CN112334875A - 一种功耗预测方法及装置 - Google Patents
一种功耗预测方法及装置 Download PDFInfo
- Publication number
- CN112334875A CN112334875A CN201880095096.0A CN201880095096A CN112334875A CN 112334875 A CN112334875 A CN 112334875A CN 201880095096 A CN201880095096 A CN 201880095096A CN 112334875 A CN112334875 A CN 112334875A
- Authority
- CN
- China
- Prior art keywords
- power consumption
- user
- application
- daily
- day
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 50
- 238000012360 testing method Methods 0.000 claims abstract description 101
- 238000004891 communication Methods 0.000 claims description 10
- 238000012545 processing Methods 0.000 description 17
- 238000010586 diagram Methods 0.000 description 13
- 230000006870 function Effects 0.000 description 8
- 230000000694 effects Effects 0.000 description 4
- 238000004091 panning Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 238000002813 epsilometer test Methods 0.000 description 2
- 238000011835 investigation Methods 0.000 description 2
- 230000006399 behavior Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 235000019800 disodium phosphate Nutrition 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011031 large-scale manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Power Sources (AREA)
- Telephone Function (AREA)
Abstract
本发明实施例公开了一种功耗预测方法及装置,该方法包括:接收多个用户的历史使用信息,该历史使用信息包括终端使用信息和应用使用信息;根据该多个用户的终端使用信息将多个用户划分为一个或多个用户类别;根据第一用户类别的用户的应用使用信息将第一用户类别的用户所使用的应用划分为多个应用类别;从每个应用类别中获取一个第一应用;针对每个第一应用,测试第一应用在第二终端设备上的第三日耗电量;根据总耗电量确定第一用户类别中的每个用户在第二终端设备的日耗电量,总耗电量为所有第三日耗电量之和。通过实施本申请实施例,能够准确地对第一用户类别中的用户在第二终端设备的日耗电量进行预测。
Description
PCT国内申请,说明书已公开。
Claims (22)
- PCT国内申请,权利要求书已公开。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2018/118626 WO2020107415A1 (zh) | 2018-11-30 | 2018-11-30 | 一种功耗预测方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112334875A true CN112334875A (zh) | 2021-02-05 |
CN112334875B CN112334875B (zh) | 2022-04-29 |
Family
ID=70852643
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201880095096.0A Active CN112334875B (zh) | 2018-11-30 | 2018-11-30 | 一种功耗预测方法及装置 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN112334875B (zh) |
WO (1) | WO2020107415A1 (zh) |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100231616A1 (en) * | 2009-03-16 | 2010-09-16 | Samsung Electronics Co., Ltd. | Method and apparatus for reducing power consumption in electronic equipment using self-emitting type display |
US20100235840A1 (en) * | 2009-03-10 | 2010-09-16 | International Business Machines Corporation | Power management using dynamic application scheduling |
US20120053925A1 (en) * | 2010-08-31 | 2012-03-01 | Steven Geffin | Method and System for Computer Power and Resource Consumption Modeling |
CN103428320A (zh) * | 2013-08-23 | 2013-12-04 | 清华大学 | 基于模型拟合的智能手机功耗评估方法 |
CN103888990A (zh) * | 2012-12-20 | 2014-06-25 | 中国移动通信集团公司 | 终端设备网络业务应用的功耗测试方法、装置及系统 |
CN104636133A (zh) * | 2014-12-31 | 2015-05-20 | 小米科技有限责任公司 | 功耗计算方法及装置 |
CN104954528A (zh) * | 2014-11-04 | 2015-09-30 | 深圳市腾讯计算机系统有限公司 | 终端设备的耗电信息的检测方法和装置 |
CN105718027A (zh) * | 2016-01-20 | 2016-06-29 | 努比亚技术有限公司 | 后台应用程序的管理方法及移动终端 |
CN105830081A (zh) * | 2013-12-06 | 2016-08-03 | 高通股份有限公司 | 生成用于有针对性地保护重要应用的特定于应用的模型的方法和系统 |
CN106133642A (zh) * | 2014-04-08 | 2016-11-16 | 高通股份有限公司 | 在移动设备中通过执行行为分析操作推断应用状态的方法和系统 |
CN106774786A (zh) * | 2016-11-22 | 2017-05-31 | 珠海市魅族科技有限公司 | 一种功耗控制方法以及装置 |
US20170329382A1 (en) * | 2014-11-25 | 2017-11-16 | Huawei Technologies Co., Ltd. | Power management method and power management apparatus for user equipment |
WO2017221240A1 (en) * | 2016-06-21 | 2017-12-28 | Foresight Energy Ltd. | System and method for management and forecasting power consumption data |
CN107783801A (zh) * | 2017-11-06 | 2018-03-09 | 广东欧珀移动通信有限公司 | 应用程序预测模型建立、预加载方法、装置、介质及终端 |
WO2018083202A1 (en) * | 2016-11-02 | 2018-05-11 | Cork Institute Of Technology | System and method for scheduling energy consumption in a network |
CN108089970A (zh) * | 2018-01-11 | 2018-05-29 | 深圳市金立通信设备有限公司 | 预测剩余电量可使用时间的方法、终端及存储介质 |
CN108712575A (zh) * | 2018-05-31 | 2018-10-26 | 平安科技(深圳)有限公司 | 充电提醒方法、装置、计算机设备及存储介质 |
-
2018
- 2018-11-30 WO PCT/CN2018/118626 patent/WO2020107415A1/zh active Application Filing
- 2018-11-30 CN CN201880095096.0A patent/CN112334875B/zh active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100235840A1 (en) * | 2009-03-10 | 2010-09-16 | International Business Machines Corporation | Power management using dynamic application scheduling |
US20100231616A1 (en) * | 2009-03-16 | 2010-09-16 | Samsung Electronics Co., Ltd. | Method and apparatus for reducing power consumption in electronic equipment using self-emitting type display |
US20120053925A1 (en) * | 2010-08-31 | 2012-03-01 | Steven Geffin | Method and System for Computer Power and Resource Consumption Modeling |
CN103888990A (zh) * | 2012-12-20 | 2014-06-25 | 中国移动通信集团公司 | 终端设备网络业务应用的功耗测试方法、装置及系统 |
CN103428320A (zh) * | 2013-08-23 | 2013-12-04 | 清华大学 | 基于模型拟合的智能手机功耗评估方法 |
CN105830081A (zh) * | 2013-12-06 | 2016-08-03 | 高通股份有限公司 | 生成用于有针对性地保护重要应用的特定于应用的模型的方法和系统 |
CN106133642A (zh) * | 2014-04-08 | 2016-11-16 | 高通股份有限公司 | 在移动设备中通过执行行为分析操作推断应用状态的方法和系统 |
CN104954528A (zh) * | 2014-11-04 | 2015-09-30 | 深圳市腾讯计算机系统有限公司 | 终端设备的耗电信息的检测方法和装置 |
US20170329382A1 (en) * | 2014-11-25 | 2017-11-16 | Huawei Technologies Co., Ltd. | Power management method and power management apparatus for user equipment |
CN104636133A (zh) * | 2014-12-31 | 2015-05-20 | 小米科技有限责任公司 | 功耗计算方法及装置 |
CN105718027A (zh) * | 2016-01-20 | 2016-06-29 | 努比亚技术有限公司 | 后台应用程序的管理方法及移动终端 |
WO2017221240A1 (en) * | 2016-06-21 | 2017-12-28 | Foresight Energy Ltd. | System and method for management and forecasting power consumption data |
WO2018083202A1 (en) * | 2016-11-02 | 2018-05-11 | Cork Institute Of Technology | System and method for scheduling energy consumption in a network |
CN106774786A (zh) * | 2016-11-22 | 2017-05-31 | 珠海市魅族科技有限公司 | 一种功耗控制方法以及装置 |
CN107783801A (zh) * | 2017-11-06 | 2018-03-09 | 广东欧珀移动通信有限公司 | 应用程序预测模型建立、预加载方法、装置、介质及终端 |
CN108089970A (zh) * | 2018-01-11 | 2018-05-29 | 深圳市金立通信设备有限公司 | 预测剩余电量可使用时间的方法、终端及存储介质 |
CN108712575A (zh) * | 2018-05-31 | 2018-10-26 | 平安科技(深圳)有限公司 | 充电提醒方法、装置、计算机设备及存储介质 |
Non-Patent Citations (2)
Title |
---|
SAFAA DAWOUD等: "Optimizing the Power Consumption of Mobile Networks Based on Traffic Prediction", 《2014 IEEE 38TH ANNUAL COMPUTER SOFTWARE AND APPLICATIONS CONFERENCE》 * |
王海等: "基于GINI指数分类的嵌入式CPU功耗预测方法", 《计算机学报》 * |
Also Published As
Publication number | Publication date |
---|---|
CN112334875B (zh) | 2022-04-29 |
WO2020107415A1 (zh) | 2020-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109165249B (zh) | 数据处理模型构建方法、装置、服务器和用户端 | |
CN107577522B (zh) | 应用控制方法、装置、存储介质以及电子设备 | |
CN108985489B (zh) | 一种风险预测方法、风险预测装置和终端设备 | |
CN107704876B (zh) | 应用控制方法、装置、存储介质以及电子设备 | |
CN112997134A (zh) | 应用图标显示方法、装置、存储介质及电子设备 | |
CN113780548B (zh) | 用于训练模型的方法、装置、设备以及存储介质 | |
CN112994980B (zh) | 时延测试方法、装置、电子设备和存储介质 | |
CN107766316B (zh) | 评价数据的分析方法、装置及系统 | |
CN111400126A (zh) | 网络服务异常数据检测方法、装置、设备和介质 | |
CN107729144B (zh) | 应用控制方法、装置、存储介质及电子设备 | |
CN114780846A (zh) | 信息检索系统的排序模型训练方法、装置、介质及设备 | |
CN106651410B (zh) | 一种应用管理方法及装置 | |
CN112784102B (zh) | 视频检索方法、装置和电子设备 | |
CN116842238B (zh) | 基于大数据分析的企业数据可视化实现方法及系统 | |
CN112334875B (zh) | 一种功耗预测方法及装置 | |
CN108920064A (zh) | 分屏窗口调节方法、装置、存储介质及电子设备 | |
CN104469092A (zh) | 一种图像采集方法及电子设备 | |
CN114265777B (zh) | 应用程序的测试方法、装置、电子设备及存储介质 | |
CN113190154B (zh) | 模型训练、词条分类方法、装置、设备、存储介质及程序 | |
CN114036391A (zh) | 数据推送方法、装置、电子设备和存储介质 | |
CN113190460A (zh) | 一种测试案例自动生成方法及装置 | |
CN111222739A (zh) | 核电站的任务分配方法及核电站的任务分配系统 | |
CN116704341A (zh) | 一种信息推荐方法、装置、设备及存储介质 | |
CN116383372B (zh) | 基于人工智能的数据分析方法及系统 | |
CN116186389A (zh) | 信息推荐方法、装置、系统、电子设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |