CN112415628A - Sandstone-type uranium ore sampling plane distribution diagram mapping method - Google Patents
Sandstone-type uranium ore sampling plane distribution diagram mapping method Download PDFInfo
- Publication number
- CN112415628A CN112415628A CN201910768681.9A CN201910768681A CN112415628A CN 112415628 A CN112415628 A CN 112415628A CN 201910768681 A CN201910768681 A CN 201910768681A CN 112415628 A CN112415628 A CN 112415628A
- Authority
- CN
- China
- Prior art keywords
- value
- max
- sample
- sandstone
- borehole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V9/00—Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B21/00—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
- G01B21/02—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring length, width, or thickness
- G01B21/04—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring length, width, or thickness by measuring coordinates of points
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N1/00—Sampling; Preparing specimens for investigation
- G01N1/02—Devices for withdrawing samples
- G01N1/04—Devices for withdrawing samples in the solid state, e.g. by cutting
- G01N1/08—Devices for withdrawing samples in the solid state, e.g. by cutting involving an extracting tool, e.g. core bit
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Health & Medical Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Geophysics And Detection Of Objects (AREA)
- Sampling And Sample Adjustment (AREA)
Abstract
The sandstone-type uranium ore sampling plane distribution diagram mapping method is provided, the automation and the intellectualization of the whole process are realized, and the working efficiency and the mapping precision are effectively improved; comprising the steps of S1: selecting a region needing geological exploration, and drawing a rectangular exploration line graph S2 of the region: determining the length and width of the rectangular survey map: s3: determining the types and the number of the drilling samples in the sandstone-type uranium ore sampling plane distribution map obtained in the step S2; s4: and determining the circular color shapes of the samples corresponding to the types and the number of the drilling samples.
Description
Technical Field
The invention relates to a sandstone-type uranium ore sampling plane distribution diagram mapping method
Background
Most of the previous sampling plane distribution maps are manually completed, the workload is large, and the calculation is complex. Along with the improvement of the investigation degree of a working area, a large amount of drilling data are accumulated, in order to finish a sampling plane distribution diagram, a former person is inevitably utilized to form geological data to form the latest and most complete sampling plane distribution diagram, and the latest and most complete sampling plane distribution diagram needs to be rearranged and drawn, so that the workload is greatly increased, and the working efficiency is reduced. With the comprehensive and rapid development of computer technology, a nuclear industry system develops digital coal mine exploration software and establishes an independent database of the whole coal mine exploration process. The full process automation and intellectualization are realized, and the working efficiency and the mapping precision are effectively improved.
Disclosure of Invention
The invention aims to: the sandstone-type uranium ore sampling plane distribution diagram mapping method is provided, full process automation and intellectualization are achieved, and working efficiency and mapping precision are effectively improved.
The invention has the following remarkable effects: the invention needs to be manually, fussy and repeated for compiling the sandstone-type coal mine sampling plane distribution map in the coal mine geological exploration based on the digital coal mine exploration software, thereby realizing the digitization, standardization and informatization of the sampling plane distribution map.
