CN112376558A - Anchor rope and anchor backing plate and anchor rope construction method - Google Patents
Anchor rope and anchor backing plate and anchor rope construction method Download PDFInfo
- Publication number
- CN112376558A CN112376558A CN202011322547.5A CN202011322547A CN112376558A CN 112376558 A CN112376558 A CN 112376558A CN 202011322547 A CN202011322547 A CN 202011322547A CN 112376558 A CN112376558 A CN 112376558A
- Authority
- CN
- China
- Prior art keywords
- anchor
- backing plate
- plate
- anchor cable
- guide hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明提供本发明提供的锚索锚垫板及锚索施工方法,其中,锚索锚垫板包括上垫板、下垫板以及设置在上垫板和下垫板之间的支撑螺栓;其中,在上垫板上设置有与支撑螺栓相适配的活动连接件,支撑螺栓的一端与下垫板固定连接,支撑螺栓的另一端通过活动连接件与上垫板活动连接;并且,在下垫板上开设第一导向孔,在上垫板上开设有与第一导向孔对应的第二导向孔,待定位钢绞线依次通过第一导向孔、第二导向孔并与上垫板上方的锚具夹片相连。利用上述发明能够通过实际需求调整锚垫板的角度,使其与锚索端部(钢绞线)垂直;而对于临时锚索,也能够在工程结束后进行回收重复利用,降低施工成本。
The present invention provides the anchor cable anchor plate and the anchor cable construction method provided by the present invention, wherein the anchor cable anchor plate includes an upper plate, a lower plate and a support bolt arranged between the upper plate and the lower plate; wherein , the upper backing plate is provided with a movable connecting piece that matches the supporting bolt, one end of the supporting bolt is fixedly connected with the lower backing plate, and the other end of the supporting bolt is movably connected with the upper backing plate through the movable connecting piece; A first guide hole is opened on the plate, and a second guide hole corresponding to the first guide hole is opened on the upper plate. The steel strand to be positioned passes through the first guide hole and the second guide hole in turn The anchor clips are connected. Using the above invention, the angle of the anchor plate can be adjusted according to the actual demand to make it perpendicular to the end of the anchor cable (steel strand); and the temporary anchor cable can also be recycled and reused after the project is completed, reducing the construction cost.
Description
技术领域technical field
本发明涉及锚索施工领域,更为具体地,涉及一种锚索锚垫板及锚索施工方法。The invention relates to the field of anchor cable construction, and more particularly, to an anchor cable anchor pad and an anchor cable construction method.
背景技术Background technique
锚索是将拉力传递至稳定岩层或土层的锚固体系。它通常包括索体、注浆体、锚具、套管以及其他连接器件,其中,锚具用于将锚索的索体进行位置固定。锚索作为一种受拉支护结构,在大而深的基坑内应用十分广泛。特别是在止水帷幕兼做支护中,其应用尤为重要。Anchor cables are anchor systems that transmit tension to stable rock or soil layers. It usually includes a cable body, a grouting body, an anchor, a casing and other connecting devices, wherein the anchor is used to fix the position of the cable body of the anchor cable. As a tension support structure, anchor cable is widely used in large and deep foundation pits. Especially in the water-stop curtain that doubles as a support, its application is particularly important.
现阶段常用的锚索多采用OVM锚具,而现有的OVM锚具由夹片、锚垫板、螺旋筋和波纹管组成,钢绞线(即锚索的索体)依次通过波纹管、锚垫板被夹片固定于锚具上,锚具的作用力靠锚垫板的反作用力支撑,而锚垫板必须与钢绞线垂直,才能保证钢绞线及锚具受力合理,同时也能够避免锚垫板受到锚具的挤压力而出现剪切变形,导致结构破坏。The commonly used anchor cables at this stage mostly use OVM anchors, and the existing OVM anchors are composed of clips, anchor plates, spiral bars and corrugated pipes. The anchor plate is fixed on the anchor by the clip, and the force of the anchor is supported by the reaction force of the anchor plate, and the anchor plate must be perpendicular to the steel strand, so as to ensure the reasonable force of the steel strand and the anchor, and at the same time It can also avoid shear deformation of the anchor plate due to the extrusion force of the anchor, resulting in structural damage.
然而,在实际施工过程中,通常情况下,锚垫板下的砼垫块是不平整的;此外,在深基坑支护或高边坡支护结构中,锚索常常需要根据实际需求调整入土入岩的角度,在这种情况下,也会使锚垫板的平面角度跟着发生变化。而目前的现有的锚垫板只有一种固定的结构,不能调整角度,且是一次性使用的,不能重复使用,也就导致对准后的深基坑支护的锚索也不能循环利用,从而造成施工资源地严重浪费。However, in the actual construction process, the concrete pads under the anchor pads are usually uneven; in addition, in deep foundation pit support or high slope support structures, the anchor cables often need to be adjusted according to actual needs The angle of the soil and rock, in this case, will also change the plane angle of the anchor plate. However, the current existing anchor plate has only one fixed structure, the angle cannot be adjusted, and it is one-time use and cannot be reused, which leads to the fact that the aligned anchor cables for deep foundation pit support cannot be recycled. , resulting in a serious waste of construction resources.
基于以上技术问题,亟需一种能够显著提高锚垫板使用效率的方法。Based on the above technical problems, there is an urgent need for a method that can significantly improve the use efficiency of the anchor plate.
发明内容SUMMARY OF THE INVENTION
鉴于上述问题,本发明的目的是提供一种活动式的锚索锚垫板,能够通过实际需求调整锚垫板的角度,使其与锚索端部(钢绞线)垂直;而对于临时锚索,也能够在工程结束后进行回收重复利用,降低施工成本。In view of the above problems, the purpose of the present invention is to provide a movable anchor cable anchor plate, which can adjust the angle of the anchor plate according to the actual demand to make it perpendicular to the end of the anchor cable (steel strand); It can also be recycled and reused after the project is completed, reducing construction costs.
为实现上述目的,本发明提供一种锚索锚垫板,包括上垫板、下垫板以及设置在所述上垫板和所述下垫板之间的支撑螺栓;其中,In order to achieve the above object, the present invention provides an anchor cable anchor plate, comprising an upper plate, a lower plate and a support bolt arranged between the upper plate and the lower plate; wherein,
在所述上垫板上设置有与所述支撑螺栓相适配的活动连接件,所述支撑螺栓的一端与所述下垫板固定连接,所述支撑螺栓的另一端通过所述活动连接件与所述上垫板活动连接;并且,The upper backing plate is provided with a movable connecting piece adapted to the supporting bolt, one end of the supporting bolt is fixedly connected with the lower backing plate, and the other end of the supporting bolt passes through the movable connecting piece is movably connected with the top plate; and,
在所述下垫板上开设第一导向孔,在所述上垫板上开设有与所述第一导向孔对应的第二导向孔,待定位钢绞线依次通过所述第一导向孔、所述第二导向孔并与所述上垫板上方的锚具夹片相连。A first guide hole is formed on the lower backing plate, and a second guide hole corresponding to the first guide hole is formed on the upper backing plate, and the steel strand to be positioned passes through the first guide hole, The second guide hole is connected with the anchor clip above the upper backing plate.
此外,优选的方案是,在所述上垫板内开设有球形滑槽,所述活动连接件包括滑动限位在所述球形滑槽内的球形滑块,在所述球形滑块内开设有与所述支撑螺栓相适配的第一螺纹孔;其中,In addition, a preferred solution is that a spherical sliding groove is opened in the upper backing plate, the movable connecting piece includes a spherical sliding block that is slidably limited in the spherical sliding groove, and a spherical sliding block is opened in the spherical sliding block. a first threaded hole adapted to the support bolt; wherein,
所述支撑螺栓远离所述下垫板的一端通过所述第一螺纹孔与所述球形滑块相连,所述支撑螺栓通过所述球形滑块配合所述球形滑槽与所述上垫板活动连接。One end of the support bolt away from the lower backing plate is connected with the spherical slider through the first threaded hole, and the support bolt cooperates with the spherical sliding groove to move with the upper backing plate through the spherical slider connect.
此外,优选的方案是,所述活动连接件还包括一体成型固定在所述球形滑块的上端的螺母座,在所述螺母座上开设有与所述第一螺纹孔位置对应的第二螺纹孔;其中,In addition, a preferred solution is that the movable connecting piece further includes a nut seat integrally formed and fixed on the upper end of the spherical slider, and a second thread corresponding to the position of the first threaded hole is opened on the nut seat. hole; in which,
所述螺母座延伸至所述球形滑槽外,所述支撑螺栓远离所述下垫板的一端依次通过所述第一螺纹孔、所述第二螺纹孔后延伸至所述上垫板的上方。The nut seat extends to the outside of the spherical chute, and the end of the support bolt away from the lower backing plate passes through the first threaded hole and the second threaded hole in sequence and extends to the top of the upper backing plate .
此外,优选的方案是,所述支撑螺栓在所述下垫板和所述上垫板之间设置有四个;并且,In addition, a preferred solution is that four support bolts are provided between the lower backing plate and the upper backing plate; and,
四个所述支撑螺栓分别与所述下垫板以及所述上垫板的四个角部位置相连接。The four support bolts are respectively connected with the four corner positions of the lower backing plate and the upper backing plate.
此外,优选的方案是,所述支撑螺栓远离所述上垫板的一端与所述下垫板焊接固定或通过螺纹固定。In addition, a preferred solution is that one end of the support bolt away from the upper backing plate is fixed to the lower backing plate by welding or by screwing.
此外,优选的方案是,所述下垫板和所述上垫板的横截面为圆形结构或多边形结构。In addition, a preferred solution is that the cross-sections of the lower backing plate and the upper backing plate are circular structures or polygonal structures.
此外,优选的方案是,所述上垫板和所述下垫板均为高强钢制件。In addition, a preferred solution is that both the upper backing plate and the lower backing plate are made of high-strength steel.
此外,优选的方案是,所述第一导向孔为在所述下垫板上开设的一个或者多个与锚具小孔对应的均布小孔,所述第二导向孔为在所述上垫板上开设的有一个或者多个均布小孔;并且,各第一导向孔与各第二导向孔上下位置对应。In addition, a preferred solution is that the first guide hole is one or more uniformly distributed small holes corresponding to the small holes of the anchor set on the lower backing plate, and the second guide hole is on the upper One or more evenly distributed small holes are opened on the backing plate; and each first guide hole corresponds to the upper and lower positions of each second guide hole.
另一方面,本发明还提供一种锚索施工方法,利用如前述的锚索锚垫板进行锚索施工,所述施工方法包括:On the other hand, the present invention also provides an anchor cable construction method, which utilizes the aforementioned anchor cable anchor pad for anchor cable construction, and the construction method includes:
在基坑岩的预设位置开设锚索孔并对所述锚索孔进行清孔处理;Opening an anchor cable hole at a preset position of the foundation pit rock and clearing the anchor cable hole;
使锚索端部的钢绞线束穿过所述锚索孔后进行分束处理,以形成至少两根待定位钢绞线;The steel strand bundles at the ends of the anchor cable are passed through the anchor cable holes and then subjected to a splitting process to form at least two steel strands to be positioned;
在锚索端部安装锚索锚垫板并对所述锚索锚垫板进行位置调整,以使各待定位钢绞线依次通过第一导向孔和第二导向孔后与所述上垫板互相垂直;Install the anchor cable anchor plate at the end of the anchor cable and adjust the position of the anchor cable and anchor plate, so that each steel strand to be positioned passes through the first guide hole and the second guide hole in sequence and then communicates with the upper plate. Perpendicular to each other;
安装锚具夹片以对各待定位钢绞线进行夹紧固定;Install anchor clips to clamp and fix each steel strand to be positioned;
对锚索孔进行封孔处理以实现锚索端部与基坑岩的固定连接。The hole of the anchor cable is sealed to realize the fixed connection between the end of the anchor cable and the foundation pit rock.
此外,优选的方案是,在所述基坑岩靠近所述锚索锚垫板的一侧固定有支撑圈梁;并且,所述锚索锚垫板安装后,所述下垫板与所述支撑圈梁挤压固定。In addition, a preferred solution is that a support ring beam is fixed on the side of the foundation pit rock close to the anchor cable and anchor plate; and, after the anchor cable and anchor plate is installed, the lower plate and the The support ring beam is extruded and fixed.
根据上述技术内容可知,本发明提供的锚索锚垫板通过设置活动连接件,能够实现锚索锚垫板的上垫板的角度调节,在实际施工过程中,能够根据实际需求调整锚索锚垫板的上垫板的角度,使其与锚索端部(钢绞线)垂直;而对于临时锚索,也能够在工程结束后进行回收重复利用,降低施工成本。According to the above technical content, the anchor cable anchor plate provided by the present invention can realize the angle adjustment of the upper plate of the anchor cable anchor plate by setting the movable connector, and in the actual construction process, the anchor cable anchor plate can be adjusted according to actual needs. The angle of the upper backing plate of the backing plate makes it perpendicular to the end of the anchor cable (steel strand); and for the temporary anchor cable, it can also be recycled and reused after the project is completed, reducing the construction cost.
为了实现上述以及相关目的,本发明的一个或多个方面包括后面将详细说明的特征。下面的说明以及附图详细说明了本发明的某些示例性方面。然而,这些方面指示的仅仅是可使用本发明的原理的各种方式中的一些方式。此外,本发明旨在包括所有这些方面以及它们的等同物。To achieve the above and related objects, one or more aspects of the present invention include the features hereinafter described in detail. The following description and accompanying drawings illustrate certain exemplary aspects of the invention in detail. These aspects are indicative, however, of but a few of the various ways in which the principles of the invention may be employed. Furthermore, the present invention is intended to include all such aspects and their equivalents.
附图说明Description of drawings
通过参考以下结合附图的说明,并且随着对本发明的更全面理解,本发明的其它目的及结果将更加明白及易于理解。在附图中:Other objects and results of the present invention will become more apparent and readily understood by reference to the following description taken in conjunction with the accompanying drawings, and as the present invention is more fully understood. In the attached image:
图1为根据本发明实施例的锚索锚垫板的结构示意图;1 is a schematic structural diagram of an anchor cable anchor pad according to an embodiment of the present invention;
图2为根据本发明实施例的锚索锚垫板位置调整前的剖视图;2 is a cross-sectional view of an anchor cable anchor pad before position adjustment according to an embodiment of the present invention;
图3为根据本发明实施例的锚索锚垫板位置调整后的剖视图;3 is a cross-sectional view of an anchor cable anchor pad after the position of the anchor plate is adjusted according to an embodiment of the present invention;
图4为根据本发明实施例的锚索锚垫板的施工局部放大图;4 is an enlarged view of a construction part of an anchor cable anchor pad according to an embodiment of the present invention;
图5为根据本发明实施例的锚索施工方法的流程图。FIG. 5 is a flowchart of an anchor cable construction method according to an embodiment of the present invention.
其中,附图标记包括:下垫板11、第三螺纹孔111、第一导向孔112、支撑螺栓12、外螺纹121、上垫板13、球形滑槽131、第二导向孔132、球形滑块14、螺母座141、待定位钢绞线15、锚具夹片16、支撑圈梁17、钢绞线束18、基坑岩19。The reference numerals include:
在所有附图中相同的标号指示相似或相应的特征或功能。The same reference numbers indicate similar or corresponding features or functions throughout the drawings.
具体实施方式Detailed ways
在下面的描述中,出于说明的目的,为了提供对一个或多个实施例的全面理解,阐述了许多具体细节。然而,很明显,也可以在没有这些具体细节的情况下实现这些实施例。在其它例子中,为了便于描述一个或多个实施例,公知的结构和设备以方框图的形式示出。In the following description, for the purposes of explanation, numerous specific details are set forth in order to provide a thorough understanding of one or more embodiments. It will be apparent, however, that the embodiments may be practiced without these specific details. In other instances, well-known structures and devices are shown in block diagram form in order to facilitate describing one or more embodiments.
以下将结合附图对本发明的具体实施例进行详细描述。The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
图1示出了根据本发明实施例的锚索锚垫板的结构,图2示出了根据本发明实施例的锚索锚垫板位置调整前的剖视结构;图3示出了根据本发明实施例的锚索锚垫板位置调整后的剖视结构;图4示出了根据本发明实施例的锚索锚垫板的施工局部放大结构。Fig. 1 shows the structure of the cable anchor pad according to the embodiment of the present invention; Fig. 2 illustrates the cross-sectional structure of the cable anchor pad according to the embodiment of the present invention before the position adjustment; The cross-sectional structure of the anchor cable and anchor plate after the position adjustment of the embodiment of the invention; FIG. 4 shows the enlarged construction structure of the anchor cable and anchor plate according to the embodiment of the invention.
结合图1至图4共同所示,本发明提供的锚索锚垫板包括起支撑作用的上垫板13、下垫板11以及设置在上垫板13和下垫板11之间的支撑螺栓12;其中,在上垫板13上设置有与支撑螺栓12相适配的活动连接件,支撑螺栓12的一端与下垫板11固定连接,支撑螺栓12的另一端通过活动连接件与上垫板13活动连接;并且,在下垫板11上开设第一导向孔112,在上垫板13上开设有与第一导向孔112对应的第二导向孔132。1 to 4 , the cable anchor pad provided by the present invention includes an
在实际安装过程中,待定位钢绞线15依次通过第一导向孔112、第二导向孔132并与上垫板13上方的锚具夹片16相连,此时,钢绞线即会被拉紧,下垫板11即会与基坑岩19上的支撑圈梁17(一般为钢筋砼梁)挤压固定,上垫板13承受锚具夹片16的反作用力,而这些上垫板13上的反作用力通过支撑螺栓12传递至下钢板上,最终传递至支撑圈梁17实现待定位钢绞线15的拉紧固定。During the actual installation process, the
具体地,为实现上垫板13的位置调节(调整前如图2,调整后如图3),在上垫板13内开设有球形滑槽131,活动连接件包括滑动限位在球形滑槽131内的球形滑块14,在球形滑块14内开设有与支撑螺栓12相适配的第一螺纹孔;其中,支撑螺栓12远离下垫板11的一端通过第一螺纹孔与球形滑块14相连,支撑螺栓12通过球形滑块14配合球形滑槽131与上垫板13活动连接。Specifically, in order to realize the position adjustment of the upper backing plate 13 (as shown in Fig. 2 before adjustment and as shown in Fig. 3 after adjustment), a
在实际使用过程中,由于不同的施工要求,钢绞线对应的施工角度不同,为确保钢绞线能够与上垫板13之间保持垂直,从而减小两者之间的纵向作用力,可以在通过调整支撑螺栓12与第一螺纹孔之间的适配位置来实现对上垫板13角度和位置调节(具体调节过程根据施工要求而定,在此不再赘述),从而满足相应的施工要求。In the actual use process, due to different construction requirements, the corresponding construction angles of the steel strands are different. Adjust the angle and position of the
具体地,球形滑块14上端的螺母座141呈六角形或多边形,在实际调节过程中,可以拧转六角螺母座141使球形滑块14绕支撑螺栓12转动,从而实现上钢板上下运动。Specifically, the
更为具体地,活动连接件还包括一体成型固定在球形滑块14的上端的螺母座141,在螺母座141上开设有与第一螺纹孔位置对应的第二螺纹孔;其中,螺母座141延伸至球形滑槽131外,支撑螺栓12远离下垫板11的一端依次通过第一螺纹孔、第二螺纹孔后延伸至上垫板13的上方。通过在球形滑块14的上端固定延伸至球形滑槽131外的螺母座141,不仅能够提高支撑螺栓12与球形滑块14之间连接的稳定性,还能够防止球形滑块14在球形滑槽131内出现过度转动,导致在组装锚索锚垫板时无法找到与支撑螺栓12位置对应的第一螺纹孔。More specifically, the movable connecting piece further includes a
优选地,支撑螺栓12在下垫板11和上垫板13之间设置有四个;并且,四个支撑螺栓12分别与下垫板11以及上垫板13的四个角部位置相连接。通过这种设计能够进一步提高支撑螺栓12的支撑效果,防止单个支撑螺栓12的受力过大,降低其使用寿命。Preferably, four
需要说明的是,支撑螺栓12远离上垫板13的一端是与下垫板11固定连接的,只有这样才能保证整个锚索锚垫板的稳定性,具体地,支撑螺栓12远离上垫板13的一端可以与下垫板11焊接固定或通过第三螺纹孔111进行螺纹固定,通过这种设计能够确保下垫板11受力均匀,以减小应力集中而发生剪切变形,导致下垫板11板破坏。It should be noted that the end of the
此外,还需要说明的是,下垫板11和上垫板13的横截面可以为圆形结构和/或多边形结构或其他结构,在实际使用过程中,只要满足相应的支撑效果即可。In addition, it should be noted that the cross-sections of the
此外,为提高上垫板13和下垫板11的支撑强度,上垫板13和下垫板11均采用高强钢进行制件。当然,锚索锚垫板的四根支撑螺栓12也需要均采用高强螺栓,确保锚索锚垫板在锚索巨大张拉力作用下能安全工作,避免锚索锚垫板损坏而发生安全事故。In addition, in order to improve the support strength of the
需要说明的是,待定位钢绞线15由于是有锚索钢绞线束18分束后形成的,因此,一般同时存在多根,为实现这些钢绞线的同时固定,第一导向孔112在下垫板11上开设有至少两个,第二导向孔132在上垫板13上开设有至少两个;并且,各第一导向孔112与各第二导向孔132上下位置对应。在实际使用过程中,各待定位钢绞线15分别通过与其位置对应的第一导向孔112与第二导向孔132后实现位置固定。It should be noted that the
在实际制作过程中,可以通过就地取材的方式制造,例如,上垫板13和下垫板11均采用Q235高强钢制造,其中,上钢板尺寸为200*200*40mm,下钢板尺为250*250*30mm;支撑螺栓12采用M20高强螺栓,螺栓长150mm。其中,支撑螺栓12上的螺纹一般设置为外螺纹121,第一螺纹孔、第二螺纹孔以及第三螺纹孔111的螺纹一般设置为内螺纹。In the actual production process, it can be manufactured by local materials. For example, the
另一方面,为实现通过本发明提供的锚索锚垫板的实现锚索固定,本发明还提供一种锚索施工方法,图5示出了根据本发明实施例的锚索施工方法的流程,利用如前述的锚索锚垫板进行锚索施工,具体施工方法包括:On the other hand, in order to realize the fixing of the anchor cable through the anchor cable and anchor plate provided by the present invention, the present invention also provides an anchor cable construction method, and FIG. 5 shows the flow of the anchor cable construction method according to an embodiment of the present invention. , using the anchor cable anchor plate as mentioned above to carry out the anchor cable construction, and the specific construction methods include:
S110:在基坑岩19的预设位置开设锚索孔并对锚索孔进行清孔处理;S110: opening an anchor cable hole at a preset position of the
S120:使锚索端部的钢绞线束18穿过锚索孔后进行分束处理,以形成至少两根待定位钢绞线15;S120: The steel strand bundles 18 at the ends of the anchor cables are passed through the anchor cable holes and then subjected to a splitting process to form at least two
S130:在锚索端部安装锚索锚垫板并对锚索锚垫板进行位置调整,以使各待定位钢绞线15依次通过第一导向孔112和第二导向孔132后与上垫板13互相垂直;S130: Install the anchor cable anchor plate at the end of the anchor cable and adjust the position of the anchor cable anchor plate, so that the
S140:安装锚具夹片16以对各待定位钢绞线15进行夹紧固定;S140: Install the anchor clips 16 to clamp and fix the
S150:对锚索孔进行封孔处理以实现锚索端部与基坑岩19的固定连接;其中,在封孔处理过程中,对锚索孔压浆,水泥浆边到预设刻度后,张拉锚索使锚具夹片16及锚索锚垫板受力,达到预设拉力后停止张拉,待水泥浆凝固后即可实现锚索端部与基坑岩19的固定连接。需要强调的是,外露的钢绞线的长度先不要切断,留着后续退锚使用。S150: Sealing the anchor cable hole to realize the fixed connection between the end of the anchor cable and the
此外,为提高下垫板11支撑稳定性,在基坑岩19靠近锚索锚垫板的一侧固定有支撑圈梁17;并且,锚索锚垫板安装后,下垫板11与支撑圈梁17挤压固定。对锚索孔压浆,水泥浆边到刻度后,张拉锚索使锚具及锚垫板受力,达到设计纸拉力后停止张拉,外露钢绞线的工作长度先不要切断,留着后续退锚使用。In addition, in order to improve the support stability of the
需要说明的是,对于一些临时锚索来说,在深基坑支护的止水帷幕施工结束,可以利用本发明提供的锚索锚垫板的可调节结构(通过转动支撑螺栓12实现钢绞线的松动)回收锚具和锚垫板各部件,以备日后使用,以降低施工成本,节约资源。具体退锚过程为:在深基坑内工程结束后,用千斤顶张拉锚索外露的钢绞线进行退锚,卸下锚具夹片16及锚垫板以回收利用,以降低施工成本。It should be noted that, for some temporary anchor cables, after the construction of the water-stop curtain supported by the deep foundation pit is completed, the adjustable structure of the anchor cable and anchor plate provided by the present invention can be used (the steel strands can be realized by rotating the support bolts 12). Looseness of the wire) to recover the parts of the anchor and the anchor plate for future use, so as to reduce the construction cost and save resources. The specific anchor withdrawal process is as follows: after the completion of the project in the deep foundation pit, use the exposed steel strands of the jack to tension the anchor cable to withdraw the anchor, remove the
此外,由于本发明提供的锚索锚垫板呈空间结构(上垫板13、下垫板11以及之间的支撑螺栓12),对于永久工程类锚索,钢绞线张拉结束后,可以用砼对锚索锚垫板进行封锚处理,能够永久保护锚索锚垫板、锚具,防止其锈蚀损坏而使钢绞线张拉力失效。In addition, since the cable anchor plate provided by the present invention has a spatial structure (the
如上参照图1至图5以示例的方式描述根据本发明的锚索锚垫板及锚索施工方法。但是,本领域技术人员应当理解,对于上述本发明所提出的锚索锚垫板及锚索施工方法,还可以在不脱离本发明内容的基础上做出各种改进。因此,本发明的保护范围应当由所附的权利要求书的内容确定。As described above with reference to FIGS. 1 to 5 , the anchor cable anchor pad and the anchor cable construction method according to the present invention are described by way of example. However, those skilled in the art should understand that various improvements can also be made to the anchor cable anchor pad and the anchor cable construction method provided by the present invention without departing from the content of the present invention. Therefore, the protection scope of the present invention should be determined by the contents of the appended claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202011322547.5A CN112376558A (en) | 2020-11-23 | 2020-11-23 | Anchor rope and anchor backing plate and anchor rope construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202011322547.5A CN112376558A (en) | 2020-11-23 | 2020-11-23 | Anchor rope and anchor backing plate and anchor rope construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN112376558A true CN112376558A (en) | 2021-02-19 |
Family
ID=74589029
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202011322547.5A Pending CN112376558A (en) | 2020-11-23 | 2020-11-23 | Anchor rope and anchor backing plate and anchor rope construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN112376558A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114808695A (en) * | 2022-04-19 | 2022-07-29 | 国能神东煤炭集团有限责任公司 | Support anchor rope and fixed knot construct |
| CN115198743A (en) * | 2021-10-19 | 2022-10-18 | 北方工业大学 | Design of optimal proportioning scheme of pea stone mortar anchor disc |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105970970A (en) * | 2016-05-25 | 2016-09-28 | 中国能源建设集团安徽电力建设第工程有限公司 | Pre-stressed anchor cable supporting construction method for near-railway deep foundation pit |
| CN207297056U (en) * | 2017-10-18 | 2018-05-01 | 河南宇建科技股份有限公司 | A kind of novel ball anchor cable |
| CN109253369A (en) * | 2018-11-15 | 2019-01-22 | 威创集团股份有限公司 | A kind of bracket and projector |
| KR20190029156A (en) * | 2017-09-12 | 2019-03-20 | 박문경 | An anchor assembly |
| CN109653218A (en) * | 2019-01-09 | 2019-04-19 | 河南省交通规划设计研究院股份有限公司 | A kind of existing engineering prestressd anchor cable measuring method and its dedicated anchoring measurement device |
| CN209742939U (en) * | 2019-02-10 | 2019-12-06 | 山东唐口煤业有限公司 | Anchor cable inclined installation anti-tearing mechanism |
| CN111236257A (en) * | 2020-03-10 | 2020-06-05 | 云南建投第一勘察设计有限公司 | A new type of foundation pit support structure |
| CN214033704U (en) * | 2020-11-23 | 2021-08-24 | 中冶交通建设集团有限公司 | Anchor rope and anchor backing plate |
-
2020
- 2020-11-23 CN CN202011322547.5A patent/CN112376558A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105970970A (en) * | 2016-05-25 | 2016-09-28 | 中国能源建设集团安徽电力建设第工程有限公司 | Pre-stressed anchor cable supporting construction method for near-railway deep foundation pit |
| KR20190029156A (en) * | 2017-09-12 | 2019-03-20 | 박문경 | An anchor assembly |
| CN207297056U (en) * | 2017-10-18 | 2018-05-01 | 河南宇建科技股份有限公司 | A kind of novel ball anchor cable |
| CN109253369A (en) * | 2018-11-15 | 2019-01-22 | 威创集团股份有限公司 | A kind of bracket and projector |
| CN109653218A (en) * | 2019-01-09 | 2019-04-19 | 河南省交通规划设计研究院股份有限公司 | A kind of existing engineering prestressd anchor cable measuring method and its dedicated anchoring measurement device |
| CN209742939U (en) * | 2019-02-10 | 2019-12-06 | 山东唐口煤业有限公司 | Anchor cable inclined installation anti-tearing mechanism |
| CN111236257A (en) * | 2020-03-10 | 2020-06-05 | 云南建投第一勘察设计有限公司 | A new type of foundation pit support structure |
| CN214033704U (en) * | 2020-11-23 | 2021-08-24 | 中冶交通建设集团有限公司 | Anchor rope and anchor backing plate |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115198743A (en) * | 2021-10-19 | 2022-10-18 | 北方工业大学 | Design of optimal proportioning scheme of pea stone mortar anchor disc |
| CN114808695A (en) * | 2022-04-19 | 2022-07-29 | 国能神东煤炭集团有限责任公司 | Support anchor rope and fixed knot construct |
| CN114808695B (en) * | 2022-04-19 | 2023-06-13 | 国能神东煤炭集团有限责任公司 | Support anchor cable and fixed structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105421666B (en) | Pre-stressed carbon fiber plate anchor and its construction method | |
| CN214033704U (en) | Anchor rope and anchor backing plate | |
| CN107724242A (en) | A kind of low retraction steel strand wires vertical prestressing two times tensioning method | |
| CN111593674A (en) | Suspended casting beam cable construction structure and construction method for n-shaped beam bridge | |
| CN103628698B (en) | Construction method for opening prestressed floor slab in structural reinforcement engineering | |
| CN104032945A (en) | Recyclable rebar anchor pull ring and mounting support thereof | |
| CN206625595U (en) | Girder steel construction safety protection device | |
| CN103397787B (en) | The two-way X intersection of a kind of reinforced column underpinning technique | |
| CN111424555A (en) | A continuous girder bridge pier beam temporary consolidation system, continuous girder bridge and construction method | |
| CN205259459U (en) | Prestressing force carbon fiber plate anchor | |
| CN110905198B (en) | A construction method for reinforcing a steel stranded wire template and a reinforcing anchor device | |
| CN106382018A (en) | Angle iron reinforcing structure capable of applying prestress to rectangular column and construction method of angle iron reinforcing structure | |
| CN109235924B (en) | Double-rod early warning device and ductility control method for prestressed FRP reinforced structures | |
| CN116607414A (en) | Cable-stayed bridge main tower low-retraction anchor single-end tensioning construction method | |
| CN102943437A (en) | Device for limiting and protecting anchoring end of vertical steel strand | |
| CN106149575A (en) | Prestress rope tensioning system and method | |
| CN206205010U (en) | Anti-pulling capacity testing equipment | |
| CN202483155U (en) | Cantilever beam anchoring apparatus | |
| CN210067217U (en) | A prefabricated large cantilevered steel structure | |
| CN119034129A (en) | Quick fixing and hanging device and hanging method for safety rope of safety belt | |
| CN202247712U (en) | Initiative reinforcing device of web of long-span concrete box girder bridge | |
| CN201162311Y (en) | Clip Anchors Applied to Carbon Fiber Reinforced Polymer Prestressed Tendons | |
| CN217176657U (en) | Installation positioner of tunnel waterstop | |
| CN110607846A (en) | A detachable assembled beam-column joint | |
| CN115977083A (en) | A pressure-type carbon fiber anchor cable device and anchoring method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |