/10Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Abstract

The invention discloses a medium-voltage main line branch line analysis method based on a distribution network running state, which comprises the steps of obtaining primary equipment information of a feeder line of a main line branch line to be analyzed at present, constructing a static topological structure of the feeder line to be analyzed according to topological connection points of the primary equipment, and obtaining power supply bus data, feeder line data and the on-off state of a switching-on device and the switching-off state of the switching-off device from the static topological structure; according to the feeder automation data and the operation ticket data, acquiring remote signaling disconnection running time of the disconnection equipment in a time interval; calculating the remote signaling disconnection operation rate of the disconnection equipment on each feeder line; acquiring on-off equipment serving as a tie switch according to the remote signaling off operation rate; and acquiring a main line and a branch line in the static topological structure according to the interconnection switch. The medium-voltage trunk line branch line analysis method based on the distribution network running state can avoid the problems that the trunk/branch line analysis fails due to the quality problem of the model, the related application cannot be normally used and the like to the maximum extent.

Description

Medium-voltage main line branch line analysis method based on distribution network operation state
Technical Field
The invention relates to a distribution network operation state-based medium-voltage main line branch line analysis method, and belongs to the technical field of power grid model analysis.
Background
The main line and the branch line are correctly analyzed, and the method plays an important role in analyzing the running state of the power grid, positioning and recovering faults, analyzing the power distribution of the branch lines, the power loss of the network and the like. And the basis of the main/branch line analysis mainly depends on the integrity and correctness of the power grid model.
The power grid model is a digital description of an objective power grid structure, and the power grid network model is the basis of power system software analysis. The power distribution network model is mainly imported from a Geographic Information System (GIS) or a Production Management System (PMS) and spliced with an Energy Management System (EMS) scheduling model, and partial projects are constructed in a manual maintenance mode, so that the problems of low power distribution network model quality, disordered topology connection, incomplete equipment attribute maintenance and the like exist on the whole. When the trunk line and the branch line are analyzed according to the standard, the trunk/branch line information cannot be acquired or the trunk line and the branch line path are not consistent with the real path.
Currently, the analysis of the main lines and branch lines of the medium voltage distribution network is mainly based on the static topology of the electrical equipment and the type and attributes of the electrical equipment. The existing analysis method has the advantages that the trunk/branch line analysis method is simple and rapid, but the basic data quality is required to be accurate, the equipment attribute is complete, and the quality of models in various cities is different when the current power distribution network is rapidly developed. For the development direction of the current smart power grid, the original analysis method is increasingly incapable of supporting the analysis method of the trunk line and the branch line of the complex medium-voltage distribution network.
A main line: the shortest path between the medium voltage line to the contact equipment. The power transmission system is a line which has the maximum power transmission and the highest voltage grade or is the most critical line in the power transmission system, and plays roles of main power transmission and the support and the connection of the power grid, once the power transmission system is damaged, the power grid can be cracked, normal power transmission is hindered, and large-area power failure occurs. Branching: refers to a branch of a main line in a power transmission system.
Disclosure of Invention
The purpose is as follows: in order to overcome the defects in the prior art, the invention provides a medium-voltage trunk line branch line analysis method based on the distribution network operation state.
The technical scheme is as follows: in order to solve the technical problems, the technical scheme adopted by the invention is as follows:
a distribution network operation state-based medium-voltage main line branch line analysis method comprises the following steps:
step 1: the method comprises the steps of obtaining primary equipment information of a feeder line of a current trunk branch line to be analyzed, constructing a static topological structure of the feeder line to be analyzed according to topological connection points of the primary equipment, and obtaining power supply bus data, feeder line data and the on-off state of a switching-on and switching-off device from the static topological structure.
Step 2: and according to the feeder automation data and the operation ticket data, acquiring the remote signaling disconnection running time of the disconnection equipment in a time interval.
And step 3: and calculating the remote signaling disconnection operation rate of the disconnection equipment on each feeder line.
And 4, step 4: and acquiring the on-off equipment of the interconnection switch according to the remote signaling off operation rate.
And 5: and acquiring a main line and a branch line in the static topological structure according to the interconnection switch.
As a preferred scheme, the static topology structure adopts a ring network static topology structure.
Preferably, the step 2 comprises the following steps:
2.1 setting time intervals, and acquiring feeder automation data and operation ticket data;
2.2, searching for the remote signaling disconnection running time and the remote signaling closing running time of the disconnection equipment in the feeder automation data and the operation ticket data;
2.3 if the cut-off equipment is cut off due to a fault, reducing the remote signaling cut-off running time of the cut-off equipment to be the closed running time, wherein the remote signaling cut-off running time of the cut-off equipment is the sum of the original closed running time and the reduced closed running time subtracted by the time interval;
and 2.4, if the cut-off equipment is switched to be closed due to switching, reducing the remote signaling closing operation time of the cut-off equipment to be cut-off operation time, wherein the remote signaling cut-off operation time of the cut-off equipment is the sum of the original cut-off operation time and the reduced cut-off operation time.
Preferably, the remote signaling disconnection operation rate calculation formula is as follows:
Figure BDA0002758417400000021
wherein X represents a remote signaling disconnection operation rate.
Preferably, the step 4 comprises the following steps:
4.1, acquiring equipment with the maximum remote signaling disconnection operation rate of disconnection equipment on the topological structure;
4.2 if the number of the equipment is 1, directly judging that the equipment is a communication switch;
4.3 if the number of the equipment is multiple, judging whether the equipment has a transfer scheme in the feeder automation scheme or the type of the equipment is an interconnection switch, and judging that the equipment is the interconnection switch;
4.4 if the number of the equipment is multiple and the equipment does not accord with the judgment rule of 4.3, selecting the equipment far away from the power supply bus as a communication switch;
4.5 if the number of the devices is multiple and the judgment rule is not satisfied, one of the devices is selected as the interconnection switch.
Preferably, the step 5 comprises the following steps:
and obtaining a feeder line between the power supply bus and the interconnection switch as a main line, wherein the feeder line connected with the main line is a branch line.
Has the advantages that: the invention provides a distribution network operation state-based medium-voltage trunk line branch line analysis method, which is based on the quality of a current medium-voltage configuration model, enriches basic analysis data by introducing mutual combination of feeder automation data and operation ticket data, recovers remote signaling displacement information caused by faults, overhaul, switching and the like, calculates the switching-off weight on each power supply path, judges contact equipment again, and analyzes a trunk/branch line topological path.
The invention improves the analysis method of the trunk line and the branch line, adopts the standard analysis method to be mutually combined with FA (feeder automation), the remote signaling state of the cut-off equipment and the hierarchical relation of the equipment, enriches the basic analysis data, and further improves the quality of the branch result of the trunk/branch line, so that the problems that the analysis of the trunk/branch line fails due to the quality problem of the model, the related application cannot be normally used and the like can be avoided to the maximum extent.
Drawings
Fig. 1 is a static topology structure diagram.
Fig. 2 is a state diagram of a pre-fault topology.
Fig. 3 is a topology state diagram after fault isolation and transition.
Fig. 4 is a power supply bus-bar topological path diagram.
Fig. 5 is a diagram of remote signaling disconnection operation rate of a topological path between power supply buses.
Fig. 6 is a trunk branch line calculation chart.
Detailed Description
The present invention will be further described with reference to the following examples.
A distribution network operation state-based medium-voltage main line branch line analysis method comprises the following steps:
step 1, establishing a ring network static topological structure model.
Obtaining primary equipment information of a feeder line of a current trunk line branch line to be analyzed, and constructing a ring network static topological structure of the feeder line to be analyzed according to topological connection points of the primary equipment. As shown in fig. 1, the ring network topology structure includes 2 feeders, a feeder a and a feeder B, which are respectively supplied with power by a power supply bus 1 and a power supply bus 2, and the remote signaling states of the cut-off devices (such as a circuit breaker and a disconnecting link) on the topology path are all default to be a closed state.
As shown in fig. 2-3, step 2, the feeder automation data, and the data recovery of the operation ticket data.
According to 2 feeders of a ring network static topological structure, 2 feeders in a set time interval (the time interval is configured according to actual conditions on site, and the accuracy is higher when the time span is larger) are acquired from a database, all feeder automation data and operation ticket data which are associated with the on-off equipment in the 2 feeders are related, the telecommand closing operation time and the telecommand opening operation time of the on-off equipment in the time interval are calculated according to the time interval, and reduction is carried out according to the feeder automation data and the operation ticket data attributes. Specifically, the data to be restored are processed as follows:
feeder automation data:
(1) for a feeder automation scheme, the open and close running times of the cut-off equipment caused by executing the automation remote control scheme are restored according to the remote signaling operation of the cut-off equipment in the scheme, for example: in the fault isolation transfer scheme: setting the time interval as 2019, 08 months and 08 days 0: 00-24: 00, the time interval is 24 hours, and the execution time of the fault isolation switching supply scheme occurs in 10:50 minutes in 08-08 months in 2019. The fault isolation transfer recovery execution time is as follows: 13:10 points on 08 month and 08 days in 2019. The isolation scheme cut-off devices 1-2 and 1-3 remotely signal the cut-off operation time for 2 hours and 20 minutes, and according to the feeder automation data, the cut-off of the cut-off devices is caused by faults, so the cut-off operation time is restored to the closed operation time, namely the cut-off operation of the cut-off devices does not occur, and the remote signaling cut-off operation time is 0 hour. And the closing running time of the disconnecting equipment 1-5 remote signaling of the isolation switching supply scheme is 2 hours and 20 minutes, and according to the feeder automation data, the closing of the disconnecting equipment is caused by switching supply, so the closing running time is restored to the disconnecting running time, namely the disconnecting equipment does not perform closing running, the remote signaling disconnecting running time is 24 hours, and the operation is repeated for the remote signaling state running time of the disconnecting equipment influenced by all the feeder automation schemes in a time interval.
Operating ticket data:
(1) and screening out the operation tickets with the changed remote signaling states of the cut-off equipment according to the types of the operation tickets, obtaining the running time of the remote signaling states according to the starting time and the ending time of the operation tickets, influencing all the operation tickets in a time interval, and sequentially restoring the running time of the remote signaling states of the cut-off equipment corresponding to the isolation or conversion of the types of the operation tickets.
As shown in fig. 4-5, step 3, the determination of the tie switch is made for the disconnected device.
And based on the characteristic that the interconnection switch is positioned on the topological path between different power supply buses, all the switching-off equipment with remote signaling on the topological path between the feeder line A and the feeder line B are found out according to the finding. According to the time results of the remote signaling closed operation and the remote signaling open operation in the step 2, calculating the remote signaling open operation rate of each open-close device, wherein the calculation formula is as follows:
Figure BDA0002758417400000041
x represents the telecommand disconnect duty cycle.
Updating the calculation result to the corresponding cut-off equipment, if the X of the cut-off equipment 1-1 is 0, the X of 1-2 is 0, the X of 1-3 is 0.3, the X of 1-4 is 1, the X of 1-5 is 1, the X of 1-6 is 0, and the X of 1-7 is 0, obtaining the equipment with the maximum remote signaling cut-off operation rate of the cut-off equipment on the topology according to the calculation result, and if the obtained equipment number is unique, directly judging that the switch has the contact switch attribute in the current time interval; if a plurality of devices with the maximum remote signaling disconnection operation rate exist, judging whether the devices with the same operation rate exist in a transfer scheme or the type of the switch is an interconnection switch in the feeder automation scheme, and judging that the disconnection devices are the interconnection switches. If the auxiliary judgment information is not available, the communication switch which is far away from the power supply bus is selected. If none of the above is satisfied, then one of the switches is a tie switch. And judging that the on-off equipment 1-5 is an interconnection switch according to the calculation result of the on-line method.
As shown in fig. 6, step 4, trunk and branch path analysis.
And (3) calculating and judging the result of the interconnection switch according to the flow 3, and searching rules according to the branch line of the main line, namely, the feeder line from the power supply bus to the interconnection switch is the main line, the feeder line connected with the main line is the branch line, the main lines 1-1 to 1-4 are the main line of the feeder line A, the branch line path from 1-10 to the tail end of the feeder line A, the main line from 1-7 to 1-6 are the feeder line B, and the branch line path from 1-8 to the tail end of the feeder line B.
Through the steps of the method, the problem of the route error analysis of the trunk branch line caused by wrong equipment attribute, unclear contact identification, disordered equipment hierarchical relation and the like can be solved, the topological route of the trunk branch line can be accurately found, and the current power grid operation state can be truly reflected.
The above description is only of the preferred embodiments of the present invention, and it should be noted that: it will be apparent to those skilled in the art that various modifications and adaptations can be made without departing from the principles of the invention and these are intended to be within the scope of the invention.

Claims (6)

1. A medium-voltage trunk line branch line analysis method based on a distribution network running state is characterized in that: the method comprises the following steps:
step 1: obtaining primary equipment information of a feeder line of a main line branch line to be analyzed currently, constructing a static topological structure of the feeder line to be analyzed according to topological connection points of the primary equipment, and obtaining power supply bus data, feeder line data and the on-off state of a switching-on and switching-off device from the static topological structure;
step 2: according to the feeder automation data and the operation ticket data, acquiring remote signaling disconnection running time of the disconnection equipment in a time interval;
and step 3: calculating the remote signaling disconnection operation rate of the disconnection equipment on each feeder line;
and 4, step 4: acquiring on-off equipment serving as a tie switch according to the remote signaling off operation rate;
and 5: and acquiring a main line and a branch line in the static topological structure according to the interconnection switch.
2. The method for analyzing the branch line of the medium-voltage trunk line based on the distribution network operation state according to claim 1, characterized in that: the static topological structure adopts a ring network static topological structure.
3. The method for analyzing the branch line of the medium-voltage trunk line based on the distribution network operation state according to claim 1, characterized in that: the step 2 comprises the following specific steps:
2.1 setting time intervals, and acquiring feeder automation data and operation ticket data;
2.2, searching for the remote signaling disconnection running time and the remote signaling closing running time of the disconnection equipment in the feeder automation data and the operation ticket data;
2.3 if the cut-off equipment is cut off due to a fault, reducing the remote signaling cut-off running time of the cut-off equipment to be the closed running time, wherein the remote signaling cut-off running time of the cut-off equipment is the sum of the original closed running time and the reduced closed running time subtracted by the time interval;
and 2.4, if the cut-off equipment is switched to be closed due to switching, reducing the remote signaling closing operation time of the cut-off equipment to be cut-off operation time, wherein the remote signaling cut-off operation time of the cut-off equipment is the sum of the original cut-off operation time and the reduced cut-off operation time.
4. The method for analyzing the branch line of the medium-voltage trunk line based on the distribution network operation state according to claim 1, characterized in that: the remote signaling disconnection operation rate calculation formula is as follows:
Figure FDA0002758417390000011
wherein X represents a remote signaling disconnection operation rate.
5. The method for analyzing the branch line of the medium-voltage trunk line based on the distribution network operation state according to claim 1, characterized in that: the step 4 comprises the following specific steps:
4.1, acquiring equipment with the maximum remote signaling disconnection operation rate of disconnection equipment on the topological structure;
4.2 if the number of the equipment is 1, directly judging that the equipment is a communication switch;
4.3 if the number of the equipment is multiple, judging whether the equipment has a transfer scheme in the feeder automation scheme or the type of the equipment is an interconnection switch, and judging that the equipment is the interconnection switch;
4.4 if the number of the equipment is multiple and the equipment does not accord with the judgment rule of 4.3, selecting the equipment far away from the power supply bus as a communication switch;
4.5 if the number of the devices is multiple and the judgment rule is not satisfied, one of the devices is selected as the interconnection switch.
6. The method for analyzing the branch line of the medium-voltage trunk line based on the distribution network operation state according to claim 1, characterized in that: the step 5 comprises the following steps:
and obtaining a feeder line between the power supply bus and the interconnection switch as a main line, wherein the feeder line connected with the main line is a branch line.
CN202011212860.3A 2020-11-03 2020-11-03 Medium-voltage main line branch line analysis method based on distribution network operation state Active CN112421612B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011212860.3A CN112421612B (en) 2020-11-03 2020-11-03 Medium-voltage main line branch line analysis method based on distribution network operation state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011212860.3A CN112421612B (en) 2020-11-03 2020-11-03 Medium-voltage main line branch line analysis method based on distribution network operation state

Publications (2)

Publication Number Publication Date
CN112421612A true CN112421612A (en) 2021-02-26
CN112421612B CN112421612B (en) 2023-01-06

Family

ID=74828322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011212860.3A Active CN112421612B (en) 2020-11-03 2020-11-03 Medium-voltage main line branch line analysis method based on distribution network operation state

Country Status (1)

Country Link
CN (1) CN112421612B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112966379A (en) * 2021-03-07 2021-06-15 广东电网有限责任公司广州供电局 Anti-misoperation method and device based on locking
CN113922357A (en) * 2021-08-26 2022-01-11 国网福建省电力有限公司经济技术研究院 Power grid line trunk analysis method and terminal

