CN112301833A - Landscape waterfront footpath system and construction method - Google Patents
Landscape waterfront footpath system and construction method Download PDFInfo
- Publication number
- CN112301833A CN112301833A CN202011124593.4A CN202011124593A CN112301833A CN 112301833 A CN112301833 A CN 112301833A CN 202011124593 A CN202011124593 A CN 202011124593A CN 112301833 A CN112301833 A CN 112301833A
- Authority
- CN
- China
- Prior art keywords
- landscape
- prefabricated box
- construction
- waterfront
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C15/00—Pavings specially adapted for footpaths, sidewalks or cycle tracks
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G27/00—Self-acting watering devices, e.g. for flower-pots
- A01G27/02—Self-acting watering devices, e.g. for flower-pots having a water reservoir, the main part thereof being located wholly around or directly beside the growth substrate
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
- E01C11/226—Coherent pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/02—Concrete base for bituminous paving
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0283—Retaining or protecting walls characterised by constructional features of mixed type
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Water Supply & Treatment (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Road Paving Structures (AREA)
Abstract
The invention relates to a landscape waterfront pavement system and a construction method, belonging to the field of civil engineering, and mainly comprising the following steps: the construction method comprises the following steps of slope treatment, foundation construction, retaining wall rear side soil body backfilling, blind ditch construction and pervious concrete pavement construction, wherein an excavation step is formed by excavating on a side slope during construction, a broken stone cushion layer, a concrete foundation and a broken stone cushion layer are arranged on the lower portion of the side slope, a prefabricated retaining wall is arranged on the upper portion of the concrete foundation, backfill is laid on the rear portion of the prefabricated retaining wall, a blind ditch is arranged in the backfill, a punching corrugated pipe wrapped by geotextile is arranged in the blind ditch, and water seeping from a pervious concrete sidewalk flows into a water storage stone cage and a water collecting tank in the prefabricated retaining wall through a water discharge pipe arranged on the blind ditch to be irrigated for green plants, so that water resources are effectively utilized.
Description
Technical Field
The invention relates to a landscape waterfront pavement system and a construction method, belongs to the field of civil engineering, and is suitable for construction of the landscape waterfront pavement system.
Background
Water is the most basic condition for life source spring and human being to live, and the closeness of human being to water can make the waterfront space become the place where people go and gather; the waterfront footpath is a complex and special footpath with a waterfront space close to a water-land boundary, is positioned at a boundary where a water area space and a land area space are intersected, presents a beautiful space form of blending a natural environment and an artificial landscape, and is an ideal place for people to have a waterfront rest and a leisure.
The conventional landscape waterfront pavement construction at present has the problems of poor integral stability of a retaining wall structure, easy settlement of a road surface, low construction speed of the retaining wall structure, easy water accumulation of the landscape waterfront pavement and the like.
Disclosure of Invention
Technical problem to be solved
The invention aims to provide a landscape waterfront pavement system and a construction method aiming at the problem of construction of the landscape waterfront pavement system, and the landscape waterfront pavement system and the construction method meet the requirement of structure construction.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme:
the landscape waterfront footpath system and the construction method thereof comprise the following steps:
step one, slope surface treatment: cleaning the surface of the side slope, setting an excavation line, and then excavating according to the excavation line and forming an excavation step;
step two, foundation construction: excavating an anti-slip groove at the bottom of the foundation pit, paving a gravel cushion layer, and then performing concrete cushion layer construction;
step three, retaining wall construction: installing an A-type prefabricated box body on the upper part of a concrete foundation, pouring foam concrete in the A-type prefabricated box body, installing a B-type prefabricated box body on the upper part of the A-type prefabricated box body, backfilling coarse sand backfill at the lower part of the B-type prefabricated box body, installing a water storage gabion and a water collecting tank, arranging reserved planting holes on the upper part of the B-type prefabricated box body, paving root-prick-preventing geotextiles around the reserved planting holes, and then planting trees and backfilling planting soil;
step four, backfilling soil bodies on the rear side of the retaining wall: backfilling the soil body on the rear side of the prefabricated retaining wall by adopting backfilled soil;
step five, blind ditch construction: digging a blind ditch in the backfill soil, and paving a perforated corrugated pipe wrapped by geotextile in the blind ditch;
step six, construction of the pervious concrete pavement: the method comprises the following steps of laying a cushion layer on backfill soil, constructing a base layer on the upper portion of the cushion layer, constructing a permeable concrete surface layer on the upper portion of the base layer, laying a guide rail on the upper portion of the base layer, fixing a horizontal support frame on the base layer through a fixing soil nail by adopting a modeling support frame, scraping the front end of the permeable concrete surface layer in the construction process by adopting a scraper blade, compacting the middle of the permeable concrete surface layer by adopting a flat vibrator, performing light-collecting treatment on the rear portion of the permeable concrete surface layer by adopting a light-collecting plate, and performing watering maintenance on the constructed permeable concrete surface layer by adopting a plastic maintenance.
Preferably, be equipped with the soft drain pipe on the prefabricated case of A type, and soft drain pipe both ends all pass prefabricated case lateral wall of A type, and soft drain pipe input is located backfill soil department.
Preferably, the concrete pavement that permeates water is constituteed to bed course, basic unit and the concrete surface course that permeates water, and the french drain is located the concrete pavement below that permeates water, be equipped with the drain pipe in the french drain, and the drain pipe input with the bellows intercommunication that punches, the drain pipe output is located retaining gabion and water catch bowl.
Preferably, the prefabricated box of A type and the prefabricated box of B type all are equipped with the butt joint groove on, and prefabricated retaining wall of prefabricated assembled of formation of a type and the prefabricated box of B type through the combination of butt joint groove.
Preferably, the outer wall of the B-shaped prefabricated box body is provided with a water drainage hole.
Preferably, a guardrail is arranged on the outer side of the top of the B-type prefabricated box body.
Preferably, the guide rail sets up in the concrete surface course both sides that permeate water of pouring in-process, and the guide rail adopts regularization support frame to fix, and the regularization support frame is fixed on the basic unit through the staple of fixing soil to horizontal support frame.
Preferably, the horizontal support frame is provided with a vertical support frame, and an inclined support is arranged between the horizontal support frame and the vertical support frame.
(III) advantageous effects
Compared with the prior art, the landscape waterfront footpath system and the construction method provided by the invention have the following beneficial effects:
1. according to the landscape waterfront footpath system and the construction method, the retaining wall construction is carried out by adopting the prefabricated retaining wall, the retaining wall construction speed is improved, the construction efficiency is high, and the anti-sliding grooves are arranged at the lower part of the prefabricated retaining wall to improve the overall stability of the retaining wall;
2. according to the landscape waterfront pavement system and the construction method, the permeable concrete pavement structure is adopted, so that the water permeability of the pavement is improved, and the accumulated water on the pavement is reduced;
3. according to the landscape waterfront pavement system and the construction method, the blind ditch is adopted to collect water seeping under the pervious concrete pavement, the collected water is input into the water storage gabion and the water collection tank through the drain pipe to be collected, the collected water is supplied to green plants for irrigation through evaporation, and water resources are effectively utilized.
Drawings
FIG. 1 is a block diagram of a landscape waterfront walkway system;
FIG. 2 is a construction structure view of a pervious concrete sidewalk;
fig. 3 is a sectional view of a construction structure of a pervious concrete sidewalk.
In the figure: 1. a gravel cushion layer; 2. an anti-slip groove; 3. excavating steps; 4. side slope; 5. excavating a line; 6. backfilling; 7. a cushion layer; 8. a pervious concrete facing; 9. a base layer; 10. a pervious concrete sidewalk; 11. blind ditches; 12. geotextile; 13. a drain pipe; 14. a tree; 15. a guardrail; 16. b type prefabricated box body; 17. planting soil; 18. reserving a planting hole; 19. root-stab resistant geotextiles; 20. punching a corrugated pipe; 21. a water drain hole; 22. a water storage gabion; 23. a water collection tank; 24. a butt joint groove; 25. backfilling coarse sand; 26. foam concrete; 27. a soft drain pipe; 28. a type A prefabricated box; 29. a concrete foundation; 30. a squeegee; 31. a flat plate vibrator; 32. a guide rail; 33. a light-receiving plate; 34. fixing the soil nails; 35. plastic curing films; 36. shaping a support frame; 37. a horizontal support frame; 38. bracing; 39. a vertical support frame; 40. pervious concrete; 41. and (5) prefabricating the assembled retaining wall.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments that can be derived by one of ordinary skill in the art from the embodiments given herein are intended to be within the scope of the present invention.
It will be understood by those skilled in the art that the terms "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in an orientation or positional relationship indicated in the drawings for convenience in describing the invention and for simplicity in description, and do not indicate or imply that the referenced device or element must be in a particular orientation, constructed and operated in a particular orientation, and thus the above terms are not to be construed as limiting the invention.
The landscape waterfront footpath system and the construction method thereof comprise the following steps:
step one, slope surface treatment: cleaning the surface of the side slope 4, setting an excavation line 5, and then excavating according to the excavation line 5 to form an excavation step 3;
step two, foundation construction: excavating an anti-slip groove 2 at the bottom of the foundation pit, paving a gravel cushion layer 1, and then constructing a concrete cushion layer 7;
step three, retaining wall construction: installing an A-type prefabricated box body 28 on the upper part of a concrete foundation 29, pouring foam concrete 26 in the A-type prefabricated box body 28, installing a B-type prefabricated box body 16 on the upper part of the A-type prefabricated box body 28, backfilling coarse sand backfill 25 on the lower part of the B-type prefabricated box body 16, installing a water storage stone cage 22 and a water collecting tank 23, arranging a reserved planting hole 18 on the upper part of the B-type prefabricated box body 16, paving root-prick-prevention geotextile 19 around the reserved planting hole 18, and then planting trees 14 and backfilling planting soil 17;
step four, backfilling soil bodies on the rear side of the retaining wall: backfilling the soil body on the rear side of the prefabricated retaining wall 41 by adopting backfilled soil 6;
step five, constructing a blind ditch 11: digging a blind ditch 11 in the backfill soil 6, and laying a perforated corrugated pipe 20 wrapped by geotextile 12 in the blind ditch 11, wherein the perforated corrugated pipe is subsequently drained, and the geotextile prevents sand and stone from entering the perforated corrugated pipe;
step six, construction of the permeable concrete 40 pavement: laying a cushion layer 7 on backfill soil 6, constructing a base layer 9 on the upper part of the cushion layer 7, constructing a pervious concrete surface layer 8 on the upper part of the base layer 9, laying a guide rail 32 on the upper part of the base layer 9, fixing a horizontal support frame 37 on the base layer 9 by adopting a modeling support frame 36 through a fixing soil nail 34, scraping the front end of the pervious concrete surface layer 8 by adopting a scraper 30 in the construction process, compacting the middle by adopting a flat vibrator 31, collecting light by adopting a light collecting plate 33 at the rear part, and watering and curing the constructed pervious concrete surface layer 8 by adopting a plastic curing film 35.
As shown in the structure diagram of the landscape waterfront system shown in FIG. 1, a soft drain pipe 27 is arranged on an A-type prefabricated box 28, both ends of the soft drain pipe 27 penetrate through the side wall of the A-type prefabricated box 28, the input end of the soft drain pipe 27 is positioned at the backfill soil 6, the soft drain pipe 27 can drain water on the rear side of a prefabricated retaining wall 41, a cushion layer 7, a base layer 9 and a permeable concrete surface layer 8 form a permeable concrete sidewalk 10, a blind ditch 11 is positioned below the permeable concrete sidewalk 10, a drain pipe 13 is arranged in the blind ditch 11, the input end of the drain pipe 13 is communicated with a perforated corrugated pipe 20, the output end of the drain pipe 13 is positioned in a water storage stone cage 22 and a water collecting tank 23, accumulated water on the permeable concrete pavement can be quickly drained, meanwhile, the water storage stone cage 22 filters the water to prevent sundries from entering the water collecting tank, and has the function of water storage, butt-joint grooves 24 are arranged on the A-type prefabricated box 28, the A-type prefabricated box body 28 and the B-type prefabricated box body 16 are formed by combining the butt joint grooves 24, and meanwhile, the butt joint grooves 24 are common technical means in buildings, so that the butt joint grooves 24 are not described too much, the outer wall of the B-type prefabricated box body 16 is provided with water drainage holes, redundant water in the B-type prefabricated box body 16 can be drained, and the outer side of the top of the B-type prefabricated box body 16 is provided with the guardrail 15, so that the protection effect is enhanced.
As shown in fig. 2-3, guide rail 32 sets up 8 both sides of the concrete surface course that permeates water in the pouring process, and guide rail 32 adopts regularization support frame 36 to fix, and regularization support frame 36 is fixed on basic unit 9 through fixing soil nail 34 to horizontal support frame 37, is equipped with vertical support frame 39 on the horizontal support frame 37 to be equipped with bracing 38 between horizontal support frame 37 and vertical support frame 39, reinforcing location effect.
This view waterfront pavement system is after the construction is accomplished, through the water permeability that 40 road surface structures of concrete that permeates water improved the road surface, reduce the ponding on road surface, simultaneously collect the water that permeates water concrete pavement 10 and ooze down through french drain 11, the water of collecting is input in the bellows 20 that punches through geotechnological cloth 12, the rethread drain pipe 13 is input and is collected in retaining gabion 22 and the water catch bowl 23, wherein retaining gabion 22 filters the soil in the water, prevent that debris from getting into the water catch bowl 23, the water after the collection provides green plant irrigation through the evaporation, effectively utilize the water resource.
It is understood that the terms "a" and "an" should be interpreted as meaning that a number of one element or element is one in one embodiment, while a number of other elements is one in another embodiment, and the terms "a" and "an" should not be interpreted as limiting the number.
The present invention is not limited to the above-mentioned preferred embodiments, and any other products in various forms can be obtained by anyone in the light of the present invention, but any changes in the shape or structure thereof, which have the same or similar technical solutions as those of the present application, fall within the protection scope of the present invention.
Claims (9)
1. The landscape waterfront footpath system and the construction method are characterized by comprising the following steps:
step one, slope surface treatment: cleaning the surface of the side slope (4), setting an excavation line (5), and then excavating according to the excavation line (5) to form an excavation step (3);
step two, foundation construction: excavating an anti-slip groove (2) at the bottom of the foundation pit, paving a gravel cushion layer (1), and then constructing a concrete cushion layer (7);
step three, retaining wall construction: installing an A-type prefabricated box body (28) at the upper part of a concrete foundation (29), pouring foam concrete (26) in the A-type prefabricated box body (28), installing a B-type prefabricated box body (16) at the upper part of the A-type prefabricated box body (28), backfilling coarse sand backfill soil (25) at the lower part of the B-type prefabricated box body (16) and installing a water storage gabion (22) and a water collecting tank (23), arranging a reserved planting hole (18) at the upper part of the B-type prefabricated box body (16), paving root-thorn-preventing geotextile (19) around the reserved planting hole (18), and then planting trees (14) and backfilling planting soil (17);
step four, backfilling soil bodies on the rear side of the retaining wall: backfilling the soil body on the rear side of the prefabricated retaining wall (41) by adopting backfilled soil (6);
step five, constructing a blind ditch (11): digging a blind ditch (11) in the backfill soil (6), and paving a perforated corrugated pipe (20) which is wrapped by geotextile (12) in the blind ditch (11);
sixthly, construction of the permeable concrete (40) pavement: the method comprises the steps of paving a cushion layer (7) on backfill soil (6), constructing a base layer (9) on the upper portion of the cushion layer (7), constructing a pervious concrete surface layer (8) on the upper portion of the base layer (9), paving a guide rail (32) on the upper portion of the base layer (9) and fixing a horizontal support frame (37) on the base layer (9) through a fixed soil nail (34) by adopting a modeling support frame (36), scraping the front end of the pervious concrete surface layer (8) by adopting a scraper (30) in the construction process, compacting the middle of the pervious concrete surface layer by adopting a flat vibrator (31), collecting light by adopting a light collecting plate (33) at the rear portion, and watering and maintaining the constructed pervious concrete surface layer (8) by adopting a plastic maintenance film (35).
2. The landscape waterfront pavement system and the construction method according to claim 1, wherein: be equipped with soft drain pipe (27) on A type prefabricated box (28), and soft drain pipe (27) both ends all pass A type prefabricated box (28) lateral wall, and soft drain pipe (27) input is located backfill soil (6) department.
3. The landscape waterfront pavement system and the construction method according to claim 1, wherein: the concrete pavement that permeates water (10) are constituteed to bed course (7), basic unit (9) and the concrete surface course that permeates water (8), and french drain (11) are located the concrete pavement that permeates water (10) below, be equipped with drain pipe (13) in french drain (11), and drain pipe (13) input and bellows (20) intercommunication that punch, drain pipe (13) output is located retaining gabion (22) and water catch bowl (23).
4. The landscape waterfront pavement system and the construction method according to claim 1, wherein: all be equipped with butt joint groove (24) on prefabricated box (28) of A type and the prefabricated box (16) of B type, and prefabricated box (28) of A type and the prefabricated box (16) of B type form prefabricated assembled barricade (41) through butt joint groove (24) combination.
5. The landscape waterfront pavement system and the construction method according to claim 1, wherein: and a water drainage hole (21) is formed in the outer wall of the B-shaped prefabricated box body (16).
6. The landscape waterfront pavement system and the construction method according to claim 1, wherein: and a guardrail (15) is arranged on the outer side of the top of the B-shaped prefabricated box body (16).
7. The landscape waterfront pavement system and the construction method according to claim 1, wherein: the guide rails (32) are arranged on two sides of the pervious concrete surface layer (8) in the pouring process, the guide rails (32) are fixed through the shaping support frames (36), and the shaping support frames (36) fix the horizontal support frames (37) on the base layer (9) through the fixing soil nails (34).
8. The landscape waterfront pavement system and the construction method according to claim 1, wherein: a vertical support frame (39) is arranged on the horizontal support frame (37), and an inclined support (38) is arranged between the horizontal support frame (37) and the vertical support frame (39).
9. Landscape waterfront pavement system, its characterized in that: the landscape waterfront pavement system and the construction method according to any one of claims 1 to 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011124593.4A CN112301833B (en) | 2020-10-20 | 2020-10-20 | Landscape waterfront footpath system and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011124593.4A CN112301833B (en) | 2020-10-20 | 2020-10-20 | Landscape waterfront footpath system and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112301833A true CN112301833A (en) | 2021-02-02 |
CN112301833B CN112301833B (en) | 2022-02-15 |
Family
ID=74328003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011124593.4A Active CN112301833B (en) | 2020-10-20 | 2020-10-20 | Landscape waterfront footpath system and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112301833B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113322731A (en) * | 2021-05-17 | 2021-08-31 | 浙大城市学院 | Construction method of foam concrete landscape restoration system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06292473A (en) * | 1993-04-08 | 1994-10-21 | Pariteii Jipangu:Kk | Greening breast wall and laying block for greening breast wall |
JPH07331674A (en) * | 1994-06-13 | 1995-12-19 | Fujita Corp | Construction of retaining wall |
CN101029480A (en) * | 2007-03-21 | 2007-09-05 | 任红星 | Dyke gabion baffling structure and method for planting hydrophyte by the structure |
CN107905089A (en) * | 2017-11-21 | 2018-04-13 | 中冶南方城市建设工程技术有限公司 | A kind of reinforcement platform back of the body for preventing bumping at bridge-head and its construction method |
CN109371907A (en) * | 2018-11-13 | 2019-02-22 | 中交第三航务工程勘察设计院有限公司 | A kind of breathing pattern gravity type prefabricated box ecological revetment structure and its construction method |
CN209010890U (en) * | 2018-09-28 | 2019-06-21 | 田薇 | A kind of triangular concrete gutter structure for highway drainage |
CN110552269A (en) * | 2019-08-08 | 2019-12-10 | 杭州江润科技有限公司 | Construction method of ecological sidewalk |
CN111395257A (en) * | 2020-04-28 | 2020-07-10 | 广东水利电力职业技术学院(广东省水利电力技工学校) | Green road combined with green-planted ecological retaining wall and construction method thereof |
-
2020
- 2020-10-20 CN CN202011124593.4A patent/CN112301833B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06292473A (en) * | 1993-04-08 | 1994-10-21 | Pariteii Jipangu:Kk | Greening breast wall and laying block for greening breast wall |
JPH07331674A (en) * | 1994-06-13 | 1995-12-19 | Fujita Corp | Construction of retaining wall |
CN101029480A (en) * | 2007-03-21 | 2007-09-05 | 任红星 | Dyke gabion baffling structure and method for planting hydrophyte by the structure |
CN107905089A (en) * | 2017-11-21 | 2018-04-13 | 中冶南方城市建设工程技术有限公司 | A kind of reinforcement platform back of the body for preventing bumping at bridge-head and its construction method |
CN209010890U (en) * | 2018-09-28 | 2019-06-21 | 田薇 | A kind of triangular concrete gutter structure for highway drainage |
CN109371907A (en) * | 2018-11-13 | 2019-02-22 | 中交第三航务工程勘察设计院有限公司 | A kind of breathing pattern gravity type prefabricated box ecological revetment structure and its construction method |
CN110552269A (en) * | 2019-08-08 | 2019-12-10 | 杭州江润科技有限公司 | Construction method of ecological sidewalk |
CN111395257A (en) * | 2020-04-28 | 2020-07-10 | 广东水利电力职业技术学院(广东省水利电力技工学校) | Green road combined with green-planted ecological retaining wall and construction method thereof |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113322731A (en) * | 2021-05-17 | 2021-08-31 | 浙大城市学院 | Construction method of foam concrete landscape restoration system |
Also Published As
Publication number | Publication date |
---|---|
CN112301833B (en) | 2022-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102174816B (en) | Ecological restoration structured approach for unstable earth and rockfill side slope | |
CN117926849A (en) | Construction method and application of high-strength gravity retaining wall | |
CN112575877B (en) | Landscaping engineering and construction method | |
CN108867806B (en) | Rainwater garden for rainwater collection, recycling and reuse | |
CN112301833B (en) | Landscape waterfront footpath system and construction method | |
CN109989474A (en) | A kind of construction method of rain water collecting system | |
CN110616615A (en) | Town road paves road surface structure that permeates water | |
CN112343067B (en) | Prefabricated block empty box filling type ecological retaining wall and construction method | |
CN213709024U (en) | Sponge city green road seepage and drainage system | |
CN113944138B (en) | Construction method of natural bank slope protection structure based on sponge city concept | |
CN111778925B (en) | River channel ecological slope protection structure and construction method thereof | |
CN110396983B (en) | Frame beam ecological slope protection structure with drainage and greening functions | |
CN112064756A (en) | Detachable three-dimensional ecological drainage ditch structure and construction method | |
KR100734812B1 (en) | Stairtype concrete retaining wall having functions of drainage and vegetation and constructing method thereof | |
CN111395104A (en) | Colorful asphalt beam pouring type commercial residential district landscape pavement | |
CN214657144U (en) | Novel ecological bank protection suitable for northwest loess plateau area | |
CN216786729U (en) | Prevent road surface ponding's novel ecology road structure that permeates water | |
CN210507515U (en) | Greening gravity type retaining wall | |
CN214301528U (en) | Sponge transformation system for urban river retaining wall | |
CN210766240U (en) | Sponge type urban road structure | |
CN106894387A (en) | A kind of town and country river course slope protection system and method for paving | |
CN112695774A (en) | Steep slope surface reinforcing and greening system and construction method thereof | |
CN214143521U (en) | Landscape waterfront footpath system | |
CN112813758A (en) | Highway spoil heap processing system | |
CN111663492A (en) | River channel ecological management construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |