CN112324493A - Deep large shaft bottom water intercepting and collecting system for railway tunnel - Google Patents

Deep large shaft bottom water intercepting and collecting system for railway tunnel Download PDF

Info

Publication number
CN112324493A
CN112324493A CN202010726952.7A CN202010726952A CN112324493A CN 112324493 A CN112324493 A CN 112324493A CN 202010726952 A CN202010726952 A CN 202010726952A CN 112324493 A CN112324493 A CN 112324493A
Authority
CN
China
Prior art keywords
water
tunnel
water collecting
collecting bin
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010726952.7A
Other languages
Chinese (zh)
Inventor
朱廷宇
杨昌宇
王唤龙
刘黎
范圣明
宋智来
王贵虎
李昕晖
范磊
邸成
朱勇
曾云川
桂林岗
曾劲
徐军
黄智�
刘建兵
胡金星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN202010726952.7A priority Critical patent/CN112324493A/en
Publication of CN112324493A publication Critical patent/CN112324493A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A water intercepting and collecting system for the deep and large vertical shaft of railway tunnel is disclosed, which can effectively collect and discharge underground water at the bottom of shaft, ensure the working environment in tunnel and ensure the safety of construction in the work area of vertical shaft. The system comprises a water intercepting structure and a water collecting system, wherein the water collecting system comprises a water collecting bin and a water collecting well, the outer end of the water collecting bin is communicated with a tunnel, a drainage pump house is arranged above the tail end of the water collecting bin, the drainage pump house is connected with a vertical shaft and a shaft bottom channel through a drainage channel, and two ends of the shaft bottom channel are connected with the tunnel; the water interception structure comprises a concrete water blocking block and a water interception tank, wherein the concrete water blocking block is arranged at a shaft bottom channel and a tunnel, so that underground water can naturally flow to the lower end operation surface of the lower end tunnel and is pumped, drained and collected into the water collection bin; the water intercepting tank is arranged at the joint of the tunnel and the water collecting bin, and underground water at the high end of the tunnel is naturally overflown and collected into the water collecting bin; and a water pumping device is arranged in the drainage pump room in a centralized manner, and underground water in the water collecting bin is pumped and discharged out of the hole through a drainage channel and a vertical shaft.

