CN112366697B - 一种多能流配电网日前能量管理模型的管理方法 - Google Patents

一种多能流配电网日前能量管理模型的管理方法 Download PDF

Info

Publication number
CN112366697B
CN112366697B CN202011197729.4A CN202011197729A CN112366697B CN 112366697 B CN112366697 B CN 112366697B CN 202011197729 A CN202011197729 A CN 202011197729A CN 112366697 B CN112366697 B CN 112366697B
Authority
CN
China
Prior art keywords
power
heat
formula
gas
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011197729.4A
Other languages
English (en)
Other versions
CN112366697A (zh
Inventor
肖修林
樊印龙
张宝
马骏超
黄弘扬
楼伯良
周丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Hangzhou E Energy Electric Power Technology Co Ltd
Original Assignee
Zhejiang University of Technology ZJUT
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Hangzhou E Energy Electric Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd, Hangzhou E Energy Electric Power Technology Co Ltd filed Critical Zhejiang University of Technology ZJUT
Priority to CN202011197729.4A priority Critical patent/CN112366697B/zh
Publication of CN112366697A publication Critical patent/CN112366697A/zh
Application granted granted Critical
Publication of CN112366697B publication Critical patent/CN112366697B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/004Artificial life, i.e. computing arrangements simulating life
    • G06N3/006Artificial life, i.e. computing arrangements simulating life based on simulated virtual individual or collective life forms, e.g. social simulations or particle swarm optimisation [PSO]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/067Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/466Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Power Engineering (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Biomedical Technology (AREA)
  • Biophysics (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Molecular Biology (AREA)
  • Computing Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明为一种多能流配电网日前能量管理模型的管理方法,属于多能流配电网领域,针对现有模型和算法不能保证配电网实际运行和调度的效果的问题,采用技术方案如下:一种多能流配电网日前能量管理模型的管理方法,包括如下步骤:步骤1,考虑配电网内部能量网络,建立多能流配电网日前能量管理模型,其包括天然气网络模型、热力网络模型和电力网络模型;步骤2,根据步骤1建立的多能流配电网日前能量管理模型,采用自适应改进鲸鱼优化算法计算结果。本发明考虑了配电网内部能量网络以保证配电网实际运行和调度的效果,并通过改进的鲸鱼优化算法解决了复杂的非凸非线性优化的问题。

Description

一种多能流配电网日前能量管理模型的管理方法
技术领域
本发明属于多能流配电网领域,特别涉及一种多能流配电网日前能量管理模型的管理方法。
背景技术
目前,能源危机和经济问题日益严重,促使工业界寻求更有效的能源消费和生产方式。为了提高能源利用率,多能流系统受到越来越多的关注。在结构上,多能流配电网与传统的配电网相比,能源形式多样,能源利用率高,能够同时为用户提供多种能源需求。然而,目前的能量管理方法大部分都是针对单一能源网络而建立的,这导致了能源效率低并且经济性较差。少部分人针对多能流配电网提出了能量管理方法,但他们都是运用能量枢纽概念对多能流配电网进行建模,这种方法缺乏对配电网内部能量网络的考虑,不能保证配电网实际运行和调度的效果。因此,需要对现有模型和算法进行改进,以保证配电网实际运行和调度的效果。
发明内容
针对现有技术的问题,本发明提供一种多能流配电网日前能量管理模型的管理方法,采用模型考虑了配电网内部能量网络,以保证实际配电网实际运行和调度的效果,此外,通过改进的鲸鱼优化算法解决了复杂的非凸非线性优化的问题。
本发明采用技术方案如下:一种多能流配电网日前能量管理模型的管理方法,包括如下步骤:
步骤1,建立多能流配电网日前能量管理模型:
步骤1.1,在满足系统内负荷要求的前提下,以多能流配电网总运行成本最小为优化目标,建立目标函数;
步骤1.2,考虑多能流配电网日前能量管理模型的燃气网络影响因素包括P2G机组和燃气负荷,其中,燃气负荷还包括锅炉、CHP机组和燃气需求,由此建立天然气网络模型;
步骤1.3,考虑多能流配电网日前能量管理模型的热力网络影响因素包括管道、热源、热负荷以及热储能,其中,热源为锅炉和CHP机组,通过电动泵在多能流配电网系统中提供水循环,由此建立热力网络模型;
步骤1.4,考虑多能流配电网日前能量管理模型的电力网络中的每个节点都必须满足包括有功功率和无功功率在内的电力平衡,由此建立电力网络模型;
步骤2,根据步骤1建立的多能流配电网日前能量管理模型,采用自适应改进鲸鱼优化算法计算结果。
本发明考虑了配电网内部能量网络以保证配电网实际运行和调度的效果,并通过改进的鲸鱼优化算法解决了复杂的非凸非线性优化的问题。
进一步地,步骤1.1中的目标函数为公式(1):
Figure BDA0002754478460000021
式中,
Figure BDA0002754478460000022
为与上游热网交换的热能,MW;
Figure BDA0002754478460000023
为与上游气网交换的气能,m3/day;
Figure BDA0002754478460000024
为与上游电网交换的电能,MW;
Figure BDA0002754478460000025
为热能价格,元/MW;
Figure BDA0002754478460000026
为天然气价格,元/m3
Figure BDA0002754478460000027
为电力价格,元/MW;
Figure BDA0002754478460000028
表示上游热网与多能流配电网之间交换热能的成本,元;
Figure BDA0002754478460000029
表示上游天然气网络和多能流配电网之间交换天然气的成本,元;
Figure BDA00027544784600000210
表示上游大电网与多能流配电网之间交换电能的成本,元;
需要指出的是,在每个时间段,多能流配电网都可以将剩余能源出售给相关的上游网络,从而降低其日常运营成本。
多能流配电网日前能源调度中所有控制变量如下:
Figure BDA00027544784600000211
式中,
Figure BDA00027544784600000212
为热电联产机组(combined heat and power,CHP)产热功率,MW;
Figure BDA00027544784600000213
为燃气锅炉产热功率,MW;
Figure BDA0002754478460000031
分别为CHP和燃气锅炉初始温度,K;
Figure BDA0002754478460000032
为电储能系统的充放电状态,MW;
Figure BDA00027544784600000323
为热储能系统的变化状态,无量纲。
进一步地,步骤1.2的天然气网络模型中各节点气流平衡如式(3):
Figure BDA0002754478460000033
式中,
Figure BDA0002754478460000034
为g节点P2G的产气量,m3/day;
Figure BDA0002754478460000035
为g节点天然气需求量,m3/day;
Figure BDA0002754478460000036
为g节点CHP耗气量,m3/day;
Figure BDA0002754478460000037
为g节点燃气锅炉耗气量,m3/day;
Figure BDA0002754478460000038
为g节点到k节点的输气量,m3/day;NG为天然气网络节点总数。
求解式(3)中的
Figure BDA0002754478460000039
使用如下公式:
Figure BDA00027544784600000310
Figure BDA00027544784600000311
Figure BDA00027544784600000312
Figure BDA00027544784600000313
式中,
Figure BDA00027544784600000314
为管道压力符号函数,无量纲,如果Πg≥Πk,表明能量流从气网g节点转移到气网k节点,其值等于1,反之则等于-1;
Figure BDA00027544784600000322
为节点g和节点k之间的管道常数,无量纲;Hg、Hk分别为管道高度,m;Πg、Πk分别为g节点与k节点的气体压力,kPa;
Figure BDA00027544784600000315
为管道坡度校正,kPa2
Figure BDA00027544784600000316
为管道的平均压力,kPa;Za气体平均压缩系数,无量纲;
Figure BDA00027544784600000317
为管道气流平均温度,K;
Figure BDA00027544784600000318
为管道平均压力,kpa;T0为初始温度,K;
Figure BDA00027544784600000319
为管道直径,mm;Ep为天然气管道绝对粗糙度,mm;Lgk为管道长度,km;γG为气体比重,无量纲;
Figure BDA00027544784600000320
为天然气管道摩擦系数,其可根据科尔布鲁克方程计算,即式(8)而得:
Figure BDA00027544784600000321
式中:
Figure BDA0002754478460000041
为雷诺数,无量纲;
同时,每个节点的压力Πj必须位于以下约束范围内:
Figure BDA0002754478460000042
式中:Πj为节点j的气体压力,kPa;
Figure BDA0002754478460000043
分别为节点j气体压力的最大最小值,kPa;NG为气网节点总数。
P2G单元耗电量如下:
Figure BDA0002754478460000044
式中,
Figure BDA0002754478460000045
为t时刻P2G耗电功率,MW;GHV为天然气热值,MW·h/m3
Figure BDA0002754478460000046
为t时刻P2G产气效率,无量纲;
Figure BDA0002754478460000047
为t时刻P2G产气量,m3/day;
每个P2G单元t时刻的产气量必须位于以下约束范围内:
Figure BDA0002754478460000048
式中,
Figure BDA0002754478460000049
分别为每个P2G的最小产气量和最大产气量,m3/day;
燃气锅炉耗气量计算如下:
Figure BDA00027544784600000410
式中,
Figure BDA00027544784600000411
为t时刻燃气锅炉耗气量,m3/day;
Figure BDA00027544784600000412
为t时刻燃气锅炉产热量,MW;aboil、bboil分别为燃气锅炉分项系数,无量纲;φboil,max为燃气锅炉最大产热量,MW;
CHP机组耗气量为:
Figure BDA00027544784600000413
Figure BDA00027544784600000414
式中,
Figure BDA00027544784600000415
为t时刻CHP的耗气量,m3/day;
Figure BDA00027544784600000416
为t时刻CHP的发电功率,MVA/day;
Figure BDA00027544784600000417
为t时刻CHP的产热功率,MW;
Figure BDA00027544784600000418
为CHP的效率,无量纲;
按式(15)对每个管道气体流量
Figure BDA00027544784600000419
进行约束:
Figure BDA0002754478460000051
式中,
Figure BDA0002754478460000052
为每个管道气体流量,m3/day;
Figure BDA0002754478460000053
为最大管道数量;
Figure BDA0002754478460000054
为每个管道的最大气体流量,m3/day。
进一步地,步骤1.3中的热力网络模型中,每根管道的热功率Φhb和每根管道末端温度计算如下:
Figure BDA0002754478460000055
Figure BDA0002754478460000056
式中,Φhb为为每根管道的热功率,MW;
Figure BDA0002754478460000057
为节点h和节点b之间管道的水流量,kg/s;cp为水的比热容,kJ/(kg·K);Tstart,h、Tend,b分别为节点h和节点b的水流温度,K;Tg为环境温度,K;
Figure BDA0002754478460000058
为热管长度,km;Γ热传导系数,W/mK;
由摩擦导致的每个热力管道中的压力损失
Figure BDA0002754478460000059
通过Darcy-Weisbach方程计算:
Figure BDA00027544784600000510
Figure BDA00027544784600000511
式中,
Figure BDA00027544784600000512
为每个热力管道中的压力损失,Pa;
Figure BDA00027544784600000513
为热管道的阻力系数,无量纲;g为重力加速度,N/kg;ρW为水密度,kg/m3
Figure BDA00027544784600000514
为管道直径,mm;
Figure BDA00027544784600000522
为管道流量符号函数,无量纲;
Figure BDA00027544784600000515
为热管道的摩擦系数,无量纲。
热管道的摩擦系数
Figure BDA00027544784600000516
由Colebrook方程计算:
Figure BDA00027544784600000517
Figure BDA00027544784600000518
Figure BDA00027544784600000519
式中,εH为管道粗糙度,Ra;
Figure BDA00027544784600000520
为雷诺数,无量纲;
Figure BDA00027544784600000521
为流速,m/s;μW为水的运动粘度,m2/s。
混合热节点的温度为:
Figure BDA0002754478460000061
式中,
Figure BDA0002754478460000062
分别为混合热节点处流入和流出的水流流量,kg/s;Tin、Tout分别为混合热节点处流入和流出的水流温度,K。可以看出,混合前各管道水流温度不同,混合后从该节点流入到其他管道的水流温度相同。
热力网络模型中热平衡约束如下:
Figure BDA0002754478460000063
式中,φh,load为热负荷功率,MW;
Figure BDA0002754478460000064
为热储能储热功率,MW;
Figure BDA0002754478460000065
分别为CHP/燃气锅炉所产热水的流量,kg/s;
Figure BDA0002754478460000066
为热储能放热水流量,kg/s;Nh为热网节点数;Tend,load为热负荷温度,K。
所有节点的供水和回水温度平衡满足如下条件:
Figure BDA0002754478460000067
Figure BDA0002754478460000068
式中,Tstart,CHP、Tstart,Boiler、Tstart,TSS分别为CHP、锅炉和热储能水流温度,K;
Figure BDA0002754478460000069
为负荷流量,kg/s;Tstart、Tend为管道首端和末端水流温度,K;
每个节点的供水和回水温度必须在约束范围内,需满足如下条件:
Figure BDA00027544784600000610
式中,Ts,j、Tr,j分别为节点j供水温度和回水温度,K;
Figure BDA0002754478460000071
热网节点总数,
Figure BDA0002754478460000072
为别为节点j供水温度上下限,K;
Figure BDA0002754478460000073
为别为节点j回水温度上下限,K;
每个CHP机组和燃气锅炉产热量约束,需满足如下条件:
Figure BDA0002754478460000074
Figure BDA0002754478460000075
式中,
Figure BDA0002754478460000076
为每个CHP机组的产热功率,MW;
Figure BDA0002754478460000077
为每个燃气锅炉产热功率,MW;
Figure BDA0002754478460000078
为每个CHP机组最小产热功率,MW;
Figure BDA0002754478460000079
为每个CHP机组最大产热功率,MW;
Figure BDA00027544784600000710
为每个燃气锅炉最小产热功率,MW;
Figure BDA00027544784600000711
为每个燃气锅炉最大产热功率,MW;NCHP为系统内CHP的总数;Nboil为系统内燃气锅炉总数。
此外,每个CHP机组和燃气锅炉的起始温度必须在约束范围内:
Figure BDA00027544784600000712
Figure BDA00027544784600000713
式中,
Figure BDA00027544784600000714
分别为每个CHP机组和燃气锅炉初始温度,K;
Figure BDA00027544784600000715
分别为燃气轮机的最小初始温度和最大初始温度,K;
Figure BDA00027544784600000716
分别为燃气锅炉的最小初始温度和最大初始温度,K;
热储能的状态变化满足条件如下:
Figure BDA00027544784600000717
式中,
Figure BDA00027544784600000718
为t时刻热储能系统容量,MW;ηc,TSS、ηd,TSS分别为热储能充、放能效率,无量纲;
Figure BDA00027544784600000719
分别为t时刻热储能充、放热功率,MW;
Figure BDA00027544784600000720
为t-1时刻热储能系统容量,MW。
在充电和放电状态下要考虑每个TSS不能同时充电和放电。
TSS的容量限制和充/放热功率约束满足如下条件:
Figure BDA00027544784600000721
Figure BDA0002754478460000081
Figure BDA0002754478460000082
式中,
Figure BDA0002754478460000083
为热储能系统最小容量,MW;
Figure BDA0002754478460000084
为热储能系统最大容量,MW;
Figure BDA0002754478460000085
为热储能最小充热功率,MW;
Figure BDA0002754478460000086
为热储能最大充热功率,MW;
Figure BDA0002754478460000087
为热储能最小放热功率,MW;
Figure BDA0002754478460000088
为热储能最大放热功率,MW。
热管道传输热功率
Figure BDA0002754478460000089
约束满足如下条件:
Figure BDA00027544784600000810
式中,
Figure BDA00027544784600000811
为每个热管道中传输的热功率,MW;
Figure BDA00027544784600000812
热管道数量;
Figure BDA00027544784600000813
为热管道传输热功率的最大值,MW。
进一步地,步骤1.4的电力网络模型中,每个节点都必须满足包括有功功率和无功功率在内的电力平衡:
Figure BDA00027544784600000814
Figure BDA00027544784600000815
式中:
Figure BDA00027544784600000816
分别为节点i的储能充、放电功率,MW;
Figure BDA00027544784600000817
分别为节点i的CHP有功功率和无功功率,MVA;
Figure BDA00027544784600000818
分别为节点i的有功功率和无功功率需求,MVA;
Figure BDA00027544784600000819
为节点i的热泵消耗电功率,MW;
Figure BDA00027544784600000820
分别为从大电网购买的有功功率和无功功率,MW;Vi、Vj分别为节点i和节点j的幅值,V;Yij为输电线路导纳,S;NE为电网节点数,无量纲。
热泵消耗电功率可由下式计算而得:
Figure BDA00027544784600000821
式中,
Figure BDA00027544784600000822
为热泵总质量流量,kg/s;HP为泵头,m;ηHP为泵效率,无量纲;PHP为热泵消耗电功率,MW。
每个节点的电压必须在约束范围内需满足条件如下:
Figure BDA0002754478460000091
式中,
Figure BDA0002754478460000092
电网节点总数;
Figure BDA0002754478460000093
为节点j电压上下限,V。
电线传输功率
Figure BDA0002754478460000094
约束需满足条件如下:
Figure BDA0002754478460000095
式中,
Figure BDA0002754478460000096
为电线最大允许传输功率,MW;
Figure BDA0002754478460000097
为电网支路总数。
ESS系统充放电模型如下:
Figure BDA0002754478460000098
式中,
Figure BDA0002754478460000099
为t时刻电储能系统容量,MW;ηc,ESS、ηd,ESS分别为电储能充放电效率;
Figure BDA00027544784600000910
为t时刻电储能充放电功率,MW;
Figure BDA00027544784600000911
为t-1时刻电储能系统容量,MW;
ESS容量约束需满足条件如下:
Figure BDA00027544784600000912
式中:
Figure BDA00027544784600000913
分别为电储能系统容量上下限,MW;
ESS充放电功率约束需满足条件如下:
Figure BDA00027544784600000914
Figure BDA00027544784600000915
式中:
Figure BDA00027544784600000916
为电储能系统最小充电功率,MW;
Figure BDA00027544784600000917
为电储能系统最大充电功率,MW;
Figure BDA00027544784600000918
为电储能系统最小放电功率,MW;
Figure BDA00027544784600000919
为电储能系统最大放电功率,MW。
步骤2中采用的自适应改进鲸鱼优化算法按如下步骤进行:
步骤2.1,输入多能流配电网优化问题数据,每个种群都是优化问题的一种解决方案,第i个种群Xi表示如下:
Xi=[xi,1,xi,2,...,xi,D]i=1,2,....,ps (46)
式中:ps为总群个数;D为控制变量个数;
步骤2.2,通过计算每个代理的适应度,得到初始的最优搜索代理:探索过程取决于参数A和ρ,ρ是[0,1]之间的随机数;
若ρ<0.5,执行步骤2.2(1);
若ρ≥0.5,执行步骤2.2(2);
步骤2.2(1),当|A|<1时,为开发过程,通过式(52)更新当前搜索位置,即每个候选解的下一个位置:
X(t+1)=Xbest(t)-A·E (52)
式中:Xbest为当前最优解的位置向量,E为X在位置更新前与Xbest之间的距离;
当|A|>1时,为勘探过程,选择一个随机位置向量,通过式(50)更新当前搜索位置,即每个候选解的下一个位置:
X(t+1)=Xrand(t)-A·D (50)
式中:Xrand为从当前种群中随机选择的位置向量;D为X在位置更新前与Xrand之间的距离;
步骤2.2(2),通过式(54)更新当前搜索位置,即每个候选解的下一个位置:
X(t+1)=D·ebl·cos(2πl)+Xbest(t) (54)
式中:D′为最优解位置与当前解位置之间的距离;b为常数,定义了对数螺线的形状;l为[-1,1]之间的随机数;
步骤2.3,判断迭代次数iter是否小于迭代次数最大值,
若是,增加一次迭代,并返回步骤2.2;
若否,结束计算。
步骤2.2(1)的式(52)满足下式:
E=|C·Xbest(t)-X(t)| (51)
式中:C为系数向量,X为当前解的位置向量。
步骤2.2(1)的式(50)通过下式计算:
C=2·r (48)
D=|C·Xrand(t)-X(t)| (49)
式中:C为系数向量,X为当前解的位置向量,r是[0,1]中的随机向量。
步骤2.2(2)的式(54)通过下式计算:
D′=|Xbest(t)-X(t)| (53)
式中:X为当前解的位置向量,Xbest为当前最优解的位置向量。
为了提高WOA在探索和开发过程中的有效性,从局部最优点出发,采用自适应机制来改变参数A,基于小波理论,参数A的自适应机制将在搜索中动态改变种群的突变,具体如下:
Figure BDA0002754478460000111
Figure BDA0002754478460000112
Figure BDA0002754478460000113
Figure BDA0002754478460000114
Figure BDA0002754478460000115
式中:h为膨胀参数;β是h的形状参数;ψ(φ)为Morlet小波函数;η为h的上界;iter为迭代次数;βmin、βmax为形状参数的最小值和最大值。
传统的WOA算法由搜索猎物(即勘探过程)、包围捕食(即开发过程)和泡网攻击三部分组成,其搜索过程(包括勘探过程和开发过程)取决于参数A和ρ,A的含义如下:
A=2a·r-a (47)
在勘探和开发过程中,a由2线性减小到0,r是[0,1]中的随机向量。
本发明具有的有益效果:本发明考虑了配电网内部能量网络以保证配电网实际运行和调度的效果,并通过改进的鲸鱼优化算法解决了复杂的非凸非线性优化的问题。
附图说明
图1为多能流配电网日前能量管理模型的管理方法的流程图;
图2为自适应改进鲸鱼优化算法的流程图。
具体实施方式
下面结合本发明的附图,对本发明实施例的技术方案进行解释和说明,但下述实施例仅为本发明的优选实施例,并非全部。基于实施方式中的实施例,本领域技术人员在没有做出创造性劳动的前提下所获得其他实施例,都属于本发明的保护范围。
多能流配电网日前能量管理模型的管理方法,如图1所示,包括如下步骤:
步骤1,建立多能流配电网日前能量管理模型:
步骤1.1,在满足系统内负荷要求的前提下,以多能流配电网总运行成本最小为优化目标,建立目标函数如公式(1)所示:
Figure BDA0002754478460000121
式中,
Figure BDA0002754478460000122
为与上游热网交换的热能,MW;
Figure BDA0002754478460000123
为与上游气网交换的气能,m3/day;
Figure BDA0002754478460000124
为与上游电网交换的电能,MW;
Figure BDA0002754478460000125
为热能价格,元/MW;
Figure BDA0002754478460000126
为天然气价格,元/m3
Figure BDA0002754478460000127
为电力价格,元/MW;
Figure BDA0002754478460000128
表示上游热网与多能流配电网之间交换热能的成本,元;
Figure BDA0002754478460000129
表示上游天然气网络和多能流配电网之间交换天然气的成本,元;
Figure BDA00027544784600001210
表示上游大电网与多能流配电网之间交换电能的成本,元;
需要指出的是,在每个时间段,多能流配电网都可以将剩余能源出售给相关的上游网络,从而降低其日常运营成本。
多能流配电网日前能源调度中所有控制变量如下:
Figure BDA0002754478460000131
式中,
Figure BDA0002754478460000132
为热电联产机组(combined heat and power,CHP)产热功率,MW;
Figure BDA0002754478460000133
为燃气锅炉产热功率,MW;
Figure BDA0002754478460000134
分别为CHP和燃气锅炉初始温度,K;
Figure BDA0002754478460000135
为电储能系统的充放电状态,MW;
Figure BDA0002754478460000136
为热储能系统的变化状态,无量纲。
步骤1.2,考虑多能流配电网日前能量管理模型的燃气网络影响因素包括P2G机组和燃气负荷,其中,燃气负荷还包括锅炉、CHP机组和燃气需求,由此建立天然气网络模型:节点气流平衡如式(3):
Figure BDA0002754478460000137
式中,
Figure BDA0002754478460000138
为g节点P2G的产气量,m3/day;
Figure BDA00027544784600001323
为g节点天然气需求量,m3/day;
Figure BDA0002754478460000139
为g节点CHP耗气量,m3/day;
Figure BDA00027544784600001310
为g节点燃气锅炉耗气量,m3/day;
Figure BDA00027544784600001311
为g节点到k节点的输气量m3/day;NG为天然气网络节点总数。
求解式(3)中的
Figure BDA00027544784600001312
使用如下公式:
Figure BDA00027544784600001313
Figure BDA00027544784600001314
Figure BDA00027544784600001315
Figure BDA00027544784600001316
式中,
Figure BDA00027544784600001317
为管道压力符号函数,无量纲,如果Πg≥Πk,表明能量流从气网g节点转移到气网k节点,其值等于1,反之则等于-1;
Figure BDA00027544784600001324
为节点g和节点k之间的管道常数,无量纲;Hg、Hk分别为管道高度,m;Πg、Πk分别为g节点与k节点的气体压力,kPa;
Figure BDA00027544784600001318
为管道坡度校正,kPa2
Figure BDA00027544784600001319
为管道的平均压力,kPa;Za气体平均压缩系数,无量纲;
Figure BDA00027544784600001320
为管道气流平均温度,K;
Figure BDA00027544784600001321
为管道平均压力,kpa;T0为初始温度,K;
Figure BDA00027544784600001322
为管道直径,mm;Ep为天然气管道绝对粗糙度,mm;Lgk为管道长度,km;γG为气体比重,无量纲;
Figure BDA0002754478460000141
为天然气管道摩擦系数,其可根据科尔布鲁克方程计算,即式(8)而得:
Figure BDA0002754478460000142
式中:
Figure BDA0002754478460000143
为雷诺数;
同时,每个节点的压力Πj必须位于以下约束范围内:
Figure BDA0002754478460000144
式中:Πj为节点j的气体压力,kPa;
Figure BDA0002754478460000145
分别为节点j气体压力的最大最小值,kPa;NG为气网节点总数。
P2G单元耗电量如下:
Figure BDA0002754478460000146
式中,
Figure BDA0002754478460000147
为t时刻P2G耗电功率,MW;GHV为天然气热值,MW·h/m3
Figure BDA0002754478460000148
为t时刻P2G产气效率,无量纲;
Figure BDA0002754478460000149
为t时刻P2G产气量,m3/day;
每个P2G单元的产气量必须位于以下约束范围内:
Figure BDA00027544784600001410
式中,
Figure BDA00027544784600001411
分别为每个P2G的最小产气量和最大产气量,m3/day;
燃气锅炉耗气量计算如下:
Figure BDA00027544784600001412
式中,
Figure BDA00027544784600001413
为t时刻燃气锅炉耗气量,m3/day;φt boil为t时刻燃气锅炉产热量,MW;aboil、bboil分别为燃气锅炉分项系数,无量纲;φboil,max为燃气锅炉最大产热量,MW;
CHP机组耗气量为:
Figure BDA00027544784600001414
Figure BDA0002754478460000151
式中,
Figure BDA0002754478460000152
为t时刻CHP的耗气量,m3/day;
Figure BDA0002754478460000153
为t时刻CHP的发电功率,MVA/day;
Figure BDA0002754478460000154
为t时刻CHP的产热功率,MW;;
Figure BDA0002754478460000155
为CHP的效率,无量纲;
按式(15)对每个管道气体流量
Figure BDA0002754478460000156
进行约束:
Figure BDA0002754478460000157
式中,
Figure BDA0002754478460000158
为每个管道气体流量,m3/day;
Figure BDA0002754478460000159
为最大管道数量;,
Figure BDA00027544784600001510
为每个管道的最大气体流量,m3/day;
步骤1.3,考虑多能流配电网日前能量管理模型的热力网络影响因素包括管道、热源、热负荷以及热储能,其中,热源为锅炉和CHP机组,通过电动泵在多能流配电网系统中提供水循环,由此建立热力网络模型:每根管道的热功率Φhb和每根管道末端温度计算如下:
Figure BDA00027544784600001511
Figure BDA00027544784600001512
式中,Φhb为每根管道的热功率,MW;
Figure BDA00027544784600001513
为节点h和节点b之间管道的水流量,kg/s;cp为水的比热容,kJ/(kg·K);Tstart,h、Tend,b分别为节点h和节点b的水流温度,K;Tg为环境温度,K;
Figure BDA00027544784600001514
为热管长度,km;Γ热传导系数,W/mK;
由摩擦导致的每个热力管道中的压力损失
Figure BDA00027544784600001515
通过Darcy-Weisbach方程计算:
Figure BDA00027544784600001516
Figure BDA00027544784600001517
式中,
Figure BDA00027544784600001518
为每个热力管道中的压力损失,Pa;
Figure BDA00027544784600001519
为热管道的阻力系数,无量纲;g为重力加速度,N/kg;ρW为水密度,kg/m3
Figure BDA00027544784600001520
为管道直径,mm;
Figure BDA00027544784600001521
为管道流量符号函数,无量纲;
Figure BDA00027544784600001522
为热管道的摩擦系数,无量纲;
热管道的摩擦系数
Figure BDA00027544784600001523
由Colebrook方程计算:
Figure BDA0002754478460000161
Figure BDA0002754478460000162
Figure BDA0002754478460000163
式中:εH为管道粗糙度,Ra;
Figure BDA0002754478460000164
为雷诺数,无量纲;
Figure BDA0002754478460000165
为流速,m/s;μW为水的运动粘度,m2/s;
混合热节点的温度为:
Figure BDA0002754478460000166
式中,
Figure BDA0002754478460000167
分别为混合热节点处流入和流出的水流流量,kg/s;Tin、Tout分别为混合热节点处流入和流出的水流温度,K;可以看出,混合前各管道水流温度不同,混合后从该节点流入到其他管道的水流温度相同。
热力网络模型中热平衡约束如下:
Figure BDA0002754478460000168
式中,φh,load为热负荷功率,MW;
Figure BDA0002754478460000169
为热储能储热功率,MW;
Figure BDA00027544784600001610
分别为CHP/燃气锅炉所产热水的流量,kg/s;
Figure BDA00027544784600001611
为热储能放热水流量,kg/s;Nh为热网节点数;Tend,load为热负荷温度,K。
所有节点的供水和回水温度平衡满足如下条件:
Figure BDA00027544784600001612
Figure BDA0002754478460000171
式中,Tstart,CHP、Tstart,Boiler、Tstart,TSS分别为CHP、锅炉和热储能水流温度,K;
Figure BDA0002754478460000172
为负荷流量,kg/s;Tstart、Tend为管道首端和末端水流温度,K;
每个节点的供水和回水温度必须在约束范围内,需满足如下条件:
Figure BDA0002754478460000173
式中,Ts,j、Tr,j分别为节点j供水温度和回水温度,K;
Figure BDA0002754478460000174
热网节点总数,
Figure BDA0002754478460000175
为别为节点j供水温度上下限,K;
Figure BDA0002754478460000176
为别为节点j回水温度上下限,K;
每个CHP机组和燃气锅炉产热量约束,需满足如下条件:
Figure BDA0002754478460000177
Figure BDA0002754478460000178
式中,
Figure BDA0002754478460000179
为每个CHP机组的产热功率,MW;
Figure BDA00027544784600001710
为每个燃气锅炉产热功率,MW;
Figure BDA00027544784600001711
为每个CHP机组最小产热功率,MW;
Figure BDA00027544784600001712
为每个CHP机组最大产热功率,MW;
Figure BDA00027544784600001713
为每个燃气锅炉最小产热功率,MW;
Figure BDA00027544784600001714
为每个燃气锅炉最大产热功率,MW;NCHP为系统内CHP的总数;Nboil为系统内燃气锅炉总数;
此外,每个CHP机组和燃气锅炉的起始温度必须在约束范围内:
Figure BDA00027544784600001715
Figure BDA00027544784600001716
式中,
Figure BDA00027544784600001717
分别为每个CHP机组和燃气锅炉初始温度,K;
Figure BDA00027544784600001718
分别为燃气轮机的最小初始温度和最大初始温度,K;
Figure BDA00027544784600001719
分别为燃气锅炉的最小初始温度和最大初始温度,K;
热储能的状态变化满足条件如下:
Figure BDA0002754478460000181
式中,
Figure BDA0002754478460000182
为t时刻热储能系统容量,MW;ηc,TSS、ηd,TSS分别为热储能充、放能效率,无量纲;
Figure BDA0002754478460000183
分别为t时刻热储能充、放热功率,MW;
Figure BDA0002754478460000184
为t-1时刻热储能系统容量,MW;
在充电和放电状态下要考虑每个TSS不能同时充电和放电。
TSS的容量限制和充/放热功率约束满足如下条件:
Figure BDA0002754478460000185
Figure BDA0002754478460000186
Figure BDA0002754478460000187
式中,
Figure BDA0002754478460000188
为热储能系统最小容量,MW;
Figure BDA0002754478460000189
为热储能系统最大容量,MW;
Figure BDA00027544784600001810
为热储能最小充热功率,MW;
Figure BDA00027544784600001811
为热储能最大充热功率,MW;
Figure BDA00027544784600001812
为热储能最小放热功率,MW;
Figure BDA00027544784600001822
为热储能最大放热功率,MW;
热管道传输热功率
Figure BDA00027544784600001813
约束满足如下条件:
Figure BDA00027544784600001814
式中,
Figure BDA00027544784600001815
为每个热管道中传输的热功率,MW;
Figure BDA00027544784600001816
热管道数量;
Figure BDA00027544784600001817
为热管道传输热功率的最大值,MW。
步骤1.4,考虑多能流配电网日前能量管理模型的电力网络中的每个节点都必须满足包括有功功率和无功功率在内的电力平衡,由此建立电力网络模型:每个节点都必须满足包括有功功率和无功功率在内的电力平衡:
Figure BDA00027544784600001818
Figure BDA00027544784600001819
式中:
Figure BDA00027544784600001820
分别为节点i的储能充、放电功率,MW;
Figure BDA00027544784600001821
分别为节点i的CHP有功功率和无功功率,MVA;
Figure BDA0002754478460000191
分别为节点i的有功功率和无功功率需求,MVA;
Figure BDA0002754478460000192
为节点i的热泵消耗电功率,MW;
Figure BDA0002754478460000193
分别为从大电网购买的有功功率和无功功率,MW;Vi、Vj分别为节点i和节点j的幅值,V;Yij为输电线路导纳,S;NE为电网节点数,无量纲;
热泵消耗电功率可由下式计算而得:
Figure BDA0002754478460000194
式中,
Figure BDA0002754478460000195
为热泵总质量流量,kg/s;HP为泵头,m;ηHP为泵效率,无量纲;PHP为热泵消耗电功率,MW;
每个节点的电压必须在约束范围内需满足条件如下:
Figure BDA0002754478460000196
式中,
Figure BDA0002754478460000197
电网节点总数;
Figure BDA0002754478460000198
为节点j电压上下限,V;
电线传输功率
Figure BDA0002754478460000199
约束需满足条件如下:
Figure BDA00027544784600001910
ESS系统充放电模型如下:
Figure BDA00027544784600001911
式中,
Figure BDA00027544784600001912
为t时刻电储能系统容量,MW;ηc,ESS、ηd,ESS分别为电储能充放电效率;
Figure BDA00027544784600001913
为t时刻电储能充放电功率,MW;
Figure BDA00027544784600001914
为t-1时刻电储能系统容量,MW;
ESS容量约束需满足条件如下:
Figure BDA00027544784600001915
式中:
Figure BDA00027544784600001916
分别为电储能系统容量上下限,MW;
ESS充放电功率约束需满足条件如下:
Figure BDA00027544784600001917
Figure BDA00027544784600001918
式中:
Figure BDA0002754478460000201
为电储能系统最小充电功率,MW;
Figure BDA0002754478460000202
为电储能系统最大充电功率,MW;
Figure BDA0002754478460000203
为电储能系统最小放电功率,MW;
Figure BDA0002754478460000204
为电储能系统最大放电功率,MW;
步骤2,根据步骤1建立的多能流配电网日前能量管理模型,采用自适应改进鲸鱼优化算法计算结果,如图2所示,按如下步骤进行:
步骤2.1,输入多能流配电网优化问题数据,每个种群都是优化问题的一种解决方案,第i个种群Xi表示如下:
Xi=[xi,1,xi,2,...,xi,D]i=1,2,....,ps (46)
式中:ps为总群个数;D为控制变量个数;
步骤2.2,通过计算每个代理的适应度,得到初始的最优搜索代理:探索过程取决于参数A和ρ,ρ是[0,1]之间的随机数;
若ρ<0.5,执行步骤2.2(1);
若ρ≥0.5,执行步骤2.2(2);
步骤2.2(1),当|A|<1时,为开发过程,通过式(52)更新当前搜索位置,即每个候选解的下一个位置:
D=|C·Xbest(t)-X(t)| (51)
X(t+1)=Xbest(t)-A·E (52)
式中:C为系数向量,X为当前解的位置向量,为当前最优解的位置向量,Xbest为当前最优解的位置向量,E为X在位置更新前与Xbest之间的距离;
当|A|>1时,为勘探过程,选择一个随机位置向量,通过式(50)更新当前搜索位置,即每个候选解的下一个位置:
C=2·r (48)
D=|C·Xrand(t)-X(t)| (49)
式中:C为系数向量,X为当前解的位置向量,r是[0,1]中的随机向量。
X(t+1)=Xrand(t)-A·D (50)
式中:Xrand为从当前种群中随机选择的位置向量;D为X在位置更新前与Xrand之间的距离;
步骤2.2(2),通过式(54)更新当前搜索位置,即每个候选解的下一个位置:
D′=|Xbest(t)-X(t)| (53)
X(t+1)=D′·ebl·cos(2πl)+Xbest(t) (54)
式中:D′为最优解位置与当前解位置之间的距离;b为常数,定义了对数螺线的形状;l为[-1,1]之间的随机数;
步骤2.3,判断迭代次数iter是否小于迭代次数最大值,
若是,增加一次迭代,并返回步骤2.2;
若否,结束计算。
为了提高WOA在探索和开发过程中的有效性,从局部最优点出发,采用自适应机制来改变参数A,基于小波理论,参数A的自适应机制将在搜索中动态改变种群的突变,具体如下:
Figure BDA0002754478460000211
Figure BDA0002754478460000212
Figure BDA0002754478460000213
Figure BDA0002754478460000214
Figure BDA0002754478460000215
式中:h为膨胀参数;β是h的形状参数;ψ(φ)为Morlet小波函数;η为h的上界;iter为迭代次数;βmin、βmax为形状参数的最小值和最大值。
本发明考虑了配电网内部能量网络以保证配电网实际运行和调度的效果,并通过改进的鲸鱼优化算法解决了复杂的非凸非线性优化的问题。
传统的WOA算法由搜索猎物(即勘探过程)、包围捕食(即开发过程)和泡网攻击三部分组成,其搜索过程(包括勘探过程和开发过程)取决于参数A和ρ,A的含义如下:
A=2a·r-a (47)
在勘探和开发过程中,a由2线性减小到0,r是[0,1]中的随机向量。
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,熟悉该领域的技术人员应该明白本发明包括但不限于附图和上面具体实施方式中描述的内容。任何不偏离本发明的功能和结构原理的修改都将包括在权利要求的范围中。

Claims (8)

1.一种多能流配电网日前能量管理模型的管理方法,其特征在于,包括如下步骤:
步骤1,建立多能流配电网日前能量管理模型:
步骤1.1,在满足系统内负荷要求的前提下,以多能流配电网总运行成本最小为优化目标,建立目标函数;目标函数为公式(1):
Figure FDA0003593386420000011
式中,
Figure FDA0003593386420000012
为与上游热网交换的热能,MW;
Figure FDA0003593386420000013
为与上游气网交换的气能,m3/day;
Figure FDA0003593386420000014
为与上游电网交换的电能,MW;
Figure FDA0003593386420000015
为热能价格,元/MW;
Figure FDA0003593386420000016
为天然气价格,元/m3
Figure FDA0003593386420000017
为电力价格,元/MW;
Figure FDA0003593386420000018
表示上游热网与多能流配电网之间交换热能的成本,元;
Figure FDA0003593386420000019
表示上游天然气网络和多能流配电网之间交换天然气的成本,元;
Figure FDA00035933864200000110
表示上游大电网与多能流配电网之间交换电能的成本,元;
多能流配电网日前能源调度中所有控制变量如下:
Figure FDA00035933864200000111
式中,
Figure FDA00035933864200000112
为CHP产热功率,MW;
Figure FDA00035933864200000113
为燃气锅炉产热功率,MW;
Figure FDA00035933864200000114
分别为CHP和燃气锅炉初始温度,K;
Figure FDA00035933864200000115
为电储能系统的充放电状态,MW;
Figure FDA00035933864200000116
为热储能系统的变化状态,无量纲;
步骤1.2,考虑多能流配电网日前能量管理模型的燃气网络影响因素包括P2G机组和燃气负荷,其中,燃气负荷还包括锅炉、CHP机组和燃气需求,由此建立天然气网络模型;天然气网络模型中各节点气流平衡如式(3):
Figure FDA00035933864200000117
式中,
Figure FDA00035933864200000118
为g节点P2G的产气量,m3/day;
Figure FDA00035933864200000119
为g节点天然气需求量,m3/day;
Figure FDA00035933864200000120
为g节点CHP耗气量,m3/day;
Figure FDA00035933864200000121
为g节点燃气锅炉耗气量,m3/day;
Figure FDA00035933864200000122
为g节点到k节点的输气量,m3/day;NG为天然气网络节点总数;
求解式(3)中的
Figure FDA0003593386420000021
使用如下公式:
Figure FDA0003593386420000022
Figure FDA0003593386420000023
Figure FDA0003593386420000024
Figure FDA0003593386420000025
式中,
Figure FDA0003593386420000026
为管道压力符号函数,无量纲,如果Πg≥Πk,表明能量流从气网g节点转移到气网k节点,其值等于1,反之则等于-1;
Figure FDA0003593386420000027
为节点g和节点k之间的管道常数,无量纲;Hg、Hk分别为管道高度,m;Πg、Πk分别为g节点与k节点的气体压力,kPa;
Figure FDA0003593386420000028
为管道坡度校正,kPa2
Figure FDA0003593386420000029
为管道的平均压力,kPa;Za气体平均压缩系数,无量纲;
Figure FDA00035933864200000210
为管道气流平均温度,K;
Figure FDA00035933864200000211
为管道平均压力,kpa;T0为初始温度,K;
Figure FDA00035933864200000212
为管道直径,mm;Ep为天然气管道绝对粗糙度,mm;Lgk为管道长度,km;γG为气体比重,无量纲;
Figure FDA00035933864200000213
为天然气管道摩擦系数,其可根据科尔布鲁克方程计算,即式(8)而得:
Figure FDA00035933864200000214
式中:
Figure FDA00035933864200000215
为雷诺数,无量纲;
同时,每个节点的压力Πj必须位于以下约束范围内:
Figure FDA00035933864200000216
式中:Πj为节点j的气体压力,kPa;
Figure FDA00035933864200000217
分别为节点j气体压力的最大最小值,kPa;NG为气网节点总数;
P2G单元耗电量如下:
Figure FDA0003593386420000031
式中,
Figure FDA0003593386420000032
为t时刻P2G耗电功率,MW;GHV为天然气热值,MW·h/m3
Figure FDA0003593386420000033
为t时刻P2G产气效率,无量纲;
Figure FDA0003593386420000034
为t时刻P2G产气量,m3/day;
每个P2G单元t时刻的产气量必须位于以下约束范围内:
Figure FDA0003593386420000035
式中,
Figure FDA0003593386420000036
分别为每个P2G的最小产气量和最大产气量,m3/day;
燃气锅炉耗气量计算如下:
Figure FDA0003593386420000037
式中,
Figure FDA0003593386420000038
为t时刻燃气锅炉耗气量,m3/day;
Figure FDA00035933864200000318
为t时刻燃气锅炉产热量,MW;aboil、bboil分别为燃气锅炉分项系数,无量纲;φboil,max为燃气锅炉最大产热量,MW;
CHP机组耗气量为:
Figure FDA0003593386420000039
Figure FDA00035933864200000310
式中,
Figure FDA00035933864200000311
为t时刻CHP的耗气量,m3/day;
Figure FDA00035933864200000312
为t时刻CHP的发电功率,MVA/day;
Figure FDA00035933864200000319
为t时刻CHP的产热功率,MW;
Figure FDA00035933864200000320
为CHP的效率,无量纲;
按式(15)对每个管道气体流量
Figure FDA00035933864200000313
进行约束:
Figure FDA00035933864200000314
式中,
Figure FDA00035933864200000315
为每个管道气体流量,m3/day;
Figure FDA00035933864200000316
为最大管道数量;
Figure FDA00035933864200000317
为每个管道的最大气体流量,m3/day;
步骤1.3,考虑多能流配电网日前能量管理模型的热力网络影响因素包括管道、热源、热负荷以及热储能,其中,热源为锅炉和CHP机组,通过电动泵在多能流配电网系统中提供水循环,由此建立热力网络模型;
步骤1.4,考虑多能流配电网日前能量管理模型的电力网络中的每个节点都必须满足包括有功功率和无功功率在内的电力平衡,由此建立电力网络模型;
步骤2,根据步骤1建立的多能流配电网日前能量管理模型,采用自适应改进鲸鱼优化算法计算结果。
2.根据权利要求1所述的多能流配电网日前能量管理模型的管理方法,其特征在于,步骤1.3中的热力网络模型中,每根管道的热功率Φhb和每根管道末端温度计算如下:
Figure FDA0003593386420000041
Figure FDA0003593386420000042
式中,Φhb为每根管道的热功率,MW;
Figure FDA0003593386420000043
为节点h和节点b之间管道的水流量,kg/s;cp为水的比热容,kJ/(kg·K);Tstart,h、Tend,b分别为节点h和节点b的水流温度,K;Tg为环境温度,K;
Figure FDA0003593386420000044
为热管长度,km;Γ热传导系数,W/mK;
由摩擦导致的每个热力管道中的压力损失
Figure FDA0003593386420000045
通过Darcy-Weisbach方程计算:
Figure FDA0003593386420000046
Figure FDA0003593386420000047
式中,
Figure FDA0003593386420000048
为每个热力管道中的压力损失,Pa;
Figure FDA0003593386420000049
为热管道的阻力系数,无量纲;g为重力加速度,N/kg;ρW为水密度,kg/m3
Figure FDA00035933864200000410
为管道直径,mm;
Figure FDA00035933864200000411
为管道流量符号函数,无量纲;
Figure FDA00035933864200000412
为热管道的摩擦系数,无量纲;
热管道的摩擦系数
Figure FDA00035933864200000413
由Colebrook方程计算:
Figure FDA00035933864200000414
Figure FDA00035933864200000415
Figure FDA00035933864200000416
式中,εH为管道粗糙度,Ra;
Figure FDA0003593386420000051
为雷诺数,无量纲;
Figure FDA0003593386420000052
为流速,m/s;μW为水的运动粘度,m2/s;
混合热节点的温度为:
Figure FDA0003593386420000053
式中,
Figure FDA0003593386420000054
分别为混合热节点处流入和流出的水流流量,kg/s;Tin、Tout分别为混合热节点处流入和流出的水流温度,K;
热力网络模型中热平衡约束如下:
Figure FDA0003593386420000055
式中,φh,load为热负荷功率,MW;
Figure FDA0003593386420000056
为热储能储热功率,MW;
Figure FDA0003593386420000057
分别为CHP和燃气锅炉所产热水的流量,kg/s;
Figure FDA0003593386420000058
为热储能放热水流量,kg/s;Nh为热网节点数;Tend,load为热负荷温度,K;
所有节点的供水和回水温度平衡满足如下条件:
Figure FDA0003593386420000059
Figure FDA00035933864200000510
式中,Tstart,CHP、Tstart,Boiler、Tstart,TSS分别为CHP、锅炉和热储能水流温度,K;
Figure FDA00035933864200000511
为负荷流量,kg/s;Tstart、Tend为管道首端和末端水流温度,K;
每个节点的供水和回水温度必须在约束范围内,需满足如下条件:
Figure FDA00035933864200000512
式中,Ts,j、Tr,j分别为节点j供水温度和回水温度,K;
Figure FDA0003593386420000061
热网节点总数,
Figure FDA0003593386420000062
为别为节点j供水温度上下限,K;
Figure FDA0003593386420000063
为别为节点j回水温度上下限,K;
每个CHP机组和燃气锅炉产热量约束,需满足如下条件:
Figure FDA0003593386420000064
Figure FDA0003593386420000065
式中,
Figure FDA0003593386420000066
为每个CHP机组的产热功率,MW;
Figure FDA0003593386420000067
为每个燃气锅炉产热功率,MW;
Figure FDA0003593386420000068
为每个CHP机组最小产热功率,MW;
Figure FDA0003593386420000069
为每个CHP机组最大产热功率,MW;
Figure FDA00035933864200000610
为每个燃气锅炉最小产热功率,MW;
Figure FDA00035933864200000611
为每个燃气锅炉最大产热功率,MW;NCHP为系统内CHP的总数;Nboil为系统内燃气锅炉总数;
此外,每个CHP机组和燃气锅炉的起始温度必须在约束范围内:
Figure FDA00035933864200000612
Figure FDA00035933864200000613
式中,
Figure FDA00035933864200000614
分别为每个CHP机组和燃气锅炉初始温度,K;
Figure FDA00035933864200000615
分别为燃气轮机的最小初始温度和最大初始温度,K;
Figure FDA00035933864200000616
分别为燃气锅炉的最小初始温度和最大初始温度,K;
热储能的状态变化满足条件如下:
Figure FDA00035933864200000617
式中,
Figure FDA00035933864200000618
为t时刻热储能系统容量,MW;ηc,TSS、ηd,TSS分别为热储能充、放能效率,无量纲;
Figure FDA00035933864200000619
分别为t时刻热储能充、放热功率,MW;
Figure FDA00035933864200000620
为t-1时刻热储能系统容量,MW;
TSS的容量限制和充/放热功率约束满足如下条件:
Figure FDA00035933864200000621
Figure FDA00035933864200000622
Figure FDA0003593386420000071
式中,
Figure FDA0003593386420000072
为热储能系统最小容量,MW;
Figure FDA0003593386420000073
为热储能系统最大容量,MW;
Figure FDA0003593386420000074
为热储能最小充热功率,MW;
Figure FDA0003593386420000075
为热储能最大充热功率,MW;
Figure FDA0003593386420000076
为热储能最小放热功率,MW;
Figure FDA0003593386420000077
为热储能最大放热功率,MW;
热管道传输热功率
Figure FDA0003593386420000078
约束满足如下条件:
Figure FDA0003593386420000079
式中,
Figure FDA00035933864200000710
为每个热管道中传输的热功率,MW;
Figure FDA00035933864200000711
热管道数量;
Figure FDA00035933864200000712
为热管道传输热功率的最大值,MW。
3.根据权利要求2所述的多能流配电网日前能量管理模型的管理方法,其特征在于,步骤1.4的电力网络模型中,每个节点都必须满足包括有功功率和无功功率在内的电力平衡:
Figure FDA00035933864200000713
Figure FDA00035933864200000714
式中:
Figure FDA00035933864200000715
分别为节点i的储能充、放电功率,MW;
Figure FDA00035933864200000716
分别为节点i的CHP有功功率和无功功率,MVA;
Figure FDA00035933864200000717
分别为节点i的有功功率和无功功率需求,MVA;
Figure FDA00035933864200000718
为节点i的热泵消耗电功率,MW;
Figure FDA00035933864200000719
Qgrid分别为从大电网购买的有功功率和无功功率,MW;Vi、Vj分别为节点i和节点j的幅值,V;Yij为输电线路导纳,S;NE为电网节点数,无量纲;
热泵消耗电功率可由下式计算而得:
Figure FDA00035933864200000720
式中,
Figure FDA00035933864200000721
为热泵总质量流量,kg/s;HP为泵头,m;ηHP为泵效率,无量纲;PHP为热泵消耗电功率,MW;
每个节点的电压必须在约束范围内需满足条件如下:
Figure FDA0003593386420000081
式中,
Figure FDA0003593386420000082
电网节点总数;
Figure FDA0003593386420000083
为节点j电压上下限,V;
电线传输功率
Figure FDA0003593386420000084
约束需满足条件如下:
Figure FDA0003593386420000085
式中,
Figure FDA0003593386420000086
为电线最大允许传输功率,MW;
Figure FDA0003593386420000087
为电网支路总数;
ESS系统充放电模型如下:
Figure FDA0003593386420000088
式中,
Figure FDA0003593386420000089
为t时刻电储能系统容量,MW;
Figure FDA00035933864200000810
为t-1时刻电储能系统容量,MW;ηc,ESS、ηd,ESS分别为电储能充放电效率;
Figure FDA00035933864200000811
为t时刻电储能充放电功率,MW;
ESS容量约束需满足条件如下:
Figure FDA00035933864200000812
式中:
Figure FDA00035933864200000813
分别为电储能系统容量上下限,MW;
ESS充放电功率约束需满足条件如下:
Figure FDA00035933864200000814
Figure FDA00035933864200000815
式中:
Figure FDA00035933864200000816
为电储能系统最小充电功率,MW;
Figure FDA00035933864200000817
为电储能系统最大充电功率,MW;
Figure FDA00035933864200000818
为电储能系统最小放电功率,MW;
Figure FDA00035933864200000819
为电储能系统最大放电功率,MW。
4.根据权利要求1所述的多能流配电网日前能量管理模型的管理方法,其特征在于,步骤2中采用的自适应改进鲸鱼优化算法按如下步骤进行:
步骤2.1,输入多能流配电网优化问题数据,每个种群都是优化问题的一种解决方案,第i个种群Xi表示如下:
Xi=[xi,1,xi,2,...,xi,D]i=1,2,....,ps (46)
式中:ps为总群个数;D为控制变量个数;
步骤2.2,通过计算每个代理的适应度,得到初始的最优搜索代理:探索过程取决于参数A和ρ,ρ是[0,1]之间的随机数;
若ρ<0.5,执行步骤2.2(1);
若ρ≥0.5,执行步骤2.2(2);
步骤2.2(1),当|A|<1时,为开发过程,通过式(52)更新当前搜索位置,即每个候选解的下一个位置:
X(t+1)=Xbest(t)-A·E (52)
式中:Xbest为当前最优解的位置向量,E为X在位置更新前与Xbest之间的距离;
当|A|>1时,为勘探过程,选择一个随机位置向量,通过式(50)更新当前搜索位置,即每个候选解的下一个位置:
X(t+1)=Xrand(t)-A·D (50)
式中:Xrand为从当前种群中随机选择的位置向量;D为X在位置更新前与Xrand之间的距离;
步骤2.2(2),通过式(54)更新当前搜索位置,即每个候选解的下一个位置:
X(t+1)=D·ebl·cos(2πl)+Xbest(t) (54)
式中:D′为最优解位置与当前解位置之间的距离;b为常数,定义了对数螺线的形状;l为[-1,1]之间的随机数;
步骤2.3,判断迭代次数iter是否小于迭代次数最大值,
若是,增加一次迭代,并返回步骤2.2;
若否,结束计算。
5.根据权利要求4所述的多能流配电网日前能量管理模型的管理方法,其特征在于,基于小波理论,参数A的自适应机制将在搜索中动态改变种群的突变,具体如下:
Figure FDA0003593386420000101
Figure FDA0003593386420000102
Figure FDA0003593386420000103
Figure FDA0003593386420000104
Figure FDA0003593386420000105
式中:h为膨胀参数;β是h的形状参数;ψ(φ)为Morlet小波函数;η为h的上界;iter为迭代次数;βmin、βmax为形状参数的最小值和最大值。
6.根据权利要求4所述的多能流配电网日前能量管理模型的管理方法,其特征在于,步骤2.2(1)的式(52)满足下式:
E=|C·Xbest(t)-X(t)| (51)
式中:C为系数向量,X为当前解的位置向量。
7.根据权利要求4所述的多能流配电网日前能量管理模型的管理方法,其特征在于,步骤2.2(1)的式(50)通过下式计算:
C=2·r (48)
D=|C·Xrand(t)-X(t)| (49)
式中:C为系数向量,X为当前解的位置向量,r是[0,1]中的随机向量。
8.根据权利要求4所述的多能流配电网日前能量管理模型的管理方法,其特征在于,步骤2.2(2)的式(54)通过下式计算:
D′=|Xbest(t)-X(t)| (53)
式中:X为当前解的位置向量,Xbest为当前最优解的位置向量。
CN202011197729.4A 2020-10-30 2020-10-30 一种多能流配电网日前能量管理模型的管理方法 Active CN112366697B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011197729.4A CN112366697B (zh) 2020-10-30 2020-10-30 一种多能流配电网日前能量管理模型的管理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011197729.4A CN112366697B (zh) 2020-10-30 2020-10-30 一种多能流配电网日前能量管理模型的管理方法

Publications (2)

Publication Number Publication Date
CN112366697A CN112366697A (zh) 2021-02-12
CN112366697B true CN112366697B (zh) 2022-06-17

Family

ID=74513199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011197729.4A Active CN112366697B (zh) 2020-10-30 2020-10-30 一种多能流配电网日前能量管理模型的管理方法

Country Status (1)

Country Link
CN (1) CN112366697B (zh)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9323299B2 (en) * 2012-08-27 2016-04-26 Green Light Industries, Inc. Multiple power source unit
CN106056246A (zh) * 2016-05-30 2016-10-26 清华大学 一种冷热电多能流微电网考虑运行的储能容量优化方法
CN106845671A (zh) * 2016-12-12 2017-06-13 长沙理工大学 一种多能流系统多目标最优潮流模型及其求解方法
CN110348602B (zh) * 2019-06-06 2021-09-21 国网浙江省电力有限公司经济技术研究院 计及天然气管网和热力管网特性的综合能源系统优化方法
CN110992206B (zh) * 2019-11-29 2023-09-26 燕山大学 一种多源电场的优化调度方法及系统

Also Published As

Publication number Publication date
CN112366697A (zh) 2021-02-12

Similar Documents

Publication Publication Date Title
CN110245878B (zh) 智能楼宇群体的分布式综合能源需求响应协同优化方法
CN108258679B (zh) 考虑供热网储热特性的电-热综合能源系统优化调度方法
CN109727158B (zh) 一种基于改进弱鲁棒优化的电热综合能源系统调度方法
CN108596453B (zh) 考虑网络动态特性的综合能源系统日前优化调度方法及系统
CN110263966B (zh) 考虑动态传热过程的电-热综合能源系统优化调度方法
CN107665384B (zh) 一种含多区域能源站的电力-热力综合能源系统调度方法
CN110188492B (zh) 一种考虑热网特性的冷热电联供微网优化调度方法
CN108206543A (zh) 一种基于能源梯级利用的能源路由器及其运行优化方法
CN109359839B (zh) 一种综合能源系统中区域热网的节点热价计算方法
CN108416472A (zh) 一种区域多源供冷供热系统优化调度方法
CN109389248B (zh) 基于区域热网的综合能源系统热电功率协调调度方法
CN109523065A (zh) 一种基于改进量子粒子群算法的微能源网优化调度方法
CN111191353B (zh) 考虑热惯性的电-热综合能源系统协调运行方法
CN109523076A (zh) 一种储能参与下的综合能源系统日前稳态优化分析方法
CN116341881B (zh) 计及热网灵活性的电-热系统鲁棒超前调度方法及系统
CN112949940A (zh) 一种综合能源虚拟电厂多设备选址方法
CN114266382A (zh) 一种考虑热惯性的热电联产系统两阶段优化调度方法
CN113131513B (zh) 考虑碳排放的电、热、气转换优化运行配置方法和存储介质
CN112366697B (zh) 一种多能流配电网日前能量管理模型的管理方法
CN113128868A (zh) 一种区域综合能源系统调度优化方法及装置
CN111047069A (zh) 一种考虑热网储能特性的热电联合调度灵活性评估方法
CN115169128A (zh) 考虑网络动态特性的综合能源系统机组组合方法及系统
CN113610305B (zh) 一种综合能源系统的优化调度方法
CN113761727A (zh) 一种含分布式电热泵的热电联合系统优化调度模型构建方法
Cong et al. Review of research on system thermal inertia modelling and optimal scheduling from the perspective of flexible resources

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant