CN112054493A - A method for mode operation of in-situ feeder automation function of distribution lines - Google Patents

A method for mode operation of in-situ feeder automation function of distribution lines Download PDF

Info

Publication number
CN112054493A
CN112054493A CN202010970770.4A CN202010970770A CN112054493A CN 112054493 A CN112054493 A CN 112054493A CN 202010970770 A CN202010970770 A CN 202010970770A CN 112054493 A CN112054493 A CN 112054493A
Authority
CN
China
Prior art keywords
switch
automation
fault
line
terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010970770.4A
Other languages
Chinese (zh)
Inventor
郭亮
周求宽
晏年平
杨浩
郑蜀江
曹蓓
刘洋
徐经民
李升健
邓志祥
郝钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202010970770.4A priority Critical patent/CN112054493A/en
Publication of CN112054493A publication Critical patent/CN112054493A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/085Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution lines, e.g. overhead
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The method comprises the steps of carrying out terminal automation function testing, formulating an automation and protection configuration scheme according to the characteristics of a line, carrying out software updating and parameter setting on the terminal on site, and observing the operation condition. The commissioning method can provide standardized and stylized steps for the distribution line on-site feeder automation commissioning, provides scientific basis for the setting of the switch position, improves the effectiveness and the reasonableness of the setting, and can provide scientific basis for the planning and designing department to carry out line planning and design, the operation and maintenance department to carry out line transformation work and the like.

Description

一种配电线路就地型馈线自动化功能模式化投运方法A method for mode operation of in-situ feeder automation function of distribution lines

技术领域technical field

本发明涉及一种配电线路就地型馈线自动化功能模式化投运方法,属配电线路馈线自动化技术领域。The invention relates to a method for putting into operation mode of an on-site feeder automation function of a distribution line, and belongs to the technical field of distribution line feeder automation.

背景技术Background technique

随着经济社会发展,电力用户对于供电可靠电力系统更高供电可靠性的要求,故障的处理效能深刻影响着供电可靠性。就地型馈线自动化通过电压时间型终端控制开关分合,可以实现故障自动隔离和非故障区域的自动恢复。With the development of economy and society, power users have higher power supply reliability requirements for reliable power supply systems, and the processing efficiency of faults has a profound impact on power supply reliability. In-situ feeder automation can realize automatic fault isolation and automatic recovery of non-fault areas through voltage-time terminal control switch opening and closing.

根据线路结构可以分为单幅射线路和联络线路两类就地型馈线自动化,就地型馈线自动化线路由始端开关和多个电压时间型分段开关分成若干段,动作原理可以概括为始端开关两次重合闸配合分段开关分合闸,第一次重合闸,闭锁故障点两侧开关隔离故障;二次重合,恢复电源侧非故障区域供电。具体而言,发生故障时始端开关跳闸,全线电压时间型开关失压分闸,始端开关第一次重合闸,各电压时间型开关逐个得电合闸,直到合闸到故障,始端开关再次跳闸,与此同时故障点前后的电压时间型开关通过过电流和残压闭锁,待下次得电后不再合闸;始端开关第二次重合闸,各分段开关逐个得电合闸恢复供电,若有联络线路,则联络开关按照设定的时间次序合闸恢复故障点后侧的非故障区域。According to the line structure, it can be divided into two types of local feeder automation: single-radiation line and tie line. The local feeder automation line is divided into several sections by the start switch and multiple voltage-time segment switches. The action principle can be summarized as the start switch The two-time reclosing cooperates with the sectional switch to open and close. The first reclosing will block the switch on both sides of the fault point to isolate the fault; the second reclosing will restore the power supply to the non-faulty area on the power supply side. Specifically, when a fault occurs, the start-end switch trips, the voltage-time switch on the whole line loses voltage and opens, the start-end switch recloses for the first time, and each voltage-time type switch is energized and closed one by one until the fault is closed, and the start-end switch trips again. At the same time, the voltage-time switches before and after the fault point are blocked by overcurrent and residual voltage, and will not be closed after the next power on; , if there is a tie line, the tie switch will be closed according to the set time sequence to restore the non-fault area behind the fault point.

就地型馈线自动化的优点包括:1)开关具备二遥(遥测、遥信)功能即可;2)电压型开关具备“来电延时合,无压即释放”的特点,动作可靠;3)出线开关两次重合完成故障定位和隔离;4)非线路首段故障时,出线开关总能重合成功。The advantages of on-site feeder automation include: 1) The switch has the function of two remotes (telemetry, remote signaling); 2) The voltage type switch has the characteristics of "delayed closing of incoming calls, and release without pressure", and the action is reliable; 3) The outgoing switch can be reclosed twice to complete the fault location and isolation; 4) When the fault is not in the first section of the line, the outgoing switch can always be reclosed successfully.

但是,就地型馈线自动化在实际应用过程中,却受到厂家繁多、终端控制软件版本多样、自动化逻辑不一致、保护与自动化配合困难、现场运维手段不统一等问题的困扰,影响了自动化的应用水平。同时就地型馈线自动化还存在以下弱点:1)需配置所有开关的“延时合”X时限,同一时刻不能有两个开关同时闭合;2)运行方式调整时需同时调整相关开关的延时参数配置。3)故障点电源侧开关闭锁失败时,将导致出线开关反复重合到故障;4)故障点负荷侧开关残压闭锁失败时,将导致联络开关闭合时合到故障点(所采线电压两相短路故障时);5)联络开关一侧PT断线时,如终端未识别到,将导致联络开关自动合。However, in the actual application process of in-situ feeder automation, it is plagued by problems such as many manufacturers, various terminal control software versions, inconsistent automation logic, difficulty in coordinating protection and automation, and inconsistent on-site operation and maintenance methods, which affect the application of automation. Level. At the same time, the local feeder automation also has the following weaknesses: 1) It is necessary to configure the "delay closing" X time limit of all switches, and two switches cannot be closed at the same time; 2) When adjusting the operation mode, it is necessary to adjust the delay of related switches at the same time parameter configuration. 3) When the power supply side switch at the fault point fails to lock, it will cause the outlet switch to repeatedly reclose to the fault; 4) When the residual voltage of the load side switch at the fault point fails to lock, it will cause the tie switch to be closed to the fault point (two phases of the line voltage used). 5) When the PT on one side of the tie switch is disconnected, if the terminal is not recognized, it will cause the tie switch to close automatically.

发明内容SUMMARY OF THE INVENTION

本发明的目的是,为了实现自动化线路模式化投运,提高配电线路就地型馈线自动化功能的投运效率,本发明提出一种配电线路就地型馈线自动化功能模式化投运方法。The purpose of the present invention is, in order to realize the mode operation of the automatic line and improve the operation efficiency of the local feeder automation function of the distribution line, the present invention proposes a method for the mode operation of the local feeder automation function of the distribution line.

实现本发明的技术方案如下,一种配电线路就地型馈线自动化功能模式化投运方法,所述方法按照开展终端自动化功能测试、根据线路特点制定自动化和保护配置方案、现场对终端进行软件更新和参数设置、观察运行情况,采用就地型馈线自动化为主的技术方案,实现自动化线路模式化投运,提高配电线路就地型馈线自动化功能的投运效率。The technical solution for realizing the present invention is as follows, a method for putting into operation in-situ feeder automation function of distribution lines. Update and parameter setting, observe the operation situation, adopt the technical scheme mainly based on the local feeder automation, realize the mode operation of the automatic line, and improve the operation efficiency of the local feeder automation function of the distribution line.

所述开展终端自动化功能测试,是对所有厂家的自动化功能进行统一测试,以确定各厂家的可现场运行的自动化软件版本;所述功能验证包括:终端失压(含短延时)跳闸逻辑、来电延时合闸、故障闭锁逻辑、联络开关闭锁及送电逻辑、终端调试模式逻辑;测试过程中,应不少于4台智能终端开展联合调试,调试的内容包括联络模式测试和单辐射模式测试。The terminal automation function test is to carry out a unified test of the automation functions of all manufacturers to determine the automation software versions of each manufacturer that can be run on site; the function verification includes: terminal voltage loss (including short delay) trip logic, Incoming call delay closing, fault blocking logic, liaison switch locking and power transmission logic, terminal debugging mode logic; during the test, no less than 4 intelligent terminals should carry out joint debugging, and the debugging content includes contact mode test and single radiation mode test.

所述联络模式包括一台始端开关CB、一台联络开关LL,剩下的全部是分段开关D01、D02等,调试应模拟至少三个区域的故障,始端开关CB与分段开关D01之间、分段开关D01与分段开关D02之间、分段开关D02与联络开关LL之间三个区域的故障。The contact mode includes a start switch CB, a contact switch LL, and the rest are segment switches D01, D02, etc. The debugging should simulate faults in at least three areas, between the start switch CB and the segment switch D01. , between the segment switch D01 and the segment switch D02, and between the segment switch D02 and the tie switch LL.

所述单辐射模式包括一台始端开关CB、一台联络开关LL,剩下的全部是分段开关D01、D02等,调试应模拟至少四个区域的故障,始端开关CB与分段开关D01之间、分段开关D01、D02、D03三个开关包围的区域、分段开关D02后侧区域以及分段开关D03后侧区域等四个区域的故障。The single radiation mode includes a start switch CB, a tie switch LL, and the rest are segment switches D01, D02, etc. The debugging should simulate faults in at least four areas, the difference between the start switch CB and the segment switch D01. The faults in four areas, including the area surrounded by the three switches D01, D02, and D03, the area behind the switch D02, and the area behind the switch D03.

所述制定自动化和保护配置方案包括单辐射线路和联络线路。The formulating automation and protection configuration scheme includes single radiating lines and tie lines.

在制定方案的过程中,遵循以下原则:1)充分发挥就地型馈线自动化功能,尽量缩小停电范围;2)自动化与保护之间进行结合,尽量减少跳闸次数,以提升用户用电感受;3)方案须契合线路特点,尽量不移动开关位置。In the process of formulating the plan, the following principles are followed: 1) Give full play to the automation function of the local feeder to minimize the scope of power outages; 2) Combine automation and protection to minimize the number of trips to improve the user's experience with electricity; 3 ) The solution must be in line with the characteristics of the circuit, and the switch position should not be moved as much as possible.

(1)单辐射线路自动化和保护配置方案(1) Single radiation line automation and protection configuration scheme

线路含有3条大分支,一共设置了6台自动化开关D01、F01、F02、F03、F04及F09,其中D01、F01位于主干线上,另外4个开关位于三条分支线上,其中F02、F03开关位于同一分支线上;配置保护自动化方案如下:The line contains 3 large branches, a total of 6 automatic switches D01, F01, F02, F03, F04 and F09 are set up, of which D01, F01 are located on the main line, and the other 4 switches are located on the three branch lines, of which F02, F03 switches On the same branch line; the configuration protection automation scheme is as follows:

1)出线开关设置保护,过流I段2100A/0s;过流II段1200A/0.2s;过流III段330A/0.5s;1) The outlet switch is set to protect, the overcurrent stage I is 2100A/0s; the overcurrent stage II is 1200A/0.2s; the overcurrent stage III is 330A/0.5s;

2)D01开关不投保护,投自动化功能,X时限21s、Y时限5s,零序保护告警3A/20s;2) D01 switch does not switch on protection, switch on automatic function, X time limit is 21s, Y time limit is 5s, and zero sequence protection alarm is 3A/20s;

3)F02开关不投保护,投自动化功能,X时限14s、Y时限5s,零序保护告警3A/18s;3) F02 switch does not switch on protection, switch on automatic function, X time limit is 14s, Y time limit is 5s, and zero sequence protection alarm is 3A/18s;

4)F03、F01、F04、F09等四个开关均投保护和自动化,过流I段与出线开关过流II段配合,过流II段与出线开关过流III段配合;4) Four switches such as F03, F01, F04, and F09 are all switched on for protection and automation. The overcurrent stage I cooperates with the overcurrent stage II of the outgoing switch, and the overcurrent stage II cooperates with the overcurrent stage III of the outgoing switch;

(2)联络线路自动化和保护配置方案(2) Contact line automation and protection configuration scheme

线路为手拉手联络线路,线路与对侧另一条10kV线路联络,含有1条大分支,一共设置了3台自动化开关,D01、D02和联络开关L30;各开关设置情况如下:The line is a hand-in-hand connection line. The line is connected to another 10kV line on the opposite side, including a large branch. A total of 3 automatic switches, D01, D02 and tie switch L30 are set up; the settings of each switch are as follows:

1)出线开关设置保护,过流I段退出;过流II段1500A/0.2s;过流III段330A/0.4s;1) The outlet switch is set to protect, and the overcurrent stage I exits; the overcurrent stage II is 1500A/0.2s; the overcurrent stage III is 330A/0.4s;

2)D01开关投保护,过流I段1200A/0s;过流II段300A/0.2s,零序保护告警3A/18s;;2) D01 switch protection, overcurrent I stage 1200A/0s; overcurrent II stage 300A/0.2s, zero sequence protection alarm 3A/18s;

3)D02开关不投保护,投自动化功能,X时限7s、Y时限5s,零序保护告警3A/20s;3) D02 switch does not switch on protection, switch on automatic function, X time limit is 7s, Y time limit is 5s, and zero sequence protection alarm is 3A/20s;

4)联络开关L30投联络开关自动化模式,X时限21s、Y时限5s。4) The tie switch L30 is switched to the automatic mode of the tie switch, the X time limit is 21s, and the Y time limit is 5s.

所述对终端进行软件更新和参数设置,设置方法如下:首先根据以测试通过的软件版本,对相应型号终端进行软件更新,其中包括与主站的点表核对;再根据保护自动化配置方案,设置保护定值、自动化参数信息;在条件允许的情况下,应在这个基础上设置相关故障序列,再对终端进行单体进行测试,测试成功后,终端即可投入自动化运行,自动化功能正式启用。The software update and parameter setting for the terminal are as follows: firstly, according to the software version that has passed the test, the software of the corresponding model terminal is updated, including checking the point table with the master station; then according to the protection automation configuration scheme, set Protection of fixed value and automation parameter information; if conditions permit, the relevant fault sequence should be set on this basis, and then the terminal is tested on a single unit. After the test is successful, the terminal can be put into automatic operation and the automation function is officially activated.

所述观察运行情况,在自动化功能投运后,应适时核对终端与主站的遥信遥测信息,跟踪观察运行情况;特别是发生故障后,应核对故障点与自动化定位结果是否一致,保护与自动化动作是否正确;若发生异常情况,应查找问题所在,并根据情况进行调整优化。For the observation of operation conditions, after the automation function is put into operation, the remote signaling and telemetry information of the terminal and the main station should be checked in a timely manner, and the operation conditions should be tracked and observed; especially after a fault occurs, it should be checked whether the fault point is consistent with the automatic positioning results, and the protection and Whether the automated action is correct; if an abnormal situation occurs, find the problem and adjust and optimize it according to the situation.

所述就地型馈线自动化为主的技术方案如下,The technical solution based on the on-site feeder automation is as follows:

发生故障时,先由设置了保护的出线开关跳闸,全线停电,布置在线路上的电压时间型开关,检测到失压跳闸,出线开关重合闸,各电压时间型开关逐级恢复供电,直到合闸到故障再次跳闸,电压时间型开关控制器FTU通过残压闭锁开关,下次来电不再合闸,这样完成了第一次重合闸定位故障的功能;故障第二次跳闸后,延时第二次合闸,逐步恢复非故障区域。When a fault occurs, the outlet switch with protection is tripped first, the whole line is powered off, the voltage time switch arranged on the line detects the loss of voltage and trips, the outlet switch is reclosed, and each voltage time switch restores power supply step by step until it is closed. When the fault trips again, the voltage-time switch controller FTU locks the switch through the residual voltage, and will not close the switch next time when the power is turned on, thus completing the function of the first reclosing to locate the fault; Close the switch again and gradually restore the non-faulty area.

本发明的有益效果是,本发明方法按照开展终端自动化功能测试、根据线路特点制定自动化和保护配置方案、现场对线路进行软件更新和参数设置和观察运行情况等步骤,实现自动化线路模式化投运,提高了配电线路就地型馈线自动化功能的投运效率,提升运行可靠性。本发明提出的方法,可为配电线路就地型馈线自动化的投运提供标准化、程式化步骤,开关位置的设置提供了科学依据,提高其设置的有效性和合理性,可为规划设计部门进行线路规划设计、运维检修部门开展线路改造工作等提供科学依据。The beneficial effect of the present invention is that, the method of the present invention realizes the automated line mode commissioning according to the steps of carrying out the terminal automatic function test, formulating the automation and protection configuration scheme according to the line characteristics, performing software update and parameter setting on the line on site, and observing the operation situation. , which improves the commissioning efficiency of the local feeder automation function of the distribution line and improves the operation reliability. The method proposed by the invention can provide standardized and stylized steps for the commissioning of the local feeder automation of the distribution line, provide a scientific basis for the setting of the switch position, improve the effectiveness and rationality of the setting, and can be used for planning and design departments. Provide scientific basis for line planning and design, and operation and maintenance departments to carry out line renovation work.

附图说明Description of drawings

图1为本发明配电自动化终端投运步骤示意图;Fig. 1 is the schematic diagram of the commissioning steps of the power distribution automation terminal of the present invention;

图2为故障点在联络线路始端开关与分段开关之间示意图;Figure 2 is a schematic diagram of the fault point between the start-end switch and the segment switch of the tie line;

图3为故障点在联络线路两个分段开关之间示意图;Figure 3 is a schematic diagram of a fault point between two segment switches of a tie line;

图4为故障点在联络线路分段开关与联络开关之间示意图;Figure 4 is a schematic diagram of the fault point between the tie line segment switch and the tie switch;

图5为故障点在单辐射线路始端开关与分段开关之间示意图;Figure 5 is a schematic diagram of the fault point between the start switch and the segment switch of a single radiation line;

图6为故障点在单辐射线路多个分段开关之间示意图;6 is a schematic diagram of a fault point between multiple segment switches of a single radiation line;

图7为故障点在单辐射线路分段开关后侧至末端区域示意图;Figure 7 is a schematic diagram of the fault point in the rear side of the single-radiation line segment switch to the end area;

图8为故障点在单辐射线路分段开关后侧区域示意图;Figure 8 is a schematic diagram of the fault point in the area behind the single-radiation line segment switch;

图9为物理仿真平台接线示意图;Fig. 9 is a schematic diagram of physical simulation platform wiring;

图10为自动化测试仪联合测试法示意图;Figure 10 is a schematic diagram of an automated tester combined testing method;

图11为某型号终端就地型自动化程序版本号;Figure 11 is the version number of the local automation program of a certain type of terminal;

图12为某单辐射线路结构示意图;Figure 12 is a schematic diagram of the structure of a single radiation circuit;

图13为某10kV单辐射线就地型馈线自动化与保护配置图;Figure 13 is a diagram of the automation and protection configuration of a 10kV single-radiation in-situ feeder;

图14为某10kV联络线就地型馈线自动化与保护配置图;Figure 14 is the configuration diagram of local feeder automation and protection of a 10kV tie line;

图15为单辐射线路就地型馈线自动化动作原理图;Figure 15 is a schematic diagram of the automatic operation of a single-radiation line in-situ feeder;

图16为手拉手配电线路就地型馈线自动化原理图。Fig. 16 is a schematic diagram of the local feeder automation of the hand-in-hand distribution line.

具体实施方式Detailed ways

如图1所示,本实施例一种配电线路就地型馈线自动化功能模式化投运方法,包括以下步骤:1)开展终端自动化功能测试;2)根据线路特点制定自动化和保护配置方案;3)现场对终端进行软件更新和参数设置;4)观察运行情况等步骤。As shown in FIG. 1 , a method for putting into operation in-situ feeder automation function of a distribution line in this embodiment includes the following steps: 1) carrying out a terminal automation function test; 2) formulating an automation and protection configuration scheme according to line characteristics; 3) Perform software update and parameter setting on the terminal on site; 4) Observe the operation and other steps.

步骤1开展终端自动化功能测试:Step 1 Carry out the terminal automation function test:

由于配电自动化设备厂家众多,据不完全统计,全国供货的配电自动化设备厂家超过400家,目前针对就地型馈线自动化的产品尚未有国家标准,每家厂家的设备外形、结构、功能设置、自动化逻辑都有所不同,因此在现场投运自动化之前,必须对所有厂家的自动化功能进行统一测试,以确定各厂家的可现场运行的自动化软件版本。其中功能验证包括:终端失压(含短延时)跳闸逻辑、来电延时合闸、故障闭锁逻辑、联络开关闭锁及送电逻辑、终端调试模式逻辑等。Due to the large number of distribution automation equipment manufacturers, according to incomplete statistics, there are more than 400 distribution automation equipment manufacturers nationwide. At present, there is no national standard for local feeder automation products. Each manufacturer's equipment appearance, structure and function The settings and automation logic are different. Therefore, before the automation is put into operation on site, the automation functions of all manufacturers must be tested uniformly to determine the automation software version of each manufacturer that can be run on site. Among them, functional verification includes: terminal voltage loss (including short delay) trip logic, incoming delay closing, fault blocking logic, contact switch blocking and power transmission logic, terminal debugging mode logic, etc.

在测试过程中,应不少于4台智能终端开展联合调试,调试的内容包括联络模式测试和单辐射模式测试两类情形。In the test process, no less than 4 intelligent terminals should carry out joint debugging, and the content of debugging includes two types of test: contact mode test and single radiation mode test.

(1)联络模式(1) Contact mode

联络模式包括一台始端开关CB、一台联络开关LL,剩下的全部是分段开关D01、D02等,调试应模拟至少三个区域的故障,始端开关CB与分段开关D01之间、分段开关D01与分段开关D02之间、分段开关D02与联络开关LL之间三个区域的故障。The contact mode includes a start switch CB, a contact switch LL, and all the rest are segment switches D01, D02, etc. The debugging should simulate faults in at least three areas. The distance between the start switch CB and the segment switch D01 Faults in three areas between segment switch D01 and segment switch D02, and between segment switch D02 and tie switch LL.

故障区段01:故障位于在始端开关CB与分段开关D01之间,如图2所示。Fault section 01: The fault is located between the start switch CB and the segment switch D01, as shown in Figure 2.

此时各开关动作情况为:①始端开关CB跳闸,开关D01、开关D02立即失电,失电后均经延时时间Δt分闸,开关LL不动作,保持原有的分闸状态;②始端开关CB第一次重合闸,如果故障是瞬时性故障,重合闸成功,开关D01、开关D02先后得电,分别经各自的得电延时时限ΔtD01、ΔtD02时限合闸,线路故障自动恢复供电;如果故障是永久性故障,重合闸故障仍存在,始端开关CB第二次跳闸,同时开关D01接收到残压信号,立即自动闭锁;③联络开关LL经得电延时时限ΔtLL时限合闸,从对侧线路取电恢复联络开关LL与分段开关D02之间线路的供电,接着分段开关D02得电后,经得电延时时限ΔtD02时限恢复分段开关D02与分段开关D02之间线路的供电。至此就地型馈线自动化动作过程结束。At this time, the actions of each switch are as follows: ① The switch CB at the starting end trips, and the switch D01 and switch D02 lose power immediately. After the power loss, they are all opened after the delay time Δt, and the switch LL does not operate and maintains the original opening state; ② The starting end The switch CB is reclosed for the first time. If the fault is a transient fault, the reclosing is successful, and the switch D01 and switch D02 are powered on successively. Power supply; if the fault is a permanent fault, the reclosing fault still exists, the start-end switch CB trips for the second time, and the switch D01 receives the residual voltage signal and automatically blocks immediately; Then, after the sectional switch D02 is energized, the sectional switch D02 and the sectional switch will be restored after the power delay time limit Δt D02 . Power supply for the line between D02. At this point, the automatic action process of the local feeder is over.

故障区段02:故障位于在分段开关D01与分段开关D02之间,如图3所示。Fault section 02: The fault is located between the segment switch D01 and the segment switch D02, as shown in FIG. 3 .

此时各开关动作情况为:①始端开关CB跳闸,开关D01、开关D02立即失电,失电后均经延时时间Δt分闸,开关LL不动作,保持原有的分闸状态;②始端开关CB第一次重合闸,重合闸成功,开关D01得电后经得电延时时限ΔtD01合闸,如果故障是瞬时性故障,D02得电经得电延时时限ΔtD02时限合闸,线路故障自动恢复供电;如果故障是永久性故障,D01得电合闸后故障仍存在,始端开关CB第二次跳闸,同时开关D01和开关D02接收到残压信号,立即自动闭锁;③始端开关CB第二次重合闸,恢复始端开关CB与分段开关D01之间的线路供电;④联络开关LL经得电延时时限ΔtLL时限合闸,从对侧线路取电恢复联络开关LL与分段开关D02之间线路的供电。分段开关D01与分段开关D02均闭锁,故障定位于两个开关之间,至此就地型馈线自动化动作过程结束。At this time, the actions of each switch are as follows: ① The switch CB at the starting end trips, and the switch D01 and switch D02 lose power immediately. After the power loss, they are all opened after the delay time Δt, and the switch LL does not operate and maintains the original opening state; ② The starting end The switch CB is reclosed for the first time, and the reclosing is successful. After the switch D01 is electrified, the switch D01 is closed after the delay time Δt. If the fault is a transient fault, the switch D02 is closed after the delay time Δt D02 . Line fault automatically restores power supply; if the fault is a permanent fault, the fault still exists after D01 is energized and closed, the start switch CB trips for the second time, and the switch D01 and switch D02 receive the residual voltage signal at the same time, and automatically block immediately; ③Start switch CB is reclosed for the second time to restore the power supply of the line between the start switch CB and the section switch D01; ④ The tie switch LL is closed after the power delay time limit Δt LL time limit, and the tie switch LL and the tie switch LL are restored from the opposite side line. Power supply to the line between segment switch D02. Section switch D01 and section switch D02 are both blocked, and the fault is located between the two switches. At this point, the automatic action process of the local feeder is over.

故障区段03:故障位于分段开关D02与联络开关LL之间,如图4所示。Fault section 03: The fault is located between the section switch D02 and the tie switch LL, as shown in Figure 4.

此时各开关动作情况为:①始端开关CB跳闸,分段开关D01、开关D02立即失电,失电后均经延时时间Δt分闸,开关LL不动作,保持原有的分闸状态;②始端开关CB第一次重合闸,重合闸成功,开关D01得电后经得电延时时限ΔtD01合闸,然后开关D02得电后经得电延时时限ΔtD02合闸,如果故障是瞬时性故障,线路故障自动恢复供电;如果故障是永久性故障,重合闸故障仍存在,始端开关CB第二次跳闸,同时开关D02和开关LL接收到残压信号,立即自动闭锁;③始端开关CB第二次重合闸,恢复始端开关CB与分段开关D01之间的线路供电,开关D01得电后,经得电延时时限ΔtD01合闸,然后开关D02得电后经得电延时时限ΔtD02合闸,非故障区域恢复了供电。分段开关D02与联络开关LL均闭锁,故障定位于两个开关之间,至此就地型馈线自动化动作过程结束。At this time, the actions of each switch are as follows: (1) The start switch CB trips, and the segment switch D01 and switch D02 lose power immediately. After the power loss, they are all opened after the delay time Δt, and the switch LL does not operate, maintaining the original opening state; ②The first reclosing of the start switch CB, the reclosing is successful, after the switch D01 is energized, the switch D01 is closed after the power delay time limit Δt D01 , and then the switch D02 is closed after the power delay time limit Δt D02 , if the fault is Instantaneous fault, the line fault automatically restores power supply; if the fault is a permanent fault, the reclosing fault still exists, the start switch CB trips for the second time, and the switch D02 and switch LL receive the residual voltage signal, and automatically block immediately; ③ The start switch CB is reclosed for the second time to restore the power supply of the line between the start switch CB and the segment switch D01. After the switch D01 is energized, D01 is closed after the delay time Δt, and then the switch D02 is energized after the delay time. The time limit Δt D02 is closed, and the power supply is restored in the non-fault area. Section switch D02 and tie switch LL are blocked, and the fault is located between the two switches. So far, the automatic action process of the local feeder is over.

其中分闸延时时间Δt用于躲过电网故障处理过程中引发的电压暂降、电网操作过程中引起的波动等;在一些实施例中,延时时间Δt满足:0.3s≤Δt≤1s。在一些实施例中,延时时间Δt满足:0.3s≤Δt≤0.5s。在一些实施例中,延时时间Δt满足:Δt=0.5s。The opening delay time Δt is used to avoid voltage sags caused during grid fault handling and fluctuations caused during grid operation; in some embodiments, the delay time Δt satisfies: 0.3s≤Δt≤1s. In some embodiments, the delay time Δt satisfies: 0.3s≤Δt≤0.5s. In some embodiments, the delay time Δt satisfies: Δt=0.5s.

(2)单辐射模式(2) Single radiation mode

单辐射模式包括一台始端开关CB、一台联络开关LL,剩下的全部是分段开关D01、D02等,调试应模拟至少四个区域的故障,始端开关CB与分段开关D01之间、分段开关D01、D02、D03三个开关包围的区域、分段开关D02后侧区域以及分段开关D03后侧区域等四个区域的故障。The single radiation mode includes a start switch CB, a tie switch LL, and the rest are segment switches D01, D02, etc. The debugging should simulate faults in at least four areas. Between the start switch CB and the segment switch D01, Faults in four areas: the area surrounded by the three switches D01, D02, and D03, the area behind the switch D02, and the area behind the switch D03.

故障区段01:故障位于始端开关CB与分段开关D01之间,如图5所示。Fault section 01: The fault is located between the start switch CB and the segment switch D01, as shown in Figure 5.

此时各开关动作情况为:①始端开关CB跳闸,分段开关D01、D02、D03立即失电,失电后均经延时时间Δt分闸;②始端开关CB第一次重合闸,如果故障是瞬时性故障,重合闸成功,开关D01、开关D02、开关D03先后得电,分别经各自的得电延时时限ΔtD01、ΔtD02、ΔtD03时限合闸,线路故障自动恢复供电;如果故障是永久性故障,重合闸故障仍存在,开关CB第二次跳闸,同时开关D01接收到残压信号,立即自动闭锁。故障点定位于始端开关CB与分段开关D01之间,至此就地型馈线自动化动作过程结束。At this time, the actions of each switch are as follows: ① The start switch CB trips, and the segment switches D01, D02, and D03 lose power immediately, and they all open after the delay time Δt after power loss; ② The start switch CB is reclosed for the first time, if the fault occurs It is a transient fault, the reclosing is successful, the switch D01, switch D02, and switch D03 are energized successively, and they are closed after the respective power-on delay time limits Δt D01 , Δt D02 , and Δt D03 , and the line fault automatically restores power supply; if the fault occurs It is a permanent fault, the reclosing fault still exists, the switch CB trips for the second time, and the switch D01 receives the residual voltage signal, and automatically locks it immediately. The fault point is located between the start switch CB and the segment switch D01, so far the automatic action process of the local feeder is over.

故障区段02:故障位于分段开关D01、D02、D03三个开关包围的区域,如图6所示。Fault section 02: The fault is located in the area surrounded by the three switches D01, D02 and D03, as shown in Figure 6.

此时各开关动作情况为:①始端开关CB跳闸,分段开关D01、D02、D03立即失电,失电后均经延时时间Δt分闸;②始端开关CB第一次重合闸,重合闸成功,开关D01得电后经得电延时时限ΔtD01合闸,如果故障是瞬时性故障,D02得电经得电延时时限ΔtD02时限合闸,D03得电经得电延时时限ΔtD03时限合闸,线路故障自动恢复供电;如果故障是永久性故障,D01得电合闸后故障仍存在,始端开关CB第二次跳闸,同时开关D01接收到残压过流信号,D02、D03接收到残压信号,三个开关立即自动闭锁;③始端开关CB第二次重合闸,恢复始端开关CB与分段开关D01之间的线路供电。故障定位于分段开关D01后侧与D02、D03开关之间的区域,至此就地型馈线自动化动作过程结束。At this time, the actions of each switch are as follows: ① The start switch CB trips, and the segment switches D01, D02, and D03 lose power immediately, and they all open after the delay time Δt after power loss; ② The start switch CB is reclosed for the first time, and the reclosing After the switch D01 is energized, the switch D01 closes after the delay time Δt, if the fault is a transient fault, the switch D02 is closed after the delay time Δt, and the switch D03 is closed after the delay time Δt. D03 is closed for a time limit, and the line fault automatically restores power supply; if the fault is a permanent fault, the fault still exists after D01 is powered on and closed, the start switch CB trips for the second time, and the switch D01 receives the residual voltage overcurrent signal, D02, D03 After receiving the residual voltage signal, the three switches are automatically blocked immediately; ③ The start switch CB is reclosed for the second time, and the line power supply between the start switch CB and the segment switch D01 is restored. The fault is located in the area between the rear side of sectional switch D01 and switches D02 and D03. At this point, the automatic action process of the local feeder is over.

故障区段03:故障位于分段开关D02后侧区域,如图7所示。Fault section 03: The fault is located in the area behind the segment switch D02, as shown in Figure 7.

此时各开关动作情况为:①始端开关CB跳闸,分段开关D01、D02、D03立即失电,失电后均经延时时间Δt分闸;②始端开关CB第一次重合闸,重合闸成功,开关D01得电后经得电延时时限ΔtD01合闸,如果故障是瞬时性故障,D02得电经得电延时时限ΔtD02时限合闸,然后D03得电经得电延时时限ΔtD03时限合闸,线路故障自动恢复供电;如果故障是永久性故障,D02得电合闸后故障仍存在,始端开关CB第二次跳闸,同时开关D02接收到残压过流信号,立即自动闭锁;③始端开关CB第二次重合闸,恢复始端开关CB与分段开关D01之间的线路供电,然后D03得电经得电延时时限ΔtD03时限合闸,非故障区域恢复供电。故障定位于分段开关D02后侧之间的区域,至此就地型馈线自动化动作过程结束。At this time, the actions of each switch are as follows: ① The start switch CB trips, and the segment switches D01, D02, and D03 lose power immediately, and they all open after the delay time Δt after power loss; ② The start switch CB is reclosed for the first time, and the reclosing After the switch D01 is energized, D01 closes after the delay time Δt, if the fault is a transient fault, the switch D02 is closed after the delay time Δt, and then D03 is energized after the delay time Δt D03 is closed at time limit, and the line fault will automatically restore power supply; if the fault is a permanent fault, the fault still exists after D02 is energized and closed, the start switch CB will trip for the second time, and the switch D02 will receive the residual voltage overcurrent signal and automatically automatically Blocking; ③ The start switch CB is reclosed for the second time, and the line power supply between the start switch CB and the segment switch D01 is restored, and then D03 is powered on after the power-on delay time limit Δt D03 is closed, and the non-fault area resumes power supply. The fault is located in the area between the rear sides of the sectional switch D02, and the automatic action process of the local feeder has ended.

故障区段04:故障位于分段开关D03后侧区域,如图8所示。Fault section 04: The fault is located in the area behind the segment switch D03, as shown in Figure 8.

此时各开关动作情况为:①始端开关CB跳闸,分段开关D01、D02、D03立即失电,失电后均经延时时间Δt分闸;②始端开关CB第一次重合闸,重合闸成功,开关D01得电后经得电延时时限ΔtD01合闸,D02得电经得电延时时限ΔtD02时限合闸,如果故障是瞬时性故障,D03得电经得电延时时限ΔtD03时限合闸,线路故障自动恢复供电;如果故障是永久性故障,D03得电合闸后故障仍存在,始端开关CB第二次跳闸,同时开关D03接收到残压过流信号,立即自动闭锁;③始端开关CB第二次重合闸,恢复始端开关CB与分段开关D01之间的线路供电,然后D02得电经得电延时时限ΔtD02时限合闸,非故障区域恢复供电。故障定位于分段开关D03后侧之间的区域,至此就地型馈线自动化动作过程结束。At this time, the actions of each switch are as follows: ① The start switch CB trips, and the segment switches D01, D02, and D03 lose power immediately, and they all open after the delay time Δt after power loss; ② The start switch CB is reclosed for the first time, and the reclosing Success, after switch D01 is energized, D01 closes after the power-on delay time Δt, D02 is powered on after the power-on delay time Δt D02 is closed, if the fault is a transient fault, D03 is powered on after the power-on delay time Δt D03 is closed at time limit, and the line fault will automatically restore power supply; if the fault is a permanent fault, the fault still exists after D03 is energized and closed, the start switch CB will trip for the second time, and the switch D03 will receive the residual voltage overcurrent signal and automatically lock immediately ; ③ The second reclosing of the start switch CB to restore the power supply of the line between the start switch CB and the segment switch D01, and then the power supply of D02 is closed after the power delay time limit Δt D02 , and the power supply is restored to the non-fault area. The fault is located in the area between the rear sides of the sectional switch D03, and the automatic action process of the local feeder has ended.

其中分闸延时时间Δt用于躲过电网故障处理过程中引发的电压暂降、电网操作过程中引起的波动等。在一些实施例中,延时时间Δt满足:0.3s≤Δt≤1s。在一些实施例中,延时时间Δt满足:0.3s≤Δt≤0.5s。在一些实施例中,延时时间Δt满足:Δt=0.5s。Among them, the opening delay time Δt is used to avoid the voltage sag caused in the process of grid fault processing and the fluctuation caused by the grid operation process. In some embodiments, the delay time Δt satisfies: 0.3s≤Δt≤1s. In some embodiments, the delay time Δt satisfies: 0.3s≤Δt≤0.5s. In some embodiments, the delay time Δt satisfies: Δt=0.5s.

(3)终端测试具体实施方式(3) Specific implementation of terminal test

终端功能测试可采用多种方法进行,在某些实施例中,采用物理仿真平台测试法开展终端自动化功能测试,物理仿真平台构建配电线路模拟系统,如图9所示,图中,E为电源,L1、L2、L3分别为电源E供电的三条线路,K1模拟线路L2的始端开关、K2、K3分别模拟线路L2的分段开关,K4模拟线路L2与线路L1的联络开关,每个开关由待测型号的终端控制分合闸。在测试过程中,通过模拟K1与K2开关之间故障;K2开关与K3开关之间故障;K3开关与K4开关(联络开关)之间故障。测试的各区段的故障,各开关由智能终端控制,开关动作的情况应该与前述各故障情况下的动作情况一致,在测试过程中,若发现功能错误,应找到软件问题,及时开展现场修改调整。The terminal function test can be carried out in a variety of ways. In some embodiments, a physical simulation platform test method is used to carry out the terminal automation function test, and the physical simulation platform builds a distribution line simulation system, as shown in Figure 9. In the figure, E is Power supply, L1, L2, L3 are the three lines powered by power supply E, K1 simulates the start switch of line L2, K2, K3 respectively simulate the segment switch of line L2, K4 simulates the contact switch of line L2 and line L1, each switch The opening and closing are controlled by the terminal of the model to be tested. In the test process, the fault between the K1 and K2 switches is simulated; the fault between the K2 switch and the K3 switch; the fault between the K3 switch and the K4 switch (contact switch). For the faults in each section of the test, each switch is controlled by the intelligent terminal, and the switch action should be consistent with the action in the above-mentioned fault conditions. During the test, if a functional error is found, the software problem should be found, and the on-site modification and adjustment should be carried out in time. .

在某些实施例中,采用多台自动化功能测试仪联合测试法。自动化测试仪可输出任意变化的三相电流、三相电压信号,同时含有模拟断路器,可模拟受终端控制的开关。联合测试法需要至少四台自动化测试仪和四台终端,二者之间需要做好接线,接线中包括电流、电压、信号等数据线,如图10所示。其中终端01与模拟断路器充当始端开关,终端02、03与模拟断路器充当两个分段开关,终端04与模拟断路器充当联络开关;每个终端测试仪,分别制定5套电流电压和模拟断路器状态输出序列,分别模拟正常状态、各终端之间的故障及联络开关对侧故障等5类不同的故障,每套序列都依据就地型馈线自动化逻辑,模拟故障发生时的电流电压和开关位置变化情况。In some embodiments, a combined testing method of multiple automated functional testers is used. The automatic tester can output any changing three-phase current and three-phase voltage signals, and also contains a simulated circuit breaker, which can simulate the switch controlled by the terminal. The joint test method requires at least four automated testers and four terminals, and wiring between the two needs to be done. The wiring includes data lines such as current, voltage, and signal, as shown in Figure 10. The terminal 01 and the simulated circuit breaker act as the start switch, the terminals 02, 03 and the simulated circuit breaker act as two segment switches, and the terminal 04 and the simulated circuit breaker act as the tie switch; The circuit breaker status output sequence simulates 5 different types of faults, including normal status, faults between terminals, and faults on the opposite side of the tie switch. Each sequence is based on the local feeder automation logic to simulate the current, voltage and Changes in switch position.

在测试前,各自动化测试仪都要设置多套电压电流输出方案,每套方案对应着一个故障发生区段,在测试过程中,观察各开关的终端控制开关动作情况;如果动作情况符合前述就地型自动化动作逻辑一致,则说明该终端软件是正确的,否则需要技术人员现场调整终端软件,最终确定动作全部正确的软件版本。Before the test, each automatic tester must set up multiple sets of voltage and current output solutions, each set of solutions corresponds to a fault occurrence section, during the test process, observe the terminal control switch action of each switch; If the ground-type automation action logic is consistent, it means that the terminal software is correct; otherwise, technicians need to adjust the terminal software on-site, and finally determine the correct software version for all actions.

图11所示为某型号智能终端的自动化软件版本。Figure 11 shows the automation software version of a certain type of smart terminal.

步骤2制定自动化和保护配置方案:Step 2 Develop an automation and protection configuration scheme:

就地型馈线自动化投运前,应根据线路结构和开关分布特点,确定保护配置方案和自动化方案,在制定方案的过程中,遵循以下原则:1)充分发挥就地型馈线自动化功能,尽量缩小停电范围;2)自动化与保护之间进行结合,尽量减少跳闸次数,以提升用户用电感受;3)方案须契合线路特点,尽量不移动开关位置。Before the local feeder automation is put into operation, the protection configuration scheme and automation scheme should be determined according to the line structure and switch distribution characteristics. In the process of formulating the scheme, the following principles should be followed: 1) Give full play to the local feeder automation function and minimize the 2) The combination of automation and protection, to minimize the number of trips, to improve the user's power experience; 3) The solution must be in line with the characteristics of the line, and the switch position should not be moved as much as possible.

(1)单辐射线路配置方案(1) Single Radiation Line Configuration Scheme

某线路为单辐射线路,线路含有3条大分支,一共设置了6台自动化开关D01、F01、F02、F03、F04及F09,其中D01、F01位于主干线上,另外4个开关位于三条分支线线上,其中F02、F03开关位于同一分支线上。如图12所示为线路示意图。A line is a single-radiation line, the line contains 3 large branches, a total of 6 automatic switches D01, F01, F02, F03, F04 and F09 are set, of which D01, F01 are located on the main line, and the other 4 switches are located on the three branch lines. On the line, the switches F02 and F03 are located on the same branch line. Figure 12 shows a schematic diagram of the circuit.

经过计算和分析,发现F01、F03、F04及F09开关等四个开关处于大致相同的位置,且位置位于分级保护配置有效范围之内,因此这四个开关设置保护,这样,可以确保四个开关之后的故障由这四个开关动作直接隔离,减少故障停电范围的同时也减少了前端开关动作次数。而D01、F02开关设置自动化逻辑,可以确保这两个开关与设置保护的四个开关之间的部分发生故障时,不拖累其上游非故障区域供电。After calculation and analysis, it is found that four switches, such as switches F01, F03, F04 and F09, are in roughly the same position, and the positions are within the effective range of the hierarchical protection configuration. Therefore, these four switches are set to protect, so that the four switches can be guaranteed. Subsequent faults are directly isolated by these four switch actions, which reduces the range of power outages and reduces the number of front-end switch actions. The D01 and F02 switches are set with automatic logic, which can ensure that when the part between these two switches and the four switches set for protection fails, the power supply in the upstream non-faulty area will not be dragged down.

按此思路,配置保护自动化方案如下,如图13所示。Based on this idea, configure the protection automation scheme as follows, as shown in Figure 13.

1)出线开关设置保护,过流I段2100A/0s;过流II段1200A/0.2s;过流III段330A/0.5s;1) The outlet switch is set to protect, the overcurrent stage I is 2100A/0s; the overcurrent stage II is 1200A/0.2s; the overcurrent stage III is 330A/0.5s;

2)D01开关不投保护,投自动化功能,X时限21s、Y时限5s,零序保护告警3A/20s;2) D01 switch does not switch on protection, switch on automatic function, X time limit is 21s, Y time limit is 5s, and zero sequence protection alarm is 3A/20s;

3)F02开关不投保护,投自动化功能,X时限14s、Y时限5s,零序保护告警3A/18s;3) F02 switch does not switch on protection, switch on automatic function, X time limit is 14s, Y time limit is 5s, and zero sequence protection alarm is 3A/18s;

4)F03、F01、F04、F09等四个开关均投保护和自动化,过流I段与出线开关过流II段配合,过流II段与出线开关过流III段配合。4) Four switches such as F03, F01, F04, and F09 are all switched on for protection and automation. The overcurrent stage I cooperates with the overcurrent stage II of the outgoing switch, and the overcurrent stage II cooperates with the overcurrent stage III of the outgoing switch.

(2)联络线路配置方案(2) Contact line configuration scheme

该线路为手拉手联络线路,线路与对侧另一条10kV线路联络,含有1条大分支,一共设置了3台自动化开关,D01、D02和联络开关L30。由于该线路出线开关不远处就设置了D01开关,为充分利用各开关,制定方案时,将D01设置保护和两次重合闸,出线开关也设置了保护,由于距离D01开关过近,无法通过电流实现分级保护,因此退出站内913开关的速断保护,与D01依靠时间级差实现不完全配合,另外两个开关D02和L30分别投运自动化逻辑,通过就地型电压时间型动作逻辑,实现故障隔离和自动恢复供电。The line is a hand-in-hand connection line, and the line is connected to another 10kV line on the opposite side, including a large branch, and a total of 3 automatic switches, D01, D02 and tie switch L30. Since the D01 switch is set not far from the outgoing switch of this line, in order to make full use of each switch, when formulating the plan, D01 is set to protect and reclose twice, and the outgoing switch is also set to protect. Because it is too close to the D01 switch, it cannot pass through. The current realizes grading protection, so the quick-break protection of the 913 switch in the station is withdrawn, and the D01 relies on the time difference to achieve incomplete coordination. The other two switches D02 and L30 are put into operation respectively with automatic logic, and fault isolation is realized through the local type voltage and time type action logic. and automatic power recovery.

各开关配置保护自动化方案如下,如图14所示。The protection automation scheme of each switch configuration is as follows, as shown in Figure 14.

1)出线开关设置保护,过流I段退出;过流II段1500A/0.2s;过流III段330A/0.4s;1) The outlet switch is set to protect, and the overcurrent stage I exits; the overcurrent stage II is 1500A/0.2s; the overcurrent stage III is 330A/0.4s;

2)D01开关投保护,过流I段1200A/0s;过流II段300A/0.2s,零序保护告警3A/18s;;2) D01 switch protection, overcurrent I stage 1200A/0s; overcurrent II stage 300A/0.2s, zero sequence protection alarm 3A/18s;

3)D02开关不投保护,投自动化功能,X时限7s、Y时限5s,零序保护告警3A/20s;3) D02 switch does not switch on protection, switch on automatic function, X time limit is 7s, Y time limit is 5s, and zero sequence protection alarm is 3A/20s;

4)联络开关L30投联络开关自动化模式,X时限21s、Y时限5s。4) The tie switch L30 is switched to the automatic mode of the tie switch, the X time limit is 21s, and the Y time limit is 5s.

步骤3现场对线路进行软件更新和参数设置:Step 3 Perform software update and parameter setting on the line on site:

由于自动化建设需要,实际生产中自动化开关大部分在实现自动化配合逻辑之前就投入电网运行了,因此自动化功能的投运要对在运开关和控制器进行设置实现。因此在前面工作充分准备好之后,下一步需要对现场运行线路的自动化设备进行软件更新和参数设置。Due to the needs of automation construction, most of the automatic switches in actual production are put into operation in the power grid before the automation coordination logic is realized. Therefore, the operation of the automation function requires the settings of the switches and controllers in operation. Therefore, after the previous work is fully prepared, the next step is to update the software and set parameters for the automation equipment running the line on site.

设置方法如下:首先根据以测试通过的软件版本,对相应型号终端进行软件更新,其中包括与主站的点表核对;再根据保护自动化配置方案,设置保护定值、自动化参数等信息。在条件允许的情况下,应在这个基础上设置相关故障序列,再对终端进行单体进行测试,测试成功后,终端即可投入自动化运行,自动化功能正式启用。The setting method is as follows: First, according to the software version that has passed the test, update the software of the corresponding type of terminal, including checking the point table with the master station; then, according to the protection automation configuration scheme, set the protection settings, automation parameters and other information. If conditions permit, the relevant fault sequence should be set on this basis, and then the terminal is tested on a single unit. After the test is successful, the terminal can be put into automatic operation and the automation function is officially activated.

在投运过程中,应注意以下事项:1)在更新软件版本或设置参数时,退出终端分合闸压板;2)含双侧PT的开关,应核对双侧PT开关航插与终端的航插接头对接正确性;3)联络开关两侧应配备刀闸;4)失压分闸如果可设置,应在0.3s-1.0s之间取值等。In the process of putting into operation, the following matters should be noted: 1) When updating the software version or setting parameters, exit the terminal opening and closing pressure plate; 2) For the switch with double-sided PT, check the aviation plug of the double-sided PT switch and the terminal of the terminal. The correctness of the connection of the plug connector; 3) Knife switches should be provided on both sides of the tie switch; 4) If the voltage loss opening can be set, the value should be between 0.3s-1.0s, etc.

步骤4观察运行情况:Step 4 Observe the operation:

在自动化功能投运后,应适时核对终端与主站的遥信遥测信息,跟踪观察运行情况,特别是发生故障后,应核对故障点与自动化定位结果是否一致,保护与自动化动作是否正确;若发生异常情况,应查找问题所在,并根据情况进行调整优化。After the automation function is put into operation, the remote signaling and telemetry information of the terminal and the main station should be checked in a timely manner, and the operation status should be tracked and observed. Especially after a fault occurs, it should be checked whether the fault point is consistent with the automatic positioning results, and whether the protection and automatic actions are correct; If an abnormal situation occurs, you should find the problem and adjust and optimize it according to the situation.

本实施例就地型馈线自动化为主的技术方案如下:The technical solution based on the local feeder automation in this embodiment is as follows:

馈线发生故障时,先由设置了保护的出线开关跳闸,全线停电,布置在线路上的电压时间型开关,检测到失压跳闸,出线开关重合闸,各电压时间型开关逐级恢复供电,直到合闸到故障再次跳闸,电压时间型开关控制器FTU通过残压闭锁开关,下次来电不再合闸,这样完成了第一次重合闸定位故障的功能;故障第二次跳闸后,延时第二次合闸,逐步恢复非故障区域。When the feeder fails, the outlet switch with protection is tripped first, the whole line is powered off, the voltage time switch arranged on the line detects the loss of voltage and trips, the outlet switch is reclosed, and each voltage time switch restores power supply step by step until it is closed. When the switch is on until the fault trips again, the voltage-time switch controller FTU locks the switch through the residual voltage, and will not close the switch next time when the power is turned on, thus completing the function of the first reclosing to locate the fault; Re-closing, and gradually restore the non-fault area.

对于辐射型线路和联络线路这两类线路,采用就地型馈线自动化实现区段定位的本质是相同,就是通过始端开关重合闸配合电压时间型FTU实现故障定位,两类线路处理原理如下所示:For the two types of lines, radiating line and tie line, the essence of using local feeder automation to realize section location is the same, that is, to realize fault location by starting switch reclosing and voltage-time FTU. The processing principles of the two types of lines are as follows :

(1)单辐射线路就地型馈线自动化方案(1) In-situ feeder automation scheme for single radiation line

单辐射线路,就地型馈线自动化只有在末端故障时,恢复非故障区域越大,若在始端发生故障,后侧非故障区域由于没有联络线路供电,无法恢复。单辐射线路就地型馈线自动化动作示意图如图15所示。For single radiating lines, the local feeder automation can only recover the larger the non-fault area when the terminal fails. If a fault occurs at the beginning, the rear non-fault area cannot be restored because there is no power supply from the connecting line. Figure 15 shows the schematic diagram of the automatic action of the in-situ feeder of the single-radiation line.

(2)联络线路就地型馈线自动化方案(2) In-situ feeder automation scheme of contact line

如图16所示,为手拉手联络线路的动作原理图。若是瞬时性故障自动躲避,恢复送电;若是永久性故障,再次跳闸;故障隔离完毕,恢复正常区段供电。As shown in Figure 16, it is a schematic diagram of the action of the hand-in-hand contact line. If it is a transient fault, it will automatically avoid and resume power transmission; if it is a permanent fault, it will trip again; after the fault isolation is completed, the normal section power supply will be restored.

就地型馈线自动化,采用电压型开关,电磁式机构,超级电容供电;开关二遥即可;电压型开关具备“来电延时合,无压即释放”的特点,动作可靠;出线开关两次重合完成故障定位和隔离。首次重合闸,闭锁故障点两侧开关隔离故障;二次重合,恢复电源侧非故障区域供电;非线路首段故障时,出线开关总能重合成功。Local type feeder automation, using voltage type switch, electromagnetic type mechanism, super capacitor power supply; switch two remote; voltage type switch has the characteristics of "delayed closing of incoming calls, release without pressure", reliable action; outgoing switch twice Coincidence completes fault location and isolation. For the first reclosing, the switches on both sides of the fault point are blocked to isolate the fault; for the second reclosing, the power supply in the non-faulty area on the power supply side is restored; when the first section of the line is not faulty, the outgoing switch can always be reclosed successfully.

Claims (8)

1.一种配电线路就地型馈线自动化功能模式化投运方法,其特征在于,所述方法按照开展终端自动化功能测试、根据线路特点制定自动化和保护配置方案、现场对终端进行软件更新和参数设置、观察运行情况,采用就地型馈线自动化为主的技术方案,实现自动化线路模式化投运,提高配电线路就地型馈线自动化功能的投运效率。1. A method for putting into operation in situ feeder automation functions of distribution lines, characterized in that, the method is carried out according to carrying out terminal automation function tests, formulating automation and protection configuration schemes according to line characteristics, and performing software update and Parameter setting, observing the operation situation, adopting the technical scheme mainly based on in-situ feeder automation, realizing the mode operation of the automatic line, and improving the operation efficiency of the in-situ feeder automation function of the distribution line. 2.根据权利要求1所述的一种配电线路就地型馈线自动化功能模式化投运方法,其特征在于,所述开展终端自动化功能测试,是对所有厂家的自动化功能进行统一测试,以确定各厂家的可现场运行的自动化软件版本;所述功能验证包括:终端失压跳闸逻辑、来电延时合闸、故障闭锁逻辑、联络开关闭锁及送电逻辑、终端调试模式逻辑;测试过程中,应不少于4台智能终端开展联合调试,调试的内容包括联络模式测试和单辐射模式测试。2. a kind of distribution line local type feeder automation function modelized commissioning method according to claim 1, is characterized in that, described carrying out terminal automation function test, is to carry out unified test to the automation function of all manufacturers, with Determine the automation software version of each manufacturer that can be run on site; the functional verification includes: terminal voltage loss trip logic, incoming call delay closing, fault blocking logic, contact switch lock and power transmission logic, terminal debugging mode logic; during the test process , there should be no less than 4 intelligent terminals to carry out joint debugging, the content of debugging includes contact mode test and single radiation mode test. 3.根据权利要求1所述的一种配电线路就地型馈线自动化功能模式化投运方法,其特征在于,所述制定自动化和保护配置方案包括单辐射线路和联络线路;在制定方案的过程中,遵循以下原则:1)充分发挥就地型馈线自动化功能,尽量缩小停电范围;2)自动化与保护之间进行结合,尽量减少跳闸次数,以提升用户用电感受;3)方案须契合线路特点,尽量不移动开关位置。3. The method for putting into operation in situ feeder automation function of a distribution line according to claim 1, wherein the formulating an automation and protection configuration scheme comprises a single radiating line and a tie line; In the process, the following principles are followed: 1) Give full play to the automation function of the local feeder, and minimize the scope of power outages; 2) Combine automation and protection to minimize the number of trips to improve the user's experience with electricity; 3) The scheme must fit Circuit characteristics, try not to move the switch position. 4.根据权利要求1所述的一种配电线路就地型馈线自动化功能模式化投运方法,其特征在于,所述对终端进行软件更新和参数设置,设置方法如下:首先根据以测试通过的软件版本,对相应型号终端进行软件更新,其中包括与主站的点表核对;再根据保护自动化配置方案,设置保护定值、自动化参数信息;在条件允许的情况下,应在这个基础上设置相关故障序列,再对终端进行单体进行测试,测试成功后,终端即可投入自动化运行,自动化功能正式启用。4. a kind of power distribution line local type feeder automation function patterned operation method according to claim 1, is characterized in that, described to carry out software update and parameter setting to terminal, setting method is as follows: first pass according to the test According to the software version of the corresponding model, update the software of the corresponding type of terminal, including checking the point table with the master station; then set the protection setting value and automation parameter information according to the protection automation configuration plan; if conditions permit, it should be based on this basis. Set the relevant fault sequence, and then test the terminal unit. After the test is successful, the terminal can be put into automatic operation, and the automation function is officially activated. 5.根据权利要求1所述的一种配电线路就地型馈线自动化功能模式化投运方法,其特征在于,所述观察运行情况,在自动化功能投运后,应适时核对终端与主站的遥信遥测信息,跟踪观察运行情况;特别是发生故障后,应核对故障点与自动化定位结果是否一致,保护与自动化动作是否正确;若发生异常情况,应查找问题所在,并根据情况进行调整优化。5. The method for putting into operation mode of local feeder automation function of distribution lines according to claim 1, wherein the observation of the operation situation, after the automation function is put into operation, the terminal and the main station should be checked in a timely manner In particular, after a fault occurs, it should be checked whether the fault point is consistent with the automatic positioning results, and whether the protection and automatic actions are correct; if an abnormal situation occurs, the problem should be found and adjusted according to the situation optimization. 6.根据权利要求1所述的一种配电线路就地型馈线自动化功能模式化投运方法,其特征在于,所述就地型馈线自动化为主的技术方案如下,6 . The method for putting into operation a distribution line in situ feeder automation function according to claim 1 , wherein the technical scheme mainly based on the in situ feeder automation is as follows: 7 . 发生故障时,先由设置了保护的出线开关跳闸,全线停电,布置在线路上的电压时间型开关,检测到失压跳闸,出线开关重合闸,各电压时间型开关逐级恢复供电,直到合闸到故障再次跳闸,电压时间型开关控制器FTU通过残压闭锁开关,下次来电不再合闸,这样完成了第一次重合闸定位故障的功能;故障第二次跳闸后,延时第二次合闸,逐步恢复非故障区域。When a fault occurs, the outlet switch with protection is tripped first, the whole line is powered off, the voltage time switch arranged on the line detects the loss of voltage and trips, the outlet switch is reclosed, and each voltage time switch restores power supply step by step until it is closed. When the fault trips again, the voltage-time switch controller FTU locks the switch through the residual voltage, and will not close the switch next time when the power is turned on, thus completing the function of the first reclosing to locate the fault; Close the switch again and gradually restore the non-faulty area. 7.根据权利要求2所述的一种配电线路就地型馈线自动化功能模式化投运方法,其特征在于,所述联络模式包括一台始端开关CB、一台联络开关LL,剩下的全部是分段开关D01、D02,调试应模拟至少三个区域的故障,始端开关CB与分段开关D01之间、分段开关D01与分段开关D02之间、分段开关D02与联络开关LL之间三个区域的故障。7 . The method for putting into operation in situ feeder automation function of a distribution line according to claim 2 , wherein the connection mode comprises a start switch CB, a tie switch LL, and the remaining All are segment switches D01 and D02. The debugging should simulate faults in at least three areas, between the start switch CB and the segment switch D01, between the segment switch D01 and the segment switch D02, between the segment switch D02 and the tie switch LL failure of the three areas in between. 8.根据权利要求2所述的一种配电线路就地型馈线自动化功能模式化投运方法,其特征在于,所述单辐射模式包括一台始端开关CB、一台联络开关LL,剩下的全部是分段开关D01、D02,调试应模拟至少四个区域的故障,始端开关CB与分段开关D01之间、分段开关D01、D02、D03三个开关包围的区域、分段开关D02后侧区域以及分段开关D03后侧区域四个区域的故障。8 . The method for putting into operation in situ feeder automation functions of distribution lines according to claim 2 , wherein the single radiation mode comprises a starting switch CB, a tie switch LL, and the remaining 8 . All are segment switches D01 and D02, and debugging should simulate faults in at least four areas, between the start switch CB and segment switch D01, the area surrounded by segment switches D01, D02, and D03, and segment switch D02 Faults in the rear side area and the rear side area of the segment switch D03.
CN202010970770.4A 2020-09-16 2020-09-16 A method for mode operation of in-situ feeder automation function of distribution lines Pending CN112054493A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010970770.4A CN112054493A (en) 2020-09-16 2020-09-16 A method for mode operation of in-situ feeder automation function of distribution lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010970770.4A CN112054493A (en) 2020-09-16 2020-09-16 A method for mode operation of in-situ feeder automation function of distribution lines

Publications (1)

Publication Number Publication Date
CN112054493A true CN112054493A (en) 2020-12-08

Family

ID=73604314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010970770.4A Pending CN112054493A (en) 2020-09-16 2020-09-16 A method for mode operation of in-situ feeder automation function of distribution lines

Country Status (1)

Country Link
CN (1) CN112054493A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113032978A (en) * 2021-03-08 2021-06-25 贵州电网有限责任公司 Self-adaptive comprehensive FA function logic control simulation method
CN113394779A (en) * 2021-07-20 2021-09-14 国网江苏省电力有限公司宿迁供电分公司 Virtual power distribution terminal model based on in-place FA logic
CN115859547A (en) * 2023-02-27 2023-03-28 国网江西省电力有限公司电力科学研究院 A system and method for automatically generating distribution line fixed value scheme
CN117856175A (en) * 2023-11-23 2024-04-09 国网山西省电力公司电力科学研究院 Centralized and in-situ interconversion feeder automation processing method and system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109167709A (en) * 2018-10-11 2019-01-08 陕西银河天地智能配网技术有限公司 Feeder automation scene full-automatic testing method based on cloud platform
CN110350471A (en) * 2019-06-10 2019-10-18 国网江西省电力有限公司电力科学研究院 A kind of method of voltage-time type feeder automation functional verification

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109167709A (en) * 2018-10-11 2019-01-08 陕西银河天地智能配网技术有限公司 Feeder automation scene full-automatic testing method based on cloud platform
CN110350471A (en) * 2019-06-10 2019-10-18 国网江西省电力有限公司电力科学研究院 A kind of method of voltage-time type feeder automation functional verification

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113032978A (en) * 2021-03-08 2021-06-25 贵州电网有限责任公司 Self-adaptive comprehensive FA function logic control simulation method
CN113394779A (en) * 2021-07-20 2021-09-14 国网江苏省电力有限公司宿迁供电分公司 Virtual power distribution terminal model based on in-place FA logic
CN115859547A (en) * 2023-02-27 2023-03-28 国网江西省电力有限公司电力科学研究院 A system and method for automatically generating distribution line fixed value scheme
CN115859547B (en) * 2023-02-27 2023-07-04 国网江西省电力有限公司电力科学研究院 A system and method for automatically generating distribution line fixed value scheme
CN117856175A (en) * 2023-11-23 2024-04-09 国网山西省电力公司电力科学研究院 Centralized and in-situ interconversion feeder automation processing method and system

Similar Documents

Publication Publication Date Title
CN112054493A (en) A method for mode operation of in-situ feeder automation function of distribution lines
CN102306953B (en) Test method for secondary injection of power distribution automatization system
CN104133146B (en) A kind of feeder automation fault handling logic on-the-spot test method
CN113343446B (en) Data analysis and verification method and system for transformer substation monitoring system
CN101158847B (en) Electric power substation software emulation platform building method and no power off upgrading improved method
WO2018209945A1 (en) Active power distribution network feeder automation system test method
CN104020761A (en) Automatic feeder testing system free of networking
CN108233536A (en) A kind of intelligent program remote handling system
CN113364120B (en) Method, device and equipment for checking control process of intelligent substation and storage medium
CN104020762A (en) Automatic feeder testing method free of networking
CN111458586B (en) Batch synchronization detection method and system for multi-interval localized line protection devices in smart substations
CN113162226A (en) Primary side fault injection FA system level test system and method based on HIL
CN106329720A (en) Detecting and debugging method for reconstruction and extension project secondary system for intelligent substation
CN113394779A (en) Virtual power distribution terminal model based on in-place FA logic
CN108197716A (en) Secondary equipment of intelligent converting station safety measure previews online and anti-error method for early warning
CN112416758A (en) Integrated test system and method for intelligent substation
CN110514930A (en) A kind of the detection test method and device of intelligent distributed distribution terminal
CN110460152A (en) A new interval access method for smart substation without power failure
CN201319052Y (en) Auto-switch-on integrated tester
CN113887157A (en) Active distribution network automatic terminal network closed-loop test method based on RTDS
CN106597144A (en) Centralized FA planning function detection method based on simulated transmission
CN109149534B (en) Method for rapidly diagnosing topological fault of power grid model based on DTS virtual switch
CN203870470U (en) Feeder automation test system without network
CN105515166B (en) 110 kilovolts of system busbar combining units of intelligent substation double bus scheme mode can back brake maintenance voltage allocation plan
CN111025135B (en) A test method for the coordinated control capability of an on-site FTU based on a cloud platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20201208

WD01 Invention patent application deemed withdrawn after publication