CN112405483A - Placer is used in production of degree concrete pile - Google Patents
Placer is used in production of degree concrete pile Download PDFInfo
- Publication number
- CN112405483A CN112405483A CN202011300640.6A CN202011300640A CN112405483A CN 112405483 A CN112405483 A CN 112405483A CN 202011300640 A CN202011300640 A CN 202011300640A CN 112405483 A CN112405483 A CN 112405483A
- Authority
- CN
- China
- Prior art keywords
- placing
- concrete pile
- fixed
- plate
- board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H3/00—Storage means or arrangements for workshops facilitating access to, or handling of, work tools or instruments
- B25H3/04—Racks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B17/00—Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a placing device for concrete pile production, which relates to the technical field of concrete pile production and comprises a placing box, wherein a rotating door is installed at the front end of the placing box, a plurality of placing plates are installed in the placing box from top to bottom, a plurality of square placing boxes are fixed at the top of each placing plate, the placing boxes are arranged on the placing plates in an annular array mode, a plurality of tubular pile placing mechanisms are arranged at the bottom of each placing plate, the tubular pile placing mechanisms are also arranged in an annular array mode at the bottom of each placing plate, a transverse plate is fixed between two side walls close to the top of each placing plate in the placing box, a vertical rod is fixed at the bottom of each transverse plate, and the placing plates arranged from top to bottom are all fixed on the vertical rods; the vertical rod is provided with the screw, so that the placing plate can be locked after being rotated, the concrete pile body can be taken conveniently, and the concrete pile body can be moved upwards in a rotating mode after being placed on the placing plate, so that the labor is saved.
Description
Technical Field
The invention relates to the technical field of concrete pile production, in particular to a placing device for concrete pile production.
Background
The concrete pile is made of concrete including common reinforced concrete and prestressed concrete, has the advantages of saving wood and steel, durability and the like, and is widely used in the foundation engineering of hydraulic buildings, industrial buildings, civil buildings and bridges.
In the prior art, concrete piles are mostly directly stacked in the open air after being cast and molded, and the quality of the concrete piles is affected by exposure to the sun and rain, so that a placing device for producing the concrete piles is needed to be designed to solve the problems.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a placing device for producing concrete piles, which solves the problems in the background art.
In order to achieve the purpose, the invention is realized by the following technical scheme: the placing device for concrete pile production comprises a placing box, wherein a rotating door is installed at the front end of the placing box, and a plurality of placing plates are installed in the placing box from top to bottom;
every top of placing the board is fixed with a plurality of square boxes of placing, and a plurality of boxes of placing are the annular array setting on placing the board, and every bottom of placing the board is provided with a plurality of tubular pile and places the mechanism, and a plurality of tubular pile place the mechanism and also be the annular array setting in placing the board bottom.
The placing device for producing the concrete pile is characterized in that a transverse plate is fixed between two side walls close to the top of the placing box, a vertical rod is fixed at the bottom of the transverse plate, and a plurality of placing plates arranged up and down are fixed on the vertical rod.
In the above placing device for concrete pile production, preferably, the vertical rod is a screw, and a screw hole screwed with the screw is formed at the center of the placing plate.
The placing device for concrete pile production as described above, wherein preferably, a gap is left between the bottom end of the vertical rod and the bottom in the placing box.
The placing device for producing the concrete pile is characterized in that the placing device comprises a first screw cylinder and a second screw cylinder, wherein the first screw cylinder is fixed at the bottom of the placing plate and has an opening at the lower end, a first stud is connected with the screw cylinder in an internal thread manner, and a three-leg underframe is fixed at the bottom end of the first stud.
The placing device for concrete pile production as described above, wherein preferably, the bottom end of the vertical rod is in threaded connection with a second stud, and a limiting plate is fixed at the bottom end of the second stud.
Compared with the prior art, the invention has the following beneficial effects: the montant is the setting of screw rod, firstly can so that place the board and lock promptly after changeing, the concrete pile body of being convenient for take, secondly can so that the concrete pile body place on place the board after, move on through the pivoted mode, it is more laborsaving.
Drawings
FIG. 1 is a first perspective view of the present invention;
FIG. 2 is a second perspective view of the present invention;
FIG. 3 is a front view of the present invention;
FIG. 4 is a perspective view of the placement board of the present invention;
FIG. 5 is a partial perspective view of the screw of the present invention;
fig. 6 is a perspective view of the stopper plate of the invention.
In the figure: 1. placing a box; 2. a revolving door; 3. placing the plate; 4. placing the box; 5. a transverse plate; 6. a vertical rod; 7. a screw hole; 8. a screw cylinder; 9. a stud I; 10. a three-legged chassis; 11. a second stud; 12. and a limiting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: a placing device for concrete pile production comprises a placing box 1, wherein a rotating door 2 is installed at the front end of the placing box 1, and a plurality of placing plates 3 are installed in the placing box 1 up and down;
every top of placing board 3 is fixed with a plurality of square boxes 4 of placing, and a plurality of boxes 4 of placing are the annular array setting on placing board 3, like this, just can be so that place more massive concrete pile bodies on board 3, every bottom of placing board 3 is provided with a plurality of tubular pile placement mechanisms, and a plurality of tubular pile placement mechanisms also are the annular array setting in placing board 3 bottom, like this, just can make and place more tubular concrete pile bodies on board 3.
Place and be fixed with diaphragm 5 between two lateral walls near its top in the case 1, and the bottom of diaphragm 5 is fixed with montant 6, and a plurality of boards 3 of placing that set up from top to bottom all fix on montant 6 for can place more concrete piles body in placing case 1.
Montant 6 is the screw rod, and places the center department of board 3 and set up the screw 7 that closes mutually with the screw rod, firstly can be so that place 3 locks promptly after changeing of board, the concrete pile body of being convenient for to take, secondly can make the concrete pile body place on placing board 3 after, move on through the pivoted mode, it is more laborsaving.
The bottom of the vertical rod 6 and the bottom of the placing box 1 are provided with a gap, so that the plate 3 can be conveniently disassembled, and meanwhile, all concrete piles on the plate 3 can be conveniently placed for taking, so that when the concrete piles are prevented, the concrete piles are placed on the plate 3 for rotation, and the plate 3 can be moved upwards, so that the material placing is more labor-saving.
The tubular pile placing mechanism comprises a screw cylinder 8 fixed at the bottom of a placing plate 3 and provided with an opening at the lower end, a screw bolt 9 is connected with the inner thread of the screw cylinder 8, a three-leg underframe 10 is fixed at the bottom end of the screw bolt 9, the hollow part of a tubular concrete pile body is sleeved in the screw cylinder 8, and the screw bolt 9 penetrates through the hollow part of the tubular concrete pile body and is screwed in the screw cylinder 8, so that the tubular concrete pile body is placed on the three-leg underframe 10, the tubular concrete pile body is placed vertically, the space is saved, and meanwhile, the tubular concrete pile body with different lengths can be suitable for tubular concrete pile bodies with different lengths according to the length that the screw bolt 9 extends out of the screw cylinder 8.
The bottom threaded connection of montant 6 has two 11 of double-screw bolts, and the bottom mounting of two 11 of double-screw bolts has limiting plate 12, fixes limiting plate 12 in the bottom of montant 6 through two 11 of double-screw bolts, and what can prevent places board 3 and is rocking too fast when moving down, directly drops from montant 6, when board 3 need be dismantled and place, only need with limiting plate 12 follow montant 6 on dismantle can.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a placer is used in production of degree concrete pile which characterized in that: the device comprises a placing box (1), wherein a revolving door (2) is installed at the front end of the placing box (1), and a plurality of placing plates (3) are installed in the placing box (1) up and down;
every top of placing board (3) is fixed with a plurality of square boxes of placing (4), and a plurality of boxes of placing (4) are the annular array setting on placing board (3), and every bottom of placing board (3) is provided with a plurality of tubular pile and places the mechanism, and a plurality of tubular pile place the mechanism and also be the annular array setting in placing board (3) bottom.
2. The placing device for concrete pile production according to claim 1, wherein: be fixed with diaphragm (5) between two lateral walls near its top in placing case (1), and the bottom of diaphragm (5) is fixed with montant (6), and a plurality of boards of placing (3) that set up from top to bottom all fix on montant (6).
3. The placing device for concrete pile production according to claim 2, wherein: the vertical rod (6) is a screw rod, and a screw hole (7) which is screwed with the screw rod is formed in the center of the placing plate (3).
4. The placing device for concrete pile production according to claim 3, wherein: a gap is reserved between the bottom end of the vertical rod (6) and the bottom in the placing box (1).
5. The placing device for concrete pile production according to claim 4, wherein: the tubular pile placing mechanism comprises a screw cylinder (8) which is fixed at the bottom of a placing plate (3) and is provided with an opening at the lower end, wherein a first stud (9) is connected with the screw cylinder (8) in an internal thread manner, and a three-leg chassis (10) is fixed at the bottom end of the first stud (9).
6. The placing device for concrete pile production according to claim 5, wherein: the bottom end of the vertical rod (6) is in threaded connection with a second stud (11), and a limiting plate (12) is fixed to the bottom end of the second stud (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011300640.6A CN112405483A (en) | 2020-11-19 | 2020-11-19 | Placer is used in production of degree concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011300640.6A CN112405483A (en) | 2020-11-19 | 2020-11-19 | Placer is used in production of degree concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112405483A true CN112405483A (en) | 2021-02-26 |
Family
ID=74774475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011300640.6A Pending CN112405483A (en) | 2020-11-19 | 2020-11-19 | Placer is used in production of degree concrete pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112405483A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020074587A (en) * | 2001-03-20 | 2002-10-04 | 이중원 | Mobile Type Rotating Tool Box |
CN108597129A (en) * | 2018-05-15 | 2018-09-28 | 韩银兰 | It is a kind of that there is the accurate drug dispensing frame of hospital pharmacy for being moved easily function |
CN208133252U (en) * | 2018-04-26 | 2018-11-23 | 北京安捷鑫德混凝土有限公司 | Concrete curing box |
CN208557451U (en) * | 2018-07-26 | 2019-03-01 | 滁州三威机械制造有限公司 | A kind of mold rack convenient for adjusting |
CN209615894U (en) * | 2018-10-17 | 2019-11-12 | 武汉城开新兴建材有限责任公司 | Cement standard curing box |
CN210560381U (en) * | 2019-07-26 | 2020-05-19 | 福建省亚热带植物研究所 | A portable culture rack for bacterial is cultivated |
CN211250632U (en) * | 2019-08-29 | 2020-08-14 | 苏州琦少工程科技有限公司 | Full-automatic maintenance bucket of cement test block |
-
2020
- 2020-11-19 CN CN202011300640.6A patent/CN112405483A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020074587A (en) * | 2001-03-20 | 2002-10-04 | 이중원 | Mobile Type Rotating Tool Box |
CN208133252U (en) * | 2018-04-26 | 2018-11-23 | 北京安捷鑫德混凝土有限公司 | Concrete curing box |
CN108597129A (en) * | 2018-05-15 | 2018-09-28 | 韩银兰 | It is a kind of that there is the accurate drug dispensing frame of hospital pharmacy for being moved easily function |
CN208557451U (en) * | 2018-07-26 | 2019-03-01 | 滁州三威机械制造有限公司 | A kind of mold rack convenient for adjusting |
CN209615894U (en) * | 2018-10-17 | 2019-11-12 | 武汉城开新兴建材有限责任公司 | Cement standard curing box |
CN210560381U (en) * | 2019-07-26 | 2020-05-19 | 福建省亚热带植物研究所 | A portable culture rack for bacterial is cultivated |
CN211250632U (en) * | 2019-08-29 | 2020-08-14 | 苏州琦少工程科技有限公司 | Full-automatic maintenance bucket of cement test block |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206873930U (en) | A kind of adjustable assembled composite beam die | |
CN210122814U (en) | Laminated slab support frame | |
CN112405483A (en) | Placer is used in production of degree concrete pile | |
CN208501880U (en) | Prefabricated concrete structure column and column rigid connection node | |
CN207048063U (en) | A kind of single-point type steel construction up and down and PC exterior wall connecting nodes | |
CN213062581U (en) | Steel bar truss building carrier plate convenient to construction | |
CN218952796U (en) | Adjustable kitchen and bathroom hanging die positioning and fixing device | |
CN111778863A (en) | Cantilever beam steel formwork system with adjustable cross slope | |
CN215407420U (en) | System type aluminum template suitable for building door frame | |
CN215202525U (en) | Prefabricated part horizontal molding device for architectural decoration | |
CN214136615U (en) | Thickened type outer wall evaporates presses aerated concrete wallboard positioner | |
CN211250587U (en) | Precast beam mould | |
CN207564661U (en) | A kind of prestressing force overlaps board assembly line partition apparatus | |
CN217992910U (en) | High-efficient installed part that prefabricated case roof beam edge of a wing template was used | |
CN221645989U (en) | Support bracket of assembled precast beam | |
CN218264941U (en) | A subassembly is consolidated to wall post for aluminium mould | |
CN213234374U (en) | Connecting device for building structure reinforcement | |
CN220013773U (en) | Well ring reinforcing internal mold supporting structure | |
CN215253404U (en) | Modular mobile house combined structure | |
CN214941124U (en) | Thickened type outer wall evaporates presses aerated concrete wallboard connecting device | |
CN219732750U (en) | Combined template for roof cast-in-situ deformation joint | |
CN220978806U (en) | Cylinder pouring molding guard plate structure | |
CN216914262U (en) | Precast beam board end template reinforcing apparatus | |
CN85105612A (en) | The device of pouring concrete in-situ building | |
CN216340914U (en) | Formwork structure of large-section concrete column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210226 |
|
RJ01 | Rejection of invention patent application after publication |