CN112421502A - Construction method for threading long-distance preset concealed pipe - Google Patents

Construction method for threading long-distance preset concealed pipe Download PDF

Info

Publication number
CN112421502A
CN112421502A CN202011250198.0A CN202011250198A CN112421502A CN 112421502 A CN112421502 A CN 112421502A CN 202011250198 A CN202011250198 A CN 202011250198A CN 112421502 A CN112421502 A CN 112421502A
Authority
CN
China
Prior art keywords
long
threading
construction method
distance
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011250198.0A
Other languages
Chinese (zh)
Inventor
李�根
赵翼
李朝康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
China 19th Metallurgical Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Group Co ltd filed Critical China 19th Metallurgical Group Co ltd
Priority to CN202011250198.0A priority Critical patent/CN112421502A/en
Publication of CN112421502A publication Critical patent/CN112421502A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/08Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
    • H02G1/086Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling using fluid as pulling means, e.g. liquid, pressurised gas or suction means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/36Installations of cables or lines in walls, floors or ceilings
    • H02G3/38Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a construction method, particularly discloses a construction method for threading a long-distance preset concealed pipe, and belongs to the technical field of construction processes of auxiliary facilities of constructional engineering. The construction method for threading the long-distance preset concealed pipe is convenient to construct and operate, reliable and rapid in threading and relatively low in construction cost. The construction method comprises the steps of pneumatic pre-threading of the lead, pre-threading of the lead and traction of the transition line to arrange an electric pipeline, wherein when the lead is pre-threaded pneumatically, the hollow plastic ball is driven by high-pressure gas, so that the hollow plastic ball guides the high-strength flexible lead to pass through the corresponding long-distance pre-buried pipe to complete the pneumatic pre-threading.

Description

Construction method for threading long-distance preset concealed pipe
Technical Field
The invention relates to a construction method, in particular to a construction method for threading a long-distance preset concealed pipe, and belongs to the technical field of construction processes of auxiliary facilities of constructional engineering.
Background
In modern houses, public buildings and other projects, in order to pursue the beauty of buildings, most of electrical pipelines are generally laid by using concealed pipes. Therefore, the electric appliance pipeline can be synchronously reserved when being constructed with the main body structure, and a large amount of wiring time is saved for later-stage pipeline construction. But many problems have also arisen. For example, when threading operation is carried out in the later stage, because pre-buried pipeline is too long, it is possible that the pre-buried pipeline cannot be penetrated through by adopting traditional steel wire threading. Even if the length of the laying straight line of the pre-buried pipe is more than 30 meters according to the standard requirement, the method solves the problems to a certain extent, in the actual implementation process, the risk that the pre-buried pipe is blocked is increased in the concrete pouring process by the line passing box additionally arranged in the middle of the long-distance pre-buried pipe, the cost is increased, and the position of the line passing box which is not accurately arranged is easily grasped by a worker during construction, so that the actual length of the pre-buried pipe is more than 30m, and the subsequent construction difficulty is caused.
Application number is 202010362990.9's a novel threading machine power structure's patent provides's technical scheme, though can carry out long distance threading, its turn radius to pre-buried spool requires than higher, send the line or act as go-between poor stability, can't satisfy to complicated operating mode. Meanwhile, the equipment is expensive, the lead of the equipment is easy to damage, and the later maintenance cost is very high.
To sum up, the threading of long distance embedded pipe is very difficult, and it is great to add the stifled pipe risk of line box in the middle of adopting, and novel threading machine dynamic structure requires height and its cost is higher to embedded pipe turning radius. How to adopt a simpler, quicker and more reliable construction method to complete the pre-buried threading and laying becomes a technical problem which needs to be solved urgently by technical personnel in the field.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: the construction method for threading the long-distance preset concealed pipe is convenient to construct and operate, reliable and rapid in threading and relatively low in construction cost.
The technical scheme adopted for solving the technical problems is as follows: a construction method for threading a long-distance preset concealed pipe comprises the steps of arranging an electric pipeline by pneumatic pre-threading lead wires, pre-threading lead wire crossover wires and crossover wire traction,
when the lead is pre-threaded pneumatically, the hollow plastic ball is driven by high-pressure gas, so that the high-strength flexible lead is guided by the hollow plastic ball to pass through the corresponding long-distance preset concealed pipe to complete the pre-threading.
Further, high-pressure air used in pneumatic pre-threading of the lead wire is high-pressure air provided by an external air pressing station, before the external high-pressure air is connected into the long-distance preset concealed pipe, the hollow plastic small ball is firstly placed into the long-distance preset concealed pipe, and a high-strength flexible lead wire passing hole is formed near the port of the long-distance preset concealed pipe, so that the high-strength flexible lead wire passes through the high-strength flexible lead wire passing hole along with the hollow plastic small ball to enter the long-distance preset concealed pipe.
The preferred mode of above-mentioned scheme is that the high-pressure gas who uses when pneumatic pre-threading lead wire is the highly-compressed air who blows off by the air-blower scene, and the highly-compressed air output of air-blower passes through the blast pipe and the lead wire of the preset hidden pipe of long distance penetrates the end and is connected, and before even the preset hidden pipe of long distance with outside highly-compressed air, put hollow plastic bobble in the preset hidden pipe of long distance earlier to set up the flexible lead wire that excels in near this preset hidden pipe port of long distance and pass the hole, make the flexible lead wire that excels in pass the hole and get into the preset hidden pipe of long distance from the flexible lead wire that excels in along with.
Furthermore, the hollow plastic ball is a hollow plastic ball with the diameter smaller than the inner diameter of the long-distance preset concealed pipe by one grade.
The preferable mode of the above scheme is that the high-strength flexible lead is one of high-strength fishing line, nylon line and cotton line.
Further, the transition line is one of a thin steel wire, a thin cable wire and a thin steel strand.
The invention has the beneficial effects that: according to the construction method, high-pressure gas is used as driving force, the hollow plastic ball drives the high-strength flexible lead to penetrate through the long-distance preset concealed pipe under the driving force, and finally the high-strength flexible lead finishes the threading work of the long-distance preset concealed pipe in a mode that a small wire pulls a large wire to lay a high-voltage cable between two similar iron towers. Because the construction method only uses high-pressure gas as driving force, has no complex mechanical structure, adopts a small wire traction large wire mode similar to the mode of laying a high-voltage cable between two iron towers in the threading process, not only has convenient construction operation and reliable and rapid threading, but also has relatively low construction cost, and is suitable for the line laying construction of the embedded threading pipes of the vast residential buildings and public buildings.
Drawings
Fig. 1 is a threading schematic diagram related to the construction method for threading the long-distance preset concealed pipe.
Labeled as: the high-strength flexible lead wire comprises a high-strength flexible lead wire 1, a hollow plastic ball 2, a long-distance preset concealed pipe 3, a high-strength flexible lead wire passing hole 4, a blower 5 and an air supply pipe 6.
Detailed Description
As shown in fig. 1, the construction method for threading the long-distance preset concealed pipe provided by the invention is convenient to construct and operate, reliable and quick in threading and relatively low in construction cost. The construction method comprises the steps of pneumatic pre-threading of the lead wire, pre-threading of the lead wire through a crossover line and traction of the crossover line to lay an electric pipeline,
when the lead is pre-threaded pneumatically, the hollow plastic ball 2 is driven by high-pressure gas, so that the hollow plastic ball 2 guides the high-strength flexible lead 1 to pass through the corresponding long-distance pre-set concealed pipe 3 to complete the pre-threading. According to the construction method, high-pressure gas is used as driving force, the hollow plastic ball drives the high-strength flexible lead to penetrate through the long-distance preset concealed pipe under the driving force, and finally the high-strength flexible lead finishes the threading work of the long-distance preset concealed pipe in a mode that a small wire pulls a large wire to lay a high-voltage cable between two similar iron towers. Because the construction method only uses high-pressure gas as driving force, has no complex mechanical structure, adopts a small wire traction large wire mode similar to the mode of laying a high-voltage cable between two iron towers in the threading process, not only has convenient construction operation and reliable and rapid threading, but also has relatively low construction cost, and is suitable for the line laying construction of the embedded threading pipes of the vast residential buildings and public buildings.
In the above embodiment, in combination with the actual situation on site, the high-pressure gas for driving the hollow plastic pellet 2 may be of the following two types, one type is high-pressure air provided for an external air compression station for the high-pressure gas used in pneumatic pre-threading, before the external high-pressure air is connected into the long-distance pre-set concealed pipe 3, the hollow plastic pellet 2 is firstly placed into the long-distance pre-set concealed pipe 3, and the high-strength flexible lead passing hole 4 is arranged near the port of the long-distance pre-set concealed pipe, so that the high-strength flexible lead 1 enters the long-distance pre-set concealed pipe 3 along with the hollow plastic pellet 2 from the high-strength flexible lead passing hole 4. The other type is high-pressure air blown out on site by a blower 5 when a lead is pre-threaded pneumatically, the high-pressure air output end of the blower 5 is connected with the lead penetrating end of the long-distance preset concealed pipe 3 through an air supply pipe 6, before external high-pressure air is connected into the long-distance preset concealed pipe 3, the hollow plastic small ball 2 is firstly placed into the long-distance preset concealed pipe 3, and a high-strength flexible lead penetrating hole 4 is formed near the port of the long-distance preset concealed pipe, so that the high-strength flexible lead 1 enters the long-distance preset concealed pipe 3 along with the hollow plastic small ball 2 from the high-strength flexible lead penetrating hole 4.
Further, in order to blow the air plastics bobble through long distance through high-pressure gas in proper order and predetermine concealed conduit 3, hollow plastics bobble 2 for the sphere diameter than long distance predetermine the hollow plastics bobble that concealed conduit 3 internal diameter is little a grade. Correspondingly, in order to avoid the breakage of the pre-threading lead wire in the process of pulling the pre-threading lead wire to pre-pass through the crossover wire, the high-strength flexible lead wire 1 is one of a high-strength fish wire, a nylon wire and a cotton wire, and the crossover wire is one of a thin steel wire, a thin cable wire and a thin steel strand. The construction method combines the practical engineering situation, and the light hollow plastic ball with the lead wire, which is smaller than the pipeline by one grade, is introduced into the long-distance pipeline, so that the ball is led out from the other end of the embedded pipe under the action of compressed air or blast air on site. Then, a high-voltage line is laid between the iron towers, the small lines pull the large lines, and finally the laying of the electric wires in the embedded pipelines is completed, so that the effects of high efficiency, reliability, recycling and low cost are achieved.
In summary, the technical scheme provided by the application also has the following advantages:
1. the technical method solves the problem that the traditional method cannot carry out threading of the long-distance pre-embedded pipe, and simultaneously can avoid the problem that the pre-embedded wire passing box leaks and blocks the pipe in the traditional process, so that the smoothness of the pre-embedded pipe is ensured;
2. the long-distance line pre-buried pipe can be buried in place at one time, and a middle wire passing box is omitted, so that the construction is convenient and rapid, and the economic effect of saving labor and materials is achieved;
3. can be recycled, is simple to operate, is convenient and practical, and saves the construction cost.
Example one
The technical scheme adopted by the application for solving the technical problem is as follows:
1. the construction method mainly comprises the steps that the diameter of the light plastic ball hollow ball is one grade smaller than that of the embedded pipe, the high-strength flexible lead wire, the air blower and the air supply sleeve are arranged;
2. the high-strength flexible lead wire penetrates through the light plastic ball hollow ball to be connected with the ball body into a whole, and the connected ball body is placed into a section of the pipe to be threaded;
3. connecting an air supply pipe with a wire pipe placed at one end of the small ball, and reserving a small hole for a lead to enter;
4. the blower is connected with the air supply pipe, and the blower is started to drive the plastic balls to move along the embedded pipeline by wind power and simultaneously release the lead wires. After the plastic ball is blown out from the other section of the embedded pipe, the lead smoothly passes through the embedded pipe;
5. the mode of erecting the high-voltage wire is adopted, the lead wire is changed into the lead wire with higher strength and is sequentially changed, and finally the wire penetrates through the embedded pipe.
If the distance of the pipeline is increased, the air inlet amount of the pipe opening can be further increased, and the wind power effect is increased, so that the small balls can smoothly pass through the pipeline.

Claims (6)

1. A construction method for threading a long-distance preset concealed pipe is characterized by comprising the following steps: the construction method comprises the steps of pneumatic pre-threading of the lead wire, pre-threading of the lead wire through a crossover line and traction of the crossover line to lay an electric pipeline,
when the lead is pre-threaded pneumatically, the hollow plastic ball (2) is driven by high-pressure gas, so that the hollow plastic ball (2) guides the high-strength flexible lead (1) to pass through the corresponding long-distance pre-arranged concealed pipe (3) to complete the pre-threading.
2. The construction method for threading the long-distance preset concealed pipe according to claim 1, wherein the construction method comprises the following steps: high-pressure gas who uses when pneumatic lead wire of wearing in advance is the high-pressure air that outside pressure gas station provided, even go into outside high-pressure air and predetermine before hidden pipe (3) in the long distance, put into hollow plastic pellet (2) in the long distance predetermines hidden pipe (3) earlier to near this long distance predetermines the hidden pipe port set up high-strength flexible lead wire and pass hole (4), make high-strength flexible lead wire (1) pass hole (4) and get into in the long distance predetermines hidden pipe (3) along with hollow plastic pellet (2) from high-strength flexible lead wire.
3. The construction method for threading the long-distance preset concealed pipe according to claim 1, wherein the construction method comprises the following steps: high-pressure gas who uses when pneumatic lead wire of wearing in advance is for the highly-compressed air who blows out by air-blower (5) scene, and the highly-compressed air output of air-blower (5) passes through blast pipe (6) and the lead wire of long-range preset concealed pipe (3) penetrates the end and is connected, even into outside highly-compressed air and the long-range preset concealed pipe (3) before, put into long-range preset concealed pipe (3) hollow plastics bobble (2) earlier, and set up near this long-range preset concealed pipe port that excels in and pass hole (4), make high strength flexible lead wire (1) pass hole (4) along with hollow plastics bobble (2) from high strength flexible lead wire and get into long-range preset concealed pipe (3).
4. The construction method for threading the long-distance preset concealed pipe according to any one of claims 1 to 3, wherein the construction method comprises the following steps: the hollow plastic ball (2) is a hollow plastic ball with the diameter one grade smaller than the inner diameter of the long-distance preset concealed pipe (3).
5. The construction method for threading the long-distance preset concealed pipe according to claim 4, wherein the construction method comprises the following steps: the high-strength flexible lead (1) is one of a high-strength fishing line, a nylon line and a cotton line.
6. The construction method for threading the long-distance preset concealed pipe according to claim 5, wherein the construction method comprises the following steps: the transition line is one of a thin steel wire, a thin cable wire and a thin steel strand.
CN202011250198.0A 2020-11-10 2020-11-10 Construction method for threading long-distance preset concealed pipe Pending CN112421502A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011250198.0A CN112421502A (en) 2020-11-10 2020-11-10 Construction method for threading long-distance preset concealed pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011250198.0A CN112421502A (en) 2020-11-10 2020-11-10 Construction method for threading long-distance preset concealed pipe

Publications (1)

Publication Number Publication Date
CN112421502A true CN112421502A (en) 2021-02-26

Family

ID=74781316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011250198.0A Pending CN112421502A (en) 2020-11-10 2020-11-10 Construction method for threading long-distance preset concealed pipe

Country Status (1)

Country Link
CN (1) CN112421502A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2632902Y (en) * 2003-06-11 2004-08-11 庞伟 Concealed piping wire apparatus
CN110233447A (en) * 2019-07-22 2019-09-13 广东电网有限责任公司 A kind of power matching network line construction wiring threading apparatus
CN111463719A (en) * 2020-04-17 2020-07-28 五冶集团上海有限公司 A electric wire threading device for building electrical pre-buried pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2632902Y (en) * 2003-06-11 2004-08-11 庞伟 Concealed piping wire apparatus
CN110233447A (en) * 2019-07-22 2019-09-13 广东电网有限责任公司 A kind of power matching network line construction wiring threading apparatus
CN111463719A (en) * 2020-04-17 2020-07-28 五冶集团上海有限公司 A electric wire threading device for building electrical pre-buried pipe

Similar Documents

Publication Publication Date Title
KR20180131754A (en) Exchanging method of the embeded pipe for air-conditioner
CN102208779A (en) Method for rapidly inserting cable into sleeve
CN102354926A (en) Large-section conductor tension stringing construction method
CN112421502A (en) Construction method for threading long-distance preset concealed pipe
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN100568648C (en) Corrugation plastic built-in conduit for wire
CN201095831Y (en) Beam-splitting U shaped prestressing force anchorage cable
CN205901186U (en) Novel threading machine
CN201246848Y (en) Pre-embedded type pipeline laying structure
CN205622150U (en) Building monitoring wiring arrangement
CN213115554U (en) Stranded wire bundle penetrating device
CN206104597U (en) Pipe lining machine
KR102234797B1 (en) Self propelled reel type hydraulic puller
CN201931335U (en) Special tool for grinding steel pipe opening
CN204333789U (en) A kind of self routing device
CN2632902Y (en) Concealed piping wire apparatus
CN113775304A (en) Device and method for connecting or disconnecting drill rod and power head of hole forming pile machine
CN214899853U (en) Quick atmospheric pressure wire rope handling construction equipment
CN218513982U (en) Line threading tool for pressurized bullet line pipe
CN220086823U (en) Multi-unit portable high-pressure pneumatic threading device
CN110535068A (en) A kind of wall circuit threader used for architectural engineering
CN204760910U (en) Dark piping device of wearing to go between
CN110474258A (en) A kind of high-efficiency pipeline threading system and construction method
CN206496194U (en) High-pressure remote feeder
CN219106920U (en) Automatic threading system for subway shield section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210226