CN112373063A - Wind power blade flow guiding arrangement method - Google Patents

Wind power blade flow guiding arrangement method Download PDF

Info

Publication number
CN112373063A
CN112373063A CN202011134746.3A CN202011134746A CN112373063A CN 112373063 A CN112373063 A CN 112373063A CN 202011134746 A CN202011134746 A CN 202011134746A CN 112373063 A CN112373063 A CN 112373063A
Authority
CN
China
Prior art keywords
isolation
glue
flow guide
bag film
guide net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011134746.3A
Other languages
Chinese (zh)
Other versions
CN112373063B (en
Inventor
褚景春
袁凌
林涛
何明
陶生金
袁维瀚
张维斯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodian United Power Technology Lianyungang Co Ltd
Original Assignee
Guodian United Power Technology Lianyungang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian United Power Technology Lianyungang Co Ltd filed Critical Guodian United Power Technology Lianyungang Co Ltd
Priority to CN202011134746.3A priority Critical patent/CN112373063B/en
Publication of CN112373063A publication Critical patent/CN112373063A/en
Application granted granted Critical
Publication of CN112373063B publication Critical patent/CN112373063B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/30Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core
    • B29C70/34Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core and shaping or impregnating by compression, i.e. combined with compressing after the lay-up operation
    • B29C70/342Shaping by lay-up, i.e. applying fibres, tape or broadsheet on a mould, former or core; Shaping by spray-up, i.e. spraying of fibres on a mould, former or core and shaping or impregnating by compression, i.e. combined with compressing after the lay-up operation using isostatic pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/54Component parts, details or accessories; Auxiliary operations, e.g. feeding or storage of prepregs or SMC after impregnation or during ageing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2031/00Other particular articles
    • B29L2031/08Blades for rotors, stators, fans, turbines or the like, e.g. screw propellers
    • B29L2031/082Blades, e.g. for helicopters
    • B29L2031/085Wind turbine blades
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Composite Materials (AREA)
  • Mechanical Engineering (AREA)
  • Wind Motors (AREA)

Abstract

The invention relates to a wind power blade flow guiding arrangement method, which comprises the following steps: (1) sequentially laying a blade shell layer, a flow guide net and an isolation flow guide net on a blade shell mould from bottom to top; (2) laying a flow guide pipe on the flow guide net, and laying an isolation glue injection pipe on the isolation flow guide net; (3) laying an air extraction unit on the blade shell laying layer, wherein the air extraction unit comprises an air-permeable felt, an air extraction pipe and a vacuum bag film which are sequentially laid from bottom to top; (4) an adhesive blocking strip is laid on the flow guide net, and the adhesive blocking strip and the vacuum bag film form a barrier to glue solution on the glue injection side; (5) laying two sealing rubber strips on two sides of the blade shell mold, and bonding the sealing rubber strips with the vacuum bag film and the blade shell mold; according to the invention, the glue resisting strip is arranged below the isolation glue injection pipe, and the glue solution on the glue injection side is blocked by the glue resisting strip and the isolation bag film, so that the problem of indentation of the one-way cloth on the rear edge caused by the arrangement of the isolation glue injection pipe is solved, and the good quality of the wind power blade is ensured.

