CN112379726A - High integrated intelligent all-in-one of subway system - Google Patents

High integrated intelligent all-in-one of subway system Download PDF

Info

Publication number
CN112379726A
CN112379726A CN201910911800.1A CN201910911800A CN112379726A CN 112379726 A CN112379726 A CN 112379726A CN 201910911800 A CN201910911800 A CN 201910911800A CN 112379726 A CN112379726 A CN 112379726A
Authority
CN
China
Prior art keywords
board card
unit
computing
intelligent
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910911800.1A
Other languages
Chinese (zh)
Inventor
王汉军
于松伟
张辉
吴正中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Design and Development Group Co Ltd
Original Assignee
Beijing Urban Construction Design and Development Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Design and Development Group Co Ltd filed Critical Beijing Urban Construction Design and Development Group Co Ltd
Priority to CN201910911800.1A priority Critical patent/CN112379726A/en
Publication of CN112379726A publication Critical patent/CN112379726A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/16Constructional details or arrangements
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/16Constructional details or arrangements
    • G06F1/18Packaging or power distribution
    • G06Q50/40
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network

Abstract

The invention relates to a high-integration intelligent integrated machine for a subway system. The invention realizes multi-system fusion, reduces intermediate levels, realizes unified management, deployments of computing and storage resource pools and application of virtual technology, and makes the whole system more robust. The invention effectively solves the problem that each service system such as signal, comprehensive monitoring, communication, AFC and the like needs to be respectively provided with a station level server and a terminal at each station under the traditional system architecture. Therefore, the occupied space of the equipment machine room of the valuable underground station can be reduced, and the resource investment of each system equipment such as electric power, environmental control, fire control and the like can be correspondingly reduced. According to the intelligent all-in-one machine, a computing unit, a storage unit and an exchange unit of the intelligent all-in-one machine are constructed into a station cloud platform, and a computing resource pool, a storage resource pool and network resources are provided for a station subsystem.

Description

High integrated intelligent all-in-one of subway system
Technical Field
The invention relates to an integrated machine, belongs to the field of rail transit, and particularly relates to a high-integration intelligent integrated machine for a subway system.
Background
The conventional subsystems of the subway generally comprise a plurality of subsystems such as an Integrated Supervisory Control System (ISCS), an automatic fare collection system (AFC), a closed circuit television system (CCTV), a Passenger Information System (PIS) and the like, and the functions and the components of each subsystem are different.
The main functions of the integrated monitoring system (ISCS) include a real-time centralized monitoring function for electromechanical equipment and a coordinated linkage function among the systems. On one hand, the basic functions of real-time centralized monitoring and control of broadcasting information, clock information and the like of power equipment, fire alarm information and equipment thereof, station environment control equipment, interval environment control equipment, environmental parameters, shielded door equipment, flood gate prevention equipment, escalator equipment, lighting equipment, access control equipment, automatic ticket selling and checking equipment, broadcasting and closed-circuit television equipment and a passenger information display system can be realized through the comprehensive monitoring system; on the other hand, through the comprehensive monitoring system, high-level functions such as coordination and interaction among related system equipment under the night non-operation condition, the day normal operation condition, the emergency condition and the important equipment failure condition can be realized.
The conventional subway subsystems generally comprise a plurality of subsystems such as a subway integrated monitoring system (ISCS), an automatic fare collection system (AFC), a closed circuit monitoring television system (CCTV), a Passenger Information System (PIS) and the like, wherein each subsystem is built by different integrators respectively, the integrators adopt hardware products of different equipment manufacturers and own software platforms to build the subway subsystems, and the different subsystems are interconnected and communicated by interfaces. Therefore, the traditional subsystems of the subway have different functions and different structures due to the fact that various hardware devices are various, a large amount of software and hardware resources must be reserved for each subsystem, and hardware and software cannot be managed in a unified mode.
On the other hand, the traditional subway has more hardware types of each subsystem, and a large number of servers, switches, PLCs, front-end computers and other equipment are needed for data uploading, switching and processing of each subsystem. Therefore, the conventional subway subsystem equipment is complicated, the interfaces of the subsystems are not uniform, different subsystems need a large number of servers, switches, PLCs and front-end computers to build interface networks and process data, the hardware cost is high, and a software system is complex and is not easy to maintain.
Disclosure of Invention
The invention mainly solves the technical problems in the prior art and provides a high-integration intelligent integrated machine for a subway system.
The technical problem of the invention is mainly solved by the following technical scheme:
a high integrated intelligent all-in-one of subway system includes: the device comprises a computing unit, a switching unit, a storage unit and an extension unit;
the computing unit is a general computing unit and is used for processing and controlling information acquired by various field devices in the total station area;
the exchange unit is used for realizing data exchange in the cloud platform;
the storage unit is used for storing and providing a computing storage resource pool for the station subsystem.
The expansion unit comprises an expansion serial port board card and an expansion DI board card.
Preferably, the highly-integrated intelligent integrated machine for the subway system intensively realizes information acquisition, storage, processing, control, exchange and uploading of various field devices in a total station area, meets the requirements of an electrical interface and a communication interface of field access layer equipment, and has mutually independent functional units and meets the requirement of fault isolation.
Preferably, all units of the high-integration intelligent integrated machine for the subway system have a self-diagnosis function, and faults can be located to a board card level. The system has independent processing capacity, namely, when the system is separated from the center, the system can independently operate, and the requirement of emergency operation is met.
Preferably, the computing unit of the high-integration intelligent integrated machine for the subway system is composed of a case, a power board card, a main exchange board card and a computing board card;
the switching unit consists of a case, a power supply board card, a main switching board card, a switching board card and a switched card;
the storage unit consists of a case, a power supply board card, a main exchange board card and a storage board card;
the extension unit is composed of a case, a power supply board card, an extension serial port board card and an extension DI board card.
Preferably, each subsystem of the station runs on a cloud platform of the intelligent control all-in-one machine, interaction among the subsystems does not need butt joint of a front processor FEP and a physical interface, data exchange can be achieved inside the cloud platform, efficiency is improved, and linkage is achieved.
Preferably, the intelligent control all-in-one machine implements an urban rail cloud platform technology, and the cloud platform and the intelligent all-in-one machine bear production systems such as a comprehensive monitoring system, a passenger information system, an automatic fare collection system, an access control system, a public service telephone system, a centralized alarm system and an enterprise management information system, so that deployment of cloud computing is realized, and computing, storing and processing resources are greatly saved.
Therefore, the design and application of the high-integration intelligent integrated machine for the subway system break through the modes of independent processing, longitudinal design and transverse limitation of each system in the original subway weak current system, really realize multi-system fusion, reduce middle levels and realize unified management. The deployment of the computing and storage resource pool and the application of the virtual technology make the whole system more robust.
The subway system high-integration intelligent all-in-one machine implements an urban rail cloud platform technology, and the cloud platform and the intelligent all-in-one machine bear production systems such as a comprehensive monitoring system, a passenger information system, an automatic ticket selling and checking system, an access control system, a public service telephone system, a centralized alarm system and the like and an enterprise management information system, so that the deployment of cloud computing is realized, computing, storing and processing resources are greatly saved, and the problem that each service system such as signals, comprehensive monitoring, communication, AFC and the like needs to be provided with a station-level server and a terminal at each station under the traditional system architecture is effectively solved. Therefore, the occupied space of the equipment machine room of the valuable underground station can be reduced, and the resource investment of each system equipment such as electric power, environmental control, fire control and the like can be correspondingly reduced. The possibility of providing bottom layer resources for the fusion of different subsystems of the station. Through a cloud technology, a computing unit, a storage unit and an exchange unit of the intelligent all-in-one machine are constructed into a station cloud platform, and a computing resource pool, a storage resource pool and network resources are provided for a station subsystem.
Drawings
FIG. 1 is a schematic diagram of the present invention;
Detailed Description
The technical scheme of the invention is further specifically described by the following embodiments and the accompanying drawings.
Example (b):
the high integrated intelligent all-in-one of subway system of this embodiment includes: the device comprises a computing unit, a switching unit, a storage unit and an extension unit;
the computing unit is a general computing unit and is used for processing and controlling information acquired by various field devices in the total station area;
the exchange unit is used for realizing data exchange in the cloud platform;
the storage unit is used for storing and providing a computing storage resource pool for the station subsystem.
The expansion unit comprises an expansion serial port board card and an expansion DI board card.
This is described in detail below with reference to fig. 1. As shown in fig. 1, the subway system highly-integrated intelligent all-in-one machine of the embodiment is composed of a computing unit, an exchange unit, a storage unit and an expansion unit. The computing unit consists of a case, a power supply board card, a main exchange board card and a computing board card. The exchange unit consists of a case, a power supply board card, a main exchange board card, an exchange board card and an exchange back card. The storage unit consists of a case, a power supply board card, a main exchange board card and a storage board card. The expansion unit consists of a case, a power supply board card, an expansion serial port board card and an expansion DI board card. And each unit can be provided with different types of board cards to meet the actual requirements of the site.
Almost all subsystems of the station run on a cloud platform of the intelligent control all-in-one machine, interaction among the subsystems does not need a front processor FEP to be in butt joint with a physical interface, data exchange can be achieved in the cloud platform, efficiency is improved, and linkage is achieved; the application mode that the cloud platform is erected on the all-in-one machine breaks through the redundancy limitation of the traditional application dual-network dual-device, and stronger redundancy capability and switching speed are realized on the cloud platform by utilizing the high HA characteristic of the cloud platform; the cloud platform can flexibly allocate computing resources and store data according to the change of the demands of different subsystems on system resources in the later stage on the platform level, so that the resource utilization is maximized.
The design and application of the intelligent control all-in-one machine break through the modes of independent processing, longitudinal design and transverse limitation of each system in the original subway weak current system, really realize multi-system fusion, reduce middle levels and realize unified management. The deployment of the computing and storage resource pool and the application of the virtual technology make the whole system more robust.
The intelligent control all-in-one machine implements an urban rail cloud platform technology, and the cloud platform and the intelligent all-in-one machine bear production systems such as a comprehensive monitoring system, a passenger information system, an automatic ticket selling and checking system, an access control system, a business telephone system, a centralized alarm system and the like and an enterprise management information system, so that the deployment of cloud computing is realized, computing, storing and processing resources are greatly saved, and the problem that each business system such as a signal system, a comprehensive monitoring system, a communication system, an AFC system and the like needs to be provided with a station-level server and a terminal at each station under the traditional system architecture is effectively solved. Therefore, the occupied space of the equipment machine room of the valuable underground station can be reduced, and the resource investment of each system equipment such as electric power, environmental control, fire control and the like can be correspondingly reduced. The possibility of providing bottom layer resources for the fusion of different subsystems of the station. Through a cloud technology, a computing unit, a storage unit and an exchange unit of the intelligent all-in-one machine are constructed into a station cloud platform, and a computing resource pool, a storage resource pool and network resources are provided for a station subsystem.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications or additions may be made to the described embodiments or alternatives may be employed by those skilled in the art without departing from the spirit or ambit of the invention as defined in the appended claims.

Claims (6)

1. The utility model provides a high integrated intelligent all-in-one of subway system which characterized in that includes: the device comprises a computing unit, a switching unit, a storage unit and an extension unit;
the computing unit is a general computing unit and is used for processing and controlling information acquired by various field devices in the total station area;
the exchange unit is used for realizing data exchange in the cloud platform;
the storage unit is used for storing and providing a computing storage resource pool for the station subsystem.
The expansion unit comprises an expansion serial port board card and an expansion DI board card.
2. The high-integration intelligent integrated machine of the subway system as claimed in claim 1, wherein information collection, storage, processing, control, exchange and uploading of various field devices in the total station area are realized in a centralized manner, the requirements of an electrical interface and a communication interface of a field access layer device are met, and each functional unit is independent from each other and meets the fault isolation requirement.
3. The high-integration intelligent all-in-one machine for the subway system according to claim 1, wherein all units have a self-diagnosis function and can locate faults to a board card level; the system has independent processing capacity, namely, when the system is separated from the center, the system can independently operate, and the requirement of emergency operation is met.
4. The high-integration intelligent integrated machine of the subway system as claimed in claim 1,
the computing unit consists of a case, a power supply board card, a main exchange board card and a computing board card;
the switching unit consists of a case, a power supply board card, a main switching board card, a switching board card and a switched card;
the storage unit consists of a case, a power supply board card, a main exchange board card and a storage board card;
the extension unit is composed of a case, a power supply board card, an extension serial port board card and an extension DI board card.
5. The high-integration intelligent integrated machine for the subway system as claimed in claim 1, wherein each subsystem of the station runs on a cloud platform of the intelligent control integrated machine, interaction between the subsystems does not require a front processor FEP to be in butt joint with a physical interface, data exchange can be realized inside the cloud platform, efficiency is improved, and linkage is realized.
6. The integrated intelligent subway system machine of claim 1, wherein the intelligent control integrated machine implements urban rail cloud platform technology, and the cloud platform and the intelligent integrated machine carry production systems such as a comprehensive monitoring system, a passenger information system, an automatic ticket selling and checking system, an entrance guard system, a public service telephone system and a centralized alarm system, and enterprise management information systems, so that deployment of cloud computing is realized, and computing, storing and processing resources are greatly saved.
CN201910911800.1A 2019-09-25 2019-09-25 High integrated intelligent all-in-one of subway system Pending CN112379726A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910911800.1A CN112379726A (en) 2019-09-25 2019-09-25 High integrated intelligent all-in-one of subway system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910911800.1A CN112379726A (en) 2019-09-25 2019-09-25 High integrated intelligent all-in-one of subway system

Publications (1)

Publication Number Publication Date
CN112379726A true CN112379726A (en) 2021-02-19

Family

ID=74585997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910911800.1A Pending CN112379726A (en) 2019-09-25 2019-09-25 High integrated intelligent all-in-one of subway system

Country Status (1)

Country Link
CN (1) CN112379726A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116847415A (en) * 2023-09-01 2023-10-03 北京城建智控科技股份有限公司 Edge control all-in-one based on wireless transmission

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104260763A (en) * 2014-10-17 2015-01-07 成都四为电子信息股份有限公司 Railway station comprehensive monitoring system and design method thereof
CN107968843A (en) * 2017-12-29 2018-04-27 中国铁路设计集团有限公司 A kind of new city Metro Network level integrates cloud platform system
CN108282540A (en) * 2018-02-11 2018-07-13 广州地铁设计研究院有限公司 A kind of subway monitoring system and its monitoring method
US20180343304A1 (en) * 2012-01-09 2018-11-29 May Patents Ltd. System and method for server based control

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180343304A1 (en) * 2012-01-09 2018-11-29 May Patents Ltd. System and method for server based control
CN104260763A (en) * 2014-10-17 2015-01-07 成都四为电子信息股份有限公司 Railway station comprehensive monitoring system and design method thereof
CN107968843A (en) * 2017-12-29 2018-04-27 中国铁路设计集团有限公司 A kind of new city Metro Network level integrates cloud platform system
CN108282540A (en) * 2018-02-11 2018-07-13 广州地铁设计研究院有限公司 A kind of subway monitoring system and its monitoring method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116847415A (en) * 2023-09-01 2023-10-03 北京城建智控科技股份有限公司 Edge control all-in-one based on wireless transmission

Similar Documents

Publication Publication Date Title
CN206537292U (en) Carry urban track traffic dispatch control and run the cloud platform of automated system
US11565734B2 (en) Weak-current unified system for rail transit
CN101778264B (en) Video monitoring method and video monitoring system
CN107968843A (en) A kind of new city Metro Network level integrates cloud platform system
CN108725522A (en) Realize the train complex automatic system that automatic train monitoring and comprehensively monitoring integrate
CN101464690B (en) Dredging synthetic platform management system of trail suction dredger based on redundancy network
CN103096030B (en) A kind of video monitoring multi-service fusion platform and solution
CN108282540A (en) A kind of subway monitoring system and its monitoring method
CN102625339A (en) Monitoring system for using state of integrated wireless communication equipment of railway locomotive
CN104908783A (en) System architecture of comprehensive monitoring and maintaining system for railway electricity
CN102833322B (en) A kind of distributed intelligence internet of things of high scalability
CN110568834A (en) Intelligent building integrated management platform based on Internet of things and big data operation
CN113075877A (en) Track traffic integrated monitoring system
CN101599971B (en) Communication management equipment of cascade compensation device and management method thereof
CN112379726A (en) High integrated intelligent all-in-one of subway system
CN107807597A (en) A kind of cross-line road trans-regional new gate management method and system
CN101713974A (en) Integrated application platform using information flow monitoring as core
CN116847415A (en) Edge control all-in-one based on wireless transmission
CN107942752B (en) A kind of shared charge control system of motor bicycle
CN201876927U (en) Entrance guard control device
CN109649446A (en) A kind of computer interlocking man-machine interactive system of multiple redundancy networking
CN115037769A (en) SOA-based air traffic control automation system and implementation method thereof
CN104468829A (en) Enterprise IT system structure implementation method based on virtualization environment
CN108471452A (en) A kind of Single Cabinet data center monitoring method, system and device
CN211791601U (en) Mining 5G wireless communication system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210219