CN112324460B - 一种旋转式连续掘进机及其基于螺旋管片的施工方法 - Google Patents
一种旋转式连续掘进机及其基于螺旋管片的施工方法 Download PDFInfo
- Publication number
- CN112324460B CN112324460B CN202011597480.6A CN202011597480A CN112324460B CN 112324460 B CN112324460 B CN 112324460B CN 202011597480 A CN202011597480 A CN 202011597480A CN 112324460 B CN112324460 B CN 112324460B
- Authority
- CN
- China
- Prior art keywords
- spiral
- piece
- shield body
- tunneling
- machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005641 tunneling Effects 0.000 title claims abstract description 59
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 230000007246 mechanism Effects 0.000 claims abstract description 29
- 238000009434 installation Methods 0.000 claims abstract description 20
- 238000000034 method Methods 0.000 claims abstract description 18
- 230000008569 process Effects 0.000 claims abstract description 16
- 238000009412 basement excavation Methods 0.000 claims description 13
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 238000005096 rolling process Methods 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 abstract description 4
- 230000001360 synchronised effect Effects 0.000 abstract description 4
- 238000011900 installation process Methods 0.000 abstract description 3
- 230000009471 action Effects 0.000 description 7
- 244000309464 bull Species 0.000 description 6
- 239000010720 hydraulic oil Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 239000003638 chemical reducing agent Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000010729 system oil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
- E21D9/0609—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering with means for applying a continuous liner, e.g. sheets of plastics, between the main concrete lining and the rock
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011597480.6A CN112324460B (zh) | 2020-12-30 | 2020-12-30 | 一种旋转式连续掘进机及其基于螺旋管片的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011597480.6A CN112324460B (zh) | 2020-12-30 | 2020-12-30 | 一种旋转式连续掘进机及其基于螺旋管片的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112324460A CN112324460A (zh) | 2021-02-05 |
CN112324460B true CN112324460B (zh) | 2022-03-04 |
Family
ID=74301987
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011597480.6A Active CN112324460B (zh) | 2020-12-30 | 2020-12-30 | 一种旋转式连续掘进机及其基于螺旋管片的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112324460B (zh) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1408641A (en) * | 1972-03-02 | 1975-10-01 | Charcon Tunnelshld | Tunnelling shields |
JPH01315595A (ja) * | 1988-06-16 | 1989-12-20 | Kumagai Gumi Co Ltd | 覆工の構造 |
JPH06317092A (ja) * | 1993-05-07 | 1994-11-15 | Fujita Corp | シールド工法用セグメントとこのセグメントによる坑内壁の一次覆工方法 |
JPH08254097A (ja) * | 1995-03-15 | 1996-10-01 | Kajima Corp | シールドトンネルおよびシールド工法 |
JPH0932492A (ja) * | 1995-07-24 | 1997-02-04 | Mitsui Eng & Shipbuild Co Ltd | セグメント及び該セグメントから成る管渠 |
JPH10252396A (ja) * | 1997-03-12 | 1998-09-22 | Taisei Corp | シールドトンネルの構造 |
JP2001227288A (ja) * | 2000-02-15 | 2001-08-24 | Ryo Akashi | トンネル用セグメント |
EP2230380A2 (de) * | 2009-03-19 | 2010-09-22 | Herrenknecht AG | Versteifungssegment, Versteifungssegmentanordnungen und Hohlraumauskleidung |
CN102410027A (zh) * | 2011-10-19 | 2012-04-11 | 中铁隧道装备制造有限公司 | 新型双模式tbm及其控制方法 |
CN107023306A (zh) * | 2017-06-09 | 2017-08-08 | 中南大学 | 一种螺旋型装配式隧道结构及其施工方法 |
CN111936721A (zh) * | 2018-02-19 | 2020-11-13 | 托彭有限公司 | 螺旋式节段衬砌 |
-
2020
- 2020-12-30 CN CN202011597480.6A patent/CN112324460B/zh active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1408641A (en) * | 1972-03-02 | 1975-10-01 | Charcon Tunnelshld | Tunnelling shields |
JPH01315595A (ja) * | 1988-06-16 | 1989-12-20 | Kumagai Gumi Co Ltd | 覆工の構造 |
JPH06317092A (ja) * | 1993-05-07 | 1994-11-15 | Fujita Corp | シールド工法用セグメントとこのセグメントによる坑内壁の一次覆工方法 |
JPH08254097A (ja) * | 1995-03-15 | 1996-10-01 | Kajima Corp | シールドトンネルおよびシールド工法 |
JPH0932492A (ja) * | 1995-07-24 | 1997-02-04 | Mitsui Eng & Shipbuild Co Ltd | セグメント及び該セグメントから成る管渠 |
JPH10252396A (ja) * | 1997-03-12 | 1998-09-22 | Taisei Corp | シールドトンネルの構造 |
JP2001227288A (ja) * | 2000-02-15 | 2001-08-24 | Ryo Akashi | トンネル用セグメント |
EP2230380A2 (de) * | 2009-03-19 | 2010-09-22 | Herrenknecht AG | Versteifungssegment, Versteifungssegmentanordnungen und Hohlraumauskleidung |
CN102410027A (zh) * | 2011-10-19 | 2012-04-11 | 中铁隧道装备制造有限公司 | 新型双模式tbm及其控制方法 |
CN107023306A (zh) * | 2017-06-09 | 2017-08-08 | 中南大学 | 一种螺旋型装配式隧道结构及其施工方法 |
CN111936721A (zh) * | 2018-02-19 | 2020-11-13 | 托彭有限公司 | 螺旋式节段衬砌 |
Also Published As
Publication number | Publication date |
---|---|
CN112324460A (zh) | 2021-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108756913A (zh) | 一种小型矿用硬岩盾构掘进机 | |
CN108756905B (zh) | 盾构机及其双护盾撑靴装置 | |
CN112431603B (zh) | 一种复合式微型tbm施工方法及微型tbm | |
CN111305862A (zh) | 一种紧凑型超小转弯半径全断面隧道掘进机及施工方法 | |
CN101713292A (zh) | 一种用于土压平衡式盾构的全时推进系统结构 | |
CN208619109U (zh) | 一种小型矿用硬岩盾构掘进机 | |
KR20050093749A (ko) | 이중 터널굴착공법 및 이에 사용되는 굴착장치 | |
CN112324460B (zh) | 一种旋转式连续掘进机及其基于螺旋管片的施工方法 | |
CN102345459A (zh) | 一种掘进机截割机构 | |
CN111188623A (zh) | 盾构机 | |
WO2013139141A1 (zh) | 螺旋牵拉与推进联合自行进掘进装置 | |
CN108756906B (zh) | 盾构机及其斜楔撑靴装置 | |
CN102587919B (zh) | 一种多螺旋自驱动行走式隧道掘进装置及方法 | |
CN105350978A (zh) | 一种螺旋输送机 | |
CN117267512B (zh) | 一种管道一体化修复装置 | |
CN113565521A (zh) | 一种联络通道掘进装备及一种联络通道施工方法 | |
CN112324461A (zh) | 一种基于螺旋管片的连续掘进机及施工方法 | |
CN116044426A (zh) | 可变径盾构机及其施工方法 | |
KR101050756B1 (ko) | 복합중압관을 이용한 세미쉴드 굴착장치 및 터널 굴착방법 | |
CN115653627A (zh) | 一种用于3d打印隧道的盾构机推进控制装置 | |
CN209892208U (zh) | 一种用于长距离掘进的顶掘机 | |
CN113431596A (zh) | 一种可旋转的硬岩超前切割系统 | |
CN218935483U (zh) | 一种曲线型管道施工管体顶进装置 | |
CN220769475U (zh) | 一种盾构用两级螺旋输送机 | |
CN113482654B (zh) | 一种联络通道掘进机及一种联络通道施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Jia Lianhui Inventor after: Bai Linying Inventor after: Guo Zhiyong Inventor after: Liu Shang Inventor after: Zou Zhenbao Inventor after: Yuan Dan Inventor after: Zhang Zhiguo Inventor after: Li Zekui Inventor after: Xu Shunhai Inventor after: Zhang Jie Inventor after: Cherry red Inventor after: Yu Peide Inventor after: Yao Jing Inventor after: Ma Kui Inventor before: Li Zekui Inventor before: Liu Shang Inventor before: Zou Zhenbao Inventor before: Yuan Dan Inventor before: Xu Shunhai Inventor before: Zhang Jie Inventor before: Cherry red Inventor before: Yu Peide Inventor before: Yao Jing Inventor before: Ma Kui Inventor before: Bai Linying Inventor before: Guo Zhiyong |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |