CN112364626A - Intelligent management method and system for safety measures - Google Patents

Intelligent management method and system for safety measures Download PDF

Info

Publication number
CN112364626A
CN112364626A CN202011340684.1A CN202011340684A CN112364626A CN 112364626 A CN112364626 A CN 112364626A CN 202011340684 A CN202011340684 A CN 202011340684A CN 112364626 A CN112364626 A CN 112364626A
Authority
CN
China
Prior art keywords
safety measure
safety
intelligent management
arrangement
intelligent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011340684.1A
Other languages
Chinese (zh)
Other versions
CN112364626B (en
Inventor
雷剧璋
张莉珠
郁景礼
何嘉良
郑联国
程登云
邓胜初
黄湘
田松
江伟
杨锐灿
郑琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Power Supply Bureau of Guangdong Power Grid Corp filed Critical Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority to CN202011340684.1A priority Critical patent/CN112364626B/en
Publication of CN112364626A publication Critical patent/CN112364626A/en
Application granted granted Critical
Publication of CN112364626B publication Critical patent/CN112364626B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/20Natural language analysis
    • G06F40/205Parsing
    • G06F40/211Syntactic parsing, e.g. based on context-free grammar [CFG] or unification grammars
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/20Natural language analysis
    • G06F40/205Parsing
    • G06F40/216Parsing using statistical methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/20Natural language analysis
    • G06F40/237Lexical tools
    • G06F40/242Dictionaries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/20Natural language analysis
    • G06F40/279Recognition of textual entities
    • G06F40/289Phrasal analysis, e.g. finite state techniques or chunking
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Computational Linguistics (AREA)
  • General Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Artificial Intelligence (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Water Supply & Treatment (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Probability & Statistics with Applications (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Alarm Systems (AREA)

Abstract

The invention provides an intelligent management method for safety measures, which comprises the following steps: s1: establishing a specific dictionary of each transformer substation; s2: segmenting sentences on the work ticket information by adopting a dictionary matching algorithm to obtain segmentation results; s3: preprocessing the segmentation result to obtain a safety measure arrangement guide; s4: issuing a visual security measure placement notification according to the security measure guidelines. The invention also provides an intelligent management system for safety measures, which comprises an intelligent safety measure device, an internet of things communication system, a monitoring and analyzing system, a storage module and a display terminal. The invention provides an intelligent management method and system for safety measures, which are characterized in that a dictionary matching algorithm is adopted to segment work ticket information, a segmentation result is preprocessed to obtain safety measure arrangement guidance, and an operator arranges the safety measures according to the safety measure arrangement guidance, so that the problem that a large amount of time is consumed for arranging the safety measures at present is solved.

Description

Intelligent management method and system for safety measures
Technical Field
The invention relates to the technical field of intelligent management, in particular to an intelligent management method and system for security measures.
Background
The work development in the substation is generally carried out according to the work ticket, a large number of safety measures need to be arranged in the work ticket implementation specification, and particularly for some projects with complex arrangement, the arrangement of the safety measures needs to consume a large amount of time, which can lead to the reduction of the actual working time. At present, the safety measure arrangement is implemented on the basis of manual comparison of work ticket contents, the method is feasible for the work with small measure number, but for a large amount of fussy safety measure arrangement, on one hand, the method consumes too much time, so that the actual working time is shortened, and the working efficiency is reduced; on the other hand, steps are easy to omit, so that the safety measures are insufficient, the work risk is increased and the like. In addition, the work licensor frequently changes, and there are safety measure changes and work such as work completion safety measure recovery in the actual work process, which all result in low actual work efficiency, incapability of monitoring the safety measure and improvement of risk probability.
In the prior art, as a chinese patent published in 2019, 06, 18, a transformer substation secondary safety measure informatization management system with a publication number of CN109903180A, the problem of safety measure ticket full life cycle management is effectively solved, issuing, auditing, signing, executing, filing and inquiring are considered uniformly, full closed-loop management of the safety measure tickets is realized, but the time required by safety measure arrangement cannot be reduced.
Disclosure of Invention
The invention provides an intelligent management method and system for safety measures, aiming at overcoming the technical defect that a large amount of time is consumed for arranging the safety measures at present.
In order to solve the technical problems, the technical scheme of the invention is as follows:
an intelligent management method for security measures comprises the following steps:
s1: establishing a specific dictionary of each transformer substation;
s2: segmenting sentences on the work ticket information by adopting a dictionary matching algorithm to obtain segmentation results;
s3: preprocessing the segmentation result to obtain a safety measure arrangement guide;
s4: and sending a visual safety measure arrangement notice according to the safety measure guidance, thereby guiding the operating personnel to arrange the safety measure and realizing the intelligent management of the safety measure.
In the scheme, the dictionary matching algorithm is adopted to segment the work ticket information, the segmentation result is preprocessed to obtain the safety measure arrangement guide, and the operating personnel arrange the safety measures according to the safety measure arrangement guide, so that the arrangement difficulty of the safety measures is effectively reduced, the arrangement time of the safety measures is shortened, and the working efficiency is improved.
Preferably, the specific dictionary includes a text part, a number part and a mixture part.
Preferably, the dictionary matching algorithm uses the longest word as the maximum segmentation combination of the word frequency.
Preferably, the dictionary matching algorithm takes punctuation as the longest segmentation unit.
Preferably, in step S3, the preprocessing includes the steps of:
s3.1: removing meaningless contents according to set conditions;
s3.2: uniformly coding nouns in the segmentation result by adopting a main code plus subcode mode;
s3.3: and positioning and analyzing the equipment in the transformer substation according to the codes.
Preferably, in step S3.1, the set conditions include:
a: the length of the segmentation word is more than 1;
b: the auxiliary words are removed.
Preferably, the safety measure arrangement guide comprises a safety measure visual positioning chart and a safety measure arrangement table.
Preferably, the method further comprises the following steps: before the work task on the work ticket is completed, monitoring whether the state and the position of the safety measure are consistent with the arrangement guidance of the safety measure in real time;
if yes, displaying normal;
if not, the state and position change condition of the safety measure is directly reflected in a safety measure visual positioning diagram and a safety measure arrangement table so as to remind operating personnel.
Preferably, the method further comprises the following steps: when the work task on the work ticket is completed, sending a notice of safety measure recovery, and monitoring whether the safety measures are recovered to the state and position before arrangement in real time;
if yes, finishing the execution;
if not, continuing to send out a notice of safety measure recovery until the safety measure is monitored to recover the state and the position before arrangement.
An intelligent management system of safety measures is applied to realize the intelligent management method of the safety measures, and comprises an intelligent safety measure device, an internet of things communication system, a monitoring analysis system, a storage module and a display terminal; the intelligent safety measure device and the display terminal are in communication connection with the monitoring analysis system through the internet of things communication system respectively, and the monitoring analysis system is electrically connected with the storage module;
the intelligent safety measure device is used for being arranged on an operation site to provide safety guarantee and uploading self state information and position information to the monitoring analysis system;
the Internet of things communication system is used for realizing communication transmission between the intelligent safety measure device and the monitoring analysis system;
the monitoring and analyzing system is used for analyzing the work ticket to obtain safety measure arrangement guidance, receiving the uploading information of the intelligent safety measure device, analyzing and processing the information and issuing a notification instruction;
the storage module is used for storing the arrangement state and the change condition of the safety measures;
the display terminal is used for displaying safety measure arrangement guide.
Compared with the prior art, the technical scheme of the invention has the beneficial effects that:
the invention provides an intelligent management method and system for safety measures, which are characterized in that a dictionary matching algorithm is adopted to segment work ticket information, a segmentation result is preprocessed to obtain safety measure arrangement guide, and an operator arranges the safety measures according to the safety measure arrangement guide, so that the arrangement difficulty of the safety measures is effectively reduced, the arrangement time of the safety measures is shortened, and the working efficiency is improved.
Drawings
FIG. 1 is a flow chart of the steps for implementing the technical solution of the present invention;
FIG. 2 is a schematic diagram of the module connection of the present invention;
wherein: 1. an intelligent security measure device; 2. an Internet of things communication system; 3. monitoring the analysis system; 4. a storage module; 5. and displaying the terminal.
Detailed Description
The drawings are for illustrative purposes only and are not to be construed as limiting the patent;
for the purpose of better illustrating the embodiments, certain features of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product;
it will be understood by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted.
The technical solution of the present invention is further described below with reference to the accompanying drawings and examples.
Example 1
As shown in fig. 1, a method for intelligently managing security measures includes the following steps:
s1: establishing a specific dictionary of each transformer substation;
s2: segmenting sentences on the work ticket information by adopting a dictionary matching algorithm to obtain segmentation results;
s3: preprocessing the segmentation result to obtain a safety measure arrangement guide;
s4: and sending a visual safety measure arrangement notice according to the safety measure guidance, thereby guiding the operating personnel to arrange the safety measure and realizing the intelligent management of the safety measure.
In the specific implementation process, the dictionary matching algorithm is adopted to segment the work ticket information, the segmentation result is preprocessed to obtain safety measure arrangement guide, and the operating personnel arrange the safety measures according to the safety measure arrangement guide, so that the arrangement difficulty of the safety measures is effectively reduced, the arrangement time of the safety measures is shortened, and the working efficiency is improved.
More specifically, the specific dictionary includes a text part, a number part, and a mixture part.
In the specific implementation process, the text part comprises specific words in the station such as equipment names, screen names and pressure plate names, operation terms and special nouns related in operation regulations or safety regulations, the digital part comprises equipment numbers, and the mixed part is formed by combining the text part and the digital part. For example, for a XX line 5021 switch, where the text portion is the XX line, the number portion is 5021, and the hybrid portion is the XX line 5021 switch.
More specifically, the dictionary matching algorithm uses the longest word as the maximum segmentation combination of the word frequencies.
In a specific implementation process, the default setting is that the longest word is the maximum probability path in the segmentation combination.
More specifically, the dictionary matching algorithm takes punctuation as the longest segmentation unit.
In the specific implementation process, in order to ensure the segmentation speed, punctuation coincidence is taken as a longest segmentation unit, and searching is directly carried out from two root nodes of a digital part and a mixed part according to whether the longest segmentation unit contains digital content.
More specifically, in step S3, the preprocessing includes the steps of:
s3.1: removing meaningless contents according to set conditions;
s3.2: uniformly coding nouns in the segmentation result by adopting a main code plus subcode mode;
s3.3: and positioning and analyzing the equipment in the transformer substation according to the codes.
In the specific implementation process, because the position of equipment in the transformer substation is fixed, and by combining a field equipment layout diagram and a safety measure visual positioning diagram, each coordinate block in the diagram is set as a primitive, corresponds to a corresponding code, the safety measure can be quickly positioned according to the main code, the sub-code can be decoded to position the specific accessory at the interval, and finally, the safety measure visual positioning is achieved. In addition, the codes are used as corresponding addresses, relevant contents are extracted, and a safety measure arrangement table is obtained through statistics and calculation.
More specifically, in step S3.1, the conditions set include:
a: the length of the segmentation word is more than 1;
b: the auxiliary words are removed.
In the specific implementation process, an auxiliary word bank is established, matching search is carried out, and auxiliary words are removed.
More specifically, the safety measure arrangement guidance comprises a safety measure visual positioning chart and a safety measure arrangement table.
More specifically, the method further comprises the following steps: before the work task on the work ticket is completed, monitoring whether the state and the position of the safety measure are consistent with the arrangement guidance of the safety measure in real time;
if yes, displaying normal;
if not, the state and position change condition of the safety measure is directly reflected in a safety measure visual positioning diagram and a safety measure arrangement table so as to remind operating personnel.
In the specific implementation process, the state and the position of the safety measure are monitored in real time, so that the reliability and the safety of safety measure management are improved, and the personal and property safety is ensured.
More specifically, the method further comprises the following steps: when the work task on the work ticket is completed, sending a notice of safety measure recovery, and monitoring whether the safety measures are recovered to the state and position before arrangement in real time;
if yes, finishing the execution;
if not, continuing to send out a notice of safety measure recovery until the safety measure is monitored to recover the state and the position before arrangement.
Example 2
As shown in fig. 2, an intelligent management system for security measures, which is applied to implement the intelligent management method for security measures, includes an intelligent security measure device 1, an internet of things communication system 2, a monitoring and analyzing system 3, a storage module 4 and a display terminal 5; the intelligent safety measure device 1 and the display terminal 5 are respectively in communication connection with the monitoring analysis system 3 through the internet of things communication system 2, and the monitoring analysis system 3 is electrically connected with the storage module 4;
the intelligent safety measure device 1 is arranged on an operation site to provide safety guarantee, and simultaneously uploads self state information and position information to the monitoring analysis system 3;
the internet of things communication system 2 is used for realizing communication transmission between the intelligent safety measure device 1 and the monitoring analysis system 3;
the monitoring and analyzing system 3 is used for analyzing the work ticket to obtain safety measure arrangement guidance, receiving the uploading information of the intelligent safety measure device 1, analyzing and processing the information and issuing a notification instruction;
the storage module 4 is used for storing the arrangement state and the change condition of the safety measures;
the display terminal 5 is used for displaying safety measure arrangement guide.
In the specific implementation process, the intelligent safety measure device 1 comprises various intelligent devices such as an intelligent signboard, an electronic fence, a pressure plate monitoring device and the like, wherein each intelligent device comprises an identification module and a positioning module, state information is obtained through the identification module, and position information is obtained through the positioning module; the internet of things communication system 2 adopts a 5G technology to realize information uploading and receiving.
It should be understood that the above-described embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (10)

1. An intelligent management method for security measures is characterized by comprising the following steps:
s1: establishing a specific dictionary of each transformer substation;
s2: segmenting sentences on the work ticket information by adopting a dictionary matching algorithm to obtain segmentation results;
s3: preprocessing the segmentation result to obtain a safety measure arrangement guide;
s4: and sending a visual safety measure arrangement notice according to the safety measure guidance, thereby guiding the operating personnel to arrange the safety measure and realizing the intelligent management of the safety measure.
2. The intelligent management method for security measures according to claim 1, wherein the specific dictionary comprises a text part, a number part and a mixture part.
3. The intelligent management method for security measures according to claim 1, wherein the dictionary matching algorithm uses the longest word as the maximum segmentation combination of word frequencies.
4. The intelligent management method for security measures according to claim 1, wherein the dictionary matching algorithm uses punctuation as the longest segmentation unit.
5. The intelligent management method for security measures according to claim 1, wherein in step S3, the preprocessing includes the following steps:
s3.1: removing meaningless contents according to set conditions;
s3.2: uniformly coding nouns in the segmentation result in a main code and sub code mode;
s3.3: and positioning and analyzing the equipment in the transformer substation according to the codes.
6. The intelligent management method for security measures according to claim 5, characterized in that in step S3.1, the set conditions include:
a: the length of the segmentation word is more than 1;
b: the auxiliary words are removed.
7. The intelligent management method for security measures according to claim 1, wherein the security measure arrangement guidance comprises a security measure visual positioning chart and a security measure arrangement table.
8. The intelligent management method for security measures according to claim 7, further comprising the steps of: before the work task on the work ticket is completed, monitoring whether the state and the position of the safety measure are consistent with the arrangement guidance of the safety measure in real time;
if yes, displaying normal;
if not, the state and position change condition of the safety measure is directly reflected in the safety measure visual positioning diagram and the safety measure arrangement table.
9. The intelligent management method for security measures according to claim 1, further comprising the steps of: when the work task on the work ticket is completed, sending a notice of safety measure recovery, and monitoring whether the safety measures are recovered to the state and position before arrangement in real time;
if yes, finishing the execution;
if not, continuing to send out a notice of safety measure recovery until the safety measure is monitored to recover the state and the position before arrangement.
10. The intelligent management system for the safety measures is characterized by comprising an intelligent safety measure device (1), an internet of things communication system (2), a monitoring analysis system (3), a storage module (4) and a display terminal (5); the intelligent safety measure device (1) and the display terminal (5) are in communication connection with the monitoring analysis system (3) through the internet of things communication system (2), and the monitoring analysis system (3) is electrically connected with the storage module (4);
the intelligent safety measure device (1) is arranged on an operation site to provide safety guarantee, and meanwhile, the state information and the position information of the intelligent safety measure device are uploaded to the monitoring analysis system (3);
the internet of things communication system (2) is used for realizing communication transmission between the intelligent safety measure device (1) and the monitoring analysis system (3);
the monitoring and analyzing system (3) is used for analyzing the work ticket to obtain safety measure arrangement guide, receiving the uploading information of the intelligent safety measure device (1), analyzing and processing the information and issuing a notification instruction;
the storage module (4) is used for storing the arrangement state and the change condition of the safety measures;
the display terminal (5) is used for displaying safety measure arrangement guide.
CN202011340684.1A 2020-11-25 2020-11-25 Intelligent safety measure management method and system Active CN112364626B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011340684.1A CN112364626B (en) 2020-11-25 2020-11-25 Intelligent safety measure management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011340684.1A CN112364626B (en) 2020-11-25 2020-11-25 Intelligent safety measure management method and system

Publications (2)

Publication Number Publication Date
CN112364626A true CN112364626A (en) 2021-02-12
CN112364626B CN112364626B (en) 2023-09-01

Family

ID=74534404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011340684.1A Active CN112364626B (en) 2020-11-25 2020-11-25 Intelligent safety measure management method and system

Country Status (1)

Country Link
CN (1) CN112364626B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101308498A (en) * 2008-07-03 2008-11-19 上海交通大学 Text collection visualized system
CN104239406A (en) * 2014-07-31 2014-12-24 山东网聪信息科技有限公司 High-visualization display method for secondary device configuration of intelligent substation
CN104318340A (en) * 2014-09-25 2015-01-28 中国科学院软件研究所 Information visualization method and intelligent visual analysis system based on text curriculum vitae information
CN105634816A (en) * 2016-01-07 2016-06-01 烽火通信科技股份有限公司 Method and system based on video and voice wiring guidance
CN106528726A (en) * 2016-11-02 2017-03-22 四川用联信息技术有限公司 Keyword optimization-based search engine optimization realization technology
CN107506475A (en) * 2017-09-08 2017-12-22 国网辽宁省电力有限公司 A kind of magnanimity electric power customer service file classification method based on Spark
CN107563520A (en) * 2017-07-26 2018-01-09 国网安徽省电力公司 A kind of intelligent substation secondary safety measure method for visualizing
CN108170134A (en) * 2017-11-15 2018-06-15 国电南瑞科技股份有限公司 A kind of robot used for intelligent substation patrol paths planning method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101308498A (en) * 2008-07-03 2008-11-19 上海交通大学 Text collection visualized system
CN104239406A (en) * 2014-07-31 2014-12-24 山东网聪信息科技有限公司 High-visualization display method for secondary device configuration of intelligent substation
CN104318340A (en) * 2014-09-25 2015-01-28 中国科学院软件研究所 Information visualization method and intelligent visual analysis system based on text curriculum vitae information
CN105634816A (en) * 2016-01-07 2016-06-01 烽火通信科技股份有限公司 Method and system based on video and voice wiring guidance
CN106528726A (en) * 2016-11-02 2017-03-22 四川用联信息技术有限公司 Keyword optimization-based search engine optimization realization technology
CN107563520A (en) * 2017-07-26 2018-01-09 国网安徽省电力公司 A kind of intelligent substation secondary safety measure method for visualizing
CN107506475A (en) * 2017-09-08 2017-12-22 国网辽宁省电力有限公司 A kind of magnanimity electric power customer service file classification method based on Spark
CN108170134A (en) * 2017-11-15 2018-06-15 国电南瑞科技股份有限公司 A kind of robot used for intelligent substation patrol paths planning method

Also Published As

Publication number Publication date
CN112364626B (en) 2023-09-01

Similar Documents

Publication Publication Date Title
CN103729905B (en) Graphical cruising inspection system and method for inspecting
CN110334241A (en) Quality detecting method, device, equipment and the computer readable storage medium of customer service recording
CN107045663B (en) Visual online checking system and method for secondary safety measure operation ticket
CN104318300A (en) Three-card-in-one based transformer substation tool management system and method
CN113300765A (en) Intelligent identification and diagnosis method for power digital link
CN106843808B (en) A kind of instruction analytic method of compatible different-format type
CN112364626A (en) Intelligent management method and system for safety measures
CN110162440A (en) Method, electronic device and the computer readable storage medium of fault location
CN112330128A (en) Production operation management method, device, equipment and storage medium
CN115297381A (en) Data processing method, device and system based on special operation site
CN115099232A (en) Power grid operation knowledge model construction method for scheduling regulations and historical data
CN114662114A (en) Log-based code desensitization vulnerability detection method and related equipment
CN102866999B (en) Method and device for drawing alarm window of power regulation and control system
CN113190668A (en) Man-machine interaction method, device and equipment based on multi-turn conversation and storage medium
CN113610427A (en) Event early warning index obtaining method and device, terminal equipment and storage medium
CN207051911U (en) A kind of Intelligent Recognition checking terminal with a variety of automatic identification functions
CN207281934U (en) A kind of fault-indicating system and automatic teller machine for automatic teller machine
CN112597748A (en) Corpus generation method, apparatus, device and computer readable storage medium
CN109213812A (en) A kind of fault test display methods of electric energy meter
CN115691771B (en) System and method for notifying working information of medical information system
CN212749924U (en) Outwork system based on face recognition technology
CN115796160B (en) Thesis redundant data cleaning method and device based on lexical affix and storage medium
CN115690932B (en) Outdoor operation digital attendance checking method and system based on NFC technology
CN113790647B (en) Edge calculation exploder for electronic detonator construction information and control method thereof
CN116701552B (en) Case administration organization determination method and device and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant