CN112411952A - Construction method for rust prevention of steel column base by brushing slurry - Google Patents

Construction method for rust prevention of steel column base by brushing slurry Download PDF

Info

Publication number
CN112411952A
CN112411952A CN202011279399.3A CN202011279399A CN112411952A CN 112411952 A CN112411952 A CN 112411952A CN 202011279399 A CN202011279399 A CN 202011279399A CN 112411952 A CN112411952 A CN 112411952A
Authority
CN
China
Prior art keywords
steel column
brushing
grouting
steel
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011279399.3A
Other languages
Chinese (zh)
Inventor
翟宏星
王涛
宋云沛
韩官忍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202011279399.3A priority Critical patent/CN112411952A/en
Publication of CN112411952A publication Critical patent/CN112411952A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • E04B1/642Protecting metallic construction elements against corrosion

Abstract

The invention relates to a construction method for brushing slurry and preventing rust of a steel column base, which comprises the following steps: the method comprises the following steps: after the steel column is installed, vertical and elevation correction is carried out; step two: grouting the steel column after confirming that no error exists; step three: after grouting the steel column, manually brushing the steel column with cement mortar in the same proportion by using a brush, wherein the brushing thickness is 30mm, and the height is from the grouting surface to the paint brushing position; step four: because cement mortar carries out effectual isolation with steel column and air, can prevent that the surface from rustting, directly carry out the manual work with the grout of applying paint with a brush and knock out when treating later stage post package foot. The invention avoids the rusting of the bottom of the steel column due to the fact that paint is not coated, reduces the labor cost for polishing and derusting at the later stage, improves the construction efficiency and enhances the construction benefit.

Description

Construction method for rust prevention of steel column base by brushing slurry
Technical Field
The invention relates to the technical field of steel structures, in particular to a construction method for brushing slurry and preventing rust of a steel column base.
Background
Along with the increasing concern of people to the building environmental quality problem and the continuous increase of its requirement, many industrial parks factory buildings all select the steel construction as load-bearing structure now, and steel construction factory building demonstrates the trend of replacing traditional factory building gradually, and steel construction industrial factory building is as one of modern industry development's basic building facility, and its demand is constantly refreshing more.
The steel structure foundation is divided into a cup mouth type and an inserted bolt type, and the steel structure foundation is required to be in a design specification GB50017-2017 of a steel structure according to the following requirements: the part of the column base below the ground is wrapped by concrete with lower strength grade (the thickness of the protective layer is not less than 50 mm), and in order to ensure that the surface of the steel column and the concrete form enough wrapping force, the part below +/-0 of the steel base is not painted.
In the actual construction process, because civil engineering and steel construction engineering belong to cross operation, the post package foot often waits to begin the construction before pouring the indoor terrace, and waiting period is longer. The steel structure column base +/-0 part is not painted when leaving a factory, is easy to rust after being exposed in air for a long time, and can influence the bond stress of the steel column and concrete to a great extent if rust removal is not carried out before the column wraps the base.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a construction method for brushing slurry and preventing rust of a steel column base, so that the bottom of a steel column is prevented from rusting because paint is not coated, the labor cost for polishing and removing rust at the later stage is reduced, the construction efficiency is improved, and the construction benefit is enhanced.
In order to solve the technical problem, the invention is realized as follows:
a construction method for brushing slurry and preventing rust of a steel column base is characterized by comprising the following steps:
the method comprises the following steps: after the steel column is installed, vertical and elevation correction is carried out;
firstly, positioning and paying off are carried out on a column foundation cup mouth, and an ink fountain pops out a central line and a column edge control line. Then, using the steel column shoulder beam as a starting point to find out a mark height line of +/-1 m; and meanwhile, leveling by using a level gauge, measuring the elevation of the bottom of the cup opening, placing a base plate and leveling the elevation of the crane beam. Hoisting the steel column after the center line and the elevation are confirmed to be correct;
after the steel column is installed into the cup opening, a jack is used for adjusting, after calibration is completed, a steel wedge is plugged into the edge of the cup opening for fixing, deviation is placed, and a guy rope is pulled to enhance stability;
step two: grouting the steel column after confirming that no error exists;
after the steel column is corrected, pouring by adopting fine aggregate concrete or non-shrinkage micro-expansion grouting material required by the design of a drawing;
step three: after grouting the steel column, manually brushing the steel column with cement mortar in the same proportion by using a brush, wherein the brushing thickness is 30mm, and the height is from the grouting surface to the paint brushing position;
step four: because cement mortar carries out effectual isolation with steel column and air, can prevent that the surface from rustting, directly carry out the manual work with the grout of applying paint with a brush and knock out when treating later stage post package foot.
The invention has the beneficial effects that: compared with the traditional column base, the post base is not treated or painted and rustproof below +/-0, the post construction speed can be effectively improved, meanwhile, the labor cost for polishing and derusting at the later stage and removing or painting is reduced, the construction efficiency is improved, and the construction benefit is enhanced.
Drawings
The invention is described in further detail below with reference to the following figures and embodiments:
FIG. 1 is a schematic representation of a steel column after grouting.
FIG. 2 is a schematic diagram of the steel column after wrapping the legs.
Detailed Description
As shown in fig. 1 and 2: a construction method for preventing steel column base from rusting by brushing slurry comprises the following steps:
the method comprises the following steps: after the steel column is installed, vertical and elevation correction is carried out;
step two: grouting the steel column after confirming that no error exists;
step three: after grouting the steel column, manually brushing the steel column with cement mortar 3 in the same proportion by using a brush, wherein the brushing thickness is 30mm, and the height is from the grouting surface to the paint brushing position;
step four: because cement mortar carries out effectual isolation with steel column and air, can prevent that the surface from rustting, directly carry out the manual work with the grout of applying paint with a brush and knock out when treating later stage post package foot.
Firstly, positioning and paying off are carried out on a column foundation cup mouth, and an ink fountain pops out a central line and a column edge control line. Then, using the steel column shoulder beam as a starting point to find out a mark height line of +/-1 m; and meanwhile, leveling by using a level gauge, measuring the elevation of the bottom of the cup opening, placing a base plate and leveling the elevation of the crane beam. And hoisting the steel column after the center line and the elevation are confirmed to be correct.
The steel column is adjusted by using a jack after being installed into the cup opening, a steel wedge is inserted into the edge of the cup opening for fixing after the calibration is completed, the deviation is placed, and a guy rope is pulled to enhance the stability.
And after the steel column is corrected, pouring by using fine aggregate concrete or non-shrinkage micro-expansion grouting material 1 required by the design of a drawing. After pouring in the cup opening is finished, brushing cement mortar in pouring on the part, which is not painted, of the steel column below +/-0 by using a brush, wherein the thickness of the part is 30 mm. And taking out the steel wedge after the concrete is initially set.
And (3) before C20 fine stone concrete column 2 is used for covering feet in later civil engineering, roughening the foundation surface of the column, and knocking out cement paste on the surface of the steel column.
The invention avoids the rusting of the part below +/-0 of the bottom of the steel column because the paint is not coated, reduces the labor cost for polishing and derusting in the later period, has obvious antirust effect, creates good economic benefit and improves the engineering benefit.

Claims (1)

1. A construction method for brushing slurry and preventing rust of a steel column base is characterized by comprising the following steps:
the method comprises the following steps: after the steel column is installed, vertical and elevation correction is carried out;
firstly, positioning and paying off are carried out on a column foundation cup mouth, and an ink fountain pops out a central line and a column edge control line. Then, using the steel column shoulder beam as a starting point to find out a mark height line of +/-1 m; and meanwhile, leveling by using a level gauge, measuring the elevation of the bottom of the cup opening, placing a base plate and leveling the elevation of the crane beam. Hoisting the steel column after the center line and the elevation are confirmed to be correct;
after the steel column is installed into the cup opening, a jack is used for adjusting, after calibration is completed, a steel wedge is plugged into the edge of the cup opening for fixing, deviation is placed, and a guy rope is pulled to enhance stability;
step two: grouting the steel column after confirming that no error exists;
after the steel column is corrected, pouring by adopting fine aggregate concrete or non-shrinkage micro-expansion grouting material required by the design of a drawing;
step three: after grouting the steel column, manually brushing the steel column with cement mortar in the same proportion by using a brush, wherein the brushing thickness is 30mm, and the height is from the grouting surface to the paint brushing position;
step four: because cement mortar carries out effectual isolation with steel column and air, can prevent that the surface from rustting, directly carry out the manual work with the grout of applying paint with a brush and knock out when treating later stage post package foot.
CN202011279399.3A 2020-11-16 2020-11-16 Construction method for rust prevention of steel column base by brushing slurry Pending CN112411952A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011279399.3A CN112411952A (en) 2020-11-16 2020-11-16 Construction method for rust prevention of steel column base by brushing slurry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011279399.3A CN112411952A (en) 2020-11-16 2020-11-16 Construction method for rust prevention of steel column base by brushing slurry

Publications (1)

Publication Number Publication Date
CN112411952A true CN112411952A (en) 2021-02-26

Family

ID=74832037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011279399.3A Pending CN112411952A (en) 2020-11-16 2020-11-16 Construction method for rust prevention of steel column base by brushing slurry

Country Status (1)

Country Link
CN (1) CN112411952A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020049478A (en) * 2000-12-19 2002-06-26 이한승 alkali recovering agent having corrosion inhibitor in reinforced concrete structure
CN102434003A (en) * 2011-08-29 2012-05-02 山东寿光第一建筑有限公司 Heavy battened steel column construction process
CN102718454A (en) * 2012-07-01 2012-10-10 江苏建筑职业技术学院 Exposed reinforcing steel bar rust-proof cement paste in building construction and processing method
KR101213063B1 (en) * 2012-02-09 2012-12-18 (주)신광건설 Repair method for restoring the deteriorated cross-section of reinforced concrete structures
CN106760483A (en) * 2016-12-12 2017-05-31 中国水利水电第十四工程局有限公司 A kind of steel form surface rust prevention method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020049478A (en) * 2000-12-19 2002-06-26 이한승 alkali recovering agent having corrosion inhibitor in reinforced concrete structure
CN102434003A (en) * 2011-08-29 2012-05-02 山东寿光第一建筑有限公司 Heavy battened steel column construction process
KR101213063B1 (en) * 2012-02-09 2012-12-18 (주)신광건설 Repair method for restoring the deteriorated cross-section of reinforced concrete structures
CN102718454A (en) * 2012-07-01 2012-10-10 江苏建筑职业技术学院 Exposed reinforcing steel bar rust-proof cement paste in building construction and processing method
CN106760483A (en) * 2016-12-12 2017-05-31 中国水利水电第十四工程局有限公司 A kind of steel form surface rust prevention method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李雯霞等: "混凝土碳化对钢筋的腐蚀及影响因素", 《甘肃科技》 *

Similar Documents

Publication Publication Date Title
CN106150001B (en) A kind of fabricated assembly overall stair construction method
CN105464244A (en) Prefabricated integrated shear wall construction method
CN102767288A (en) Method and structure for mounting precast reinforced concrete stairs
CN111996906B (en) Efficient construction method of assembled pier
CN107653894A (en) A kind of construction technology that foundation platform is made by precast concrete
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN114059782A (en) Construction method of prefabricated slab
CN110817678A (en) Hoisting method of prefabricated column
CN101333815B (en) Concrete anchor rod and its construction method
CN108330902B (en) Construction method for cast-in-situ lower cross beam of high-pile wharf
CN110552440A (en) safe and environment-friendly construction process for high-strength assembled integral type sandwich heat-insulation shear wall
CN103061249A (en) Quick positioning construction device and construction method for steel-pipe column of bridge
CN112411952A (en) Construction method for rust prevention of steel column base by brushing slurry
CN110725324A (en) Shear wall high-limb guide wall conversion supporting structure and construction method thereof
CN114370188A (en) Construction method for public pipe gallery of industrial plant area in severe cold region
CN103790168A (en) Application method of soil nailing wall in deep foundation pit supporting
CN103132660B (en) Concrete precast stairway fixed end support
CN106703014B (en) The pre-buried steel column of diaphram wall is fixed and secondary deviation correcting device and method
CN205296197U (en) Prefabricated cushion cap of anticorrosive industry factory building concrete rim of a cup formula
CN115126254A (en) Construction method of assembled composite floor slab support
CN213773865U (en) Precast concrete reversed bank
CN110778206B (en) Method for reinforcing ultrahigh-brick chimney
CN113846714A (en) Method for repairing and reinforcing raft foundation
CN113482328A (en) Integral hoisting installation construction method for steel pipe template of outer shear wall
CN102943484B (en) Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210226