Description

Wind power blade flow guiding arrangement method
Technical Field
The invention relates to the technical field of wind generating sets, in particular to a wind power blade flow guiding arrangement method.
Background
In the diversion design of the sandwich one-way structure at the rear edge of the wind driven generator blade, the traditional diversion mode can cause the white spot of the sandwich structure, and an adhesive injection pipe is required to be arranged above the one-way cloth at the rear edge, and the adhesive injection pipe can cause the indentation defect of the one-way cloth at the rear edge, so that the diversion mode of the fan blade is required to be provided, the white spot phenomenon of the sandwich structure is eliminated, and the adhesive injection pipe is prevented from being arranged above the one-way cloth at the rear edge.
Disclosure of Invention
The invention aims to solve the technical problem of providing a wind power blade flow guide arrangement method which can not cause unidirectional indentation on the rear edge after glue injection, aiming at the defects of the prior art.
The technical problem to be solved by the present invention is achieved by the following technical means. The invention relates to a wind power blade flow guiding arrangement method which is characterized by comprising the following steps:
(1) sequentially laying a blade shell layer, a flow guide net and an isolation flow guide net on a blade shell mould from bottom to top;
(2) laying a flow guide pipe on the flow guide net, and laying an isolation glue injection pipe on the isolation flow guide net;
(3) laying an air extraction unit on the blade shell laying layer, wherein the air extraction unit comprises an air-permeable felt, an air extraction pipe and a vacuum bag film which are sequentially laid from bottom to top;
(4) an adhesive blocking strip is laid on the flow guide net, and the adhesive blocking strip and the vacuum bag film form a barrier to glue solution on the glue injection side;
(5) and two sealing rubber strips are laid on two sides of the blade shell mold, and the sealing rubber strips are bonded with the vacuum bag film and the blade shell mold.
The wind power blade flow guide arrangement method further preferably adopts the following technical scheme: the isolation flow guide net can cover the glue blocking strip and prolong the glue blocking strip after the glue blocking strip is covered, and the extending width of the isolation flow guide net is at least 20 mm.
The wind power blade flow guide arrangement method further preferably adopts the following technical scheme: and the vacuum bag film positioned below the isolation flow guide net is bonded with the glue blocking strip.
The wind power blade flow guide arrangement method further preferably adopts the following technical scheme: an isolation bag film is further laid on the isolation net below the isolation glue injection pipe, the glue blocking strips are laid between the end part of the far flow guide pipe of the isolation bag film and the flow guide net, the other end of the isolation bag film is located between the flow guide pipe and the isolation glue injection pipe, and a second glue blocking strip is laid on the end part.
Compared with the prior art, the glue blocking strip is arranged below the isolation glue injection pipe, the glue solution on the glue injection side is blocked through the glue blocking strip and the isolation bag film, the problem that the indentation is generated on the unidirectional cloth on the rear edge due to the arrangement of the isolation glue injection pipe is solved, and the good quality of the wind driven generator blade is ensured.
Drawings
FIG. 1 is a schematic structural diagram of the present invention;
fig. 2 is a cross-sectional view of another structure of the present invention.
Detailed description of the invention
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings of the present invention, and it is obvious that the described embodiments are some embodiments of the present invention, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Embodiment 1, referring to fig. 1, a wind turbine blade flow guiding arrangement method includes the following steps:
(1) sequentially laying a blade shell layer 2, a flow guiding net 5 and an isolation flow guiding net 10 on a blade shell mould 1 from bottom to top;
(2) a flow guide pipe 7 is laid on the flow guide net 5, and an isolation glue injection pipe 11 is laid on the isolation flow guide net 10;
(3) laying an air extraction unit on the blade shell laying layer 2, wherein the air extraction unit comprises an air-permeable felt 3, an air extraction pipe 4 and a vacuum bag film 12 which are sequentially laid from bottom to top;
(4) the glue blocking strip 6 is laid on the flow guide net 5, the vacuum bag film 12 positioned below the isolation flow guide net 10 is adhered to the glue blocking strip 6, the glue blocking strip 6 and the vacuum bag film 12 form a block to glue on the glue injection side, the laying width of the isolation flow guide net 10 is prolonged, the glue blocking strip 6 can be covered, and the prolonged width is 20 mm;
(5) two sealing rubber strips 13 are laid on two sides of the blade shell mold 1, and the sealing rubber strips 13 are bonded with the vacuum bag film 12 and the blade shell mold 1.
In embodiment 1, the vacuum bag film 12 located below the isolation flow guide net 10 is bonded to the glue blocking strip 6, that is, at this time, the vacuum bag film 12 is bonded to the glue blocking strip 6 and then folded again, the bottom surface of the isolation flow guide net 10 is in contact with the vacuum bag film 12 at the folded part, and the isolation glue injection pipe 11 on the isolation flow guide net 10 is formed by the folded vacuum bag film 12 to be coated;
when the device is used, the air exhaust pipe 4 is vacuumized by an external vacuum system, the guide pipe 7 is firstly opened for injecting glue, the glue moves rightwards through the blade shell laying layer 2, when the glue passes through the glue resistance strip 6 for a certain distance of 100mm, for example, the isolation glue injection pipe 11 is opened for injecting glue, the glue flows rightwards along the isolation flow guide net 10 until the glue is contacted with the flow guide net 5 and continues to move rightwards, and the arrangement of the glue resistance strip 6 enables the glue not to enter the flow guide net 5 below the isolation glue injection pipe 11, namely, the glue only moves rightwards.
Embodiment 2, referring to fig. 1, a wind turbine blade flow guiding arrangement method includes the following steps:
(1) sequentially laying a blade shell layer 2, a flow guiding net 5 and an isolation flow guiding net 10 on a blade shell mould 1 from bottom to top;
(2) a flow guide pipe 7 is laid on the flow guide net 5, and an isolation glue injection pipe 11 is laid on the isolation flow guide net 10;
(3) laying an air extraction unit on the blade shell laying layer 2, wherein the air extraction unit comprises an air-permeable felt 3, an air extraction pipe 4 and a vacuum bag film 12 which are sequentially laid from bottom to top;
(4) the glue blocking strip 6 is laid on the flow guide net 5, the vacuum bag film 12 positioned below the isolation flow guide net 10 is adhered to the glue blocking strip 6, the glue blocking strip 6 and the vacuum bag film 12 form a block for glue solution on the glue injection side, the laying width of the isolation flow guide net 10 is prolonged, the glue blocking strip 6 can be covered, and the prolonged width is 40 mm;
(5) two sealing rubber strips 13 are laid on two sides of the blade shell mold 1, and the sealing rubber strips 13 are bonded with the vacuum bag film 12 and the blade shell mold 1.
In embodiment 2, the vacuum bag film 12 located below the isolation flow guide net 10 is bonded to the glue blocking strip 6, that is, at this time, the vacuum bag film 12 is folded again after being bonded to the glue blocking strip 6, the bottom surface of the isolation flow guide net 10 is in contact with the vacuum bag film 12 at the folded part, and the isolation glue injection pipe 11 on the isolation flow guide net 10 is coated by the folded vacuum bag film 12;
when the device is used, the air exhaust pipe 4 is vacuumized by an external vacuum system, the guide pipe 7 is firstly opened for injecting glue, the glue moves rightwards through the blade shell laying layer 2, when the glue passes through the glue resistance strip 6 for a certain distance of 100mm, for example, the isolation glue injection pipe 11 is opened for injecting glue, the glue flows rightwards along the isolation flow guide net 10 until the glue is contacted with the flow guide net 5 and continues to move rightwards, and the arrangement of the glue resistance strip 6 enables the glue not to enter the flow guide net 5 below the isolation glue injection pipe 11, namely, the glue only moves rightwards.
Embodiment 3, referring to fig. 2, a wind turbine blade flow guiding arrangement method includes the following steps:
(1) sequentially laying a blade shell layer 2, a flow guiding net 5 and an isolation flow guiding net 10 on a blade shell mould 1 from bottom to top;
(2) a flow guide pipe 7 is laid on the flow guide net 5, an isolation glue injection pipe 11 is laid on the isolation flow guide net 10, an isolation bag film 8 is further laid on the isolation net below the isolation glue injection pipe 11, the glue blocking strip 6 is laid between the flow guide net 5 and the end part of the far flow guide pipe 7 of the isolation bag film 8, the other end of the isolation bag film 8 is located between the flow guide pipe 7 and the isolation glue injection pipe 11, and a second glue blocking strip 9 is laid on the end part;
(3) laying an air extraction unit on the blade shell laying layer 2, wherein the air extraction unit comprises an air-permeable felt 3, an air extraction pipe 4 and a vacuum bag film 12 which are sequentially laid from bottom to top;
(4) the glue blocking strip 6 is laid on the flow guide net 5, the glue solution on the glue injection side is blocked by the glue blocking strip 6 and the isolation bag film 8, the laying width of the isolation flow guide net 10 is prolonged, the glue blocking strip 6 can be covered, and the prolonged width is 20 mm;
(5) two sealing rubber strips 13 are laid on two sides of the blade shell mold 1, and the sealing rubber strips 13 are bonded with the vacuum bag film 12 and the blade shell mold 1.
In embodiment 3, the isolation bag film 8 disposed below the isolation flow guide net 10, and the glue blocking strips 6 and the second glue blocking strips 9 disposed at two sides of the isolation bag film 8 can press the flow guide net 5 below the isolation bag film 8, so that the glue does not flow onto the flow guide net 5 at the glue injection side;
when the device is used, the air exhaust pipe 4 is vacuumized by an external vacuum system, the guide pipe 7 is firstly opened for injecting glue, the glue moves rightwards through the blade shell layer 2, when the glue passes through the glue resistance strip 6 for a certain distance of 100mm, the isolation glue injection pipe 11 is opened for injecting glue at the moment, the glue flows rightwards along the isolation guide net 10 until the glue is contacted with the guide net 5 and continues to move rightwards, the second glue resistance strip 9 is tightly pressed on the isolation bag film 8 and the guide net 5, the vacuum bag film 12 is tightly pressed on the second glue resistance strip 9, the glue resistance strip 6 is tightly pressed on the guide net 5, the other end of the isolation bag film 8 is tightly pressed on the glue resistance strip 6, the guide net 5 below the isolation bag film 8 is completely blocked, and the glue can only move rightwards and can not flow onto the guide net 5 on the glue injection side;
that is to say, glue can only flow to the right through blade casing shop layer 2 slowly to reach the purpose that fully soaks blade casing shop layer 2 below the glue resisting strip 6, when gluing and surpassing glue resisting strip 6 certain distance for example 100mm, it can to open isolation injecting glue pipe 11 this moment and carry out the injecting glue.
Embodiment 4, referring to fig. 2, a wind turbine blade flow guiding arrangement method includes the following steps:
(1) sequentially laying a blade shell layer 2, a flow guiding net 5 and an isolation flow guiding net 10 on a blade shell mould 1 from bottom to top;
(2) a flow guide pipe 7 is laid on the flow guide net 5, an isolation glue injection pipe 11 is laid on the isolation flow guide net 10, an isolation bag film 8 is further laid on the isolation net below the isolation glue injection pipe 11, the glue blocking strip 6 is laid between the flow guide net 5 and the end part of the far flow guide pipe 7 of the isolation bag film 8, the other end of the isolation bag film 8 is located between the flow guide pipe 7 and the isolation glue injection pipe 11, and a second glue blocking strip 9 is laid on the end part;
(3) laying an air extraction unit on the blade shell laying layer 2, wherein the air extraction unit comprises an air-permeable felt 3, an air extraction pipe 4 and a vacuum bag film 12 which are sequentially laid from bottom to top;
(4) the glue blocking strip 6 is laid on the flow guide net 5, the glue solution on the glue injection side is blocked by the glue blocking strip 6 and the isolation bag film 8, the laying width of the isolation flow guide net 10 is prolonged, the glue blocking strip 6 can be covered, and the prolonged width is 40 mm;
(5) two sealing rubber strips 13 are laid on two sides of the blade shell mold 1, and the sealing rubber strips 13 are bonded with the vacuum bag film 12 and the blade shell mold 1.
In embodiment 4, the isolation bag film 8 disposed below the isolation flow guide net 10, and the glue blocking strips 6 and the second glue blocking strips 9 disposed at two sides of the isolation bag film 8 can press the flow guide net 5 below the isolation bag film 8, so that the glue does not flow onto the flow guide net 5 at the glue injection side;
when the device is used, the air exhaust pipe 4 is vacuumized by an external vacuum system, the guide pipe 7 is firstly opened for injecting glue, the glue moves rightwards through the blade shell layer 2, when the glue passes through the glue resistance strip 6 for a certain distance of 100mm, the isolation glue injection pipe 11 is opened for injecting glue at the moment, the glue flows rightwards along the isolation guide net 10 until the glue is contacted with the guide net 5 and continues to move rightwards, the second glue resistance strip 9 is tightly pressed on the isolation bag film 8 and the guide net 5, the vacuum bag film 12 is tightly pressed on the second glue resistance strip 9, the glue resistance strip 6 is tightly pressed on the guide net 5, the other end of the isolation bag film 8 is tightly pressed on the glue resistance strip 6, the guide net 5 below the isolation bag film 8 is completely blocked, and the glue can only move rightwards and can not flow onto the guide net 5 on the glue injection side;
that is to say, glue can only flow to the right through blade casing shop layer 2 slowly to reach the purpose that fully soaks blade casing shop layer 2 below the glue resisting strip 6, when gluing and surpassing glue resisting strip 6 certain distance for example 100mm, it can to open isolation injecting glue pipe 11 this moment and carry out the injecting glue.

Claims (4)

1. A wind power blade flow guiding arrangement method is characterized in that: the method comprises the following steps:
(1) sequentially laying a blade shell layer, a flow guide net and an isolation flow guide net on a blade shell mould from bottom to top;
(2) laying a flow guide pipe on the flow guide net, and laying an isolation glue injection pipe on the isolation flow guide net;
(3) laying an air extraction unit on the blade shell laying layer, wherein the air extraction unit comprises an air-permeable felt, an air extraction pipe and a vacuum bag film which are sequentially laid from bottom to top;
(4) an adhesive blocking strip is laid on the flow guide net, and the adhesive blocking strip and the vacuum bag film form a barrier to glue solution on the glue injection side;
(5) and two sealing rubber strips are laid on two sides of the blade shell mold, and the sealing rubber strips are bonded with the vacuum bag film and the blade shell mold.
2. The wind power blade flow guiding arrangement method according to claim 1, characterized in that: the isolation flow guide net can cover the glue blocking strip and prolong the glue blocking strip after the glue blocking strip is covered, and the extending width of the isolation flow guide net is at least 20 mm.
3. The wind power blade flow guiding arrangement method according to claim 2, characterized in that: and the vacuum bag film positioned below the isolation flow guide net is bonded with the glue blocking strip.
4. The wind power blade flow guiding arrangement method according to claim 2, characterized in that: an isolation bag film is further laid on the isolation net below the isolation glue injection pipe, the glue blocking strips are laid between the end part of the far flow guide pipe of the isolation bag film and the flow guide net, the other end of the isolation bag film is located between the flow guide pipe and the isolation glue injection pipe, and a second glue blocking strip is laid on the end part.
CN202011134746.3A 2020-10-21 2020-10-21 Wind power blade flow guiding arrangement method Active CN112373063B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011134746.3A CN112373063B (en) 2020-10-21 2020-10-21 Wind power blade flow guiding arrangement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011134746.3A CN112373063B (en) 2020-10-21 2020-10-21 Wind power blade flow guiding arrangement method

Publications (2)

Publication Number Publication Date
CN112373063A true CN112373063A (en) 2021-02-19
CN112373063B CN112373063B (en) 2023-04-07

Family

ID=74580491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011134746.3A Active CN112373063B (en) 2020-10-21 2020-10-21 Wind power blade flow guiding arrangement method

Country Status (1)

Country Link
CN (1) CN112373063B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55105531A (en) * 1979-02-02 1980-08-13 United Technologies Corp Hollow piece holding beam type mandrel and its preparation
CN106142593A (en) * 2015-04-10 2016-11-23 科思创聚合物(中国)有限公司 The method manufacturing article of fiber reinforced plastics
CN207630568U (en) * 2017-11-06 2018-07-20 中材科技(酒泉)风电叶片有限公司 A kind of sectional-type blade reperfusion structure
CN110328867A (en) * 2019-07-05 2019-10-15 国电联合动力技术(连云港)有限公司 A kind of fan blade water conservancy diversion method for arranging

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55105531A (en) * 1979-02-02 1980-08-13 United Technologies Corp Hollow piece holding beam type mandrel and its preparation
CN106142593A (en) * 2015-04-10 2016-11-23 科思创聚合物(中国)有限公司 The method manufacturing article of fiber reinforced plastics
CN207630568U (en) * 2017-11-06 2018-07-20 中材科技(酒泉)风电叶片有限公司 A kind of sectional-type blade reperfusion structure
CN110328867A (en) * 2019-07-05 2019-10-15 国电联合动力技术(连云港)有限公司 A kind of fan blade water conservancy diversion method for arranging

Also Published As

Publication number Publication date
CN112373063B (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN101926027B (en) Manufacturing method and manufacturing apparatus for film-covered electrical device
CN104380514A (en) Manufacturing method and manufacturing device for secondary battery
CN107866990A (en) The outer bound edge vacuum infusion method of wind electricity blade
WO2023207494A1 (en) Method for manufacturing solar cell module
CN106024997B (en) automatic welt device
CN112373063B (en) Wind power blade flow guiding arrangement method
CN110328867B (en) Fan blade flow guide arrangement method
CN207993988U (en) Lithium battery electric core automatic film-laminating device
CN104670708A (en) Inflating buffer packaging body and processing method thereof
CN201372035Y (en) Vacuum sealing bag
CN106827577A (en) A kind of carbon fibre composite vacuum bag assembly and its vacuum pumping method
CN208949145U (en) A kind of hollow glass
CN206254571U (en) Filter paper edge sealing fixture
CN220615009U (en) Vacuum filling device
CN210978988U (en) Vacuum insulation panel convenient to installation
CN210026374U (en) A system of infusing for prefabricating blade root
CN215330897U (en) Sunlight plate with honeycomb structure
CN216378042U (en) High-viscosity composite aluminum foil
CN208675148U (en) Drape over one's shoulders glue item, power generation tile assembly and power generation tile splicing body
CN220130820U (en) File management box
CN214657914U (en) Environment-friendly vertical sound insulation sheet for external wall heat insulation engineering
CN213617313U (en) Synthetic wood board for furniture
CN217840556U (en) Concatenation formula waterproof board
CN113270512B (en) Flexible high-light-transmission solar composite front plate
CN218602690U (en) Z-shaped adhesive pasting device for battery cell tab of blade battery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 222069 west side of Dapu Road, Lianyungang Economic and Technological Development Zone, Lianyungang City, Jiangsu Province (south of Dongfang Avenue)

Applicant after: Guoneng United Power Technology (Lianyungang) Co.,Ltd.

Address before: 222000 No.88 Dapu Road, Lianyungang Economic and Technological Development Zone, Lianyungang City, Jiangsu Province

Applicant before: Guodian United Power Technology (Lianyungang) Co.,Ltd.

GR01 Patent grant