CN112360510A - Full-section grouting construction method for coal mine tunnel - Google Patents

Full-section grouting construction method for coal mine tunnel Download PDF

Info

Publication number
CN112360510A
CN112360510A CN202011195686.6A CN202011195686A CN112360510A CN 112360510 A CN112360510 A CN 112360510A CN 202011195686 A CN202011195686 A CN 202011195686A CN 112360510 A CN112360510 A CN 112360510A
Authority
CN
China
Prior art keywords
grouting
construction
drill holes
drilling
roadway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011195686.6A
Other languages
Chinese (zh)
Inventor
张江利
赵斌
陶广美
马赛
王萌
原小路
陈志强
司朝
王朋卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Technology Research Institute Co ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Technology Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Technology Research Institute Co ltd filed Critical Shanxi Jincheng Anthracite Mining Group Technology Research Institute Co ltd
Priority to CN202011195686.6A priority Critical patent/CN112360510A/en
Publication of CN112360510A publication Critical patent/CN112360510A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A coal mine tunnel full-section grouting construction method belongs to the field of mining engineering and can solve the problems that the existing method for grouting, reinforcing and plugging a crack development roof of a surrounding rock of a coal mine tunnel is low in construction efficiency, frequent in equipment carrying, high in labor intensity, unreasonable in process and the like; and then, drilling and grouting construction is carried out on the top plate of the roadway, and sequential construction of two sides and the middle is adopted.

Description

Full-section grouting construction method for coal mine tunnel
Technical Field
The invention belongs to the technical field of mining engineering, and particularly relates to a technical method for grouting, reinforcing and plugging broken surrounding rocks of a top wall when the surrounding rock cracks of a coal mine tunnel develop and a top plate is sprayed with water. The method can solve a series of problems of low construction efficiency, frequent equipment transportation, high labor intensity, unreasonable working procedures and the like of the existing method for grouting, reinforcing and plugging the broken surrounding rock of the top wall when the crack of the surrounding rock of the coal mine tunnel develops and the roof is sprayed with water.
Background
The plastic zone is formed in the country rock behind the colliery tunnel tunnelling, when meeting geological structure such as fault, collapse post, the structure can switch on with the roof aquifer, can form tunnel roof trickle phenomenon, can corrode the tunnel and prop up the body, causes and props up the body and breaks, became invalid, produces the potential safety hazard, also can influence equipment safe handling in the tunnel simultaneously to it is current to influence the tunnel. The conventional common grouting mode is to firstly carry out drilling and grouting construction on the roadway wall; after the construction of the roadway side is finished, constructing a drill hole on the top plate in each section and grouting; and then constructing another drill hole on the inner top plate with the same section and grouting, and so on. The method has a series of problems of low construction efficiency, frequent equipment transportation, high labor intensity, unreasonable working procedures and the like. On the basis of guaranteeing the wall rock crack reinforcing shutoff effect, how to improve slip casting efficiency of construction reduces the auxiliary work volume, is the problem that needs to solve urgently.
Disclosure of Invention
The invention provides a coal mine tunnel full-section grouting construction method, aiming at a series of problems of low construction efficiency, frequent equipment transportation, high labor intensity, unreasonable working procedures and the like of the existing method for grouting, reinforcing and plugging the broken surrounding rock of the top wall when the crack of the surrounding rock of the coal mine tunnel develops and the roof is sprayed with water.
The invention adopts the following technical scheme:
a coal mine tunnel full-section grouting construction method comprises the following steps:
firstly, according to arrangement parameters of grouting reinforcement drill holes of surrounding rocks of a coal mine tunnel, when grouting reinforcement drill holes are uniformly distributed on a tunnel side part and a tunnel top plate in one section, performing drilling construction of grouting drill holes of the tunnel side part, performing drilling construction of grouting drill holes of the tunnel top plate, completing all the grouting drill holes in the same section, performing grouting, and then moving a drilling machine to construct a drill hole of the next section;
secondly, after the grouting reinforcement drilling construction of the roadway side part and the roadway top plate of the same section is finished, grouting is carried out on the drill holes in the same section, and firstly, grouting construction is carried out on the drill holes on the two sides of the roadway in the sequence from bottom to top; and then carrying out drilling and grouting construction on the top plate of the roadway, wherein the construction is carried out in the order of two sides and the middle.
The number of the drill holes on the two sides of the roadway is four, the drill holes are symmetrically arranged along the roadway, the two drill holes on the bottom are firstly constructed in grouting construction, and then the two drill holes on the upper side are constructed.
The drilling quantity of tunnel roof is three, arranges along tunnel roof equidistant, and the slip casting construction is under construction two drilling of both sides earlier, the drilling in the middle of the construction again.
The invention has the following beneficial effects:
the invention provides a method for drilling holes by grouting in the same section at one time and accumulating grouting after top supporting, which reduces the amount of auxiliary engineering to the maximum extent and has the crack filling and plugging effect capable of meeting the requirements of surrounding rock reinforcement and water spraying plugging. The method can obviously reduce the labor intensity, greatly improve the grouting construction efficiency, obviously reduce the auxiliary work amount of equipment carrying and the like, provide guarantee for the safe use of the coal mine tunnel, and simultaneously reduce the influence on the tunnel transportation.
Drawings
FIG. 1 is a sequence diagram of hole distribution and grouting construction of a full-section of the invention;
wherein: drilling No. 1-1; drilling No. 2-2; drilling No. 3-3; drilling No. 4-4; drilling No. 5-5; 6-6 drilling; drill holes No. 7-7.
Detailed Description
The invention is further explained with reference to the accompanying drawings.
A coal mine tunnel full-section grouting construction method comprises the following steps:
firstly, according to arrangement parameters of grouting reinforcement drill holes of surrounding rocks of a coal mine tunnel, when grouting reinforcement drill holes are uniformly distributed on a tunnel side part and a tunnel top plate in one section, performing drilling construction of grouting drill holes of the tunnel side part, performing drilling construction of grouting drill holes of the tunnel top plate, completing all the grouting drill holes in the same section, performing grouting, and then moving a drilling machine to construct a drill hole of the next section;
secondly, after the grouting reinforcement drilling construction of the roadway side part and the roadway top plate of the same section is finished, grouting is carried out on the drill holes in the same section, and firstly, grouting construction is carried out on the drill holes on the two sides of the roadway in the sequence from bottom to top; and then carrying out drilling and grouting construction on the top plate of the roadway, wherein the construction is carried out in the order of two sides and the middle.
As shown in the figure, after grouting reinforcement drilling construction of the roadway side part and the roadway top plate of the same section is completed, grouting is performed on the drill holes in the same section. Firstly, grouting construction is carried out on two sides of the drilled holes of the roadway, namely, firstly constructing No. 1 and No. 2 drilled holes and then constructing No. 3 and No. 4 drilled holes in the sequence from bottom to top; and then carrying out drilling and grouting construction on the top plate of the roadway, wherein the sequential construction of firstly constructing the 5 th drilling hole and the 6 th drilling hole and then constructing the 7 th drilling hole is adopted.

Claims (3)

1. A coal mine tunnel full-section grouting construction method is characterized by comprising the following steps: the method comprises the following steps:
firstly, according to arrangement parameters of grouting reinforcement drill holes of surrounding rocks of a coal mine tunnel, when grouting reinforcement drill holes are uniformly distributed on a tunnel side part and a tunnel top plate in one section, performing drilling construction of grouting drill holes of the tunnel side part, performing drilling construction of grouting drill holes of the tunnel top plate, completing all the grouting drill holes in the same section, performing grouting, and then moving a drilling machine to construct a drill hole of the next section;
secondly, after the grouting reinforcement drilling construction of the roadway side part and the roadway top plate of the same section is finished, grouting is carried out on the drill holes in the same section, and firstly, grouting construction is carried out on the drill holes on the two sides of the roadway in the sequence from bottom to top; and then carrying out drilling and grouting construction on the top plate of the roadway, wherein the construction is carried out in the order of two sides and the middle.
2. The coal mine roadway full-section grouting construction method according to claim 1, characterized in that: the number of the drill holes on the two sides of the roadway is four, the drill holes are symmetrically arranged along the roadway, the two drill holes on the bottom are firstly constructed in grouting construction, and then the two drill holes on the upper side are constructed.
3. The coal mine roadway full-section grouting construction method according to claim 1, characterized in that: the drilling quantity of tunnel roof is three, arranges along tunnel roof equidistant, and the slip casting construction is under construction two drilling of both sides earlier, the drilling in the middle of the construction again.
CN202011195686.6A 2020-10-30 2020-10-30 Full-section grouting construction method for coal mine tunnel Withdrawn CN112360510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011195686.6A CN112360510A (en) 2020-10-30 2020-10-30 Full-section grouting construction method for coal mine tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011195686.6A CN112360510A (en) 2020-10-30 2020-10-30 Full-section grouting construction method for coal mine tunnel

Publications (1)

Publication Number Publication Date
CN112360510A true CN112360510A (en) 2021-02-12

Family

ID=74513989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011195686.6A Withdrawn CN112360510A (en) 2020-10-30 2020-10-30 Full-section grouting construction method for coal mine tunnel

Country Status (1)

Country Link
CN (1) CN112360510A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135316A (en) * 2021-11-22 2022-03-04 紫金矿业集团股份有限公司 Multi-directional composite hole nail injection and reinforcement method suitable for tuff roadway

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135316A (en) * 2021-11-22 2022-03-04 紫金矿业集团股份有限公司 Multi-directional composite hole nail injection and reinforcement method suitable for tuff roadway

Similar Documents

Publication Publication Date Title
CN108661705B (en) Strip goaf four-in-one comprehensive treatment construction method
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN103410515B (en) It is a kind of that three-soft seam is reciprocating combines mining method without coal column
CN102071941B (en) Fully mechanized mining gob-side entry retaining-based concrete block staggered joint longitudinal stacking wall forming method
CN107829742B (en) Caving-filling-open stope-caving mining method
CN109209392B (en) Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel
CN105545353B (en) A kind of Man-made False construction method based on paste body filling
CN103375170A (en) Underground excavation construction deformation control method for three-hole small clear distance tunnel underpass trunk railway
AU2015387618B2 (en) Method for fracturing filler wall left behind in adjacent coal-mining face
CN109209490B (en) Working face withdrawing method for gangue filling auxiliary end mining stage
CN108979638B (en) Composite gob-side entry retaining method for wedge-shaped regenerated wall and single-leg shed beam of coal mining roadway
CN105370304A (en) High stress strong disturbance coal seam gob-side entry retaining multistage reinforcing method
CN107965341A (en) A kind of large-section underground pipe canopy pipe network concrete support method
CN111425205B (en) Mining support method for steeply inclined extremely thin ore body
CN103161498B (en) Half-edge coal seam section coal pillar roadside packing method
CN106401609A (en) Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure
CN111456729A (en) Mining method of steeply inclined thin ore body
CN206205903U (en) A kind of base plate release ruggedized construction of control deep tunnel bottom distension
CN103557001A (en) Low-section-height drift-pillar-free shrinkage-stoping, subsequent-filling and mining method
CN110219650B (en) Deep hole subsequent filling mining method in environment reconstruction stage
CN106014443A (en) Method for preventing roadway floor heaving and wall sliding of gob-side entry retaining
CN115163084A (en) Mechanical construction method for ultra-large section tunnel by double-side-wall pit guiding method
CN110566271A (en) Reinforcement construction method for water-rich goaf under municipal road
CN112360510A (en) Full-section grouting construction method for coal mine tunnel
CN104295315A (en) Low coal seam gob-side entry retaining method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20210212

WW01 Invention patent application withdrawn after publication