Description

Deep large shaft bottom water intercepting and collecting system for railway tunnel
Technical Field
The invention relates to a railway tunnel, in particular to a water intercepting and collecting system at the bottom of a deep large vertical shaft of the railway tunnel.
Background
With the vigorous development of railway engineering in China, a plurality of extra-long railway tunnels with deep and large vertical shafts emerge in west hard mountainous areas, particularly transverse mountains. The geological conditions of the western mountainous area are complex, the cracks of the rock mass are developed and irregular, and in addition, the underground water in the work area of the railway tunnel shaft is large in water quantity, high in water pressure and irregular due to the fact that the buried depth of the bottom of the deep large shaft is large. How to collect scattered and seal-free underground water in the tunnel, ensure the working environment in the tunnel, realize the centralized discharge of the underground water, prevent well flooding accidents, and become a big problem to be solved in a railway tunnel shaft work area.
Disclosure of Invention
The technical problem to be solved by the invention is to provide a shaft bottom water intercepting and collecting system for a deep and large shaft of a railway tunnel, so that underground water at the shaft bottom is effectively collected and discharged, the operating environment in the tunnel is guaranteed, and the construction safety of a shaft work area is ensured.
The technical scheme adopted by the invention for solving the technical problems is as follows:
the invention relates to a water intercepting and collecting system for a deep and large vertical shaft bottom of a railway tunnel, which comprises a water intercepting structure and a water collecting system and is characterized in that: the water collecting system comprises a water collecting bin and a water collecting well, the outer end of the water collecting bin is communicated with the tunnel, a drainage pump house is arranged above the tail end of the water collecting bin, the drainage pump house is connected with the vertical shaft and the shaft bottom channel through a drainage channel, and two ends of the shaft bottom channel are connected with the tunnel; the water interception structure comprises a concrete water blocking block and a water interception groove, wherein the concrete water blocking block is arranged at a shaft bottom channel and a tunnel, so that underground water can naturally flow to the lower end operation surface of the lower end tunnel, and is pumped, drained and collected into the water collection bin; the water intercepting tank is arranged at the joint of the tunnel and the water collecting bin, and underground water at the high end of the tunnel is naturally overflown and collected into the water collecting bin; and a water pumping device is arranged in the drainage pump room in a centralized manner, and underground water in the water collecting bin is pumped and discharged out of the hole through a drainage channel and a vertical shaft.
The water collecting bin comprises a main water collecting bin and an auxiliary water collecting bin which are annularly distributed, and a water collecting well is communicated with the tail ends of the main water collecting bin and the auxiliary water collecting bin.
The invention has the advantages that the system is internally provided with the water interception structure and the water collection system, scattered underground water in the tunnel is collected through the water interception structure, the comfortable construction operation environment of the well bottom is ensured, and the water collection system has sufficient water storage capacity and discharge capacity and can ensure the construction safety of the vertical shaft work area; the system is simple and clear in arrangement, and has very obvious social and economic benefits and application values because all facilities are connected in order.
Drawings
The specification includes the following three drawings:
FIG. 1 is a schematic plan view of a shaft bottom water intercepting and collecting system in the shaft bottom water intercepting and collecting system of the deep and large shaft of the railway tunnel;
FIG. 2 is a schematic cross-sectional view of a water collecting bin in the bottom water intercepting and collecting system of the deep and large vertical shaft of the railway tunnel;
FIG. 3 is a schematic sectional view of a drainage pump house in the bottom water intercepting and collecting system of the deep and large shaft of the railway tunnel;
the figure shows the components, the part names and the corresponding marks: the system comprises a tunnel 10, a low end 10b, a high end 10a, a vertical shaft 11, a concrete water stop block 21, a water intercepting tank 22, a main water collecting bin 31a, an auxiliary water collecting bin 31b, a drainage pump room 32, a drainage channel 33, a well bottom channel 34 and a water collecting well 36.
Detailed Description
The invention is further described below with reference to the accompanying drawings.
Referring to fig. 1, the bottom water intercepting and collecting system of the deep and large vertical shaft of the railway tunnel comprises a water intercepting structure and a water collecting system. The water collecting system comprises a water collecting bin and a water collecting well 36, the outer end of the water collecting bin is communicated with the tunnel 10, a drainage pump house 32 is arranged above the tail end of the water collecting bin, the drainage pump house 32 is connected with the vertical shaft 11 and the shaft bottom channel 34 through a drainage channel 33, two ends of the shaft bottom channel 34 are connected with the tunnel 10, the water collecting system has sufficient water storage capacity and discharge capacity, and the construction safety of a vertical shaft work area can be ensured. The water interception structure comprises a concrete water blocking block 21 and a water interception groove 22, so that scattered underground water in the hole can be collected, and a comfortable construction operation environment at the bottom of the hole is guaranteed. The concrete water retaining block 21 is arranged at the position of the underground channel 34 and the tunnel 10, so that underground water can naturally flow to the operation surface of the lower end 10b of the lower end tunnel 10 and is pumped, drained and collected in the water collecting bin. The water intercepting tank 22 is arranged at the joint of the tunnel 10 and the water collecting bin, and underground water in the high end 10a of the tunnel 10 naturally overflows and collects into the water collecting bin, so that the underground water at the high end of the tunnel is prevented from overflowing to a waterless area. And a water pumping device is arranged in the drainage pump room 32 in a centralized manner, and underground water in the water collecting bin is pumped and discharged out of the tunnel through the drainage channel 33 and the vertical shaft 20.
Referring to fig. 1 to 3, the water collecting bin comprises a main water collecting bin 31a and an auxiliary water collecting bin 31b which are annularly arranged, and a water collecting well 36 is communicated with the tail ends of the main water collecting bin 31a and the auxiliary water collecting bin 31 b. And ensures that the water storage capacity of the water collection bin 31a and the auxiliary water collection bin 31b is higher than the maximum water inflow amount of the tunnel 10. The drainage pump house 32 is disposed between the sump and the shaft 11, and the drainage passage 33 is disposed between the drainage pump house 32 and the upside of the ingate of the shaft 20. The water pumping equipment and the drainage pipeline are arranged in the drainage pump house 32, and the underground water is pumped and drained out of the hole through the drainage channel 33 and the vertical shaft 11. The drainage channel 33 is used for placing a drainage pipeline and can avoid mutual interference between the drainage pipeline and concrete feeding work at the ingate.
The bottom of the intercepting water tank 22 is paved with gravels with a certain thickness to prevent siltation.
The foregoing is illustrative of the principles of the present invention for the bottom intercepting and catchment system of a deep and large shaft of a railway tunnel and is not intended to limit the invention to the specific constructions and applications shown and described, and it is intended to cover all modifications and equivalents as may be employed within the scope of the invention.

Claims (4)

1. The deep and large shaft bottom water intercepting and collecting system for railway tunnel includes water intercepting structure and water collecting system, and features that: the water collecting system comprises a water collecting bin and a water collecting well, the outer end of the water collecting bin is communicated with the tunnel (10), a drainage pump room (32) is arranged above the tail end of the water collecting bin, the drainage pump room (32) is connected with the vertical shaft (11) and the shaft bottom channel (34) through a drainage channel (33), and two ends of the shaft bottom channel (34) are connected with the tunnel (10); the water intercepting structure comprises a concrete water retaining block (21) and a water intercepting tank (22), wherein the concrete water retaining block (21) is arranged at a shaft bottom channel (34) and a tunnel (10), so that underground water can naturally flow to the operation surface of the lower end (10b) of the lower end tunnel (10) and is pumped, drained and collected into a water collecting bin; the water intercepting tank (22) is arranged at the joint of the tunnel (10) and the water collecting bin, and underground water in the high end (10a) of the tunnel (10) is naturally overflown and collected into the water collecting bin; and water pumping equipment is arranged in the drainage pump room (32) in a centralized manner, and underground water in the water collecting bin is pumped and discharged out of the hole through the drainage channel (33) and the vertical shaft (20).
2. The bottom water intercepting and collecting system for the deep and large shaft of the railway tunnel as claimed in claim 1, wherein: the water collecting bin comprises a main water collecting bin (31a) and an auxiliary water collecting bin (31b) which are annularly distributed, and the water collecting well is communicated with the tail ends of the main water collecting bin (31a) and the auxiliary water collecting bin (31 b).
3. The bottom water intercepting and collecting system for the deep and large shaft of the railway tunnel as claimed in claim 1, wherein: the drainage pump room (32) is arranged between the water collecting bin and the vertical shaft (11), and the drainage channel (33) is arranged between the upside of the ingate of the vertical shaft (20) and the drainage pump room (32).
4. The bottom water intercepting and collecting system for the deep and large shaft of the railway tunnel as claimed in claim 1, wherein: and gravels with a certain thickness are paved at the bottom of the water intercepting tank (22).
CN202010726952.7A 2020-07-26 2020-07-26 Deep large shaft bottom water intercepting and collecting system for railway tunnel Pending CN112324493A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010726952.7A CN112324493A (en) 2020-07-26 2020-07-26 Deep large shaft bottom water intercepting and collecting system for railway tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010726952.7A CN112324493A (en) 2020-07-26 2020-07-26 Deep large shaft bottom water intercepting and collecting system for railway tunnel

Publications (1)

Publication Number Publication Date
CN112324493A true CN112324493A (en) 2021-02-05

Family

ID=74302923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010726952.7A Pending CN112324493A (en) 2020-07-26 2020-07-26 Deep large shaft bottom water intercepting and collecting system for railway tunnel

Country Status (1)

Country Link
CN (1) CN112324493A (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007146568A (en) * 2005-11-30 2007-06-14 Public Works Research Institute Groundwater draining method and catchment well
KR100783747B1 (en) * 2007-08-08 2007-12-10 (주)해석 Drain pipe
JP2010090566A (en) * 2008-10-06 2010-04-22 Shimizu Corp Groundwater intake facility
JP2010101062A (en) * 2008-10-23 2010-05-06 Ohbayashi Corp Drainage structure of underground water, and construction method for tunnel equipped with the drainage structure
CN207131448U (en) * 2017-08-17 2018-03-23 中铁二院工程集团有限责任公司 The tunnel new pinniform of quick counter-slope construction rich water section cuts drain structure
CN108843387A (en) * 2018-07-23 2018-11-20 中铁第四勘察设计院集团有限公司 A kind of bridge tunnel abutting lot tunnel portal drainage system
CN208441890U (en) * 2018-06-29 2019-01-29 中铁十五局集团有限公司 Long-distance reverse slope drainage system for construction tunnel
CN209083331U (en) * 2018-11-01 2019-07-09 长安大学 A kind of long tunnel inclined shaft start tunneling district drainage system
CN110185493A (en) * 2019-06-26 2019-08-30 中铁二十三局集团第三工程有限公司 Major long tunnel counter-slope drainage and construction method under a kind of complex geological condition
CN110965631A (en) * 2019-12-30 2020-04-07 中铁二院工程集团有限责任公司 Deep tunnel drainage shaft with energy dissipation function
CN210315923U (en) * 2019-07-04 2020-04-14 中铁二院工程集团有限责任公司 Water intercepting and draining structure for waste slag yard
CN111173563A (en) * 2020-03-04 2020-05-19 中铁第六勘察设计院集团有限公司 Merging structure in tunnel drainage system and construction method
CN111322086A (en) * 2020-04-06 2020-06-23 中铁二院贵阳勘察设计研究院有限责任公司 Connection structure of sluicing cave and main tunnel

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007146568A (en) * 2005-11-30 2007-06-14 Public Works Research Institute Groundwater draining method and catchment well
KR100783747B1 (en) * 2007-08-08 2007-12-10 (주)해석 Drain pipe
JP2010090566A (en) * 2008-10-06 2010-04-22 Shimizu Corp Groundwater intake facility
JP2010101062A (en) * 2008-10-23 2010-05-06 Ohbayashi Corp Drainage structure of underground water, and construction method for tunnel equipped with the drainage structure
CN207131448U (en) * 2017-08-17 2018-03-23 中铁二院工程集团有限责任公司 The tunnel new pinniform of quick counter-slope construction rich water section cuts drain structure
CN208441890U (en) * 2018-06-29 2019-01-29 中铁十五局集团有限公司 Long-distance reverse slope drainage system for construction tunnel
CN108843387A (en) * 2018-07-23 2018-11-20 中铁第四勘察设计院集团有限公司 A kind of bridge tunnel abutting lot tunnel portal drainage system
CN209083331U (en) * 2018-11-01 2019-07-09 长安大学 A kind of long tunnel inclined shaft start tunneling district drainage system
CN110185493A (en) * 2019-06-26 2019-08-30 中铁二十三局集团第三工程有限公司 Major long tunnel counter-slope drainage and construction method under a kind of complex geological condition
CN210315923U (en) * 2019-07-04 2020-04-14 中铁二院工程集团有限责任公司 Water intercepting and draining structure for waste slag yard
CN110965631A (en) * 2019-12-30 2020-04-07 中铁二院工程集团有限责任公司 Deep tunnel drainage shaft with energy dissipation function
CN111173563A (en) * 2020-03-04 2020-05-19 中铁第六勘察设计院集团有限公司 Merging structure in tunnel drainage system and construction method
CN111322086A (en) * 2020-04-06 2020-06-23 中铁二院贵阳勘察设计研究院有限责任公司 Connection structure of sluicing cave and main tunnel

Non-Patent Citations (12)

* Cited by examiner, † Cited by third party
Title
KI-IL SONG: ""Identification, remediation, and analysis of karst sinkholes in the longest railroad tunnel in South Korea"", 《ENGINEERING GEOLOGY》 *
KI-IL SONG: ""Identification, remediation, and analysis of karst sinkholes in the longest railroad tunnel in South Korea"", 《ENGINEERING GEOLOGY》, 15 May 2012 (2012-05-15) *
付刚: ""北京地铁降水方法研究与应用"", 《中国优秀硕士论文全文库工程科技II辑》 *
付刚: ""北京地铁降水方法研究与应用"", 《中国优秀硕士论文全文库工程科技II辑》, no. 3, 15 March 2017 (2017-03-15) *
卓瑞忠: ""谈城市下穿隧道排水系统设计"", 《山西建筑》 *
卓瑞忠: ""谈城市下穿隧道排水系统设计"", 《山西建筑》, no. 3, 31 March 2019 (2019-03-31) *
巩江峰,朱勇: ""从施工工艺和防排水效果反思铁路隧道的防排水设计"", 《铁道标准设计》 *
巩江峰,朱勇: ""从施工工艺和防排水效果反思铁路隧道的防排水设计"", 《铁道标准设计》, vol. 62, no. 4, 28 March 2018 (2018-03-28) *
王磊,舒东利: ""铁路隧道排水方法与工程实践"", 《铁道标准设计》 *
王磊,舒东利: ""铁路隧道排水方法与工程实践"", 《铁道标准设计》, vol. 64, no. 6, 6 December 2019 (2019-12-06) *
陆泳: ""古迹坪隧道雪沟斜井排水施工技术"", 《绿色环保建材》 *
陆泳: ""古迹坪隧道雪沟斜井排水施工技术"", 《绿色环保建材》, no. 8, 31 August 2019 (2019-08-31) *

Similar Documents

Publication Publication Date Title
CN101550701B (en) Method and device for treating partial water burst of foundation ditch
RU2448216C2 (en) Dehydration method of mineral deposit
CN208441890U (en) Long-distance reverse slope drainage system for construction tunnel
CN201874614U (en) Drainage structure for emptying overhaul of derivation tunnel
CN203530996U (en) Multi-well-point combined type precipitation facility
CN208533546U (en) A kind of series-parallel underground stereo drainage system suitable for side landslide engineering
CN111173563A (en) Merging structure in tunnel drainage system and construction method
CN103939109A (en) Permanent blocking inclined shaft structure isolated from tunnel
CN203441529U (en) Shaft multiple section parallel interception device
CN101446107B (en) Layered drainage structure of underground powerhouse chamber of hydropower station in water-rich region and construction method thereof
CN212927943U (en) Reverse slope drainage system in open cut tunnel construction process
CN112324493A (en) Deep large shaft bottom water intercepting and collecting system for railway tunnel
CN106968227B (en) Maintenance arrangement structure and maintenance method of permanent plugs of diversion tunnel of high arch dam
CN210288405U (en) Local deep pit water conservancy diversion escape canal system
CN111322086A (en) Connection structure of sluicing cave and main tunnel
CN112012789A (en) Shaft bottom collection drainage system of railway tunnel long and large inclined shaft
CN212272299U (en) Water collecting and draining structure of mine method tunnel
CN114575359B (en) Weak-permeability soil layer side slope underground flood control method
CN206928255U (en) The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN104088664B (en) A kind of mine wastewater treatment method and system of upwards filling mining
CN212803334U (en) Tunnel inverted arch lower one-way drain pipe convenient for drainage and pressure relief
CN211773873U (en) Drainage system of piping lane
CN111005761A (en) Water collecting and draining structure of mine-method tunnel and construction method thereof
CN106049543B (en) Tunnel inspection shaft with sluicing anti-floating function
CN210827352U (en) Rubber dam water supply system applied to anti-seepage river channel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210205

WD01 Invention patent application deemed withdrawn after publication