The technical scheme of the invention is as follows: a sandstone-type uranium ore sampling plane distribution map mapping method comprises the following steps:
s1: selecting a region to be subjected to geological exploration, and drawing a rectangular exploration line map of the region, wherein the rectangular exploration line comprises a plurality of drill holes; and determining a survey line in the survey line graph through the borehole;
s2: determining the length and width of the rectangular survey map:
establishing a coordinate system by taking one end point of the rectangular survey line graph determined in the S1 as an origin, wherein coordinates of the drill hole No. 1 to the drill hole No. n in the rectangular survey line graph are sequentially (X1, Y1), (X2, Y2), (X3, Y3,), … … (Xn, Yn);
calculating the most value of coordinates from No. 1 drill hole to No. n drill hole in the rectangular exploration line graph, wherein:
the minimum X value of all borehole coordinates, namely min (zkx) min (zk1.X, zk2. X.,. zkn. X);
the minimum Y value of all borehole coordinates, min (zky) min (zk1.y, zk2.y.. zkn.y);
the maximum X value of all borehole coordinates, namely max (zkx) max (zk1.x, zk2.x.. zkn.x);
max (zky) max (zk1.y, zk2.y.. zkn.y);
minimum X value of all survey line end points, min (ktxx) min (ktxx 1.X, ktxx 2.X,... ktxn.x);
the minimum Y value of all survey line end points, min (ktxy) min (ktx1.Y, ktx2.Y.. kl.. ktx n. Y);
the maximum X value of all survey line end points, max (ktxx) max (ktx1.X, ktx2.X,... ktxn. X);
max (ktxy) max (ktx1.Y, ktx2.Y.... ktxn.y) which is the maximum Y value of all survey line endpoints;
minimum X value for all sample circle center points, min (yqx) min (yq1.X, yq2.X, yq3. X.. yqn. X);
minimum Y value for all sample circle center points, min (yqy) min (yq1.Y, yq2.Y, yq3. Y.. yqn. Y);
the maximum X value of all sample circle center points, i.e., max (yqx) max (yq1.X, yq2.X, yq3. X.. yqn. X);
the maximum Y value of all sample circle center points, i.e., max (yqy) max (yq1.y, yq2.y, yq3.y.. yqn.y);
obtaining a sandstone-type uranium ore sampling plane distribution map:
the minimum X value of the profile min (zkx), min (ktxx), min (yqx));
the minimum Y value of the profile min (zky), min (ktxy), (min (yqy));
maximum X value of profile max (zkx), max (ktxx), max (yqx));
maximum Y value of profile max (zky), max (ktxy), max (yqy));
the method comprises the steps that the length of a map amplitude of a sandstone-type uranium ore sampling plane distribution map is the maximum Y value of the distribution map and the minimum Y value of the distribution map;
the width of a sandstone-type uranium ore sampling plane distribution diagram is the maximum X value of the distribution diagram-the minimum X value of the distribution diagram;
wherein:
zk1.x represents: the x value of borehole orifice coordinate No. 1, zk2.x denotes: x value for borehole orifice coordinate No. 2, zkn. x denotes: x value of n number of borehole orifice coordinates;
ktx1.x denotes: the x value of the coordinates of the starting point or the ending point of survey line No. 1, ktx2.x denotes: x value of coordinates of starting point or ending point of survey line No. 2, ktxn.x represents: x value of the coordinate of the starting point or the ending point of the n exploration line;
yq1.x. denotes: the x value of the 1 st sample circle center point coordinate, yq1.x. represents: the x value of the 2 nd sample circle center point coordinate, yqn.x. represents: x value of the center point coordinate of the circle of the nth sample;
zk1.y represents: the y value for borehole orifice coordinate No. 1, zk2.y represents: the y value for borehole orifice coordinate number 2, zkn. y denotes: the y value of the n number of drilling hole coordinates;
ktx1.y denotes: the y value of the coordinates of the starting point or the ending point of survey line No. 1, ktx2.y denotes: y value of coordinates of starting point or ending point of survey line No. 2, ktxn.y represents: the y value of the coordinate of the starting point or the ending point of the n exploration line;
yq1.y. denotes: the y value of the 1 st sample circle center point coordinate, yq2.y. indicates: the y value of the 2 nd sample circle center point coordinate, yq1.y. indicates: the y value of the center point coordinate of the circle of the nth sample;
s3: determining the types and the number of the drilling samples in the sandstone-type uranium ore sampling plane distribution map obtained in the step S2;
s4: determining the circular color shapes of the samples corresponding to the types and the number of the drilling samples;
in S3, if there are c sample types in the sampling plan, there must be the number of samples corresponding to the c sample types;
the borehole sample types are expressed as: h1, h2, h3
h1 corresponds to 1 drilled sample
h2 corresponds to 2 borehole samples
h3 corresponds to 3 drilled samples
…..
hc corresponds to c drilled samples.
In the step S4, in the step S,
if the type of the drilling sample is h1, dividing the circle of the drilling sample into 1 part;
if the type of the drilling sample is h2, dividing the circle of the drilling sample into 2 parts;
…..
if the borehole sample type is hy, the borehole sample circle is equally divided into c parts.
In S4, circles for each of the drill samples are represented by different colors.
In S4, circles are represented by different colors for each of the drill samples.
In S4, circles for each of the drill samples are indicated by different symbols.
In S4, circles for each drill sample are indicated by different symbols.
The invention has the advantages of improving the working efficiency, and the pictures are digital data, and can repeatedly call, modify and utilize data.
Specific implementation and verification:
a sandstone-type uranium ore sampling plane distribution map mapping method comprises the following steps:
s1: selecting a region to be subjected to geological exploration, and drawing a rectangular exploration line map of the region, wherein the rectangular exploration line comprises a plurality of drill holes; and determining a survey line in the survey map through the borehole
S2: determining the length and width of the rectangular survey map:
establishing a coordinate system by taking one end point of the rectangular survey line graph determined in the S1 as an origin, wherein coordinates of the drill hole No. 1 to the drill hole No. n in the rectangular survey line graph are sequentially (X1, Y1), (X2, Y2), (X3, Y3,), … … (Xn, Yn);
calculating the most value of coordinates from No. 1 drill hole to No. n drill hole in the rectangular exploration line graph, wherein:
the minimum X value of all borehole coordinates, namely min (zkx) min (zk1.X, zk2. X.,. zkn. X);
the minimum Y value of all borehole coordinates, min (zky) min (zk1.y, zk2.y.. zkn.y);
the maximum X value of all borehole coordinates, namely max (zkx) max (zk1.x, zk2.x.. zkn.x);
max (zky) max (zk1.y, zk2.y.. zkn.y);
minimum X value of all survey line end points, min (ktxx) min (ktxx 1.X, ktxx 2.X,... ktxn.x);
the minimum Y value of all survey line end points, min (ktxy) min (ktx1.Y, ktx2.Y.. kl.. ktx n. Y);
the maximum X value of all survey line end points, max (ktxx) max (ktx1.X, ktx2.X,... ktxn. X);
max (ktxy) max (ktx1.Y, ktx2.Y.... ktxn.y) which is the maximum Y value of all survey line endpoints;
minimum X value of all sample circle center points, min (yqx) min (yq1.X, yq2.X, yq3.X,.. yqn. X)
Minimum Y value of all sample circle center points, min (yqy) min (yq1.Y, yq2.Y, yq3.Y,... yqn. Y)
The maximum X value of all sample circle center points, i.e., max (yqx) max (yq1.X, yq2.X, yq3. X.,. yqn. X)
The maximum Y value of all sample circle center points, max (yqy) max (yq1.y, yq2.y, yq3.y.. yqn.y)
Obtaining a sandstone-type uranium ore sampling plane distribution map:
the minimum X value of the profile min (zkx), min (ktxx), min (yqx));
the minimum Y value of the profile min (zky), min (ktxy), (min (yqy));
maximum X value of profile max (zkx), max (ktxx), max (yqx));
maximum Y value of profile max (zky), max (ktxy), max (yqy));
the length of the map width of the sandstone-type uranium ore sampling plane distribution map is the maximum Y value of the distribution map and the minimum Y value of the distribution map.
The width of a sandstone-type uranium ore sampling plane distribution diagram is the maximum X value of the distribution diagram-the minimum X value of the distribution diagram.
Wherein:
zk1.x represents: the x value of borehole orifice coordinate No. 1, zk2.x denotes: x value for borehole orifice coordinate No. 2, zkn. x denotes: x value of n number of borehole orifice coordinates;
ktx1.x denotes: the x value of the coordinates of the starting point or the ending point of survey line No. 1, ktx2.x denotes: x value of coordinates of starting point or ending point of survey line No. 2, ktxn.x represents: x value of the coordinate of the starting point or the ending point of the n exploration line;
yq1.x. denotes: the x value of the 1 st sample circle center point coordinate, yq1.x. represents: the x value of the 2 nd sample circle center point coordinate, yqn.x. represents: x value of center point coordinate of n sample circle
zk1.y represents: the y value for borehole orifice coordinate No. 1, zk2.y represents: the y value for borehole orifice coordinate number 2, zkn. y denotes: y value of n number of drill hole coordinates
ktx1.y denotes: the y value of the coordinates of the starting point or the ending point of survey line No. 1, ktx2.y denotes: y value of coordinates of starting point or ending point of survey line No. 2, ktxn.y represents: y value of coordinate of starting point or ending point of n exploration line
yq1.y. denotes: the y value of the 1 st sample circle center point coordinate, yq2.y. indicates: the y value of the 2 nd sample circle center point coordinate, yq1.y. indicates: y value of center point coordinate of n sample circle
S3: determining the types and the number of the drilling samples in the sandstone-type uranium ore sampling plane distribution map obtained in the step S2;
if there are c sample types in the sampling plan, there must be the number of samples corresponding to the c sample types;
the borehole sample types are expressed as: h1, h2, h3
h1 corresponds to 1 drilled sample
h2 corresponds to 2 borehole samples
h3 corresponds to 3 drilled samples
…..
hc corresponds to c borehole samples
S4: and determining the circular color shapes of the samples corresponding to the types and the number of the drilling samples.
If the type of the drilling sample is h1, dividing the circle of the drilling sample into 1 part;
if the type of the drilling sample is h2, dividing the circle of the drilling sample into 2 parts;
…..
if the type of the drilling sample is hy, equally dividing the circle of the drilling sample into c parts;
circles are represented by different colors for each drill sample.
Claims (7)
1. A sandstone-type uranium ore sampling plane distribution map mapping method is characterized by comprising the following steps: the method comprises the following steps:
s1: selecting a region to be subjected to geological exploration, and drawing a rectangular exploration line map of the region, wherein the rectangular exploration line comprises a plurality of drill holes; and determining a survey line in the survey line graph through the borehole;
s2: determining the length and width of the rectangular survey map:
establishing a coordinate system by taking one end point of the rectangular survey line graph determined in the S1 as an origin, wherein coordinates of the drill hole No. 1 to the drill hole No. n in the rectangular survey line graph are sequentially (X1, Y1), (X2, Y2), (X3, Y3,), … … (Xn, Yn);
calculating the most value of coordinates from No. 1 drill hole to No. n drill hole in the rectangular exploration line graph, wherein:
the minimum X value of all borehole coordinates, namely min (zkx) min (zk1.X, zk2. X.,. zkn. X);
the minimum Y value of all borehole coordinates, min (zky) min (zk1.y, zk2.y.. zkn.y);
the maximum X value of all borehole coordinates, namely max (zkx) max (zk1.x, zk2.x.. zkn.x);
max (zky) max (zk1.y, zk2.y.. zkn.y);
minimum X value of all survey line end points, min (ktxx) min (ktxx 1.X, ktxx 2.X,... ktxn.x);
the minimum Y value of all survey line end points, min (ktxy) min (ktx1.Y, ktx2.Y.. kl.. ktx n. Y);
the maximum X value of all survey line end points, max (ktxx) max (ktx1.X, ktx2.X,... ktxn. X);
max (ktxy) max (ktx1.Y, ktx2.Y.... ktxn.y) which is the maximum Y value of all survey line endpoints;
minimum X value for all sample circle center points, min (yqx) min (yq1.X, yq2.X, yq3. X.. yqn. X);
minimum Y value for all sample circle center points, min (yqy) min (yq1.Y, yq2.Y, yq3. Y.. yqn. Y);
the maximum X value of all sample circle center points, i.e., max (yqx) max (yq1.X, yq2.X, yq3. X.. yqn. X);
the maximum Y value of all sample circle center points, i.e., max (yqy) max (yq1.y, yq2.y, yq3.y.. yqn.y);
obtaining a sandstone-type uranium ore sampling plane distribution map:
the minimum X value of the profile min (zkx), min (ktxx), min (yqx));
the minimum Y value of the profile min (zky), min (ktxy), (min (yqy));
maximum X value of profile max (zkx), max (ktxx), max (yqx));
maximum Y value of profile max (zky), max (ktxy), max (yqy));
the method comprises the steps that the length of a map amplitude of a sandstone-type uranium ore sampling plane distribution map is the maximum Y value of the distribution map and the minimum Y value of the distribution map;
the width of a sandstone-type uranium ore sampling plane distribution diagram is the maximum X value of the distribution diagram-the minimum X value of the distribution diagram;
wherein:
zk1.x represents: the x value of borehole orifice coordinate No. 1, zk2.x denotes: x value for borehole orifice coordinate No. 2, zkn. x denotes: x value of n number of borehole orifice coordinates;
ktx1.x denotes: the x value of the coordinates of the starting point or the ending point of survey line No. 1, ktx2.x denotes: x value of coordinates of starting point or ending point of survey line No. 2, ktxn.x represents: x value of the coordinate of the starting point or the ending point of the n exploration line;
yq1.x. denotes: the x value of the 1 st sample circle center point coordinate, yq1.x. represents: the x value of the 2 nd sample circle center point coordinate, yqn.x. represents: x value of the center point coordinate of the circle of the nth sample;
zk1.y represents: the y value for borehole orifice coordinate No. 1, zk2.y represents: the y value for borehole orifice coordinate number 2, zkn. y denotes: the y value of the n number of drilling hole coordinates;
ktx1.y denotes: the y value of the coordinates of the starting point or the ending point of survey line No. 1, ktx2.y denotes: y value of coordinates of starting point or ending point of survey line No. 2, ktxn.y represents: the y value of the coordinate of the starting point or the ending point of the n exploration line;
yq1.y. denotes: the y value of the 1 st sample circle center point coordinate, yq2.y. indicates: the y value of the 2 nd sample circle center point coordinate, yq1.y. indicates: the y value of the center point coordinate of the circle of the nth sample;
s3: determining the types and the number of the drilling samples in the sandstone-type uranium ore sampling plane distribution map obtained in the step S2;
s4: and determining the circular color shapes of the samples corresponding to the types and the number of the drilling samples.
2. The method for mapping the sandstone-type uranium ore sampling plane according to claim 1, wherein: in S3, if there are c sample types in the sampling plan, there must be the number of samples corresponding to the c sample types;
the borehole sample types are expressed as: h1, h2, h3
h1 corresponds to 1 drilled sample
h2 corresponds to 2 borehole samples
h3 corresponds to 3 drilled samples
…..
hc corresponds to c drilled samples.
3. The method for mapping the sandstone-type uranium ore sampling plane according to claim 1, wherein: in the step S4, in the step S,
if the type of the drilling sample is h1, dividing the circle of the drilling sample into 1 part;
if the type of the drilling sample is h2, dividing the circle of the drilling sample into 2 parts;
…..
if the borehole sample type is hy, the borehole sample circle is equally divided into c parts.
4. The method for mapping the sandstone-type uranium ore sampling plane according to claim 3, wherein: in S4, circles for each of the drill samples are represented by different colors.
5. The method for mapping the sandstone-type uranium ore sampling plane according to claim 4, wherein: in S4, circles are represented by different colors for each of the drill samples.
6. The method for mapping the sandstone-type uranium ore sampling plane according to claim 3, wherein: in S4, circles for each of the drill samples are indicated by different symbols.
7. The method for mapping the sandstone-type uranium ore sampling plane according to claim 3, wherein: in S4, circles for each drill sample are indicated by different symbols.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910768681.9A CN112415628B (en) | 2019-08-20 | 2019-08-20 | Sandstone-type uranium ore sampling plane distribution diagram forming method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910768681.9A CN112415628B (en) | 2019-08-20 | 2019-08-20 | Sandstone-type uranium ore sampling plane distribution diagram forming method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112415628A true CN112415628A (en) | 2021-02-26 |
CN112415628B CN112415628B (en) | 2022-07-26 |
Family
ID=74779140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910768681.9A Active CN112415628B (en) | 2019-08-20 | 2019-08-20 | Sandstone-type uranium ore sampling plane distribution diagram forming method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112415628B (en) |
Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4924950A (en) * | 1985-10-16 | 1990-05-15 | K. Nakatsuka | Method of drilling a well by utilizing AE/MA measurement |
CN101038680A (en) * | 2007-04-29 | 2007-09-19 | 中国地质大学(北京) | Method for finding mine with cubic forecast model based on three-dimensional modeling |
CN101311750A (en) * | 2007-05-21 | 2008-11-26 | 江西铜业集团公司 | Geological prospecting borehole data processing system |
CN102750449A (en) * | 2012-06-20 | 2012-10-24 | 北京航空航天大学 | Point cloud linear feature extraction method based on substep three-dimensional space and feature dimension mapping |
WO2012146047A1 (en) * | 2011-04-29 | 2012-11-01 | Huang Guizhi | Geological exploration method for making plan and elevation drawings directly by rotational tin network and non-profiling method |
CN103645516A (en) * | 2013-11-20 | 2014-03-19 | 中国石油大学(北京) | Method of determining oil and gas productivity based on oil and gas control effects of petrophysical facies |
CN104375195A (en) * | 2013-08-15 | 2015-02-25 | 中国石油天然气集团公司 | Time-frequency electromagnetic multi-source multi-component three-dimensional joint inversion method |
WO2015103165A1 (en) * | 2013-12-31 | 2015-07-09 | Biota Technology, Inc. | Microbiome based systems, apparatus and methods for monitoring and controlling industrial processes and systems |
CN105785467A (en) * | 2015-12-29 | 2016-07-20 | 核工业二六大队 | Method for identifying hydrodynamic force of in-situ leachable sandstone-type uranium deposit |
CN205748977U (en) * | 2016-06-24 | 2016-11-30 | 中国电建集团华东勘测设计研究院有限公司 | A kind of sampling without damage structure being applicable to weak schist |
CN106257310A (en) * | 2015-06-18 | 2016-12-28 | 核工业北京地质研究院 | Sedimentary basin oil gas strong reducing action district Prospecting Sandstone-type Uranium Deposits method for establishing model |
CN106437677A (en) * | 2016-10-10 | 2017-02-22 | 北京合康科技发展有限责任公司 | Coal mine underground drilled hole group drilling quality evaluation method and device |
CN106886584A (en) * | 2017-02-14 | 2017-06-23 | 北京市地质调查研究院 | Based on the underground space development present situation evaluation method on the basis of the various geodatas in city |
CN107102377A (en) * | 2017-06-27 | 2017-08-29 | 中国石油大学(华东) | The method of quantitative forecast tight sand favorable oil/gas exploration area |
CN107368624A (en) * | 2017-06-14 | 2017-11-21 | 东南大学 | Aggregate particle model generation algorithm and Inhomogeneous charge material test specimen model generating method |
JP2018054339A (en) * | 2016-09-26 | 2018-04-05 | 国立大学法人 東京大学 | Hypocenter information visualization system and hypocenter information visualization method |
CN108665544A (en) * | 2018-05-09 | 2018-10-16 | 中冶北方(大连)工程技术有限公司 | Three-dimensional geological model modeling method |
WO2018212680A1 (en) * | 2017-05-17 | 2018-11-22 | Mineral Exploration Network (Finland) Ltd. | Geochemical method for searching mineral resource deposits |
US10190998B1 (en) * | 2018-08-29 | 2019-01-29 | Research Institute Of Petroleum Exploration & Development, Dagang Oil Field Of Cnpc | Method and device for evaluating and predicting a shale oil enrichment areas of fault lacustrine basins |
CN109581486A (en) * | 2018-12-10 | 2019-04-05 | 上海宝冶集团有限公司 | A kind of detection method of tunnel solution cavity, device and computer readable storage medium |
CN109655937A (en) * | 2017-10-10 | 2019-04-19 | 中国石油化工股份有限公司 | A kind of evaluation method of earthquake data before superposition regularization observation system |
CN109725347A (en) * | 2018-12-25 | 2019-05-07 | 核工业北京地质研究院 | A kind of interlayer oxidation zone sandstone-type uranium three-dimensional geologic model building method |
US20190212460A1 (en) * | 2018-01-08 | 2019-07-11 | Dagang Oil Field Of Cnpc | Method for secondary exploration of old oil area in fault subsidence basin |
CN110096565A (en) * | 2019-05-27 | 2019-08-06 | 江苏省测绘工程院 | A kind of multi-source data standardization processing method of integration engineering Geological Achievements |
-
2019
- 2019-08-20 CN CN201910768681.9A patent/CN112415628B/en active Active
Patent Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4924950A (en) * | 1985-10-16 | 1990-05-15 | K. Nakatsuka | Method of drilling a well by utilizing AE/MA measurement |
CN101038680A (en) * | 2007-04-29 | 2007-09-19 | 中国地质大学(北京) | Method for finding mine with cubic forecast model based on three-dimensional modeling |
CN101311750A (en) * | 2007-05-21 | 2008-11-26 | 江西铜业集团公司 | Geological prospecting borehole data processing system |
WO2012146047A1 (en) * | 2011-04-29 | 2012-11-01 | Huang Guizhi | Geological exploration method for making plan and elevation drawings directly by rotational tin network and non-profiling method |
CN102750449A (en) * | 2012-06-20 | 2012-10-24 | 北京航空航天大学 | Point cloud linear feature extraction method based on substep three-dimensional space and feature dimension mapping |
CN104375195A (en) * | 2013-08-15 | 2015-02-25 | 中国石油天然气集团公司 | Time-frequency electromagnetic multi-source multi-component three-dimensional joint inversion method |
CN103645516A (en) * | 2013-11-20 | 2014-03-19 | 中国石油大学(北京) | Method of determining oil and gas productivity based on oil and gas control effects of petrophysical facies |
WO2015103165A1 (en) * | 2013-12-31 | 2015-07-09 | Biota Technology, Inc. | Microbiome based systems, apparatus and methods for monitoring and controlling industrial processes and systems |
CN106257310A (en) * | 2015-06-18 | 2016-12-28 | 核工业北京地质研究院 | Sedimentary basin oil gas strong reducing action district Prospecting Sandstone-type Uranium Deposits method for establishing model |
CN105785467A (en) * | 2015-12-29 | 2016-07-20 | 核工业二六大队 | Method for identifying hydrodynamic force of in-situ leachable sandstone-type uranium deposit |
CN205748977U (en) * | 2016-06-24 | 2016-11-30 | 中国电建集团华东勘测设计研究院有限公司 | A kind of sampling without damage structure being applicable to weak schist |
JP2018054339A (en) * | 2016-09-26 | 2018-04-05 | 国立大学法人 東京大学 | Hypocenter information visualization system and hypocenter information visualization method |
CN106437677A (en) * | 2016-10-10 | 2017-02-22 | 北京合康科技发展有限责任公司 | Coal mine underground drilled hole group drilling quality evaluation method and device |
CN106886584A (en) * | 2017-02-14 | 2017-06-23 | 北京市地质调查研究院 | Based on the underground space development present situation evaluation method on the basis of the various geodatas in city |
WO2018212680A1 (en) * | 2017-05-17 | 2018-11-22 | Mineral Exploration Network (Finland) Ltd. | Geochemical method for searching mineral resource deposits |
CN107368624A (en) * | 2017-06-14 | 2017-11-21 | 东南大学 | Aggregate particle model generation algorithm and Inhomogeneous charge material test specimen model generating method |
CN107102377A (en) * | 2017-06-27 | 2017-08-29 | 中国石油大学(华东) | The method of quantitative forecast tight sand favorable oil/gas exploration area |
CN109655937A (en) * | 2017-10-10 | 2019-04-19 | 中国石油化工股份有限公司 | A kind of evaluation method of earthquake data before superposition regularization observation system |
US20190212460A1 (en) * | 2018-01-08 | 2019-07-11 | Dagang Oil Field Of Cnpc | Method for secondary exploration of old oil area in fault subsidence basin |
CN108665544A (en) * | 2018-05-09 | 2018-10-16 | 中冶北方(大连)工程技术有限公司 | Three-dimensional geological model modeling method |
US10190998B1 (en) * | 2018-08-29 | 2019-01-29 | Research Institute Of Petroleum Exploration & Development, Dagang Oil Field Of Cnpc | Method and device for evaluating and predicting a shale oil enrichment areas of fault lacustrine basins |
CN109581486A (en) * | 2018-12-10 | 2019-04-05 | 上海宝冶集团有限公司 | A kind of detection method of tunnel solution cavity, device and computer readable storage medium |
CN109725347A (en) * | 2018-12-25 | 2019-05-07 | 核工业北京地质研究院 | A kind of interlayer oxidation zone sandstone-type uranium three-dimensional geologic model building method |
CN110096565A (en) * | 2019-05-27 | 2019-08-06 | 江苏省测绘工程院 | A kind of multi-source data standardization processing method of integration engineering Geological Achievements |
Also Published As
Publication number | Publication date |
---|---|
CN112415628B (en) | 2022-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109725347A (en) | A kind of interlayer oxidation zone sandstone-type uranium three-dimensional geologic model building method | |
US9990588B2 (en) | System for predicting amount of production and method for predicting amount of production | |
CN108564264B (en) | Data processing method and device for determining water injection development effect | |
CN101950034B (en) | Natural potential curve baseline drift correction method for seismic inversion | |
CN112415628B (en) | Sandstone-type uranium ore sampling plane distribution diagram forming method | |
CN112907693B (en) | Sandstone type uranium ore sand body top and bottom plate contour map imaging method | |
CN109165312A (en) | A kind of survey data management system | |
CN103280152A (en) | Building coding method based on longitude and latitude coordinate conversion code | |
CN108072893B (en) | Diversified construction method of micro-seismic fracturing fracture model | |
CN112908145A (en) | Equal-thickness map mapping method for sandstone-type uranium ore sand bodies | |
CN110610541B (en) | BIM geologic model modeling method based on database and GIS technology | |
CN112489148B (en) | Sandstone type uranium deposit flat uranium amount contour map imaging method | |
CN104778296B (en) | Mathematical planning method for lithological description layout of drilling histogram | |
CN107194966B (en) | Identification method for geological boundary and attribute information of two-dimensional geological section map | |
CN104749632A (en) | K-line analysis method of earthquake trend | |
CN115688209A (en) | CAD secondary development investigation drawing aided design system | |
CN108074282B (en) | Thickness correction method of physical property parameters based on three-dimensional geological modeling software | |
CN112487598A (en) | Program design method for volcanic type uranium ore hydrogeological profile of uranium ore exploration system | |
US20090273599A1 (en) | Systems and methods for imaging relationship data in a three-dimensional image | |
CN112211621A (en) | Sandstone-type coal mine reserve estimation profile map mapping method | |
CN112951069A (en) | Sand ratio contour map mapping method for sandstone-type uranium ore | |
CN110990936A (en) | Method and system for determining rock mass quality index | |
CN108090962B (en) | Method for quickly generating PLAAXIS geometric model based on ANSYS data file | |
CN112820184A (en) | Sandstone-type uranium ore exploration line design profile map forming method | |
CN106846480B (en) | Uncertainty probability field attribute distribution modeling method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |