- CN103939109A CN103939109A CN201410159719.XA CN201410159719A CN103939109A CN 103939109 A CN103939109 A CN 103939109A CN 201410159719 A CN201410159719 A CN 201410159719A CN 103939109 A CN103939109 A CN 103939109A
- Authority
- CN
- China
- Prior art keywords
- inclined shaft
- wall
- tunnel
- block wall
- ditch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention relates to a permanent blocking inclined shaft structure isolated from a tunnel. An inclined shaft is a temporary project, supporting measures are weak, and therefore the inclined shaft is prone to collapsing, and underground water leaks and can not be led out. A lining at the bottom of the inclined shaft is enhanced to serve as a permanent structure, and an inclined shaft body stone blocking wall and two blocking walls are arranged along an inclined shaft channel. A transverse well direction ditch is arranged on the upper slope toe of a first blocking wall body in an excavated mode, connected into a longitudinal well direction ditch arranged at the bottom of the wall body in an excavated mode and then connected into a transverse well direction water flowing groove formed in the lower slope toe of the wall body in an excavated mode. A longitudinal well direction water flowing groove formed along one side of the lower slope of the first blocking wall penetrates through the second blocking wall and is connected into a water flowing groove formed in the upper slope of a tunnel-entering opening of the inclined shaft in an excavated mode and connected into a side ditch in the tunnel through a longitudinal well direction drainage pipe, and finally water is drained out. The inclined shaft can be safely isolated from the tunnel, besides, the water in the inclined shaft can be drained out normally, so that structure safety of the bottom of the inclined shaft is guaranteed, and water drainage is smooth, and therefore no threat on the tunnel can be caused.
Description
Technical field
the invention belongs to tunnel traffic field of engineering technology, be specifically related to permanent shutoff inclined shaft structure a kind of and tunnel isolation.
Background technology
The traffic engineering such as China railways, highway has been built a large amount of construction of tunnel, length and super long tunnel are for accelerating construction progress, shortening construction period, often in conjunction with landform condition setting the service galleries such as inclined shaft, Heng Dong, vertical shaft as increasing the means of work plane, and more in the majority with inclined shaft.Inclined shaft is temporary works often, only use in construction period, therefore its supporting measure relatively a little less than, construction period can be taked local stiffening measure at any time, after finishing using, long-term placement easily produces the phenomenon of caving in, falling rocks tumbles and can cause direct harm to tunnel, inclined shaft bottom, simultaneously, in general inclined shaft, all there is ground water seepage, flowing water can only flow to tunnel Zheng Dong along slope, as carry silt secretly, be easy to stop up Zheng Dong gutter, therefore, need to take a kind of appropriate plugging structure, by inclined shaft and tunnel safety isolation, water in inclined shaft normally can be drained again simultaneously, tunnel itself is threatened avoiding.
Summary of the invention
The object of this invention is to provide permanent shutoff inclined shaft structure a kind of and tunnel isolation, can, by inclined shaft and tunnel safety isolation, the water in inclined shaft normally can be drained again.
The technical solution adopted in the present invention is:
With the permanent shutoff inclined shaft structure of tunnel isolation, be provided with the inclined shaft passage of incoming tunnel, it is characterized in that:
Inclined shaft passage to the access section in tunnel arranges shaft bottom permanent lining, secondary lining and forms reinforcing section, in the inclined shaft passage of reinforcing section, is disposed with inclined shaft well bore stone cut off wall and twice block wall Zi upward slope to descending;
The upper toe of inclined shaft well bore stone cut off wall body of wall dig horizontal well to ditch, the vertical well of burying underground with body of wall bottom to gutter be communicated with;
The upper toe of first block wall body of wall dig horizontal well to ditch, this horizontal well to the vertical well that digs of ditch access first block wall body of wall bottom to ditch, this vertical well to the horizontal well that digs of ditch access first block wall body of wall descending toe to gutter channel, this horizontal well to the vertical well that arranges of gutter channel and first block wall descending one side to gutter channel be communicated with, this vertical well to gutter channel through second block wall, access inclined shaft enter tunnel mouth go up a slope the horizontal well that digs to gutter channel in, this horizontal well to gutter channel by the vertical well in this place to gutter incoming tunnel in lateral sulcus.
In the body of wall of inclined shaft well bore stone cut off wall and first block wall, be provided with vertical well to spilled water hole.
Between first block wall and second block wall on the path of gutter channel, between second block wall and tunnel, on the path of gutter channel, all dig sedimentation basin.
The ditch of first block wall and second block wall all offers inspection passage through place, and the inspection channel setting of first block wall has steel casement door.
The entrance of all spilled water holes and gutter is provided with screen pack.
The present invention has the following advantages:
The present invention is based on the existence conditions of inclined shaft, arrange one to twice block wall in inclined shaft bottom, one to two sedimentation basin, can, by inclined shaft and tunnel safety isolation, the water in inclined shaft normally can be drained again, ensure inclined shaft shaft bottom structural safety, draining is unimpeded, can not threaten to tunnel itself, well bore stone cut off wall also can keep at a certain distance away and arrange flexibly according to factors such as inclined shaft length, plurality of advantages such as having easy construction, reduce investment outlay, be safe and reliable.
Brief description of the drawings
Fig. 1 is plan view of the present invention.
Fig. 2 is longitudinal plan of the present invention.
Fig. 3 is I-I sectional drawing of the present invention.
Fig. 4 is II-II sectional drawing of the present invention.
In figure, 1-shaft bottom permanent lining, secondary lining, 2-second block wall, 3-checks passage, 4-first block wall, 5-inclined shaft well bore stone cut off wall, 6-spilled water hole, 7-gutter, 8-ditch, 9-sedimentation basin, 10-gutter channel, 11-steel casement door.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the present invention will be described in detail.
The permanent shutoff inclined shaft structure of a kind of and tunnel isolation the present invention relates to, that existing inclined shaft passage is transformed to the structure of reinforcing, comprise the inclined shaft passage of incoming tunnel, inclined shaft passage to the access section in tunnel arranges shaft bottom permanent lining, secondary lining 1 and forms reinforcing section, and the rock mass in inclined shaft passage is reinforced.In the inclined shaft passage of reinforcing section, be disposed with inclined shaft well bore stone cut off wall 5 and twice block wall Zi going up a slope to descending.
Inclined shaft well bore stone cut off wall 5 is used for tackling the Rolling Stone after inclined shaft partial collapse, avoid directly impacting the block wall of descending, the quantity of inclined shaft well bore stone cut off wall 5 can keep at a certain distance away and arrange flexibly according to inclined shaft length, the upper toe of inclined shaft well bore stone cut off wall 5 bodies of wall dig horizontal well to ditch 8, the vertical well of burying underground with body of wall bottom to gutter 7 be communicated with.
The upper toe of first block wall 4 bodies of wall dig horizontal well to ditch 8, this horizontal well to ditch 8 access vertical well that first block wall 4 bodies of wall bottoms dig to ditch 8, this vertical well to ditch 8 access horizontal well that first block wall 4 body of wall descending toes dig to gutter channel 10, this horizontal well to gutter channel 10 and the 4 descending one side settings of first block wall vertical well to gutter channel 10 be communicated with, this vertical well to gutter channel 10 through second block wall 2, access inclined shaft enter tunnel mouth go up a slope the horizontal well that digs to gutter channel 10 in, this horizontal well to gutter channel 10 by the vertical well in this place to gutter 7 incoming tunnels in lateral sulcus.
In the body of wall of inclined shaft well bore stone cut off wall 5 and first block wall 4, be provided with vertical well to spilled water hole 6.Between first block wall 4 and second block wall 2 on the path of gutter channel 10, between second block wall 2 and tunnel, on the path of gutter channel 10, all dig sedimentation basin 9, with precipitation silt, what ensure to flow out is clear water, results in blockage after avoiding flowing into tunnel lateral sulcus.First block wall 4 all offers and checks passage 3 through place with the ditch 8 of second block wall 2, and the inspection passage 3 of first block wall 4 is provided with steel casement door 11.The entrance of all spilled water holes 6 and gutter 7 is provided with screen pack, prevents from stopping up, and makes inclined shaft seep water unimpeded excretion to tunnel lateral sulcus the final tunnel of discharging.
It is cited that content of the present invention is not limited to embodiment, and the conversion of any equivalence that those of ordinary skill in the art take technical solution of the present invention by reading manual of the present invention, is claim of the present invention and contains.
Claims (5)
1. with the permanent shutoff inclined shaft structure of tunnel isolation, be provided with the inclined shaft passage of incoming tunnel, it is characterized in that:
Inclined shaft passage to the access section in tunnel arranges shaft bottom permanent lining, secondary lining (1) and forms reinforcing section, in the inclined shaft passage of reinforcing section, is disposed with inclined shaft well bore stone cut off wall (5) and twice block wall Zi upward slope to descending;
The upper toe of inclined shaft well bore stone cut off wall (5) body of wall dig horizontal well to ditch (8), the vertical well of burying underground with body of wall bottom to gutter (7) be communicated with;
The upper toe of first block wall (4) body of wall dig horizontal well to ditch (8), this horizontal well to the vertical well that digs of ditch (8) access first block wall (4) body of wall bottom to ditch (8), this vertical well to the horizontal well that digs of ditch (8) access first block wall (4) body of wall descending toe to gutter channel (10), this horizontal well to the vertical well that arranges of gutter channel (10) and first block wall (4) descending one side to gutter channel (10) be communicated with, this vertical well to gutter channel (10) through second block wall (2), access inclined shaft enter tunnel mouth go up a slope the horizontal well that digs to gutter channel (10) in, this horizontal well to gutter channel (10) by the vertical well in this place to gutter (7) incoming tunnel in lateral sulcus.
2. permanent shutoff inclined shaft structure of isolating with tunnel according to claim 1, is characterized in that:
In the body of wall of inclined shaft well bore stone cut off wall (5) and first block wall (4), be provided with vertical well to spilled water hole (6).
3. permanent shutoff inclined shaft structure of isolating with tunnel according to claim 1, is characterized in that:
Between first block wall (4) and second block wall (2) on the path of gutter channel (10), between second block wall (2) and tunnel, on the path of gutter channel (10), all dig sedimentation basin (9).
4. permanent shutoff inclined shaft structure of isolating with tunnel according to claim 3, is characterized in that:
First block wall (4) all offers and checks passage (3) through place with the ditch (8) of second block wall (2), and the inspection passage (3) of first block wall (4) is provided with steel casement door (11).
5. permanent shutoff inclined shaft structure of isolating with tunnel according to claim 4, is characterized in that:
The entrance of all spilled water holes (6) and gutter (7) is provided with screen pack.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410159719.XA CN103939109B (en) | 2014-04-21 | 2014-04-21 | The permanent shutoff inclined shaft structure of isolating with tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410159719.XA CN103939109B (en) | 2014-04-21 | 2014-04-21 | The permanent shutoff inclined shaft structure of isolating with tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103939109A true CN103939109A (en) | 2014-07-23 |
CN103939109B CN103939109B (en) | 2016-04-13 |
Family
ID=51186955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410159719.XA Active CN103939109B (en) | 2014-04-21 | 2014-04-21 | The permanent shutoff inclined shaft structure of isolating with tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103939109B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104790351A (en) * | 2015-04-23 | 2015-07-22 | 化工部长沙设计研究院 | Flood drainage system blockage structure with underground spring water and tailing seeping water drainage function |
CN105604607A (en) * | 2016-03-02 | 2016-05-25 | 中铁第一勘察设计院集团有限公司 | Flow splitting system between ditches in two sides in water-rich tunnel provided with inclined shafts and flow splitting method of flow splitting system |
CN109681213A (en) * | 2019-01-09 | 2019-04-26 | 济南城建集团有限公司 | One kind inclined shaft end increase vertical shaft become a full member hole accelerate Impacts Evaluation of Urban Tunnel construction method |
CN113565524A (en) * | 2021-08-04 | 2021-10-29 | 中铁二院工程集团有限责任公司 | Groove type inclined shaft and tunnel structure capable of preventing outburst sand gushing in operation period and design method |
CN113685227A (en) * | 2021-08-25 | 2021-11-23 | 中铁二院工程集团有限责任公司 | Swing wing type structure for preventing and treating sudden water gushing during operation of inclined shaft and design method |
CN114483185A (en) * | 2022-02-17 | 2022-05-13 | 中铁二院工程集团有限责任公司 | Overflow-prevention structure for operating period of diffusion-accumulation inclined shaft and construction method |
CN114960483A (en) * | 2022-04-22 | 2022-08-30 | 浙江华东工程建设管理有限公司 | Diversion tail water tunnel reconstruction plug upstream permanent drainage structure and drainage method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002371785A (en) * | 2001-06-19 | 2002-12-26 | Okumura Corp | Method for draining pressurized water in ground on planned tunneling line |
CN202047865U (en) * | 2011-04-21 | 2011-11-23 | 王国伟 | Simple U-shaped enclosed water guide apparatus used in coal mine tunnel |
CN202937303U (en) * | 2012-12-14 | 2013-05-15 | 中铁二十三局集团有限公司 | Drainage system for extra-long tunnel |
CN203114340U (en) * | 2013-01-17 | 2013-08-07 | 陕西陕煤黄陵矿业有限公司 | Drainage device for constructing inclined shaft |
CN203796274U (en) * | 2014-04-21 | 2014-08-27 | 中铁第一勘察设计院集团有限公司 | Permanent inclined shaft blocking structure isolated from tunnel |
-
2014
- 2014-04-21 CN CN201410159719.XA patent/CN103939109B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002371785A (en) * | 2001-06-19 | 2002-12-26 | Okumura Corp | Method for draining pressurized water in ground on planned tunneling line |
CN202047865U (en) * | 2011-04-21 | 2011-11-23 | 王国伟 | Simple U-shaped enclosed water guide apparatus used in coal mine tunnel |
CN202937303U (en) * | 2012-12-14 | 2013-05-15 | 中铁二十三局集团有限公司 | Drainage system for extra-long tunnel |
CN203114340U (en) * | 2013-01-17 | 2013-08-07 | 陕西陕煤黄陵矿业有限公司 | Drainage device for constructing inclined shaft |
CN203796274U (en) * | 2014-04-21 | 2014-08-27 | 中铁第一勘察设计院集团有限公司 | Permanent inclined shaft blocking structure isolated from tunnel |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104790351A (en) * | 2015-04-23 | 2015-07-22 | 化工部长沙设计研究院 | Flood drainage system blockage structure with underground spring water and tailing seeping water drainage function |
CN104790351B (en) * | 2015-04-23 | 2016-05-11 | 化工部长沙设计研究院 | There is the flood drainage system plugging structure of the underground spring of row and mine tailing water seepage function |
CN105604607A (en) * | 2016-03-02 | 2016-05-25 | 中铁第一勘察设计院集团有限公司 | Flow splitting system between ditches in two sides in water-rich tunnel provided with inclined shafts and flow splitting method of flow splitting system |
CN109681213A (en) * | 2019-01-09 | 2019-04-26 | 济南城建集团有限公司 | One kind inclined shaft end increase vertical shaft become a full member hole accelerate Impacts Evaluation of Urban Tunnel construction method |
CN109681213B (en) * | 2019-01-09 | 2024-03-08 | 济南城建集团有限公司 | Construction method for accelerating urban underground road by adding vertical shaft turning positive hole at inclined shaft end |
CN113565524A (en) * | 2021-08-04 | 2021-10-29 | 中铁二院工程集团有限责任公司 | Groove type inclined shaft and tunnel structure capable of preventing outburst sand gushing in operation period and design method |
CN113565524B (en) * | 2021-08-04 | 2022-04-08 | 中铁二院工程集团有限责任公司 | Groove type inclined shaft and tunnel structure capable of preventing outburst sand gushing in operation period and design method |
CN113685227A (en) * | 2021-08-25 | 2021-11-23 | 中铁二院工程集团有限责任公司 | Swing wing type structure for preventing and treating sudden water gushing during operation of inclined shaft and design method |
CN114483185A (en) * | 2022-02-17 | 2022-05-13 | 中铁二院工程集团有限责任公司 | Overflow-prevention structure for operating period of diffusion-accumulation inclined shaft and construction method |
CN114483185B (en) * | 2022-02-17 | 2022-09-13 | 中铁二院工程集团有限责任公司 | Overflow-prevention structure for operating period of diffusion-accumulation inclined shaft and construction method |
CN114960483A (en) * | 2022-04-22 | 2022-08-30 | 浙江华东工程建设管理有限公司 | Diversion tail water tunnel reconstruction plug upstream permanent drainage structure and drainage method |
CN114960483B (en) * | 2022-04-22 | 2024-01-12 | 浙江华东工程建设管理有限公司 | Diversion tail water hole reconstruction plugging head upstream permanent drainage structure and drainage method |
Also Published As
Publication number | Publication date |
---|---|
CN103939109B (en) | 2016-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103939109B (en) | The permanent shutoff inclined shaft structure of isolating with tunnel | |
CN101922303B (en) | Treatment method for tunnel passing through underground river karst hall | |
CN206386150U (en) | A kind of Underground Subway Station draining and examination and repair system | |
CN107237650B (en) | Drilling siphon negative pressure drainage system and method for treating water seepage of tunnel wall | |
CN103758123B (en) | The construction method of manually digging hole filling pile retaining wall lining | |
CN107035401A (en) | A kind of abandoned mine fire damp administers new technology | |
CN105179011B (en) | A kind of tunnel closure facility and its method for blocking | |
CN107131001A (en) | A kind of and water delivery and the Railway Tunnel of communication function | |
CN108547639B (en) | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings | |
CN102635402A (en) | Siphon drainage method for tunnel wall water seepage disposal by using dipping borehole | |
CN206530363U (en) | One kind can the outer drainage system of maintenance type railway tunnel bottom structure | |
CN105673074A (en) | Tunnel base local deep-buried drainage ditch structure | |
CN109441482A (en) | A kind of cup type pre-pouring grout reinforcement means of tunneling boring curtain-grouting | |
CN106812542A (en) | A kind of use prefabricated components and preceding slotting shield build the construction method of subway station | |
CN104791007A (en) | Water draining method for tunnel construction process of penetrating through water-rich fracture zone | |
CN104234726A (en) | Internal dewatering and drainage construction method for tunnel passing through water-rich unconformable contact zone | |
CN107152294A (en) | High hydraulic pressure big flow Karst Tunnel underground water seal blocking method | |
CN108678753B (en) | Reverse-slope tunnel construction method | |
CN206448286U (en) | It is a kind of to be used to reduce the radial system of grey field dam seepage line | |
CN203796274U (en) | Permanent inclined shaft blocking structure isolated from tunnel | |
CN102720511A (en) | Tunnel construction structure for draining and desilting | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN207454024U (en) | A kind of inclined shaft and the main tunnel intersection section anti-water damage structure of inclined shaft | |
CN102296962B (en) | Adverse slope excavating construction method of large-section tunnel in water-rich tunnel section | |
RU2590153C1 (en) | Method for cascade dehydration of landslip body of slopes or walls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |