CN112395012B - Data emptying method and device based on double-core intelligent ammeter and computer equipment - Google Patents

Data emptying method and device based on double-core intelligent ammeter and computer equipment Download PDF

Info

Publication number
CN112395012B
CN112395012B CN202011209169.XA CN202011209169A CN112395012B CN 112395012 B CN112395012 B CN 112395012B CN 202011209169 A CN202011209169 A CN 202011209169A CN 112395012 B CN112395012 B CN 112395012B
Authority
CN
China
Prior art keywords
data
emptying
instruction
execution result
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011209169.XA
Other languages
Chinese (zh)
Other versions
CN112395012A (en
Inventor
张本松
周尚礼
张乐平
吴昊文
王波
尹仕红
赵雪松
郭兴林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Digital Grid Technology Guangdong Co ltd
Original Assignee
China Southern Power Grid Digital Grid Technology Guangdong Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Digital Grid Technology Guangdong Co ltd filed Critical China Southern Power Grid Digital Grid Technology Guangdong Co ltd
Priority to CN202011209169.XA priority Critical patent/CN112395012B/en
Publication of CN112395012A publication Critical patent/CN112395012A/en
Application granted granted Critical
Publication of CN112395012B publication Critical patent/CN112395012B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/4401Bootstrapping
    • G06F9/4405Initialisation of multiprocessor systems
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/44Program or device authentication
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/602Providing cryptographic facilities or services

Abstract

The application relates to a data emptying method, device, computer equipment and storage medium based on a dual-core intelligent ammeter. The method comprises the steps of sending a first data emptying instruction to a metering unit in the dual-core intelligent electric meter through a data emptying instruction sent by response command sending equipment, enabling data of the metering unit in the dual-core intelligent electric meter to be emptied, sending a second data emptying instruction to a management unit in the dual-core intelligent electric meter when the metering unit successfully executes the first data emptying instruction, enabling the data of the management unit to be emptied, and determining the data emptying state of the dual-core intelligent electric meter according to a second execution result returned by the management unit and aiming at the second data emptying instruction. Compared with the traditional method for emptying the intelligent electric meter, the scheme empties the electric meter through the data emptying instruction, and adapts to the software and hardware structure of the intelligent electric meter of the new generation, so that the effect of data emptying of the intelligent electric meter of the new generation with double cores can be achieved.

Description

Data emptying method and device based on double-core intelligent ammeter and computer equipment
Technical Field
The application relates to the technical field of data processing, in particular to a data emptying method, device, computer equipment and storage medium based on a dual-core intelligent ammeter.
Background
Along with the rapid promotion and implementation of the construction of the intelligent power grid in China, the intelligent power meter is taken as an important component of the power consumption link, and the storage quantity of the intelligent power meter is continuously and rapidly increased. By 2019, the domestic intelligent ammeter has broken through 6 hundred million.
The electric energy meter is taken as a typical metering device for manufacturing and is used for bearing the electricity trade settlement task, the electric energy meter needs to restore the initial state of the electric energy meter through the electric energy meter reset when the electric energy meter leaves a factory or after overhauling and operation, and the existing data or records are cleared, so that the normal operation of the electricity trade settlement is ensured. At present, the intelligent ammeter in operation in China generally adopts a single microprocessor, namely a single MCU and software as an integrated design. Along with the implementation of the IR46 standard, in order to realize the requirement of independent metering, the new-generation intelligent electric meter, namely the double-core intelligent electric meter, adopts the design thought of two MCUs, and the management core bears the management task of the whole meter and mainly comprises the tasks of cost control, display, external communication, event recording, data freezing, load control and the like. The hardware architecture and the software architecture of the previous-generation intelligent electric meter and the new-generation double-core intelligent electric meter are basically different, so that the electric meter resetting method of the previous-generation intelligent electric meter is not suitable for the requirements of the new-generation double-core intelligent electric meter, and the electric meter resetting method of the previous-generation intelligent electric meter directly adopted by the new-generation intelligent electric meter cannot guarantee stable and reliable execution of electric meter resetting.
Therefore, how to empty data of a new generation of dual-core smart meters has become a problem to be solved.
Disclosure of Invention
In view of the foregoing, it is desirable to provide a data emptying method, apparatus, computer device and storage medium based on a dual-core smart meter, which can achieve data emptying of the dual-core smart meter.
A data emptying method based on a dual-core smart meter, the method comprising:
responding to a data emptying instruction sent by the command sending equipment, and sending a first data emptying instruction to a metering unit in the dual-core intelligent ammeter; the first data emptying instruction is used for indicating the metering unit to empty data;
acquiring a first execution result of the metering unit aiming at the first data emptying instruction, and if the first execution result is successful, sending a second data emptying instruction to a basic application in a management unit in the dual-core intelligent electric meter; the second data emptying instruction is used for indicating the basic application emptying data in the management unit;
and acquiring a second execution result of the basic application in the management unit aiming at the second data emptying instruction, and determining the data emptying state of the dual-core intelligent electric meter according to the second execution result.
In one embodiment, before the responding to the data emptying instruction sent by the command sending device and sending the first data emptying instruction to the metering unit in the dual-core smart meter, the method further includes:
and acquiring an encrypted emptying instruction based on the dual-core intelligent ammeter, which is sent by the command sending equipment, performing decryption authentication on the encrypted emptying instruction, and taking the decrypted emptying instruction after the decryption authentication as the data emptying instruction.
In one embodiment, after the response to the data emptying instruction sent by the command sending device sends the first data emptying instruction to the metering unit in the dual-core smart meter, the method further includes:
acquiring response time of the first data emptying instruction; the response time is used for representing the time from the time when the first data emptying instruction is sent to the time when the metering unit responds to the first data emptying instruction;
and if the response time is greater than a preset time threshold, determining that the data of the dual-core intelligent ammeter is emptied and fails.
In one embodiment, after the obtaining the execution result of the metering unit for the first data flushing instruction, the method further includes:
If the first execution result is failure, determining that the data emptying of the dual-core intelligent ammeter fails;
after the obtaining the second execution result of the basic application in the management unit for the second data emptying instruction, the method further includes:
and if the second execution result is failure, determining that the data emptying of the dual-core intelligent ammeter fails.
In one embodiment, the base application includes: the system comprises an event module, a metering module, a freezing module, a control module and a display module;
the management unit is used for:
executing the second data emptying instruction on an event module in the management unit to obtain a first sub-execution result;
if the first sub-execution result is successful, executing the second data emptying instruction on the metering module in the management unit to obtain a second sub-execution result;
if the second sub-execution result is successful, executing the second data emptying instruction on the freezing module in the management unit to obtain a third sub-execution result;
if the third sub-execution result is successful, executing the second data emptying instruction on a control module in the management unit to obtain a fourth sub-execution result;
If the fourth sub-execution result is successful, executing the second data emptying instruction on a display module in the management unit to obtain a fifth sub-execution result;
and if the fifth sub-execution result is successful, determining that the execution of the second data emptying instruction is completed.
In one embodiment, the management unit is further configured to:
if an event module in the management unit receives the second data emptying instruction, generating a data emptying record, adding the data emptying record into an event record of the event module, and emptying other event records in the event module to obtain the first sub-execution result;
and/or the number of the groups of groups,
if the metering module receives the second data emptying instruction, stopping receiving the electric quantity data sent by the metering unit, and emptying the electric quantity data in the metering module to obtain the second sub-execution result;
and/or the number of the groups of groups,
and if the metering module receives the second data emptying instruction, stopping receiving the electric quantity data sent by the metering unit, and after waiting for a preset time, re-receiving and synchronizing the electric quantity data sent by the metering unit.
In one embodiment, the obtaining the second execution result of the basic application in the management unit for the second data emptying instruction, and determining the data emptying state of the dual-core smart meter according to the second execution result includes:
Acquiring a data emptying state of a display module in the management unit;
if the data emptying state of the display module is emptying completion, determining that the second execution result is successful, and the data emptying state of the dual-core intelligent ammeter is emptying completion;
and after the second execution result is determined to be successful and the data emptying state of the dual-core intelligent ammeter is that the emptying is completed, the method further comprises:
and returning the data clearing state to the command sending equipment, and ending executing the data clearing instruction.
A dual-core smart meter-based data emptying device, the device comprising:
the first emptying module is used for responding to the data emptying instruction sent by the command sending equipment and sending the first data emptying instruction to the metering unit in the double-core intelligent ammeter; the first data emptying instruction is used for indicating the metering unit to empty data;
the second emptying module is used for acquiring a first execution result of the metering unit aiming at the first data emptying instruction, and sending a second data emptying instruction to a management unit in the dual-core intelligent ammeter if the first execution result is successful; the second data emptying instruction is used for indicating the basic application emptying data in the management unit;
And the determining module is used for acquiring a second execution result of the basic application in the management unit aiming at the second data emptying instruction, and determining the data emptying state of the dual-core intelligent ammeter according to the second execution result.
A computer device comprising a memory storing a computer program and a processor implementing the steps of the method described above when the processor executes the computer program.
A computer readable storage medium having stored thereon a computer program which, when executed by a processor, performs the steps of the method described above.
According to the data emptying method, the device, the computer equipment and the storage medium based on the double-core intelligent electric meter, the first data emptying instruction is sent to the metering unit in the double-core intelligent electric meter through the data emptying instruction sent by the response command sending equipment, so that the data of the metering unit in the double-core intelligent electric meter is emptied, when the first data emptying instruction is successfully executed by the metering unit, the second data emptying instruction is sent to the basic application in the management unit in the double-core intelligent electric meter, so that the data of the basic application in the management unit is emptied, and then the data emptying state of the double-core intelligent electric meter is determined according to the second execution result of the second data emptying instruction returned by the basic application in the management unit. Compared with the traditional method for emptying the intelligent electric meter, the scheme empties the electric meter through the data emptying instruction, and adapts to the structure of the new-generation intelligent electric meter, so that the effect of performing stable and reliable data emptying on the double-core intelligent electric meter can be achieved.
Drawings
FIG. 1 is an application environment diagram of a data emptying method based on a dual-core smart meter in one embodiment;
FIG. 2 is a flow chart of a data emptying method based on a dual-core smart meter in one embodiment;
FIG. 3 is a flow chart illustrating a process of event module data purging in one embodiment;
FIG. 4 is a flow chart of a metering module data flushing step in one embodiment;
FIG. 5 is a flow chart of a data emptying method based on a dual-core smart meter according to another embodiment;
FIG. 6 is a block diagram of a dual-core smart meter based data emptying device in one embodiment;
fig. 7 is an internal structural diagram of a computer device in one embodiment.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the present application will be further described in detail with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the present application.
The data clearing method based on the dual-core intelligent ammeter can be applied to an application environment shown in fig. 1. Wherein the distribution component 102 communicates with the command transmitting device 104 via a communication component. The distribution component 102 in the dual-core smart meter may receive the data flushing instruction from the command sending device 104, so that the distribution component 102 may perform data flushing on the management unit and the metering unit in the dual-core smart meter according to the data flushing instruction. The command transmitting device 104 may be a metering master station or an upper computer.
In one embodiment, as shown in fig. 2, a data emptying method based on a dual-core smart meter is provided, and the method is applied to the distribution assembly in fig. 1 for illustration, and includes the following steps:
step S202, a first data emptying instruction is sent to a metering unit in the dual-core intelligent ammeter in response to the data emptying instruction sent by the command sending device 104; the first data flushing instruction is used for indicating the metering unit to flush data.
The command sending device 104 may be a device for sending a command, specifically, may be a metering master station or an upper computer, the dual-core smart meter may be a smart meter including a metering core and a management core, and the distribution component 102 in the dual-core smart meter may receive a data emptying instruction sent by the command sending device 104 through a communication component in the dual-core smart meter, where the communication component may utilize a communication module to communicate with the command sending device 104, that is, the dual-core smart meter may utilize the communication module to communicate with the command sending device 104. After receiving the data emptying instruction, the distribution component 102 may send the first data emptying instruction to the metering unit in the dual-core smart electric meter, so that the metering unit empties the data of the metering unit after receiving the first data emptying instruction. The first data flushing instruction may be an instruction formed by the distributing component 102 forwarding the data flushing instruction sent by the command sending device 104 to the metering unit.
Additionally, in some embodiments, the distribution component 102 may further decrypt and authenticate the received instruction before sending the first data flush instruction to the metering unit, including: acquiring an encryption emptying instruction based on the dual-core intelligent ammeter, which is sent by command sending equipment; decrypting the encrypted emptying instruction by utilizing a communication assembly in the double-core intelligent ammeter to obtain a decrypted emptying instruction; and authenticating the decryption emptying instruction, and taking the decryption emptying instruction as a data emptying instruction if the authentication is passed.
Specifically, the instruction sent by the command sending device 104 may be sent in a ciphertext manner, after the dual-core smart meter receives the instruction, the dual-core smart meter may decrypt the instruction in the ciphertext manner, for example, decrypt the encrypted emptying instruction through the communication component, and the distribution component 102 may further perform identity authentication on the decrypted emptying instruction to determine whether the instruction is an instruction sent by the command sending device corresponding to the dual-core smart meter, if the authentication is passed, the distribution component 102 may use the decrypted emptying instruction as the data emptying instruction, so as to empty the dual-core instruction meter by using the data emptying instruction.
Step S204, a first execution result of the metering unit aiming at the first data emptying instruction is obtained, and if the first execution result is successful, a second data emptying instruction is sent to a basic application in a management unit in the dual-core intelligent ammeter; the second data flushing instruction is used for indicating the basic application in the management unit to flush the data.
The metering unit may be a unit for metering in the dual-core smart meter, the metering unit may receive a first data emptying instruction from the distribution unit 102, and empty data in the metering unit according to the first data emptying instruction, so as to obtain a first execution result, the metering unit may return the first execution result to the distribution unit 102, and the distribution unit 102 may determine a next step according to the first execution result, specifically, if the first execution result is successful, the distribution unit 102 may send a second data emptying instruction to a base application in a management unit in the dual-core smart meter, and the base application in the management unit may receive the second data emptying instruction and empty data in the base application in the management unit. The basic application can comprise an event module, a metering module, a freezing module, a control module, a display module and the like; the second data flushing instruction may be an instruction formed by the distributing component 102 forwarding the data flushing instruction sent by the command sending device 104 to the management unit. The management unit can empty the data of each module in the management unit according to the second data emptying instruction and a preset sequence, so that the data of the management unit can be emptied.
Step S206, a second execution result of the basic application in the management unit aiming at the second data emptying instruction is obtained, and the data emptying state of the dual-core intelligent ammeter is determined according to the second execution result.
The second data emptying instruction may be an instruction for performing data emptying on a base application in a management unit in the dual-core smart electric meter, after receiving the second data emptying instruction sent by the distribution component 102, the base application in the management unit may perform data emptying on each module in the management unit according to a preset sequence, and obtain a corresponding second execution result, where the second execution result may represent a data emptying state of the base application in the management unit, and the base application in the management unit may send the second execution result to the distribution component 102, and the distribution component 102 may determine the data emptying state of the dual-core smart electric meter according to the second execution result. For example, when the second execution result is detected to be successful, the success of data clearing of the dual-core intelligent ammeter can be determined, the traditional ammeter responds to the success of clearing immediately after receiving a clearing command, but the condition that the success of ammeter clearing response is inconsistent with the actual state of the ammeter possibly occurs after actually completing ammeter clearing, the ammeter needs to be cleared repeatedly or read after the ammeter is cleared successfully, the processing result is uncertain, and when the second execution result is detected to be successful in the application, namely, the data clearing success of the dual-core intelligent ammeter is determined after the ammeter is cleared, and repeated confirmation is not needed, so that the processing efficiency can be improved.
According to the data emptying method based on the dual-core intelligent electric meter, the first data emptying instruction is sent to the metering units in the dual-core intelligent electric meter through the data emptying instruction sent by the response command sending device, so that the data of the metering units in the dual-core intelligent electric meter are emptied, when the first data emptying instruction is successfully executed by the metering units, the second data emptying instruction is sent to the basic application in the management unit in the dual-core intelligent electric meter, so that the data of the basic application in the management unit are emptied, and then the data emptying state of the dual-core intelligent electric meter is determined according to the second execution result of the second data emptying instruction returned by the basic application in the management unit. Compared with the traditional method for emptying the intelligent electric meter, the scheme empties the electric meter through the data emptying instruction, and adapts to the structure of the new-generation intelligent electric meter, so that the effect of performing stable and reliable data emptying on the double-core intelligent electric meter can be achieved.
In one embodiment, after transmitting the first data flushing instruction to the metering unit in the dual-core smart meter in response to the data flushing instruction transmitted by the command transmitting device 104, the method further includes: acquiring response time of a first data emptying instruction; the response time is used for representing the time from the sending of the first data emptying instruction to the time before the metering unit responds to the first data emptying instruction; and if the response time is greater than the preset time threshold, determining that the data of the dual-core intelligent ammeter is emptied and fails.
In this embodiment, the command sending device 104 may be a device for sending a data emptying command, after receiving the data emptying command, the distributing component 102 in the dual-core smart meter may send a first data emptying command to the metering unit in the dual-core smart meter, and the response time may be a time before the metering unit responds to the first data emptying command after the distributing component 102 sends the first data emptying command, where the distributing component 102 may calculate the response time, and if a preset time threshold is exceeded, for example, more than 5 seconds, the distributing component 102 may determine that the data emptying of the dual-core smart meter fails. Specifically, the process of the distribution component 102 sending the first data flush instruction to the metering unit may be: the distribution component 102 firstly forwards the data emptying instruction to an interaction component in the dual-core intelligent ammeter, and then the interaction component sends the data emptying instruction to the metering unit, so that the sending of the first data emptying instruction is completed. In addition, when the distribution component 102 determines that the data of the dual-core smart meter fails to be emptied, the execution of the data emptying instruction may be stopped, and the emptying failure information may be sent to the command sending device 104, so that the command sending device 104 may perform corresponding processing, such as resending or generating detection information of the dual-core smart meter, or the like, according to the emptying failure information.
Through the embodiment, the distribution component 102 can determine that the data of the dual-core smart meter fails to be emptied when the response time of the first data emptying instruction exceeds a certain time, so that the deadlock can be avoided when the data emptying instruction is executed, and the efficiency of data emptying is improved.
In one embodiment, after obtaining the execution result of the metering unit for the first data flushing instruction, the method further includes: if the first execution result is failure, determining that the data of the dual-core intelligent ammeter is failed to empty; after obtaining the second execution result of the base application in the management unit for the second data emptying instruction, the method further comprises: and if the second execution result is failure, determining that the data of the dual-core intelligent ammeter is failed to be emptied.
In this embodiment, the first data emptying instruction may be an emptying instruction for a metering unit in the dual-core smart meter, the second data emptying instruction may be an emptying instruction for a basic application in a management unit in the dual-core smart meter, after receiving the first data emptying instruction sent by the distribution component 102, the metering unit may empty data of the metering unit based on the first data emptying instruction, and obtain a first execution result, return the first execution result to the distribution component 102, and the distribution component 102 may determine a next step according to the first execution result, specifically, when the distribution component 102 detects that the first execution result is unsuccessful, may determine an emptying failure of the dual-core smart meter, and send information of the emptying failure to the command sending device 104, so that the command sending device 104 performs corresponding processing according to the information of the emptying failure, for example, resends the data emptying instruction or detects the dual-core smart meter.
When the distribution component 102 detects that the first execution result is successful, a second data emptying instruction may be sent to the base application in the management unit, after receiving the second data emptying instruction, the base application in the management unit may perform data emptying on each module in the management unit, and obtain a corresponding second execution result, and return the second execution result to the distribution component 102, and the distribution component 102 may determine a next step according to the second execution result, specifically, when the distribution component 102 detects that the second execution result is failed, may determine that the emptying of the dual-core smart electric meter fails, and send information about the emptying failure to the command sending device 104, so that the command sending device 104 performs corresponding processing according to the information about the emptying failure, for example, resends the data emptying instruction or detects the dual-core smart electric meter. And the distribution component 102 may determine that the data emptying instruction sent by the command sending device 104 is successfully executed when the second execution result is detected to be successful.
Through the embodiment, the distribution component 102 can stop continuing to execute and return failure information to the command sending device 104 when the basic application in the metering unit or the management unit fails to execute the command, and compared with a method that the conventional dual-core smart meter receives the command and returns successful execution to the upper computer, the embodiment can return corresponding information according to actual execution conditions, thereby realizing improvement of the execution authenticity of the data emptying command, and simultaneously stopping continuing to execute the data emptying command in time when the execution fails, avoiding execution entry deadlock and improving the execution efficiency of the data emptying command.
In one embodiment, the management unit is configured to: executing a second data emptying instruction on an event module in the management unit to obtain a first sub-execution result; if the first sub-execution result is successful, executing a second data emptying instruction by the metering module in the management unit to obtain a second sub-execution result; if the second sub-execution result is successful, executing a second data emptying instruction by the freezing module in the management unit to obtain a third sub-execution result; if the third sub-execution result is successful, executing a second data emptying instruction by a control module in the management unit to obtain a fourth sub-execution result; if the fourth sub-execution result is successful, executing a second data emptying instruction by the display module in the management unit to obtain a fifth sub-execution result; and if the fifth sub-execution result is successful, determining that the execution of the second data emptying instruction is completed.
In this embodiment, the basic application may include: the system comprises an event module, a metering module, a freezing module, a control module and a display module; the base application in the management unit may include a plurality of application modules, and when the base application in the management unit receives the second data emptying instruction sent by the distribution component 102, the plurality of modules may be emptied of data according to a preset sequence. Wherein, the plurality of modules can comprise an event module, a metering module, a freezing module, a control module, a display module and the like; the event module can be a module for recording events occurring in the dual-core intelligent ammeter, namely, log recording is carried out; the metering module can be a module for synchronizing the power data sent by the metering unit; the freezing module can be a module for freezing data of the ammeter; the control module may be a module for performing corresponding operations and control on the management unit; the display module may be a module for display. The management unit may perform data emptying on the event module first, specifically, may execute the second data emptying instruction on the event module, for example, perform emptying on a related record in the event module, so as to obtain a first sub-execution result; if the management unit detects that the first sub-execution result is successful, a second data emptying instruction can be executed on the metering module, so that a second sub-execution result is obtained; if the management unit detects that the second sub-execution result is successful, the second data emptying instruction can be executed on the freezing module, so that a third sub-execution result is obtained; if the management unit detects that the third sub-execution result is successful, the second data emptying instruction can be executed on the control module, so that a fourth sub-execution result is obtained; if the management unit detects that the fourth sub-execution result is successful, the second data emptying instruction can be executed to the display module, so that a fifth sub-execution result is obtained, and if the management unit detects that the fifth sub-execution result is successful, the management unit can determine that the second data emptying instruction is successfully executed, namely the second execution result is successful. It should be noted that, if the execution of the second data flush instruction of any module in the basic application in the management unit fails, that is, if any sub-execution result is failure, the management unit may determine that the execution of the second data flush instruction fails, stop executing the second data flush instruction on the next module, and may also return information that the second execution result is failure to the distribution component 102.
Through the embodiment, the distribution component 102 can utilize the management unit to empty the data in the management unit according to the preset sequence, so that the effect of data emptying of the dual-core intelligent ammeter can be achieved.
In an embodiment, the management unit is further configured to: if an event module in a basic application in the management unit receives a second data emptying instruction, generating a data emptying record, adding the data emptying record into an event record of the event module, and emptying other event records in the event module to obtain a first sub-execution result; in a further embodiment, the management unit is further configured to: if the metering module receives a second data emptying instruction, stopping receiving the electric quantity data sent by the metering unit, and emptying the electric quantity data in the metering module to obtain a second sub-execution result; and if the electric quantity data is emptied, re-receiving the electric quantity data sent by the metering unit and synchronizing.
In the above embodiment, the management unit may be a unit located in the dual-core smart meter, and the base application in the management unit may include a plurality of modules, and the management unit may execute the second data emptying instruction on the modules in the management unit according to a preset sequence. Specifically, as shown in fig. 3, fig. 3 is a flow chart illustrating a step of event module data emptying in one embodiment. After receiving the second data emptying instruction sent by the distributing component 102, the base application in the management unit may add a management unit emptying event record to the event module, where the record may include the occurrence time of data emptying and the electric energy data when the data is emptying, and then the base application in the management unit may empty other event records except the newly added emptying event record, so as to complete the data emptying of the event module, and obtain the first sub-execution result.
In addition, as shown in fig. 4, fig. 4 is a schematic flow chart of the metering module data emptying step in one embodiment. The management unit may execute the second data emptying instruction to the metering module after the data emptying is successful, specifically, when the metering module receives the second data emptying instruction, may stop receiving and synchronizing the electric quantity data sent by the metering unit, and may empty the electric quantity data of the metering module in the metering module, when the management unit determines that the electric quantity data is completely emptied, it may determine that the second sub-execution result of the metering module is successful, specifically, the metering application distributes the electric meter clearing command to the electric quantity metering module, the electric quantity metering module starts a 5s timeout timer (which matches with the timeout time of the last timeout timer) after receiving the electric meter clearing command, then stops the electric quantity data pushed by the synchronous metering unit, clears the electric quantity data of the metering module, and continues to synchronize the electric quantity data pushed by the metering unit after waiting for 5s (i.e. after the electric meter clearing is completed). If the clearing fails, the distributing component responds that the ammeter clearing fails to the communication component, the communication component responds that the ammeter clearing fails to be used for the metering master station or the upper computer software, and the ammeter clearing process is finished, namely the metering module can stop synchronizing the electric quantity data after receiving the data clearing instruction when the second data clearing instruction is successfully or failed to execute, and continues synchronizing the electric quantity data after the preset time, so that the normal running of the electric power settlement is ensured.
Through the above embodiment, the distribution component 102 may send the second data emptying instruction to the basic application in the management unit, and the management unit may perform data emptying on each module in the basic application in the management unit according to the second data emptying instruction and a preset sequence, so as to achieve an effect of emptying data in the dual-core smart electric meter; in addition, before the event module is cleared, the event clearing record is added, so that the trace of the execution of the data clearing can be ensured to be circulated, and the traceability of the execution of the data clearing instruction is improved.
In one embodiment, obtaining a second execution result of the base application in the management unit for the second data emptying instruction, and determining the data emptying state of the dual-core smart meter according to the second execution result includes: acquiring a data clearing state of a display module in a basic application in a management unit; if the data emptying state of the display module is the emptying completion, determining that the second execution result is successful, and the data emptying state of the dual-core intelligent ammeter is the emptying completion; and after determining that the second execution result is successful and the data emptying state of the dual-core intelligent ammeter is that the emptying is completed, the method further comprises the following steps: the data clear state is returned to the command transmitting device 104 and execution of the data clear instruction ends.
In this embodiment, the second execution result may be an execution result obtained after the base application in the management unit executes the second data emptying instruction, where the base application in the management unit may include a plurality of modules, for example, an event module, a metering module, a freezing module, a control module, and a display module, where the base application in the management unit may perform data emptying on each module according to a preset sequence after receiving the second data emptying instruction, and when data emptying of the display module in the management unit is completed, i.e., when the fifth sub-execution result is successful, the second execution result may be determined to be successful, if the distribution component 102 detects that the second execution result is successful, it may be determined that the data emptying state in the dual-core smart meter is successful, i.e., the distribution component 102 may use the display module in the management unit as the last emptying unit, and the data emptying of the display module is completed.
In addition, when the distribution component 102 determines that the second execution result is successful, that is, the data emptying state in the dual-core smart meter is emptying, the data emptying state of the dual-core smart meter may be returned to the command sending device 104, and the execution of the data emptying instruction is ended. Specifically, the distributing component 102 may send, through the communication component, the information that the dual-core smart meter is emptied successfully to the command sending device 104, and end executing the data emptying instruction.
Through the embodiment, the distribution component 102 can determine that the data emptying state of the dual-core smart meter is emptying completion when detecting that the data emptying of the preset unit is completed, so that the effect of performing data emptying on the dual-core smart meter can be achieved, and the emptying result can be fed back to the command sending device 104, so that timely feedback to the command sending device 104 is achieved.
In one embodiment, as shown in fig. 5, fig. 5 is a flow chart of a data emptying method based on a dual-core smart meter in another embodiment. In this embodiment, the command sending device 104 may be a metering master station or an upper computer, the distributing component 102 in the dual-core smart electric meter may obtain a ciphertext command sent by the command sending device 104 through the communication component, decrypt and authenticate the ciphertext command, the distributing component 102 may send a decrypted data emptying command to the metering unit through the interaction component, start a timeout timer, if the preset time, for example, 5 seconds, is exceeded, the metering unit does not respond, it is determined that the emptying fails, after receiving the data emptying command, the metering unit may empty data in the metering unit, and feed back a processing result to the distributing component 102.
After determining that the data in the metering unit is emptied, the distribution component 102 can store the emptying result, and when the data in the metering unit is emptied successfully, send a data emptying instruction to a basic application in the management unit, so that each module in the basic application in the management unit performs data emptying, including an event module, namely an event module, a metering module, namely an electric quantity metering module, a freezing module, namely an electric quantity freezing module, a control module, namely a control module, and a display module, namely a display module.
Specifically, the event module in the management unit, that is, the emptying process of the event module, may be as shown in fig. 3, after receiving the second data emptying instruction sent by the distributing component 102, the base application in the management unit may add a management unit zero clearing event record to the event module, where the record may include the occurrence time of data emptying and the electric energy data during data emptying, and then the base application in the management unit may empty other event records except for the newly added zero clearing event record, so as to complete data emptying of the event module, and obtain the first sub-execution result. In addition, as shown in fig. 4, the emptying process of the metering module in the management unit may be shown in fig. 4, where the management unit may execute the second data emptying instruction to the metering module after the data emptying is successful, specifically, when the metering module receives the second data emptying instruction, may stop receiving and synchronizing the electric quantity data sent by the metering unit, and may empty the electric quantity data of the metering module in the metering module, and when the management unit determines that the electric quantity data emptying is completed, may determine that the second sub-execution result of the metering module is successful, where the metering module may first wait for a preset time, for example, after receiving the second data emptying instruction, and then stop synchronizing the electric quantity data pushed by the metering unit, and after the electric quantity data emptying is completed, the metering module may re-accept and synchronize the electric quantity data sent by the metering unit, and may also wait for a preset time, for example, after 5 seconds, continue synchronizing the electric quantity data sent by the metering unit, and ensure normal running of electric power. Wherein the above-described respective modules may sequentially perform the process of data flushing, and when the data flushing of any one of the modules fails, the distribution component 102 may determine that the execution of the data flushing instruction fails, thereby ending the continuous execution of the data flushing instruction, and when the data flushing of the display module is completed, the distribution component 102 may determine that the execution of the data flushing execution is completed, and may transmit the result of the completion of the flushing to the above-described command transmission device 104 through the communication component, thereby ending the data flushing instruction execution process. In addition, if the distributing component 102 determines that the execution of the data flushing instruction fails, the distributing component 102 may send the failure information to the command sending device 104 through the communication component, and end the execution of the data flushing instruction.
Through this embodiment, the distribution component 102 can empty the dual-core smart meter through the data emptying instruction, and adapts to the hardware structure of the new generation smart meter, so as to achieve the effect of data emptying on the dual-core smart meter.
It should be understood that, although the steps in the flowcharts of fig. 2-5 are shown in order as indicated by the arrows, these steps are not necessarily performed in order as indicated by the arrows. The steps are not strictly limited to the order of execution unless explicitly recited herein, and the steps may be executed in other orders. Moreover, at least a portion of the steps of fig. 2-5 may include multiple steps or stages that are not necessarily performed at the same time, but may be performed at different times, nor does the order in which the steps or stages are performed necessarily occur sequentially, but may be performed alternately or alternately with at least a portion of the steps or stages in other steps or other steps.
In one embodiment, as shown in fig. 6, there is provided a data emptying device based on a dual-core smart meter, including: a first emptying module 500, a second emptying module 502, and a determining module 504, wherein:
The first emptying module 500 is used for responding to the data emptying instruction sent by the command sending device and sending the first data emptying instruction to the metering unit in the dual-core intelligent ammeter; the first data flushing instruction is used for indicating the metering unit to flush data.
The second emptying module 502 is configured to obtain a first execution result of the metering unit for the first data emptying instruction, and if the first execution result is successful, send the second data emptying instruction to a base application in the management unit in the dual-core smart electric meter; the second data flushing instruction is used for indicating the basic application in the management unit to flush the data.
And the determining module 504 is configured to obtain a second execution result of the basic application in the management unit for the second data emptying instruction, and determine a data emptying state of the dual-core smart meter according to the second execution result.
In one embodiment, the apparatus further comprises: the decryption authentication module is used for acquiring an encryption emptying instruction based on the dual-core intelligent ammeter, which is sent by the command sending equipment; decrypting the encrypted emptying instruction by utilizing a communication assembly in the double-core intelligent ammeter to obtain a decrypted emptying instruction; and authenticating the decryption emptying instruction, and taking the decryption emptying instruction as a data emptying instruction if the authentication is passed.
In one embodiment, the apparatus further comprises: the statistics module is used for acquiring the response time of the first data emptying instruction; the response time is used for representing the time from the sending of the first data emptying instruction to the time before the metering unit responds to the first data emptying instruction; and if the response time is greater than the preset time threshold, determining that the data of the dual-core intelligent ammeter is emptied and fails.
In one embodiment, the apparatus further comprises: the first failure determining module is used for determining that the first execution result is failure and determining that the data emptying of the dual-core intelligent ammeter fails;
in one embodiment, the apparatus further comprises: and the second failure determining module is used for determining that the data of the dual-core intelligent ammeter is emptied if the second execution result is failure.
In one embodiment, the apparatus further comprises; the management unit is used for executing a second data emptying instruction on the event module in the management unit to obtain a first sub-execution result; if the first sub-execution result is successful, executing a second data emptying instruction by the metering module in the management unit to obtain a second sub-execution result; if the second sub-execution result is successful, executing a second data emptying instruction by the freezing module in the management unit to obtain a third sub-execution result; if the third sub-execution result is successful, executing a second data emptying instruction by a control module in the management unit to obtain a fourth sub-execution result; if the fourth sub-execution result is successful, executing a second data emptying instruction by the display module in the management unit to obtain a fifth sub-execution result; and if the fifth sub-execution result is successful, determining that the execution of the second data emptying instruction is completed.
In an embodiment, the management unit is further configured to generate a data emptying record and add the data emptying record to an event record of the event module if the event module in the management unit receives the second data emptying instruction, and empty other event records in the event module to obtain the first sub-execution result.
In an embodiment, the management unit is further configured to stop receiving the power data sent by the metering unit and empty the power data in the metering module if the metering module receives a second data emptying instruction, so as to obtain a second sub-execution result.
In an embodiment, the management unit is further configured to stop receiving the power data sent by the metering unit if the metering module receives the second data emptying instruction, and re-receive and synchronize the power data sent by the metering unit after waiting for a preset time.
In one embodiment, the determining module 504 is specifically configured to obtain a data empty state of the display module in the management unit; if the data emptying state of the display module is the emptying completion, the second execution result is determined to be successful, and the data emptying state of the dual-core intelligent ammeter is the emptying completion.
In one embodiment, the apparatus further comprises: and the feedback module is used for returning the data clearing state to the command sending equipment and ending executing the data clearing instruction.
For specific limitation of the data emptying device based on the dual-core smart meter, reference may be made to the limitation of the data emptying method based on the dual-core smart meter hereinabove, and the description thereof will not be repeated herein. The modules in the data emptying device based on the dual-core intelligent ammeter can be all or partially realized by software, hardware and a combination thereof. The above modules may be embedded in hardware or may be independent of a processor in the computer device, or may be stored in software in a memory in the computer device, so that the processor may call and execute operations corresponding to the above modules.
In one embodiment, a computer device is provided, which may be a dual-core smart meter, the internal structure of which may be as shown in fig. 7. The computer device includes a processor, a memory, and a network interface connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, computer programs, and a database. The internal memory provides an environment for the operation of the operating system and computer programs in the non-volatile storage media. The database of the computer device is used for storing metering data and management data of the dual-core intelligent ammeter. The network interface of the computer device is used for communicating with an external terminal through a network connection. The computer program, when executed by the processor, implements a data emptying method based on a dual-core smart meter.
It will be appreciated by those skilled in the art that the structure shown in fig. 7 is merely a block diagram of some of the structures associated with the present application and is not limiting of the computer device to which the present application may be applied, and that a particular computer device may include more or fewer components than shown, or may combine certain components, or have a different arrangement of components.
In one embodiment, a computer device is provided, including a memory and a processor, the memory storing a computer program, the processor implementing a dual-core smart meter-based data flushing method as described above when executing the computer program.
In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, which when executed by a processor implements a dual core smart meter based data flushing method as described above.
Those skilled in the art will appreciate that implementing all or part of the above described methods may be accomplished by way of a computer program stored on a non-transitory computer readable storage medium, which when executed, may comprise the steps of the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in embodiments provided herein may include at least one of non-volatile and volatile memory. The nonvolatile Memory may include Read-Only Memory (ROM), magnetic tape, floppy disk, flash Memory, optical Memory, or the like. Volatile memory can include random access memory (Random Access Memory, RAM) or external cache memory. By way of illustration, and not limitation, RAM can be in the form of a variety of forms, such as static random access memory (Static Random Access Memory, SRAM) or dynamic random access memory (Dynamic Random Access Memory, DRAM), and the like.
The technical features of the above embodiments may be arbitrarily combined, and all possible combinations of the technical features in the above embodiments are not described for brevity of description, however, as long as there is no contradiction between the combinations of the technical features, they should be considered as the scope of the description.
The above examples merely represent a few embodiments of the present application, which are described in more detail and are not to be construed as limiting the scope of the invention. It should be noted that it would be apparent to those skilled in the art that various modifications and improvements could be made without departing from the spirit of the present application, which would be within the scope of the present application. Accordingly, the scope of protection of the present application is to be determined by the claims appended hereto.

Claims (10)

1. A data emptying method based on a dual-core smart meter, the method comprising:
responding to a data emptying instruction sent by the command sending equipment, and sending a first data emptying instruction to a metering unit in the dual-core intelligent ammeter; the first data emptying instruction is used for indicating the metering unit to empty data;
acquiring a first execution result of the metering unit aiming at the first data emptying instruction, and if the first execution result is successful, sending a second data emptying instruction to a basic application in a management unit in the dual-core intelligent electric meter; the second data emptying instruction is used for indicating the basic application emptying data in the management unit;
Acquiring a second execution result of the basic application in the management unit for the second data emptying instruction, and determining a data emptying state of the dual-core intelligent electric meter according to the second execution result;
the management unit is further configured to:
if an event module in the management unit receives the second data emptying instruction, generating a data emptying record, adding the data emptying record into an event record of the event module, and emptying other event records in the event module to obtain a first sub-execution result;
and/or the number of the groups of groups,
if the metering module receives the second data emptying instruction, stopping receiving the electric quantity data sent by the metering unit, and emptying the electric quantity data in the metering module to obtain a second sub-execution result;
and/or the number of the groups of groups,
and if the metering module receives the second data emptying instruction, stopping receiving the electric quantity data sent by the metering unit, and after waiting for a preset time, re-receiving and synchronizing the electric quantity data sent by the metering unit.
2. The method of claim 1, wherein the sending, in response to the data flushing instruction sent by the command sending device, the first data flushing instruction to the metering unit in the dual-core smart meter is preceded by:
And acquiring an encrypted emptying instruction based on the dual-core intelligent ammeter, which is sent by the command sending equipment, performing decryption authentication on the encrypted emptying instruction, and taking the decrypted emptying instruction after the decryption authentication as the data emptying instruction.
3. The method of claim 1, wherein after the sending the first data clear instruction to the metering unit in the dual-core smart meter in response to the data clear instruction sent by the command sending device, further comprises:
acquiring response time of the first data emptying instruction; the response time is used for representing the time from the time when the first data emptying instruction is sent to the time when the metering unit responds to the first data emptying instruction;
and if the response time is greater than a preset time threshold, determining that the data of the dual-core intelligent ammeter is emptied and fails.
4. The method of claim 1, wherein after the obtaining the execution result of the metering unit for the first data flushing instruction, further comprising:
if the first execution result is failure, determining that the data emptying of the dual-core intelligent ammeter fails;
after the obtaining the second execution result of the basic application in the management unit for the second data emptying instruction, the method further includes:
And if the second execution result is failure, determining that the data emptying of the dual-core intelligent ammeter fails.
5. The method of claim 1, wherein the base application comprises: the system comprises an event module, a metering module, a freezing module, a control module and a display module;
the management unit is used for:
executing the second data emptying instruction on an event module in the management unit to obtain a first sub-execution result;
if the first sub-execution result is successful, executing the second data emptying instruction on the metering module in the management unit to obtain a second sub-execution result;
if the second sub-execution result is successful, executing the second data emptying instruction on the freezing module in the management unit to obtain a third sub-execution result;
if the third sub-execution result is successful, executing the second data emptying instruction on a control module in the management unit to obtain a fourth sub-execution result;
if the fourth sub-execution result is successful, executing the second data emptying instruction on a display module in the management unit to obtain a fifth sub-execution result;
and if the fifth sub-execution result is successful, determining that the execution of the second data emptying instruction is completed.
6. The method according to claim 5, wherein the obtaining a second execution result of the base application in the management unit for the second data flushing instruction, and determining the data flushing status of the dual-core smart meter according to the second execution result, includes:
acquiring a data emptying state of a display module in the management unit;
and if the data emptying state of the display module is the emptying completion, determining that the second execution result is successful, and the data emptying state of the dual-core intelligent ammeter is the emptying completion.
7. The method of claim 6, wherein after the determining that the second execution result is successful and the data empty status of the dual-core smart meter is empty, further comprising:
and returning the data clearing state to the command sending equipment, and ending executing the data clearing instruction.
8. Data emptying device based on two-core smart electric meter, characterized in that, the device includes:
the first emptying module is used for responding to the data emptying instruction sent by the command sending equipment and sending the first data emptying instruction to the metering unit in the double-core intelligent ammeter; the first data emptying instruction is used for indicating the metering unit to empty data;
The second emptying module is used for acquiring a first execution result of the metering unit aiming at the first data emptying instruction, and sending a second data emptying instruction to a management unit in the dual-core intelligent ammeter if the first execution result is successful; the second data emptying instruction is used for indicating the basic application emptying data in the management unit;
the determining module is used for obtaining a second execution result of the basic application in the management unit aiming at the second data emptying instruction, and determining the data emptying state of the dual-core intelligent ammeter according to the second execution result;
the management unit is further configured to:
if an event module in the management unit receives the second data emptying instruction, generating a data emptying record, adding the data emptying record into an event record of the event module, and emptying other event records in the event module to obtain a first sub-execution result;
and/or the number of the groups of groups,
if the metering module receives the second data emptying instruction, stopping receiving the electric quantity data sent by the metering unit, and emptying the electric quantity data in the metering module to obtain a second sub-execution result;
and/or the number of the groups of groups,
and if the metering module receives the second data emptying instruction, stopping receiving the electric quantity data sent by the metering unit, and after waiting for a preset time, re-receiving and synchronizing the electric quantity data sent by the metering unit.
9. A computer device comprising a memory and a processor, the memory storing a computer program, characterized in that the processor implements the steps of the method of any of claims 1 to 7 when the computer program is executed.
10. A computer readable storage medium, on which a computer program is stored, characterized in that the computer program, when being executed by a processor, implements the steps of the method of any of claims 1 to 7.
CN202011209169.XA 2020-11-03 2020-11-03 Data emptying method and device based on double-core intelligent ammeter and computer equipment Active CN112395012B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011209169.XA CN112395012B (en) 2020-11-03 2020-11-03 Data emptying method and device based on double-core intelligent ammeter and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011209169.XA CN112395012B (en) 2020-11-03 2020-11-03 Data emptying method and device based on double-core intelligent ammeter and computer equipment

Publications (2)

Publication Number Publication Date
CN112395012A CN112395012A (en) 2021-02-23
CN112395012B true CN112395012B (en) 2024-02-27

Family

ID=74598102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011209169.XA Active CN112395012B (en) 2020-11-03 2020-11-03 Data emptying method and device based on double-core intelligent ammeter and computer equipment

Country Status (1)

Country Link
CN (1) CN112395012B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115201561B (en) * 2021-04-09 2023-10-24 浙江正泰仪器仪表有限责任公司 Electric energy meter data transmission system, control method and electric energy meter

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103578207A (en) * 2012-07-20 2014-02-12 中国移动通信集团公司 Data processing method, device and system and relevant equipment
CN107967801A (en) * 2017-12-25 2018-04-27 东华理工大学 A kind of energy measurement data online acquisition and monitoring method and system
CN108318721A (en) * 2018-01-18 2018-07-24 宁波三星医疗电气股份有限公司 A kind of twin-core electric energy meter method for managing security
CN111239675A (en) * 2020-02-24 2020-06-05 云南电网有限责任公司电力科学研究院 Multi-meter parallel traversal test method and system for multi-core module electric energy meter minute freezing
CN111488166A (en) * 2020-04-28 2020-08-04 南方电网数字电网研究院有限公司 Method and device for upgrading software of management unit of double-core intelligent ammeter and storage medium
CN111540190A (en) * 2020-07-07 2020-08-14 南方电网数字电网研究院有限公司 Data distribution method and device based on double-core intelligent electric meter and computer equipment
CN111583622A (en) * 2020-04-28 2020-08-25 南方电网数字电网研究院有限公司 Metering information distribution processing system and method of double-core intelligent ammeter management unit
CN111722009A (en) * 2020-05-29 2020-09-29 宁波三星医疗电气股份有限公司 Modular electric energy meter and data interchange method thereof
CN111768608A (en) * 2020-07-16 2020-10-13 南方电网数字电网研究院有限公司 Data transmission method and device based on double-core intelligent electric meter and computer equipment
CN111857777A (en) * 2020-07-16 2020-10-30 南方电网数字电网研究院有限公司 System updating method and device based on double-core intelligent electric meter and computer equipment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8538015B2 (en) * 2007-03-28 2013-09-17 Intel Corporation Flexible architecture and instruction for advanced encryption standard (AES)
US8246799B2 (en) * 2009-05-28 2012-08-21 Nabsys, Inc. Devices and methods for analyzing biomolecules and probes bound thereto

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103578207A (en) * 2012-07-20 2014-02-12 中国移动通信集团公司 Data processing method, device and system and relevant equipment
CN107967801A (en) * 2017-12-25 2018-04-27 东华理工大学 A kind of energy measurement data online acquisition and monitoring method and system
CN108318721A (en) * 2018-01-18 2018-07-24 宁波三星医疗电气股份有限公司 A kind of twin-core electric energy meter method for managing security
CN111239675A (en) * 2020-02-24 2020-06-05 云南电网有限责任公司电力科学研究院 Multi-meter parallel traversal test method and system for multi-core module electric energy meter minute freezing
CN111488166A (en) * 2020-04-28 2020-08-04 南方电网数字电网研究院有限公司 Method and device for upgrading software of management unit of double-core intelligent ammeter and storage medium
CN111583622A (en) * 2020-04-28 2020-08-25 南方电网数字电网研究院有限公司 Metering information distribution processing system and method of double-core intelligent ammeter management unit
CN111722009A (en) * 2020-05-29 2020-09-29 宁波三星医疗电气股份有限公司 Modular electric energy meter and data interchange method thereof
CN111540190A (en) * 2020-07-07 2020-08-14 南方电网数字电网研究院有限公司 Data distribution method and device based on double-core intelligent electric meter and computer equipment
CN111768608A (en) * 2020-07-16 2020-10-13 南方电网数字电网研究院有限公司 Data transmission method and device based on double-core intelligent electric meter and computer equipment
CN111857777A (en) * 2020-07-16 2020-10-30 南方电网数字电网研究院有限公司 System updating method and device based on double-core intelligent electric meter and computer equipment

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
"低功耗的高精度智能电表的设计与实现";沈帅言;《中国优秀硕士学位论文全文数据库 (工程科技Ⅱ辑)》;20180615;第C042-1177页 *
"计量自动化终端故障智能诊断系统设计与开发";伍少成 ,周尚礼;《广东电力》;20110825;第24卷(第8期);第59-62页 *
基于IR46标准的新型智能双芯电表设计;王立州;付飞亚;刘亚辉;;自动化仪表;20180518(第05期);第23-27页 *
基于IR46理念的智能电能表管理芯软件架构设计;冯海舟;林向阳;戚凯;路长宝;;信息系统工程;20180720(第07期);第137-140页 *

Also Published As

Publication number Publication date
CN112395012A (en) 2021-02-23

Similar Documents

Publication Publication Date Title
CN108804706B (en) Block chain data processing method, device, equipment and storage medium
CN104092719B (en) Document transmission method, device and distributed cluster file system
CN109101662B (en) Block generation method, device, equipment and storage medium
CN110138867A (en) File transmission and method of reseptance, computer equipment and storage medium
CN101697136B (en) Method and device for controlling resource
WO2020232859A1 (en) Distributed storage system, data writing method, device, and storage medium
CN103902407A (en) Virtual machine recovery method and server
CN110659905B (en) Transaction verification method, device, terminal equipment and storage medium
CN109213828B (en) Block generation method, device, equipment and storage medium
CN112395012B (en) Data emptying method and device based on double-core intelligent ammeter and computer equipment
CN112631633A (en) Function module upgrading method and device based on double-core intelligent electric meter
CN107688512A (en) One kind optimization virtual-machine data backup method and system
CN104917813A (en) Resource request method and device
CN108418859B (en) Method and device for writing data
US9413542B2 (en) Managing data feeds
CN111311254A (en) Service processing method, device and system based on block chain
CN109921897B (en) Triggering method and device for workload certification calculation, calculating equipment and storage medium
CN110245038A (en) Data cross backup and restorer and method
CN105302489A (en) Heterogeneous multi-core remote embedded memory system and method
US20200394904A1 (en) Metering data management system and computer readable recording medium
CN112686568B (en) Operation and maintenance strategy generation processing method, device, system, equipment and storage medium
CN108241616B (en) Message pushing method and device
CN112685391A (en) Service data migration method and device, computer equipment and storage medium
CN105471930B (en) A kind of method, system and equipment reading distributed data
CN102984160B (en) Distributed network scan task processing method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230407

Address after: Full Floor 14, Unit 3, Building 2, No. 11, Middle Spectra Road, Huangpu District, Guangzhou, Guangdong 510700

Applicant after: China Southern Power Grid Digital Grid Technology (Guangdong) Co.,Ltd.

Address before: Room 86, room 406, No.1, Yichuang street, Zhongxin Guangzhou Knowledge City, Huangpu District, Guangzhou City, Guangdong Province

Applicant before: Southern Power Grid Digital Grid Research Institute Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant