CN112296245B - Forging method for improving creep property of Wasp ring forging - Google Patents

Forging method for improving creep property of Wasp ring forging Download PDF

Info

Publication number
CN112296245B
CN112296245B CN202010979541.9A CN202010979541A CN112296245B CN 112296245 B CN112296245 B CN 112296245B CN 202010979541 A CN202010979541 A CN 202010979541A CN 112296245 B CN112296245 B CN 112296245B
Authority
CN
China
Prior art keywords
ring
forging
rolling
ring forging
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010979541.9A
Other languages
Chinese (zh)
Other versions
CN112296245A (en
Inventor
方萍
刘小刚
黄震
宋利冰
杨超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Howmet Aerospace Components Suzhou Co Ltd
Original Assignee
Howmet Aerospace Components Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Howmet Aerospace Components Suzhou Co Ltd filed Critical Howmet Aerospace Components Suzhou Co Ltd
Priority to CN202010979541.9A priority Critical patent/CN112296245B/en
Publication of CN112296245A publication Critical patent/CN112296245A/en
Application granted granted Critical
Publication of CN112296245B publication Critical patent/CN112296245B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/76Making machine elements elements not mentioned in one of the preceding groups
    • B21K1/761Making machine elements elements not mentioned in one of the preceding groups rings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21HMAKING PARTICULAR METAL OBJECTS BY ROLLING, e.g. SCREWS, WHEELS, RINGS, BARRELS, BALLS
    • B21H1/00Making articles shaped as bodies of revolution
    • B21H1/06Making articles shaped as bodies of revolution rings of restricted axial length
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • B21J1/02Preliminary treatment of metal stock without particular shaping, e.g. salvaging segregated zones, forging or pressing in the rough
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • B21J1/06Heating or cooling methods or arrangements specially adapted for performing forging or pressing operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting

Abstract

The invention provides a forging method for improving creep property of Wasp ring forgings, which avoids cracking phenomenon through a series of steps of blanking, punching, high-temperature ring forging rolling, relatively low-temperature ring forging rolling and rounding and shaping, and the control of temperature and rolling deformation in each step, does not need polishing in the forging process, and improves production efficiency; and the crystal grains of the ring forging are controlled within ASTM #4.5-7, the 0.2 percent creep time is more than 150h, the ring forging can obtain a uniform microstructure more easily, the cracking phenomenon is further avoided, the requirement of high performance of the product is ensured, and the production cost is further reduced.

Description

Forging method for improving creep property of Wasp ring forging
Technical Field
The invention relates to the field of processing of ring forgings, in particular to a forging method for improving creep property of Wasp ring forgings.
Background
At present, in order to obtain fine grains, the Wasp ring forging is usually at a lower forging temperature, and the grain size is closely related to creep property, so that the creep property is poor, and the Wasp ring forging cannot be applied to aeroengine parts with high performance requirements; in order to improve the fluidity and the structure uniformity of the metal, if a higher forging temperature is adopted, the forged piece is easy to crack, multiple fire ring rolling and polishing are needed, and the production cost is higher.
In addition, the strain energy can be improved due to excessive deformation in the forging process, and dynamic recrystallization is easy to generate double grains; an excessively small amount of deformation requires an increased number of forging shots, resulting in an increase in cost.
Disclosure of Invention
In order to solve the problems, the invention provides a forging method for improving the creep property of Wasp ring forgings.
The main content of the invention comprises:
a forging method for improving creep property of Wasp ring forgings comprises the following steps:
blanking: cutting according to the specification to obtain a blank;
punching: heating the blank to 1090-1110 ℃ by adopting a high-temperature gas furnace, and preserving heat for 1-3 hours; then taking out the blank from the high-temperature gas furnace and transporting the blank to a 3000T press, wherein the transfer time is less than 30s; upsetting and punching round holes on the blank for less than 180s to obtain a punched ring forging;
high-temperature ring forging rolling: heating the punched ring forging to 1040-1060 ℃ by using a high-temperature gas furnace, preserving heat for 0.5-3 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling machine, wherein the transfer time is less than 30s; performing a plurality of fire times of straight ring rolling on the ring forging by adopting an R350 ring rolling mill, wherein the rolling amount per fire is 5-20%, and the time for straight ring rolling per fire is within 120 s;
and (3) ring forging and rolling at relatively low temperature: heating the ring forging after high-temperature ring forging rolling to 1000-1020 ℃ by using a high-temperature gas furnace, preserving heat for 0.5-3 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling mill within 30s; performing a plurality of fire times of straight ring rolling on the ring forging by adopting an R350 ring rolling mill, wherein the rolling amount per fire is 5-20%, and the time for straight ring rolling per fire is within 120 s;
rounding and shaping: heating the ring forging rolled by the relatively low-temperature ring forging to 1000-1020 ℃ by using a high-temperature gas furnace, preserving heat for 0.5-1.5 hours, taking out the ring forging from the high-temperature gas furnace, transferring the ring forging to a 400T ring expanding machine for ring expanding and shaping, wherein the transfer time is within 30s, and the ring expanding and shaping time of the ring forging by using the 400T ring expanding machine is within 90 s.
Preferably, in the steps of rolling the high-temperature ring segment and rolling the relatively low-temperature ring forging, the ring rolling feed rate of the R350 ring rolling mill for performing straight ring rolling on the ring forging is 0.6-1.3mm/s.
Preferably, in the rounding step, when a 400T ring expanding machine is used for ring expanding and shaping the ring forging, the ring expanding amount is within 1%.
The invention has the beneficial effects that: the invention provides a forging method for improving creep property of Wasp ring forgings, which comprises the steps of punching at a relatively high temperature, and then carrying out high-temperature ring forging rolling at 1040-1060 ℃, wherein in the temperature range, metal flows fast, cracking is avoided, grinding is not needed in the forging process, and production efficiency is improved; meanwhile, the rolling deformation of each fire is controlled to be 5-20%, so that the crystal grains of the ring forging are controlled within ASTM #4.5-7, and the knitting time of 0.2% is more than 150h, the ring forging can obtain a uniform microstructure more easily, the cracking phenomenon is further avoided, the requirement on high performance of the product is met, and the production cost is further reduced.
Detailed Description
The technical solution protected by the present invention will be specifically explained below.
Example one
A forging method for improving creep property of Wasp ring forgings comprises the following steps:
blanking: cutting according to the specification to obtain a blank;
punching: heating the blank to 1090 ℃ by adopting a high-temperature gas furnace, and preserving heat for 3 hours; then taking out the blank from the high-temperature gas furnace and transporting the blank to a 3000T press, wherein the transfer time is less than 30s; upsetting the blank and punching a round hole, wherein the operation time is less than 180s, and obtaining a punched ring forging;
high-temperature ring forging rolling: heating the punched ring forging to 1040 ℃ by using a high-temperature gas furnace, preserving heat for 3 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling mill for less than 30 seconds; performing a plurality of fire times of straight ring rolling on the ring forging by using an R350 ring rolling mill, wherein the rolling amount per fire is 20%, the fire times of the straight ring rolling are related to the size of the ring forging, and the time of the straight ring rolling per fire is within 120 s; the ring rolling feed rate is 1.3mm/s;
and (3) ring forging and rolling at relatively low temperature: heating the ring forging after high-temperature ring forging rolling to 1000 ℃ by using a high-temperature gas furnace, preserving heat for 3 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling mill within 30s; performing straight ring rolling on the ring forging by using an R350 ring rolling mill for a plurality of times of fire, wherein the rolling quantity of each fire is 20%, the time for the straight ring rolling of each fire is within 120s, and the number of times of the straight ring rolling is related to the size of the ring forging; the ring rolling feed rate is 1.3mm/s;
rounding and shaping: heating the ring forging rolled by the relatively low-temperature ring forging to 1000 ℃ by using a high-temperature gas furnace, preserving heat for 1.5 hours, taking out the ring forging from the high-temperature gas furnace, transferring the ring forging to a 400T ring expanding machine for ring expanding and shaping, wherein the transferring time is within 30s, the ring expanding and shaping time of the ring forging by using the 400T ring expanding machine is within 90s, and the ring expanding amount is within 1%.
Example two
A forging method for improving creep property of Wasp ring forgings comprises the following steps:
blanking: cutting according to the specification to obtain a blank;
punching: heating the blank to 1110 ℃ by adopting a high-temperature gas furnace, and preserving heat for 1 hour; then taking out the blank from the high-temperature gas furnace and transporting the blank to a 3000T press, wherein the transfer time is less than 30s; upsetting the blank and punching a round hole, wherein the operation time is less than 180s, and obtaining a punched ring forging;
high-temperature ring forging rolling: heating the punched ring forging to 1060 ℃ by using a high-temperature gas furnace, preserving heat for 0.5 hour, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling mill for less than 30 seconds; performing straight ring rolling on the ring forging for a plurality of times by using an R350 ring rolling mill, wherein the rolling amount per time is 5%, and the time for straight ring rolling per time is within 120 s; the ring rolling feed rate is 0.6mm/s;
and (3) ring forging and rolling at relatively low temperature: heating the ring forging after high-temperature ring forging rolling to 1020 ℃ by using a high-temperature gas furnace, preserving heat for 0.5 hour, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling machine within 30s; performing straight ring rolling on the ring forging for a plurality of times by using an R350 ring rolling mill, wherein the rolling amount per fire is 5%, and the time for straight ring rolling per fire is within 120 s; the ring rolling feed rate is 0.6mm/s;
rounding and shaping: heating the ring forging subjected to ring forging rolling at a relatively low temperature to 1020 ℃ by using a high-temperature gas furnace, preserving heat for 0.5 hour, taking out the ring forging from the high-temperature gas furnace, transferring the ring forging to a 400T ring expanding machine for ring expanding and shaping, wherein the transfer time is within 30s, and the ring expanding and shaping time of the ring forging by using the 400T ring expanding machine is within 90 s; and the amount of ring expansion is within 1%.
EXAMPLE III
A forging method for improving creep property of Wasp ring forgings comprises the following steps:
blanking: cutting according to the specification to obtain a blank;
punching: heating the blank to 1100 ℃ by adopting a high-temperature gas furnace, and preserving heat for 2 hours; then taking out the blank from the high-temperature gas furnace and transporting the blank to a 3000T press, wherein the transfer time is less than 30s; upsetting the blank and punching a round hole, wherein the operation time is less than 180s, and obtaining a punched ring forging;
high-temperature ring forging rolling: heating the punched ring forging to 1050 ℃ by using a high-temperature gas furnace, preserving heat for 1.5 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling mill for less than 30s; performing straight ring rolling on the ring forging for a plurality of times by using an R350 ring rolling mill, wherein the rolling amount of each fire is 10 percent, and the time for the straight ring rolling of each fire is within 120 s; the ring rolling feed rate is 1mm/s
And (3) ring forging and rolling at relatively low temperature: heating the ring forging after high-temperature ring forging rolling to 1010 ℃ by using a high-temperature gas furnace, preserving heat for 1.5 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling machine within 30s; performing straight ring rolling on the ring forging for a plurality of times by using an R350 ring rolling mill, wherein the rolling amount of each fire is 10 percent, and the time for straight ring rolling of each fire is within 120 s; the ring rolling feed rate is 1mm/s
Rounding and shaping: heating the ring forging after the ring forging rolling at the relatively low temperature to 1010 ℃ by using a high-temperature gas furnace, preserving heat for 1 hour, taking out the ring forging from the high-temperature gas furnace, transferring the ring forging to a 400T ring expanding machine for ring expanding and shaping, wherein the transferring time is within 30s, the ring expanding and shaping time of the ring forging by using the 400T ring expanding machine is within 90s, and the ring expanding amount is within 1%.
Example four
A forging method for improving creep property of Wasp ring forgings comprises the following steps:
blanking: cutting according to the specification to obtain a blank;
punching: heating the blank to 1100 ℃ by adopting a high-temperature gas furnace, and preserving heat for 2.5 hours; then taking out the blank from the high-temperature gas furnace and transporting the blank to a 3000T press, wherein the transfer time is less than 30s; upsetting the blank and punching a round hole, wherein the operation time is less than 180s, and obtaining a punched ring forging;
high-temperature ring forging rolling: heating the punched ring forging to 1040 ℃ by using a high-temperature gas furnace, preserving heat for 3 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling mill for less than 30s; performing straight ring rolling on the ring forging for a plurality of times by using an R350 ring rolling mill, wherein the rolling amount per fire is 15%, and the time for straight ring rolling per fire is within 120 s; the ring rolling feed rate is 1.3mm/s;
and (3) ring forging and rolling at relatively low temperature: heating the ring forging after high-temperature ring forging rolling to 1000 ℃ by using a high-temperature gas furnace, preserving heat for 2 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling mill within 30s; performing straight ring rolling on the ring forging for a plurality of times by using an R350 ring rolling mill, wherein the rolling amount per fire is 15%, and the time for straight ring rolling per fire is within 120 s; the ring rolling feed rate is 0.8mm/s;
rounding and shaping: heating the ring forging after the ring forging rolling at the relatively low temperature to 1020 ℃ by using a high-temperature gas furnace, preserving heat for 1 hour, taking out the ring forging from the high-temperature gas furnace, transferring the ring forging to a 400T ring expanding machine for ring expanding and shaping, wherein the transferring time is within 30s, the ring expanding and shaping time of the ring forging by using the 400T ring expanding machine is within 90s, and the ring expanding amount is within 1%.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (3)

1. A forging method for improving creep property of Wasp ring forgings is characterized by comprising the following steps:
blanking: cutting according to the specification to obtain a blank;
punching: heating the blank to 1090-1110 ℃ by adopting a high-temperature gas furnace, and preserving heat for 1-3 hours; then taking out the blank from the high-temperature gas furnace and transporting the blank to a 3000T press, wherein the transfer time is less than 30s; upsetting and punching round holes on the blank for less than 180s to obtain a punched ring forging;
high-temperature ring forging rolling: heating the punched ring forging to 1040-1060 ℃ by using a high-temperature gas furnace, preserving heat for 0.5-3 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling machine, wherein the transfer time is less than 30s; performing a plurality of fire times of straight ring rolling on the ring forging by adopting an R350 ring rolling mill, wherein the rolling amount per fire is 5-10%, and the time for straight ring rolling per fire is within 120 s;
and (3) relatively low-temperature ring forging rolling: heating the ring forging after high-temperature ring forging rolling to 1000-1020 ℃ by using a high-temperature gas furnace, preserving heat for 0.5-3 hours, taking out the ring forging from the high-temperature gas furnace, and transferring the ring forging to an R350 ring rolling mill within 30s; performing a plurality of fire times of straight ring rolling on the ring forging by adopting an R350 ring rolling mill, wherein the rolling amount per fire is 5-10%, and the time for straight ring rolling per fire is within 120 s;
rounding and shaping: heating the ring forging rolled by the relatively low-temperature ring forging to 1000-1020 ℃ by using a high-temperature gas furnace, preserving heat for 0.5-1.5 hours, taking out the ring forging from the high-temperature gas furnace, transferring the ring forging to a 400T ring expanding machine for ring expanding and shaping, wherein the transfer time is within 30s, and the ring expanding and shaping time of the ring forging by using the 400T ring expanding machine is within 90 s.
2. The forging method for improving the creep property of the Wasp ring forging according to claim 1, wherein in the steps of high-temperature ring forging rolling and relatively low-temperature ring forging rolling, the ring rolling feed rate of the R350 ring rolling mill for performing straight ring rolling on the ring forging is 0.6-1.3mm/s.
3. The forging method for improving the creep property of the Wasp ring forging according to claim 1, wherein in the rounding step, when a 400T ring expanding machine is used for expanding and shaping the ring forging, the ring expanding amount is within 1%.
CN202010979541.9A 2020-09-17 2020-09-17 Forging method for improving creep property of Wasp ring forging Active CN112296245B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010979541.9A CN112296245B (en) 2020-09-17 2020-09-17 Forging method for improving creep property of Wasp ring forging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010979541.9A CN112296245B (en) 2020-09-17 2020-09-17 Forging method for improving creep property of Wasp ring forging

Publications (2)

Publication Number Publication Date
CN112296245A CN112296245A (en) 2021-02-02
CN112296245B true CN112296245B (en) 2023-01-31

Family

ID=74483097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010979541.9A Active CN112296245B (en) 2020-09-17 2020-09-17 Forging method for improving creep property of Wasp ring forging

Country Status (1)

Country Link
CN (1) CN112296245B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101279349A (en) * 2008-04-23 2008-10-08 贵州航宇科技发展有限公司 Method for rolling and forming nickel-based high-temperature alloy conical ring
CN103350167B (en) * 2013-06-30 2015-04-22 贵州安大航空锻造有限责任公司 Roll forming method of 4340 H steel E-shaped ring forging
CN107138538B (en) * 2017-06-16 2019-06-07 奥科宁克航空机件(苏州)有限公司 A kind of forging method of fining high temperature alloy annular forging piece grain size
CN108672624B (en) * 2018-05-03 2019-07-30 奥科宁克航空机件(苏州)有限公司 A kind of nickel base superalloy ring forging method
CN111215567A (en) * 2019-12-06 2020-06-02 陕西宏远航空锻造有限责任公司 Forging method for improving grain size of GH4099 high-temperature alloy thin-wall ring
CN111069496B (en) * 2019-12-30 2021-06-01 西北工业大学 Preparation method of GH4738 alloy crystal homogenizing ring forging

Also Published As

Publication number Publication date
CN112296245A (en) 2021-02-02

Similar Documents

Publication Publication Date Title
CN108907049B (en) Forging method for improving special TC4 titanium alloy structure performance
CN109648025B (en) Manufacturing process for optimizing cobalt-based deformation high-temperature alloy forged bar
CN111069496B (en) Preparation method of GH4738 alloy crystal homogenizing ring forging
CN107138538A (en) A kind of forging method of fining high temperature alloy annular forging piece grain size
CN112589022B (en) Method for manufacturing high-quality hard-to-deform high-temperature alloy low-segregation fine-grain bar
CN105441845A (en) Forging technology for abnormal structure of TC18 titanium alloy raw material
CN105088118A (en) Grain ultra-fining method for nickel-based superalloy board
CN112846015B (en) GH536 high-temperature alloy annular forging forming method
CN108559934A (en) A kind of cryogenic treatment process of TC6 titanium alloy forgings
CN111926274B (en) Manufacturing method for improving creep resistance of TI6242 titanium alloy
CN112296245B (en) Forging method for improving creep property of Wasp ring forging
CN111451425B (en) Forging method for controlling white point defect
CN111136106B (en) Method for producing fine-grained steel by directly rolling continuous casting billet without passing through heating furnace
CN112122543B (en) Forging method for refining crystal grains of In783 alloy thick-wall ring forging
CN106834642B (en) Optimized forging process of GH6783 alloy bar
CN108380801B (en) Manufacturing process of large pressure vessel tube plate forging
CN114433758B (en) Forging processing method of high-silver aluminum alloy
CN114618970A (en) Forging process for improving strength of thick-section TA15 titanium alloy forging
CN114350969A (en) Manufacturing method of stainless steel bar for liquid hydrogen storage device
CN109967672B (en) Forging method of CuAl10Fe5Ni5 copper alloy
CN112210647B (en) Process for improving impact value of A286 aviation forging
CN115709254A (en) Forging process of annular forging of R41 alloy
CN107774712A (en) A kind of production method of the big thickness low alloy steel plate of low cost
CN112275978B (en) Forging method of anti-cracking metal steel column
CN111020429B (en) Heat treatment method for large-thickness ultra-wide TA1 titanium plate of ingot finished material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant