CN112347072B - Verification method for data of electric power acquisition terminal - Google Patents
Verification method for data of electric power acquisition terminal Download PDFInfo
- Publication number
- CN112347072B CN112347072B CN202011061870.1A CN202011061870A CN112347072B CN 112347072 B CN112347072 B CN 112347072B CN 202011061870 A CN202011061870 A CN 202011061870A CN 112347072 B CN112347072 B CN 112347072B
- Authority
- CN
- China
- Prior art keywords
- data
- day
- data2
- data3
- judging whether
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000012795 verification Methods 0.000 title claims abstract description 8
- 230000008014 freezing Effects 0.000 claims abstract description 39
- 238000007710 freezing Methods 0.000 claims abstract description 39
- 238000003860 storage Methods 0.000 claims abstract description 18
- 230000001502 supplementing effect Effects 0.000 claims description 5
- 238000005259 measurement Methods 0.000 claims description 3
- 230000000295 complement effect Effects 0.000 description 5
- 238000004458 analytical method Methods 0.000 description 3
- 238000013524 data verification Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000005856 abnormality Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003306 harvesting Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/21—Design, administration or maintenance of databases
- G06F16/219—Managing data history or versioning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/21—Design, administration or maintenance of databases
- G06F16/215—Improving data quality; Data cleansing, e.g. de-duplication, removing invalid entries or correcting typographical errors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/23—Updating
- G06F16/2358—Change logging, detection, and notification
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/23—Updating
- G06F16/2365—Ensuring data consistency and integrity
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/95—Retrieval from the web
- G06F16/953—Querying, e.g. by the use of web search engines
- G06F16/9537—Spatial or temporal dependent retrieval, e.g. spatiotemporal queries
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Computer Security & Cryptography (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Quality & Reliability (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Recording Measured Values (AREA)
Abstract
The invention discloses a verification method of power acquisition terminal data, which comprises the following steps: 1) The method comprises the steps that on the first day, a power acquisition terminal reads day freezing data of the last day of a power utilization terminal, records the data as data1, finds a corresponding storage position according to a day freezing time scale, and stores the storage position; 2) The next day is entered, the electric power acquisition terminal reads the day freezing data of the last day of the electric power utilization terminal, and records the data as data2; 3) Comparing the data2 with the data1, and preliminarily judging whether the data2 is correct or not by using the size comparison result of the data1 and the data2; 4) The third day is entered, the electric power acquisition terminal reads the day freezing data of the last day of the electric power utilization terminal, and records the data as data3; 5) Comparing the data3 with the data2, and judging whether the data2 and the data3 are correct or not by using the size comparison result of the data2 and the data3; 6) The method comprises the steps of entering a fourth day, reading day freezing data of the last day of the power utilization terminal, and recording the data as data4; and judging whether the data4 and the data3 are correct or not according to the size comparison result of the data3 and the data4, and checking the data of each day and the like.
Description
Technical Field
The invention relates to a power terminal, in particular to a verification method for data of a power acquisition terminal.
Background
With the rapid development of economy, the automation and intelligence of production and life are increasingly relied on, and the demand for electric power is not kept away. The power harvesting terminals are also growing in scale as a ring of grid terminals.
In recent years, with the development of technology, large data storage, front-end business expansion and high-speed rate communication are new fashion, and the power industry has higher requirements. In order to meet the national power grid requirements, the running speed of the power acquisition terminal is faster and faster, and the storage space is larger and larger. The power company not only strengthens the requirement on the acquisition rate of the power acquisition terminal, but also puts forward higher requirements on the accuracy of data.
However, in the prior art, only the validity of the data of the power acquisition terminal is judged, and the accuracy is not judged. Such a solution has its own drawbacks: first, if the data is valid, the correctness cannot be ensured; second, when the data may be wrong, the data is deleted by means of all erasure, which is not scientific. Thirdly, whether the current data is correct or not is the information lag obtained by the personnel of the later master station through observation.
Disclosure of Invention
The invention aims to solve the technical problem of providing a verification method for data of an electric power acquisition terminal aiming at the defects in the prior art, which can automatically verify data abnormality and improve data accuracy.
The technical scheme adopted for solving the technical problems is as follows: a verification method of power acquisition terminal data comprises the following steps:
1) The method comprises the steps that on the first day, a power acquisition terminal reads day freezing data of the last day of a power utilization terminal, records the data as data1, finds a corresponding storage position according to a day freezing time scale, and stores the storage position;
2) The next day is entered, the electric power acquisition terminal reads the day freezing data of the last day of the electric power utilization terminal, and records the data as data2;
3) Comparing the data2 with the data1, and preliminarily judging whether the data2 is correct or not by using the size comparison result of the data1 and the data2;
4) The third day is entered, the electric power acquisition terminal reads the day freezing data of the last day of the electric power utilization terminal, and records the data as data3;
5) Comparing the data3 with the data2, and judging whether the data2 and the data3 are correct or not by using the size comparison result of the data2 and the data3;
6) The method comprises the steps of entering a fourth day, reading day freezing data of the last day of the power utilization terminal, and recording the data as data4; and judging whether the data4 and the data3 are correct or not according to the size comparison result of the data3 and the data4, and checking the data of each day and the like.
Preferably, the specific method for judging by comparing the sizes is that in the step 3), specifically, the method comprises the following steps:
3.1 Judging whether data2 > data1 is true or not, if yes, entering step 4); if not, preliminarily judging that the data2 has a problem, and entering the step 3.2 if not;
3.2 A data2 supplementing process is started, daily frozen data reading is carried out, reading is carried out at a certain time interval, and step 3.3) is carried out after refreshing data2 once for each reading;
3.3 Judging whether the day has elapsed, if so, indicating that the data is still wrong until the end of the day, and entering the step 4); if not, entering step 3.4);
3.4 Judging whether data2 > data1 is true or not, if yes, entering step 4); if not, the current data2 is judged to still have problems, the data is not stored, the copying is continued, and the step 3.2 is returned.
Preferably, the specific method for judging by comparing the sizes is that in the step 5), specifically, the method includes the following steps:
5.1 Judging whether data3 & gtdata 2 is true or not, if yes, indicating that the current data2 is correct, finding a corresponding storage position according to a daily freezing time scale, then storing the current data2, and entering the step 6); if not, preliminarily judging that the data3 has a problem, and entering step 5.2 if not;
5.2 A data3 supplementing process is started, daily frozen data reading is carried out, reading is carried out at a certain time interval, and step 5.3) is carried out after refreshing data3 once for each reading;
5.3 Judging whether the day has elapsed, if so, indicating that the data is still wrong until the end of the day, and entering the step 6); if not, go to step 5.4);
5.4 Judging whether data3 & gtdata 2 is true or not, if so, finding a corresponding storage position according to a daily freezing time scale, then storing the current data2, and simultaneously entering the step 6); if not, the current data3 is judged to still have problems, the data is not stored, the copying is continued, and the step 5.2 is returned.
Preferably, in step 6), in order to facilitate continuous verification of data, the method of judging whether data4 and data3 are correct is the same as the method of judging whether data3 and data2 are correct.
In order to automatically obtain information of data plagiarism errors and avoid human analysis, in step 3.3), if it is determined that the date has elapsed, step 7) is further entered: the data is wrong, 1 is arranged on the corresponding position of the stored information mark, and then the data is reported to the master station through an alarm.
Preferably, a reasonable frequency of the complementary copying is determined, and in step 3.2), the time interval of the complementary copying is one hour.
In order to automatically obtain information of data plagiarism errors and avoid human analysis, in step 5.3), if it is determined that the date has elapsed, step 7) is further entered: the data is wrong, 1 is arranged on the corresponding position of the stored information mark, and then the data is reported to the master station through an alarm.
Preferably, a reasonable frequency of the complementary copying is determined, and in step 3.2), the time interval of the complementary copying is one hour.
Preferably, the daily freezing data is daily frozen power.
In order to reduce the storage space, the length of the read data is M, the number of storage points is N, the number of measurement points is T, the number of bytes stored in the data is M x N x T, and the number of bytes of the stored information mark is M x N x T/8.
Compared with the prior art, the invention has the advantages that: the collected data is checked at regular time, self-checking and self-checking are carried out, the accuracy of the data is improved, and the data is safe and reliable; the data can be automatically repaired by the data complement and copy; when the data is abnormal, the error data can be marked in time, and the data can be automatically reported to the master station, so that manual analysis is avoided, and the system is safe and reliable.
Drawings
FIG. 1 is a flow chart of a verification method according to an embodiment of the invention.
Detailed Description
The invention is described in further detail below with reference to the embodiments of the drawings.
Referring to fig. 1, for convenience of understanding, the method analyzes based on the daily frozen power of the power consumption terminal, the length of data to be read is M, the number of storage points is N, the number of measurement points is T, the number of bytes stored in the data is m×n×t, and the number of bytes stored in the data is m×n×t/8 (represented by bits, reduced space, 0 represents normal, and 1 represents data anomaly).
The data verification method comprises the following steps:
1) The first day, the electric power acquisition terminal reads daily freezing data, in this embodiment, reads daily freezing electric quantity of the electric power acquisition terminal (electric energy meter) on one day, records the daily freezing electric quantity as data1, finds a corresponding storage position according to a daily freezing time scale, and stores the data;
2) The next day is entered, the electric power acquisition terminal carries out day freezing data reading, and the same is carried out, and the day freezing electric quantity of the electric power consumption terminal in one day is recorded as data2;
3) Comparing data2 with data1, and preliminarily judging whether data2 is correct or not by using the size comparison result of data1 and data 2:
3.1 Judging whether data2 > data1 is true or not, if yes, entering step 4); if not, preliminarily judging that the data2 has a problem, and entering the step 3.2 if not;
3.2 A data2 supplementing process is started, daily freezing data are read, and the data are read at certain time intervals, as in the embodiment, the data are read once every hour, and similarly, the daily freezing electric quantity of the last day is read, and the step 3.3) is carried out after refreshing the data2 once every reading;
3.3 Judging whether a day has elapsed, i.e. a day after 24 points have been crossed; if yes, the data is still wrong until the end of the present day, and the steps 7) and 4) are entered; if not, entering step 3.4);
3.4 Judging whether data2 > data1 is true or not, if yes, entering step 4); if not, the current data2 still has problems, is not stored, and is continuously read, and the step 3.2 is returned;
4) The third day is entered, the electric power acquisition terminal carries out day freezing data reading, and the day freezing electric quantity of the electric power consumption terminal in one day is also read and recorded as data3;
5) Comparing data3 with data2, and judging whether the data2 and the data3 are correct or not by using the size comparison result of the data2 and the data 3:
5.1 Judging whether data3 is more than data2 is true, if so, because data2 is more than data1, indicating that the current data2 is correct, finding a corresponding storage position according to a daily freezing time scale, then storing the current data2, and entering the step 6); if not, preliminarily judging that the data3 has a problem, and entering step 5.2 if not;
5.2 A data3 flow is supplemented, daily freezing data reading is carried out, and the data is read at certain time intervals, as in the embodiment, the data is read once every hour, and similarly, the daily freezing electric quantity of the last day is read, and the step 5.3) is carried out after refreshing the data3 once every reading;
5.3 Judging whether a day has elapsed, i.e. a day after 24 points have been crossed; if yes, the data is still wrong until the end of the present day, and the steps 7) and 6) are entered; if not, go to step 5.4);
5.4 Judging whether data3 & gtdata 2 is true or not, if so, finding a corresponding storage position according to a daily freezing time scale, then storing the current data2, and simultaneously entering the step 6); if not, the current data3 is judged to still have problems, the data is not stored, the copying is continued, and the step 5.2 is returned;
6) Reading daily freezing data after entering the fourth day, and recording the daily freezing electric quantity of the same day as data4; judging whether the data4 and the data3 are correct or not by using the size comparison result of the data3 and the data4, comparing the judging method with the data2 and the data3, and checking the data of each day and the like;
7) The data is wrong, 1 is arranged on the corresponding position of the stored information mark, and then the data is reported to the master station through an alarm.
In the steps 3) and 5), the step of performing the additional reading is performed, because the daily frozen electric quantity on the electric energy meter is not updated, and thus, the data of the electric power acquisition terminal is inconsistent with the data of the electric energy meter. For example, when the time of the electric energy meter is inconsistent with the time of the electric power collection terminal, the time of the electric power collection terminal is the third day, and the time of the electric energy meter stays on the second day (a condition that a difference of a few minutes may exist in general), the day freezing data2 of the last day collected by the electric power collection terminal is actually data1, so that collection errors can occur, and the problem can be solved by carrying out the copying.
Claims (9)
1. A verification method of power acquisition terminal data comprises the following steps:
1) The method comprises the steps that on the first day, a power acquisition terminal reads day freezing data of the last day of a power utilization terminal, records the data as data1, finds a corresponding storage position according to a day freezing time scale, and stores the storage position;
2) The next day is entered, the electric power acquisition terminal reads the day freezing data of the last day of the electric power utilization terminal, and records the data as data2;
3) Comparing the data2 with the data1, and preliminarily judging whether the data2 is correct or not by using the size comparison result of the data1 and the data2;
4) The third day is entered, the electric power acquisition terminal reads the day freezing data of the last day of the electric power utilization terminal, and records the data as data3;
5) Comparing the data3 with the data2, and judging whether the data2 and the data3 are correct or not by using the size comparison result of the data2 and the data3;
6) The method comprises the steps of entering a fourth day, reading day freezing data of the last day of the power utilization terminal, and recording the data as data4; judging whether the data4 and the data3 are correct or not according to the size comparison result of the data3 and the data4, and checking the data of each day and the like;
in step 3), the method specifically comprises the following steps:
3.1 Judging whether data2 > data1 is true or not, if yes, entering step 4); if not, preliminarily judging that the data2 has a problem, and entering the step 3.2 if not;
3.2 A data2 supplementing process is started, daily frozen data reading is carried out, reading is carried out at a certain time interval, and step 3.3) is carried out after refreshing data2 once for each reading;
3.3 Judging whether the day has elapsed, if so, indicating that the data is still wrong until the end of the day, and entering the step 4); if not, entering step 3.4);
3.4 Judging whether data2 > data1 is true or not, if yes, entering step 4); if not, the current data2 is judged to still have problems, the data is not stored, the copying is continued, and the step 3.2 is returned.
2. The method for verifying the data of the power acquisition terminal according to claim 1, wherein: in step 5), the method specifically comprises the following steps:
5.1 Judging whether data3 & gtdata 2 is true or not, if yes, indicating that the current data2 is correct, finding a corresponding storage position according to a daily freezing time scale, then storing the current data2, and entering the step 6); if not, preliminarily judging that the data3 has a problem, and entering step 5.2 if not;
5.2 A data3 supplementing process is started, daily frozen data reading is carried out, reading is carried out at a certain time interval, and step 5.3) is carried out after refreshing data3 once for each reading;
5.3 Judging whether the day has elapsed, if so, indicating that the data is still wrong until the end of the day, and entering the step 6); if not, go to step 5.4);
5.4 Judging whether data3 & gtdata 2 is true or not, if so, finding a corresponding storage position according to a daily freezing time scale, then storing the current data2, and simultaneously entering the step 6); if not, the current data3 is judged to still have problems, the data is not stored, the copying is continued, and the step 5.2 is returned.
3. The method for verifying the data of the power acquisition terminal according to claim 2, wherein: in step 6), the method of judging whether data4 and data3 are correct is the same as the method of judging whether data3 and data2 are correct.
4. The method for verifying the data of the power acquisition terminal according to claim 1, wherein: in step 3.3), if it is determined that the day has passed, step 7) is also entered: the data is wrong, 1 is arranged on the corresponding position of the stored information mark, and then the data is reported to the master station through an alarm.
5. The method for verifying the data of the power acquisition terminal according to claim 1, wherein: in step 3.2), the time interval for the additional reading is one hour.
6. The method for verifying the data of the power acquisition terminal according to claim 2, wherein: in step 5.3), if it is determined that the day has elapsed, step 7) is also entered: the data is wrong, 1 is arranged on the corresponding position of the stored information mark, and then the data is reported to the master station through an alarm.
7. The method for verifying the data of the power acquisition terminal according to claim 2, wherein: in step 3.2), the time interval for the additional reading is one hour.
8. The method for verifying data of an electric power collection terminal according to any one of claims 1 to 7, wherein: daily freezing data is daily freezing electric quantity.
9. The method for verifying data of an electric power collection terminal according to any one of claims 1 to 7, wherein: the length of the read data is M, the number of storage points is N, the number of measurement points is T, the number of bytes stored in the data is M.N.T, and the number of bytes of the stored information mark is M.N.T/8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011061870.1A CN112347072B (en) | 2020-09-30 | 2020-09-30 | Verification method for data of electric power acquisition terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011061870.1A CN112347072B (en) | 2020-09-30 | 2020-09-30 | Verification method for data of electric power acquisition terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112347072A CN112347072A (en) | 2021-02-09 |
CN112347072B true CN112347072B (en) | 2023-07-04 |
Family
ID=74361446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011061870.1A Active CN112347072B (en) | 2020-09-30 | 2020-09-30 | Verification method for data of electric power acquisition terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112347072B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113538881B (en) * | 2021-05-31 | 2023-04-28 | 宁波三星医疗电气股份有限公司 | 485 meter reading method based on intelligent electricity utilization terminal |
CN113590608A (en) * | 2021-09-29 | 2021-11-02 | 国网江苏省电力有限公司营销服务中心 | Data stream processing-based user electricity consumption information collecting and correcting method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107331140A (en) * | 2017-07-17 | 2017-11-07 | 宁波三星医疗电气股份有限公司 | A kind of automatic network-building formula cooperation meter register method |
CN108809716A (en) * | 2018-06-12 | 2018-11-13 | 郑州云海信息技术有限公司 | A kind of method and apparatus of gathered data audit |
CN110806556A (en) * | 2019-10-24 | 2020-02-18 | 国网四川省电力公司成都供电公司 | Metering abnormity on-line monitoring method and system and readable storage medium |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100513840B1 (en) * | 1998-06-30 | 2006-01-12 | 서창전기통신 주식회사 | Automatic metering system weighing instrument |
CN2775621Y (en) * | 2005-02-05 | 2006-04-26 | 上海自来水市北科技有限公司 | Radio water meter |
CN105427571A (en) * | 2015-12-31 | 2016-03-23 | 天津市赛鸣科技有限公司 | Binary channel communication remote meter reading monitoring and analysis system |
CN106842106A (en) * | 2017-02-23 | 2017-06-13 | 广东电网有限责任公司茂名供电局 | Electrical energy meter fault Forecasting Methodology and device |
CN107492246A (en) * | 2017-08-21 | 2017-12-19 | 宁波德晶元科技有限公司 | A kind of Internet of Things single-site data acquisition method and device |
CN108614138A (en) * | 2018-04-03 | 2018-10-02 | 广东电网有限责任公司 | Data benefit based on metering device itself copies mechanism |
CN109682436B (en) * | 2018-12-21 | 2020-06-16 | 金卡智能集团股份有限公司 | Method for additionally reading meter reading data of gas meter of Internet of things |
-
2020
- 2020-09-30 CN CN202011061870.1A patent/CN112347072B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107331140A (en) * | 2017-07-17 | 2017-11-07 | 宁波三星医疗电气股份有限公司 | A kind of automatic network-building formula cooperation meter register method |
CN108809716A (en) * | 2018-06-12 | 2018-11-13 | 郑州云海信息技术有限公司 | A kind of method and apparatus of gathered data audit |
CN110806556A (en) * | 2019-10-24 | 2020-02-18 | 国网四川省电力公司成都供电公司 | Metering abnormity on-line monitoring method and system and readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN112347072A (en) | 2021-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112347072B (en) | Verification method for data of electric power acquisition terminal | |
US20100117856A1 (en) | System and method of high volume import, validation and estimation of meter data | |
CN109191605B (en) | Highway charging rate accuracy evaluation method considering charging path | |
CN102521080B (en) | Computer data recovery method for electricity-consumption information collecting system for power consumers | |
CN112632127B (en) | Data processing method for real-time data acquisition and time sequence of equipment operation | |
CN111711192B (en) | Real-time line loss analysis method and system for lean management of line loss of support station area | |
CN110097275A (en) | A kind of family change relational checking method and device based on platform area power failure data | |
CN104978842A (en) | Self-repair method of low-pressure concentrator clock | |
CN107655515B (en) | On-site defect eliminating method for non-communication fault between acquisition terminal and main station | |
CN115508508A (en) | Carbon emission sensor state monitoring system and method for thermal power station | |
CN114461476B (en) | Memory bank fault detection method, device and system | |
CN113282588A (en) | Method and device for evaluating quality of spatio-temporal data | |
CN108491432B (en) | Electric power system accumulated quantity storage and extraction method based on message abstract, electronic equipment and storage medium | |
CN115660631A (en) | Power distribution terminal state evaluation method based on correction weight fault tree model | |
CN103399289A (en) | Automated testing method used for electricity utilization information collection system | |
CN113722906B (en) | Digital twinning-based data center air conditioning system reliability assessment method | |
CN112345972B (en) | Power distribution network line transformation relation abnormity diagnosis method, device and system based on power failure event | |
CN112114990B (en) | Method for detecting version abnormity of carrier module | |
CN116820821A (en) | Disk failure detection method, apparatus, electronic device and computer readable storage medium | |
CN111398675A (en) | Electric energy meter reading method, device and system | |
CN113139158B (en) | Method and system for monitoring and correcting COMTRADE abnormal recording data based on Gaussian process regression | |
CN113722300A (en) | Electric energy meter operation error calculation data cleaning system and method based on electricity utilization characteristics | |
CN113837579A (en) | Digital analysis statistical method for ATC alarm and field fault log | |
CN113568937A (en) | Electric quantity fitting method based on VEE process | |
CN112261509A (en) | Meter reading scheduling method for electricity consumption information acquisition terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |