CN112411774A - 一种外墙外保温施工方法 - Google Patents
一种外墙外保温施工方法 Download PDFInfo
- Publication number
- CN112411774A CN112411774A CN202011172649.3A CN202011172649A CN112411774A CN 112411774 A CN112411774 A CN 112411774A CN 202011172649 A CN202011172649 A CN 202011172649A CN 112411774 A CN112411774 A CN 112411774A
- Authority
- CN
- China
- Prior art keywords
- construction
- wall
- layer
- external
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 84
- 238000009413 insulation Methods 0.000 title claims abstract description 41
- 239000000853 adhesive Substances 0.000 claims abstract description 32
- 230000001070 adhesive effect Effects 0.000 claims abstract description 31
- 238000002955 isolation Methods 0.000 claims abstract description 18
- 238000005520 cutting process Methods 0.000 claims abstract description 17
- 229920002742 polystyrene-block-poly(ethylene/propylene) -block-polystyrene Polymers 0.000 claims abstract description 15
- 238000011282 treatment Methods 0.000 claims abstract description 14
- 238000004873 anchoring Methods 0.000 claims abstract description 10
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 10
- 238000003825 pressing Methods 0.000 claims abstract description 9
- 238000009434 installation Methods 0.000 claims abstract description 8
- 238000005498 polishing Methods 0.000 claims abstract description 8
- 239000004568 cement Substances 0.000 claims abstract description 7
- 229920006389 polyphenyl polymer Polymers 0.000 claims abstract description 6
- 238000009877 rendering Methods 0.000 claims abstract description 6
- 229920006351 engineering plastic Polymers 0.000 claims abstract description 5
- 238000010586 diagram Methods 0.000 claims abstract description 4
- 239000010410 layer Substances 0.000 claims description 78
- 239000004570 mortar (masonry) Substances 0.000 claims description 32
- 239000004744 fabric Substances 0.000 claims description 29
- 239000002585 base Substances 0.000 claims description 28
- 238000004321 preservation Methods 0.000 claims description 18
- 238000007514 turning Methods 0.000 claims description 14
- 230000000694 effects Effects 0.000 claims description 11
- 229920000642 polymer Polymers 0.000 claims description 11
- 238000012545 processing Methods 0.000 claims description 11
- 239000000463 material Substances 0.000 claims description 10
- 238000011049 filling Methods 0.000 claims description 9
- 239000004793 Polystyrene Substances 0.000 claims description 8
- 229920002223 polystyrene Polymers 0.000 claims description 8
- 239000012790 adhesive layer Substances 0.000 claims description 7
- 230000001680 brushing effect Effects 0.000 claims description 6
- 238000005187 foaming Methods 0.000 claims description 6
- 229920002635 polyurethane Polymers 0.000 claims description 6
- 239000004814 polyurethane Substances 0.000 claims description 6
- 239000002023 wood Substances 0.000 claims description 6
- 239000011083 cement mortar Substances 0.000 claims description 4
- 239000003365 glass fiber Substances 0.000 claims description 4
- 238000009527 percussion Methods 0.000 claims description 4
- 238000007789 sealing Methods 0.000 claims description 4
- 230000007704 transition Effects 0.000 claims description 4
- 244000137852 Petrea volubilis Species 0.000 claims description 3
- 229920005830 Polyurethane Foam Polymers 0.000 claims description 3
- 239000003513 alkali Substances 0.000 claims description 3
- 238000013461 design Methods 0.000 claims description 3
- 239000000945 filler Substances 0.000 claims description 3
- 238000000227 grinding Methods 0.000 claims description 3
- 238000011068 loading method Methods 0.000 claims description 3
- 210000002221 olecranon process Anatomy 0.000 claims description 3
- 239000011496 polyurethane foam Substances 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 238000003756 stirring Methods 0.000 claims description 3
- 238000002156 mixing Methods 0.000 claims description 2
- 238000005553 drilling Methods 0.000 claims 3
- 229920000715 Mucilage Polymers 0.000 claims 1
- 239000004035 construction material Substances 0.000 abstract description 3
- 238000002360 preparation method Methods 0.000 abstract description 3
- 239000003973 paint Substances 0.000 abstract 1
- 230000037452 priming Effects 0.000 abstract 1
- 230000001012 protector Effects 0.000 description 4
- UHOVQNZJYSORNB-UHFFFAOYSA-N Benzene Chemical compound C1=CC=CC=C1 UHOVQNZJYSORNB-UHFFFAOYSA-N 0.000 description 3
- 239000002344 surface layer Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 238000004134 energy conservation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000011505 plaster Substances 0.000 description 2
- 238000004381 surface treatment Methods 0.000 description 2
- RNFJDJUURJAICM-UHFFFAOYSA-N 2,2,4,4,6,6-hexaphenoxy-1,3,5-triaza-2$l^{5},4$l^{5},6$l^{5}-triphosphacyclohexa-1,3,5-triene Chemical compound N=1P(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP=1(OC=1C=CC=CC=1)OC1=CC=CC=C1 RNFJDJUURJAICM-UHFFFAOYSA-N 0.000 description 1
- 239000011230 binding agent Substances 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006253 efflorescence Methods 0.000 description 1
- 239000003063 flame retardant Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 229920006327 polystyrene foam Polymers 0.000 description 1
- 206010037844 rash Diseases 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/762—Exterior insulation of exterior walls
- E04B1/7625—Details of the adhesive connection of the insulation to the wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
- E04B1/6807—Expansion elements for parts cast in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/78—Heat insulating elements
- E04B1/80—Heat insulating elements slab-shaped
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/94—Protection against other undesired influences or dangers against fire
- E04B1/941—Building elements specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/94—Protection against other undesired influences or dangers against fire
- E04B1/948—Fire-proof sealings or joints
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
- E04F13/04—Bases for plaster
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
- E04F13/04—Bases for plaster
- E04F13/047—Plaster carrying meshes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
- E04F13/04—Bases for plaster
- E04F13/06—Edge-protecting borders
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
- E04F13/04—Bases for plaster
- E04F13/06—Edge-protecting borders
- E04F2013/063—Edge-protecting borders for corners
Abstract
一种外墙外保温施工方法,包括基层处理、弹挂控制线与排版、配置粘结剂和抹面胶浆、粘贴保温层、粘贴SEPS板、防火隔离带施工、板缝处理、安装锚固件、切割打磨、收压翻包网、粘贴加强网、抹面施工,其特征在于,所述的基层处理用渗透型封闭性透明底漆进行改善处理,所述的弹挂控制线为水平挂线和垂直挂线形成纵横交叉控制线,所述的排版是施工前的排板图,所述的板缝处理是施工时控制板间缝隙,所述的安装锚固件是将工程塑料膨胀钉的钉帽沉入聚苯板边表面,本发明的有益效果:有效地防止和减少墙体和屋面的温度变形,有效消除常见的斜裂缝或八字裂缝,更加节省施工材料,加快施工进度。
Description
技术领域
本发明涉及建筑施工领域,尤其涉及一种外墙外保温施工方法。
背景技术
外墙保温是由聚合物砂浆、玻璃纤维网格布、阻燃型模塑聚苯乙烯泡沫板(EPS)或挤塑板(XPS)等材料复合而成,现场粘结施工。
当前建筑的主要特征之一是节能环保,而建筑节能环保又与墙体改革密切相关,随着科技不断的发展,建筑外墙外保温技术得到普遍应用。但在应用同时也存在一些缺陷如保温效果不佳,墙体保温外饰面空鼓、开裂,保温砂浆的平整、垂直度等情况。
发明内容
本发明提供了一种外墙外保温施工方法,为了解决传统的外墙保温效果不佳,易开裂等问题,通过用渗透封闭性透明底漆固化基层、垂直水平交叉控制线控制苯板粘贴质量、加强锚固、增加面层附着力,有效地防止和减少墙体和屋面的温度变形,有效消除常见的斜裂缝或八字裂缝,并且通过预先排版,可以控制材料的应用,加快施工进度。
为了达到上述目的,本发明采用以下技术方案实现:
一种外墙外保温施工方法,包括基层处理、弹挂控制线与排版、配置粘结剂和抹面胶浆、粘贴保温层、粘贴SEPS板、防火隔离带施工、板缝处理、安装锚固件、切割打磨、收压翻包网、粘贴加强网、抹面施工,其特征在于,所述的基层处理用渗透型封闭性透明底漆进行改善处理,所述的弹挂控制线在楼层适当位置挂水平线,在建筑外墙大角挂垂直线,水平挂线和垂直挂线形成纵横交叉控制线,所述的排版是在施工前根据外墙立面的实际尺寸编制保温层的排板图,所述的板缝处理是施工时控制板间缝隙不得大于2mm,板间高差不得大于1.5mm。当板间缝隙小于4mm时须用聚氨酯发泡胶灌填;当板缝大于4mm时须用EPS板条填塞,所述的安装锚固件是使用根部带切割刀片的冲击钻,切割刀片的大小、切入深度与钉帽相一致,将工程塑料膨胀钉的钉帽沉入聚苯板边表面,所述的抹面施工是面层抹面砂浆需与网格布、底层砂浆呈台阶形坡茬,留茬间距不小于150mm。
所述的一种外墙外保温施工方法的具体步骤如下:
S1、基层处理:用渗透型透明封闭底漆对相容性较差附着力不好的材料表面进行清除改善处理。起到固化基层起机械锚固作用,与外墙表面有柔性过渡作用和增加附着力的作用。用聚合物改性水泥砂浆对经基层处理表面,进行找平处理,以达到后续施工平整度、垂直度要求的抹灰层。
S2、弹挂控制线与排版:根据建筑立面设计在墙面弹出起始基准线,挂控制线在建筑外墙大角挂垂直线,每个楼层适当位置挂水平线,以控制聚苯板的垂直度、平整度和粘接胶浆的粘接厚度。
排版:施工前,根据外墙立面的实际尺寸编制保温层的排板图,以达到节约材料、加快施工进度的目的。
S3、刷涂粘接层:配制好聚合物砂浆胶粘剂,配制胶粘剂和抹面砂浆时,采用聚合物干混砂浆专用搅拌机进行搅拌,严禁在配置胶粘剂和抹面胶浆时掺入砂、水泥、或其它粉质填充料,将胶粘剂刷涂于固化的基层外表面,形成粘接层。
S4、粘贴保温层:在粘接层的外表面粘贴保温层,且凡在粘贴的保温层侧边外露无网格布搭接施工面处,做网格布翻包处理。翻包网格布与主墙基层搭接尺寸≥65mm。
S5、粘贴SEPS板:SEPS板、SEPS线条、防火隔离带的最低有效粘结厚度≥3mm。上料高度不小于有效粘结厚度的2.5倍。墙体阳角和墙体阴角保温施工要交错互锁。门窗洞口四角的大面保温板材整板切割成L形进行粘贴,门窗洞口四角在200mm内不允许有板材拼接缝。
S6、防火隔离带施工:防火隔离带的设置必须交圈,与基层粘结面周边不允许有空缝,和竖向通缝。
S7、板缝处理:粘贴保温层时,板缝挤紧,相邻板齐平,施工时控制板间缝隙不得大于2mm,板间高差不得大于1.5mm。当板间缝隙小于4mm时须用聚氨酯发泡胶灌填;当板缝大于4mm时须用EPS板条填塞,干燥后的灌填缝隙及板间平整度高差大于1.5mm的部位用木锉、粗砂纸或砂轮打磨平整。
S8、安装锚固件:保温层粘结牢固后,在8~24h内安装固定件,用冲击钻钻孔,要求钻孔深度进入砌体墙中不得小于50mm,且单个锚栓抗拉承载力标准值不小于0.30kN。固定件个数按照每平方米不少于6个。
S9、切割打磨:用美工刀整理填补板缝的聚氨酯发泡胶达表面平整。保温层接缝处表面不平时,需用衬有木方的粗砂纸打底,打磨需要在粘贴完成24小时后进行。
S10、收压翻包网、粘贴加强网:用湿压法将翻包网抹压在保温层的侧面和正面,翻包网不能出现皱网、翘角和翘边现象。门窗洞口周边采用双层耐碱玻纤网包边角加强。
S11、抹面施工:抹面砂浆施工间歇在分格缝、墙体阳角、墙体阴角、挑台等自然断开处,以方便后续施工的搭接。停顿处,要与网格布、底层砂浆呈台阶形坡茬,留茬间距不小于150mm,以免网格布搭接处平整度超出偏差要求。
所述的粘贴加强网的网格布不得直接铺设在保温层的表面,网格布间不得干搭,压网格布时不允许后添灰。
所述的抹面施工在护角和鹰嘴施工时,易碰撞部位要安装PVC阳角护角条,再做抹面胶浆前完成。
与现有技术相比,本发明的有益效果是:
1)此施工方法附着力强,闭孔状态下封闭不“泛碱”,有效地防止和减少墙体和屋面的温度变形,有效消除常见的斜裂缝或八字裂缝。
2)聚苯板的平整度、垂直度和粘接厚度更好控制,墙体外保温外观质量更好,平整度更高,更贴合于外墙表面,保温效果更好
3)施工前预先根据墙面的实际尺寸做排版,可以更好的了解用料情况,节省施工材料,加快施工进度。
附图说明
图1是本发明所述一种外墙外保温施工方法施工示意图。
图2是本发明所述一种外墙外保温施工方法洞口施工示意图。
图中:1.外墙 2.基层 3.粘接层 4.保温层 5.墙体阴角 6.墙体阳角 7.交错互锁8.洞口
具体实施方式
下面结合附图对本发明的具体实施方式作进一步说明:
如图1、2所示,一种外墙外保温施工方法,包括基层2处理、弹挂控制线与排版、配置粘结剂和抹面胶浆、粘贴保温层4、粘贴SEPS板、防火隔离带施工、板缝处理、切割打磨、安装锚固件、收压翻包网、粘贴加强网、抹面施工,所述的基层2处理用渗透型封闭性透明底漆进行改善处理,以加强外墙1面层的柔性过渡作用和增加附着力的作用,所述的弹挂控制线在楼层适当位置挂水平线,在建筑外墙1大角挂垂直线,水平挂线和垂直挂线形成纵横交叉控制线,利于控制聚苯板的垂直度、平整度和粘接砂浆的砂浆厚度,保证聚苯板可以更加贴合外墙1墙面,提高聚苯板的保温效果,所述的排版在施工前根据外墙1立面的实际尺寸编制保温层4的排板图,可以提前了解保温层4聚苯板的使用情况,以达到节约材料、加快施工进度的目的,所述的板缝处理是施工时控制板间缝隙不得大于2mm,板间高差不得大于1.5mm,当板间缝隙小于4mm时须用聚氨酯发泡胶灌填;当板缝大于4mm时须用EPS板条填塞,严格控制板缝间隙,可以有效的控制保温层4的铺设质量,有效地防止和减少外墙1墙体和外墙1屋面的温度变形,有效消除常见的斜裂缝或八字裂缝,所述的安装锚固件是使用根部带切割刀片的冲击钻,切割刀片的大小、切入深度与钉帽相一致,将工程塑料膨胀钉的钉帽沉入聚苯板边表面,如此才可保证聚苯板表面平整,利于保温层4抹面施工。所述的抹面加工是面层抹面砂浆需与网格布、底层砂浆呈台阶形坡茬,留茬间距不小于150mm。利于网格布搭接处平整度,保证外墙1外保温的外观美观,保温性能更好。
如图1、2所示,所述的一种外墙外保温施工方法的具体步骤如下:
S1、基层2处理:用渗透型透明封闭底漆对相容性较差附着力不好的材料表面进行清除改善处理。起到固化基层起机械锚固作用,与外墙1表面有柔性过渡作用和增加附着力的作用。用聚合物改性水泥砂浆对经基层2处理表面,进行找平处理,以达到后续施工平整度、垂直度要求的抹灰层。
S2、弹挂控制线与排版:根据建筑立面设计在墙面弹出起始基准线,挂控制线在建筑外墙大角挂垂直线,每个楼层适当位置挂水平线,以控制聚苯板的垂直度、平整度和粘接胶浆的粘接厚度。
排版:施工前,根据外墙1立面的实际尺寸编制保温层4的排板图,以达到节约材料、加快施工进度的目的。
S3、刷涂粘接层3:配制好聚合物砂浆胶粘剂,配制胶粘剂和抹面砂浆时,采用聚合物干混砂浆专用搅拌机进行搅拌,严禁在配置胶粘剂和抹面胶浆时掺入砂、水泥、或其它粉质填充料,将胶粘剂刷涂于固化的基层2外表面,形成粘接层3。
S4、粘贴保温层4:在粘接层的外表面粘贴保温层4,且凡在粘贴的保温层4侧边外露无网格布搭接施工面处,做网格布翻包处理。翻包网格布与主墙基层搭接尺寸≥65mm。
S5、粘贴SEPS板:SEPS板、SEPS线条、防火隔离带的最低有效粘结厚度≥3mm。上料高度不小于有效粘结厚度的2.5倍。墙体阳角5和墙体阴角6保温施工要交错互锁7。门窗洞口8四角的大面保温板材应整板切割成L形进行粘贴,门窗洞口8四角在200mm内不允许有板材拼接缝。
S6、防火隔离带施工:防火隔离带的设置必须交圈,与基层2粘结面周边不允许有空缝,和竖向通缝。
S7、板缝处理:粘贴保温层4时,板缝挤紧,相邻板应齐平,施工时控制板间缝隙不得大于2mm,板间高差不得大于1.5mm。当板间缝隙小于4mm时须用聚氨酯发泡胶灌填;当板缝大于4mm时须用EPS板条填塞,干燥后的灌填缝隙及板间平整度高差大于1.5mm的部位用木锉、粗砂纸或砂轮打磨平整。
S8、安装锚固件:保温层4粘结牢固后,在8~24h内安装固定件,用冲击钻钻孔,要求钻孔深度进入砌体墙中不得小于50mm,且单个锚栓抗拉承载力标准值不小于0.30kN。固定件个数按照每平方米不少于6个。
S9、切割打磨:用美工刀整理填补板缝的聚氨酯发泡胶达表面平整。保温层4接缝处表面不平时,用衬有木方的粗砂纸打底,打磨需要在粘贴完成24小时后进行。
S10、收压翻包网、粘贴加强网:用湿压法将翻包网抹压在保温层4的侧面和正面,翻包网不能出现皱网、翘角和翘边现象。门窗洞口8周边采用双层耐碱玻纤网包边角加强。
S11、抹面施工:抹面砂浆施工间歇在分格缝、墙体阳角6、墙体阴角7、挑台等自然断开处,以方便后续施工的搭接。停顿处,要与网格布、底层砂浆呈台阶形坡茬,留茬间距不小于150mm,以免网格布搭接处平整度超出偏差要求。
所述的粘贴加强网的网格布不得直接铺设在保温层4的表面,网格布间不得干搭,压网格布时不允许后添灰。
如图1所示,所述的抹面施工在护角和鹰嘴施工时,易碰撞部位要安装PVC阳角护角条,再做抹面胶浆前完成。
以下实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。下述实施例中所用方法如无特别说明均为常规方法。
【实施例】
如图1所示,对建筑外墙1表面做基层2处理,使用渗透型透明封闭底漆做基层2固化处理,使用用聚合物改性水泥砂浆进行找平处理。
如图1所示,预制保温层4排版,挂纵横控制线,刷涂粘接层3,根据预制排版,粘贴保温层4,在每一块保温板的粘接翻包网。
如图1、2所示,按照外墙1外保温层4施工要求粘贴SEPS板、SEPS线条、防火隔离带,防火隔离带谨慎处理,板缝处理要按照施工方法的要求实施。
如图1所示,粘贴好保温层4之后,安装锚固件,使用根部带切割刀片的冲击钻,切割刀片的大小、切入深度与钉帽相一致,将工程塑料膨胀钉的钉帽沉入聚苯板边表面。
如图1所示,然后做表面处理,处理平整后,收压翻包网、粘贴加强网,表面做抹面施工。
外墙外保温层施工结束。
本发明在使用中,有效地防止和减少墙体和屋面的温度变形,有效消除常见的斜裂缝或八字裂缝,墙体外保温外观质量更好,平整度更高,更贴合于外墙表面,保温效果更好,更加节省施工材料,加快施工进度。
Claims (4)
1.一种外墙外保温施工方法,包括基层处理、弹挂控制线与排版、配置粘结剂和抹面胶浆、粘贴保温层、粘贴SEPS板、防火隔离带施工、板缝处理、安装锚固件、切割打磨、收压翻包网、粘贴加强网、抹面施工,其特征在于,所述的基层处理用渗透型封闭性透明底漆进行改善处理,所述的弹挂控制线在楼层适当位置挂水平线,在建筑外墙大角挂垂直线,水平挂线和垂直挂线形成纵横交叉控制线,所述的排版是在施工前根据外墙立面的实际尺寸编制保温层的排板图,所述的板缝处理是施工时控制板间缝隙不得大于2mm,板间高差不得大于1.5mm;当板间缝隙小于4mm时须用聚氨酯发泡胶灌填;当板缝大于4mm时须用EPS板条填塞,所述的安装锚固件是使用根部带切割刀片的冲击钻,切割刀片的大小、切入深度与钉帽相一致,将工程塑料膨胀钉的钉帽沉入聚苯板边表面,所述的抹面施工是面层抹面砂浆需与网格布、底层砂浆呈台阶形坡茬,留茬间距不小于150mm。
2.根据权利要求1所述的一种外墙外保温施工方法,其特征在于,所述的一种外墙外保温施工方法的具体步骤如下:
S1、基层处理:用渗透型透明封闭底漆对相容性较差附着力不好的材料表面进行清除改善处理。起到固化基层起机械锚固作用,与外墙表面有柔性过渡作用和增加附着力的作用;用聚合物改性水泥砂浆对经基层处理表面,进行找平处理,以达到后续施工平整度、垂直度要求的抹灰层;
S2、弹挂控制线与排版:根据建筑立面设计在墙面弹出起始基准线,挂控制线在建筑外墙大角挂垂直线,每个楼层适当位置挂水平线,以控制聚苯板的垂直度、平整度和粘接胶浆的粘接厚度;
排版:施工前,根据外墙立面的实际尺寸编制保温层的排板图,以达到节约材料、加快施工进度的目的;
S3、刷涂粘接层:配制好聚合物砂浆胶粘剂,配制胶粘剂和抹面砂浆时,采用聚合物干混砂浆专用搅拌机进行搅拌,严禁在配置胶粘剂和抹面胶浆时掺入砂、水泥、或其它粉质填充料,将胶粘剂刷涂于固化的基层外表面,形成粘接层;
S4、粘贴保温层:在粘接层的外表面粘贴保温层,且凡在粘贴的保温层侧边外露无网格布搭接施工面处,做网格布翻包处理。翻包网格布与主墙基层搭接尺寸≥65mm;
S5、粘贴SEPS板:SEPS板、SEPS线条、防火隔离带的最低有效粘结厚度≥3mm;上料高度不小于有效粘结厚度的2.5倍。墙体阳角和墙体阴角保温施工要交错互锁;门窗洞口四角的大面保温板材整板切割成L形进行粘贴,门窗洞口四角在200mm内不允许有板材拼接缝;
S6、防火隔离带施工:防火隔离带的设置必须交圈,与基层粘结面周边不允许有空缝,和竖向通缝;
S7、板缝处理:粘贴保温层时,板缝挤紧,相邻板齐平,施工时控制板间缝隙不得大于2mm,板间高差不得大于1.5mm;当板间缝隙小于4mm时须用聚氨酯发泡胶灌填;当板缝大于4mm时须用EPS板条填塞,干燥后的灌填缝隙及板间平整度高差大于1.5mm的部位用木锉、粗砂纸或砂轮打磨平整;
S8、安装锚固件:保温层粘结牢固后,在8~24h内安装固定件,用冲击钻钻孔,要求钻孔深度进入砌体墙中不得小于50mm,且单个锚栓抗拉承载力标准值不小于0.30kN;固定件个数按照每平方米不少于6个;
S9、切割打磨:用美工刀整理填补板缝的聚氨酯发泡胶达表面平整,保温层接缝处表面不平时,需用衬有木方的粗砂纸打底,打磨需要在粘贴完成24小时后进行;
S10、收压翻包网、粘贴加强网:用湿压法将翻包网抹压在保温层的侧面和正面,翻包网不能出现皱网、翘角和翘边现象;门窗洞口周边采用双层耐碱玻纤网包边角加强;
S11、抹面施工:抹面砂浆施工间歇在分格缝、墙体阳角、墙体阴角、挑台等自然断开处,以方便后续施工的搭接;停顿处,要与网格布、底层砂浆呈台阶形坡茬,留茬间距不小于150mm,以免网格布搭接处平整度超出偏差要求;
3.根据权利要求2所述的一种外墙外保温施工方法,其特征在于,所述的粘贴加强网的网格布不得直接铺设在保温层的表面,网格布间不得干搭,压网格布时不允许后添灰。
4.根据权利要求2所述的一种外墙外保温施工方法,其特征在于,所述的抹面施工在护角和鹰嘴施工时,易碰撞部位要安装PVC阳角护角条,再做抹面胶浆前完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011172649.3A CN112411774A (zh) | 2020-10-28 | 2020-10-28 | 一种外墙外保温施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011172649.3A CN112411774A (zh) | 2020-10-28 | 2020-10-28 | 一种外墙外保温施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112411774A true CN112411774A (zh) | 2021-02-26 |
Family
ID=74840820
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011172649.3A Pending CN112411774A (zh) | 2020-10-28 | 2020-10-28 | 一种外墙外保温施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112411774A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114250870A (zh) * | 2021-12-25 | 2022-03-29 | 汝州市东江建筑工业科技有限公司 | 一种预制简易房外保温系统的制备工艺 |
-
2020
- 2020-10-28 CN CN202011172649.3A patent/CN112411774A/zh active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114250870A (zh) * | 2021-12-25 | 2022-03-29 | 汝州市东江建筑工业科技有限公司 | 一种预制简易房外保温系统的制备工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11313134B2 (en) | Wall panel | |
US7836652B2 (en) | System and method for sealing joints between exterior wall panels | |
US9957722B2 (en) | Insulated wall panel | |
US20060254207A1 (en) | Composite roof and wall system -- three in one -- fireproof, insulation, and waterproofing | |
CN106284706A (zh) | 外墙外保温岩棉板的施工方法 | |
CN110273490A (zh) | 一种内嵌式轻质墙板钢结构建筑构造及施工方法 | |
US20060123736A1 (en) | System and method for filling joints between exterior cement panels | |
AU2016342075B2 (en) | Wall panel | |
CN104499614A (zh) | 墙体保温一体化点挂系统及其安装方法 | |
CN112411774A (zh) | 一种外墙外保温施工方法 | |
CN106436943A (zh) | 一种托挂式岩棉板/带薄抹灰外墙外保温系统 | |
CN103711208A (zh) | 一种外墙用热反射保温隔热节能体系及其制备方法 | |
US20140023833A1 (en) | Two-layer tape and joint system for exterior building panels | |
CN106567464A (zh) | 一种复合夹芯真空绝热板薄抹灰外墙外保温系统 | |
CN109610764B (zh) | 一种花岗岩立面铺贴施工工艺 | |
CN207934212U (zh) | 一种冷库外墙外保温防潮隔汽系统 | |
CN215858809U (zh) | 一种干铺楼地面保温隔声复合板块 | |
CN106567465A (zh) | 一种托挂锚固保温板外墙外保温系统 | |
CN116905670A (zh) | 外墙保温层结构层及施工方法 | |
CN116905669A (zh) | 一种保温外墙建筑施工工艺 | |
JPH0243955Y2 (zh) | ||
CN114961016A (zh) | 一种新型墙体构造及施工方法 | |
CN113700158A (zh) | 一种ha外模板现浇混凝土复合保温板 | |
Godbey et al. | The Selection and Use of Natural and Manufactured Stone Adhered Veneer | |
CN106522389A (zh) | 一种水泥渗透包裹聚苯颗粒防火保温板外墙外保温系统 |
Legal Events