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101488155A (en) * 2008-11-17 2009-07-22 杭州电子科技大学 Automatic generation method for power distribution single-line diagram
CN101685982A (en) * 2008-09-22 2010-03-31 毋祎 Digitalized grid system
CN102497021A (en) * 2011-12-14 2012-06-13 广东电网公司佛山供电局 Real-time monitoring and analysis system for distribution circuit
CN102508103A (en) * 2011-11-11 2012-06-20 中国电力科学研究院 Distribution network hidden short-circuit fault risk early-warning and positioning method based on distributed intelligent agents
CN107909197A (en) * 2017-11-13 2018-04-13 国网福建省电力有限公司 A kind of big branch method of operation statistical analysis technique based on feeder line tree
US20180115159A1 (en) * 2016-01-05 2018-04-26 Energo Group Canada Inc. Method and system for reducing losses during electrical power distribution

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101685982A (en) * 2008-09-22 2010-03-31 毋祎 Digitalized grid system
CN101488155A (en) * 2008-11-17 2009-07-22 杭州电子科技大学 Automatic generation method for power distribution single-line diagram
CN102508103A (en) * 2011-11-11 2012-06-20 中国电力科学研究院 Distribution network hidden short-circuit fault risk early-warning and positioning method based on distributed intelligent agents
CN102497021A (en) * 2011-12-14 2012-06-13 广东电网公司佛山供电局 Real-time monitoring and analysis system for distribution circuit
US20180115159A1 (en) * 2016-01-05 2018-04-26 Energo Group Canada Inc. Method and system for reducing losses during electrical power distribution
CN107909197A (en) * 2017-11-13 2018-04-13 国网福建省电力有限公司 A kind of big branch method of operation statistical analysis technique based on feeder line tree

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112966379A (en) * 2021-03-07 2021-06-15 广东电网有限责任公司广州供电局 Anti-misoperation method and device based on locking
CN113922357A (en) * 2021-08-26 2022-01-11 国网福建省电力有限公司经济技术研究院 Power grid line trunk analysis method and terminal
CN113922357B (en) * 2021-08-26 2023-06-27 国网福建省电力有限公司经济技术研究院 Power grid line trunk analysis method and terminal

Also Published As

Publication number Publication date
CN112421612B (en) 2023-01-06

Similar Documents

Publication Publication Date Title
CN106771883B (en) Multi-source information power distribution fault positioning method and system based on cloud
CN110276532B (en) Power distribution network reliability calculation method based on research of load blocks
CN108536770B (en) Distribution network ring net automatic generation method based on distribution GIS model
CN112421612B (en) Medium-voltage main line branch line analysis method based on distribution network operation state
CN107730093B (en) System and method for power grid accident re-routing path
CN111697566B (en) Reliability assessment method for active power distribution network information physical system considering information failure
CN102496066A (en) Reliability assessment method for medium voltage distribution network
CN107846015B (en) Intelligent power distribution network load transfer optimal path selection method based on peer-to-peer communication
CN109949178B (en) Method for judging and complementing power failure event of medium-voltage distribution network based on support vector machine
CN113328437B (en) Intelligent power distribution network CPS topology construction method and fault recovery method
CN114609468B (en) Cloud edge end cooperation-based single-phase earth fault interval distinguishing method for power distribution network
CN113131448A (en) Intelligent distributed feeder line method and device based on 5G communication
CN112054493A (en) Distribution line on-site feeder automation functional modeling commissioning method
CN110932406B (en) Remote signaling information checking method and device for intelligent substation scheduling master station
CN110635477B (en) Multi-system fusion-based distribution network fault studying and judging method, device and system
Wang et al. Reliability modeling and simulation of cyber-physical power distribution system considering the impacts of cyber components and transmission quality
CN111342455A (en) Method for switching 10kV line ring network into power supply
CN113344364B (en) Power failure plan risk analysis method and device, electronic equipment and storage medium
CN116540029B (en) Active power distribution network fault section positioning method and device based on node distortion correction
CN115663788A (en) Distributed feeder automation topology identification method and system based on RTCN node
CN113013871A (en) Load transfer method for power distribution network equipment during fault and maintenance
CN110299761A (en) A kind of city electric distribution system topology identification method and device based on LTE
CN209545252U (en) A kind of intelligent substation management system
CN112711841A (en) Micro-grid intelligent substation is innovation platform device in coordination
CN108229863B (en) Power supply reliability calculation method for power distribution network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant