CN112288179A - Optimized analysis method for planned village fruit production by using big data - Google Patents

Optimized analysis method for planned village fruit production by using big data Download PDF

Info

Publication number
CN112288179A
CN112288179A CN202011224830.4A CN202011224830A CN112288179A CN 112288179 A CN112288179 A CN 112288179A CN 202011224830 A CN202011224830 A CN 202011224830A CN 112288179 A CN112288179 A CN 112288179A
Authority
CN
China
Prior art keywords
village
planning
land
area
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011224830.4A
Other languages
Chinese (zh)
Other versions
CN112288179B (en
Inventor
高成军
廖小莉
李柏林
万斯奇
侯伟
李翔
李晶
张建
周安强
陈萃
刘佳川
杜康
马小明
胡源
郭云龙
黎欢
黄凯
徐放
周健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Planning And Natural Resources Information Center
Original Assignee
Chongqing Planning And Natural Resources Information Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Planning And Natural Resources Information Center filed Critical Chongqing Planning And Natural Resources Information Center
Priority to CN202011224830.4A priority Critical patent/CN112288179B/en
Publication of CN112288179A publication Critical patent/CN112288179A/en
Application granted granted Critical
Publication of CN112288179B publication Critical patent/CN112288179B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Abstract

The invention provides a method for optimizing and analyzing planned village fruits by using big data, which comprises the following steps: s1, importing the historic and prestored village comprehensive planning data and planning drawing layer data into a database, and performing coordinate system conversion on the village comprehensive planning data; s2, extracting newly added construction land from the village comprehensive planning data after the coordinate system conversion, and calculating the intersection area of the construction land; and S3, matching and overlapping the data of the planning map layer and the map layer of the newly added construction land to obtain the comprehensive optimization result of the data of the planning map layer.

Description

Optimized analysis method for planned village fruit production by using big data
Technical Field
The invention relates to the field of geographic information planning, in particular to a method for optimizing and analyzing planned village fruits by using big data.
Background
Because the application of big data is deepened and promoted constantly, any field is all carrying out intelligent technology with corresponding data upload high in the clouds big data platform, but the corresponding data that relates to geographic information among the prior art, can't accomplish accurate matching land used information, especially carry out the land planning in-process to the village, can not be fast accurate carry out the rational use of land and the quick show and the rational use of village land planning data, this needs technical staff in the field to solve corresponding technical problem urgently.
Disclosure of Invention
The invention aims to at least solve the technical problems in the prior art, and particularly creatively provides a method for optimizing and analyzing planned village fruits by using big data.
In order to achieve the above object, the present invention provides a method for optimized analysis of planned village fruits by using big data, comprising the steps of:
s1, importing the historic and prestored village comprehensive planning data and planning drawing layer data into a database, and performing coordinate system conversion on the village comprehensive planning data;
s2, extracting newly added construction land from the village comprehensive planning data after the coordinate system conversion, and calculating the intersection area of the construction land;
and S3, matching and overlapping the data of the planning map layer and the map layer of the newly added construction land to obtain the comprehensive optimization result of the data of the planning map layer.
Preferably, the S1 includes:
s1-1, the village comprehensive planning data are village land utilization change survey data FA and village planning result data FB; converting coordinate system of village land utilization change survey data FA and village planned fruit data FB, converting the village land utilization change survey data FA through geographical coordinate system to form village land utilization change projection coordinate system FA-PCS, converting the village planned fruit data FB through geographical coordinate system to form village planned fruit change projection coordinate system FB-PCS,
s1-2, screening the planning region FA-PCS-C of village C in the village land utilization change projection coordinate system FA-PCS according to the village screening standard, and changing the planning region FB-PCS-C of village C in the village planning projection coordinate system FB-PCS.
Preferably, the S2 includes:
s2-1, screening and extracting agricultural land and unused land in FA-PCS-C, and using agricultural land and unused land area FA-PCS-C-A of planning area FA-PCS-C of village C in the changed projection coordinate system FA-PCS in village land,
s2-2, screening construction land in FB-PCS-C, and obtaining a construction land area FB-PCS-C-B of a planning area FB-PCS-C of village C in a village planning result change projection coordinate system FB-PCS;
s2-3, intersecting the agricultural land with the unused land area FA-PCS-C-A and the construction land area FB-PCS-C-B to obtain an area overlap layer F _ inter, and establishing an area overlap layer Field1And the method is used for calculating the area of the F _ inter region, and the area of the screening region is larger than a set threshold value and is used as the NCL of the planning construction land of the newly added village.
Preferably, the planning map layer data pre-stored in the history in S1 includes: the method comprises four mountain prohibited building area map layer data FC, town control regulation map layer data FD, traffic regulation map layer data FE, power grid regulation map layer data FF, culture name and village map layer data FG, historical building map layer data FH, cultural relic protection unit map layer data FI, mountain water system green system regulation map layer data FJ and geological disaster map layer data FK.
Preferably, the S3 includes:
s3-1, performing frame cutting along the four-mountain prohibited area map layer data FC by using the NCL of the newly added village planning construction area to obtain a four-mountain prohibited area result map layer as FC-A, and then newly adding a four-mountain prohibited area field FieldFC to calculate the FC-A area;
s3-2, performing frame cutting along the data FD of the urban control regulation map layer by using NCL (national center for planning and construction) of the newly added village to obtain an urban control regulation result map layer as FD-A, and then calculating the area by newly adding an urban control regulation field FieldFD to obtain the number and the area of a plot where the FD-A is located;
s3-3, performing frame cutting along the traffic planning map layer data FE by using the NCL of the newly added village planning construction land to obtain a traffic planning result map layer which is FE-A, wherein the result comprises traffic planning result data of the NCL of the newly added village planning construction land;
s3-4, performing frame cutting along the power grid planning map layer data FF by using the NCL of the newly added village planning construction land to obtain a power grid planning result map layer FF-A, wherein the result comprises power grid planning result data of the NCL of the newly added village planning construction land;
s3-5, performing border cutting along the cultural nominal village map layer data FG by using the NCL of the newly added village planning construction land to obtain a cultural nominal village result map layer FG-A, and then calculating the FG-A area by using the field FieldFG of the newly added cultural nominal village;
s3-6, performing frame cutting along historical building layer data FH by using NCL (national center for planning construction) of the newly added village to obtain a historical building result layer FH-A, and then calculating the FH-A area by adding a historical building field FieldFH;
s3-7, performing frame cutting along the cultural relic protection unit image layer data FI by using the NCL for newly added village planning construction, obtaining a cultural relic protection unit result image layer as FI-A, and then adding a cultural relic protection unit field FieldFI to calculate the FI-A area.
Preferably, the S3 further includes:
s3-8, screening a first-level branch FJ-1, a second-level branch FJ-2 and a third-level branch FJ-3 in the green system planning map layer data FJ of the mountain water system respectively;
s3-9, establishing a first BUFFER area for the FJ-1, wherein the result of the first BUFFER area layer is FJ-1-BUFFER;
s3-10, establishing a second BUFFER area for the FJ-2, wherein the result of the layer of the second BUFFER area is FJ-2-BUFFER;
s3-11, a third BUFFER area is established for the FJ-3, and the result of the layer of the third BUFFER area is FJ-3-BUFFER.
Preferably, the S3 further includes:
s3-12, performing border clipping along the first BUFFER area layer FJ-1-BUFFER by using the NCL of the newly added village planning construction land to obtain a first BUFFER area result layer FJ-1-A, and then adding a first BUFFER area field FieldFJ1Calculating the area FJ-1-A;
s3-13, performing border clipping along the second BUFFER area layer FJ-2-BUFFER by using the NCL of the newly added village planning construction area to obtain a second BUFFER area result layer FJ-2-A, and then adding a second BUFFER area field FieldFJ2Calculating the area FJ-2-A;
s3-14, performing frame cutting along the geological disaster position map layer data FK by using the newly-added village planning and construction land NCL to obtain a geological disaster position result map layer FK-A, wherein the result comprises disaster points existing in the newly-added village planning and construction land NCL;
s3-15, comprehensive optimization result
Figure BDA0002763297320000041
The JSON file processed with Python is returned to the spatially large database.
Preferably, the agricultural land comprises: paddy field, irrigated water land, dry land, orchard, tea garden, other gardens, woodland, shrub woodland, natural pasture land, artificial pasture land, rural road, pool water surface, ditch, facility farming land, field ridge.
Preferably, the unutilized land includes: river water, lake water, coastal water, inland mudflat, glacier and permanent snow, other grasslands, saline-alkali lands, marshlands, sandy lands and bare lands.
Preferably, the construction site includes: village industrial land, village public service land, village residential land, road land and other independent construction land.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
different buffer areas and land use conditions in different areas can be rapidly acquired through image overlapping, if abnormal occupation conditions are found, matching operation is rapidly performed, an abnormal alarm is sent, reasonable planning construction is performed on planned land of villages and small towns, and red line crossing is avoided.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is a general schematic of the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the accompanying drawings are illustrative only for the purpose of explaining the present invention, and are not to be construed as limiting the present invention.
As shown in fig. 1, the invention discloses a method for optimizing and analyzing planned village fruits by using big data, which comprises the following steps:
importing historical prestored land utilization change survey data (FA), village planning result data (FB), four mountain banning area building data (FC), town control planning layer data (FD), traffic planning layer data (FE), power grid planning layer data (FF), culture name village layer data (FG), historical building layer data (FH), cultural relic protection unit layer data (FI), mountain water system green planning layer data (FJ) and geological disaster layer data (FK) into a space large database environment;
secondly, converting the FA and FB coordinate systems (converting the geographical coordinate system into a projection coordinate system) into FA-PCS and FB-PCS;
thirdly, screening out areas FA-PCS-C and FB-PCS-C of village C in FA-PCS and FB-PCS according to village administrative region codes (QSDWDM);
and fourthly, extracting the newly added construction land. In FA-PCS-C, agricultural land (paddy field, irrigated land, dry land, orchard, tea garden, other gardens, woodland, shrub forest land, other forest land, natural grassland, artificial grassland, rural road, pool water surface, ditch, facility agricultural land, field ridge) and unused land (river water surface, lake water surface, coastal water surface, inland tidal flat, glacier and permanent accumulated snow, other grassland, saline-alkali land, marsh land, sand land, bare land) are screened out, and as a result, FA-PCS-C-A, construction land (village industrial land, village public service land, village residential land, public land, other independent construction land) in FB-PCS-C-B, FA-PCS-C-A and FB-PCS-C-B are crossed, obtaining F _ inter, and establishing Field1The method is used for calculating the F _ inter area, and the screening area is larger than 10 square meters and is used as a newly added construction land (NCL);
and fifthly, conflict with the forbidden building areas of four mountains. Using NCL to cut FC, the result layer is FC-A, and adding field FieldFC to calculate FC-A area;
and sixthly, conflict with the town control and regulation map layer. The NCL is intersected with the FD, the result is FD-A, the field FieldFD is added to calculate the area, and the number and the area of the land where the FD-A is located can be obtained;
and seventhly, conflict with the traffic planning map layer. Using NCL to cut FE, wherein the result is FE-A which is a traffic plan existing in the newly added construction land;
and eighthly, conflict with the power grid planning layer. Cutting the FF by using the NCL, wherein the result is FF-A which is the power grid plan existing in the newly added construction land;
and ninth, conflict with the culture name village map layer. Using NCL to cut FG, the result is FG-A, adding a field FieldFG to calculate the area, and obtaining the FG-A area;
and tenthly, conflicting with the historical building map layer. Using NCL to cut FH, wherein the result is FH-A, adding a field FieldFH to calculate the area, and obtaining the FH-A area;
eleven, conflict with the cultural relic protection unit layer. Using NCL to clip FI, wherein the result is FI-A, adding field FieldFI to calculate the area, and obtaining the FI-A area;
and twelfth, conflict with the green planning map layer of the mountain water system.
1) Screening a first-stage branch flow (FJ-1), a second-stage branch flow (FJ-2) and a third-stage branch flow (FJ-3) from the FJ,
2) a100 m BUFFER is established for FJ-1, resulting in FJ-1-BUFFER,
3) establishing a 50m BUFFER area for the FJ-2, wherein the result is FJ-2-BUFFER;
4) establishing a 10m BUFFER area for FJ-3, and obtaining the result as FJ-2-BUFFER;
5) using NCL to crop FJ-1-BUFFER, the result is FJ-1-A, add field FieldFJ1Calculating the area to obtain the FJ-1-A area;
6) using NCL to crop FJ-2-BUFFER, the result is FJ-2-A, add field FieldFJ2Calculating the area to obtain the FJ-2-A area;
thirteen, conflict with the position of the geological disaster. The NCL is used for cutting the FK, and the result is FK-A which is a disaster point existing in the newly added construction land;
fourteen, all results are returned to the large spatial database in a Python processed JSON file.
When abnormality is found in the village planning result display process, analysis is carried out on the red land utilization line, and the method comprises the following steps:
s1, acquiring the basic data of the landed red line, and importing the basic data into a big database;
s2, carrying out ground red line space layer detection by a bottom line conflict detection method;
and S3, calculating the area of the red and ground line by a space approval data monitoring method.
Preferably, the S1 includes:
s1-1, uploading the coordinates of the inflection points of the red land lines to a large spatial database;
and S1-2, analyzing the uploaded inflection point coordinate file into a coordinate set, and calculating the space reference authentication information WKID of the projection coordinate system according to the range of the uploaded coordinate set.
Preferably, the S1 further includes:
s1-3, uploading the analyzed coordinate set and coordinate system to a space big database computing environment;
and S1-4, converting the coordinate set into a space geometric object A which can be used by a space big database computing environment by using Pyspark, analyzing the uploaded inflection point coordinate file into a coordinate set, and forming a projection coordinate system by using the uploaded coordinate set.
Preferably, the S1 includes:
s1-5, performing intersection operation on the space geometric object A and the permanent basic farmland protection area to obtain a result B, if the result B is empty, not calculating the area, otherwise, summing the area of the image spots, storing the result into a JSON file processed by Python, simultaneously issuing the intersection range into a space image layer, performing space control on the ecological protection red line, the permanent basic farmland and the natural protection area, performing space amplification operation according to the fineness of the obtained result, thereby performing global preview of the red-earth line, and then performing space reduction operation, thereby performing detail scanning of the red-earth line.
Preferably, the S2 includes:
s2-1, setting a land use range interval according to a bottom line conflict detection method, importing three layers of an ecological protection red line, a permanent basic farmland and a natural protection area, carrying out land data conflict detection judgment, calculating a corresponding land use conflict area if bottom line conflict occurs, and executing S2-2 if no conflict occurs;
s2-2, in the process of judging the bottom line conflict detection method, extracting the txt format red line file in the server, extracting the land use position and the land use application range, and analyzing by the bottom line conflict detection method.
Preferably, the S3 includes:
s3-1, calculating the area of the red earth line by a space approval data monitoring method, performing intersection operation on the space geometric object A and a specific region to obtain a result C, if the result C is empty, not calculating the area of the red earth line, otherwise, calculating the area of the red earth line, performing grouping area summation according to the specific region type, storing the result in a JSON file processed by Python, and simultaneously issuing the intersected range into a space map layer; the red-earth line calculation is carried out through linear engineering comparison and selection,
s3-2, performing intersection operation on the space geometric object A and a red land line to obtain a result D, if the result D is empty, not calculating the area, otherwise, performing the sum of the areas of the image spots, storing the result into a JSON file processed by Python, and simultaneously issuing the intersection range into a space image layer; and selecting a coverage range according to the layer attribute.
Preferably, the S3 includes:
S-A, if the region type is A natural protection region, extracting A core region of the natural protection region to perform grouping areA summation, extracting the areA of the intersecting land of the core region, and publishing the intersecting range into A space map layer;
S-B, extracting test areas of the natural protection area to sum in groups, extracting the intersecting area of the test areas, and publishing the intersecting range into a space map layer;
and S-C, extracting the buffer areas of the natural protection area to sum the grouped areas, extracting the intersecting area of the buffer areas, and issuing the intersecting range into a space image layer.
Preferably, the S1 includes:
the ground red line basic data comprises: permanent basic farmland protection area, ecological protection red line area, natural protection area and town development boundary area.
While embodiments of the invention have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.

Claims (10)

1. A method for optimizing and analyzing planned village fruits by using big data is characterized by comprising the following steps:
s1, importing the historic and prestored village comprehensive planning data and planning drawing layer data into a database, and performing coordinate system conversion on the village comprehensive planning data;
s2, extracting newly added construction land from the village comprehensive planning data after the coordinate system conversion, and calculating the intersection area of the construction land;
and S3, matching and overlapping the data of the planning map layer and the map layer of the newly added construction land to obtain the comprehensive optimization result of the data of the planning map layer.
2. The method according to claim 1, wherein S1 includes:
s1-1, the village comprehensive planning data are village land utilization change survey data FA and village planning result data FB; converting coordinate system of village land utilization change survey data FA and village planned fruit data FB, converting the village land utilization change survey data FA through geographical coordinate system to form village land utilization change projection coordinate system FA-PCS, converting the village planned fruit data FB through geographical coordinate system to form village planned fruit change projection coordinate system FB-PCS,
s1-2, screening the planning region FA-PCS-C of village C in the village land utilization change projection coordinate system FA-PCS according to the village screening standard, and changing the planning region FB-PCS-C of village C in the village planning projection coordinate system FB-PCS.
3. The method according to claim 2, wherein S2 includes:
s2-1, screening and extracting agricultural land and unused land in FA-PCS-C, and using agricultural land and unused land area FA-PCS-C-A of planning area FA-PCS-C of village C in the changed projection coordinate system FA-PCS in village land,
s2-2, screening construction land in FB-PCS-C, and obtaining a construction land area FB-PCS-C-B of a planning area FB-PCS-C of village C in a village planning result change projection coordinate system FB-PCS;
s2-3, intersecting the agricultural land with the unused land area FA-PCS-C-A and the construction land area FB-PCS-C-B to obtain an area overlap layer F _ inter, and establishing an area overlap layer Field1And the method is used for calculating the area of the F _ inter region, and the area of the screening region is larger than a set threshold value and is used as the NCL of the planning construction land of the newly added village.
4. The method for optimized analysis of village planning results according to claim 1, wherein said planning map data pre-stored in history at S1 comprises: the method comprises four mountain prohibited building area map layer data FC, town control regulation map layer data FD, traffic regulation map layer data FE, power grid regulation map layer data FF, culture name and village map layer data FG, historical building map layer data FH, cultural relic protection unit map layer data FI, mountain water system green system regulation map layer data FJ and geological disaster map layer data FK.
5. The method according to claim 4, wherein step S3 includes:
s3-1, performing frame cutting along the four-mountain prohibited area map layer data FC by using the NCL of the newly added village planning construction area to obtain a four-mountain prohibited area result map layer as FC-A, and then newly adding a four-mountain prohibited area field FieldFC to calculate the FC-A area;
s3-2, performing frame cutting along the data FD of the urban control regulation map layer by using NCL (national center for planning and construction) of the newly added village to obtain an urban control regulation result map layer as FD-A, and then calculating the area by newly adding an urban control regulation field FieldFD to obtain the number and the area of a plot where the FD-A is located;
s3-3, performing frame cutting along the traffic planning map layer data FE by using the NCL of the newly added village planning construction land to obtain a traffic planning result map layer which is FE-A, wherein the result comprises traffic planning result data of the NCL of the newly added village planning construction land;
s3-4, performing frame cutting along the power grid planning map layer data FF by using the NCL of the newly added village planning construction land to obtain a power grid planning result map layer FF-A, wherein the result comprises power grid planning result data of the NCL of the newly added village planning construction land;
s3-5, performing border cutting along the cultural nominal village map layer data FG by using the NCL of the newly added village planning construction land to obtain a cultural nominal village result map layer FG-A, and then calculating the FG-A area by using the field FieldFG of the newly added cultural nominal village;
s3-6, performing frame cutting along historical building layer data FH by using NCL (national center for planning construction) of the newly added village to obtain a historical building result layer FH-A, and then calculating the FH-A area by adding a historical building field FieldFH;
s3-7, performing frame cutting along the cultural relic protection unit image layer data FI by using the NCL for newly added village planning construction, obtaining a cultural relic protection unit result image layer as FI-A, and then adding a cultural relic protection unit field FieldFI to calculate the FI-A area.
6. The method according to claim 4, wherein the step S3 further includes:
s3-8, screening a first-level branch FJ-1, a second-level branch FJ-2 and a third-level branch FJ-3 in the green system planning map layer data FJ of the mountain water system respectively;
s3-9, establishing a first BUFFER area for the FJ-1, wherein the result of the first BUFFER area layer is FJ-1-BUFFER;
s3-10, establishing a second BUFFER area for the FJ-2, wherein the result of the layer of the second BUFFER area is FJ-2-BUFFER;
s3-11, a third BUFFER area is established for the FJ-3, and the result of the layer of the third BUFFER area is FJ-3-BUFFER.
7. The method according to claim 6, wherein S3 further includes:
s3-12, performing border clipping along the first BUFFER area layer FJ-1-BUFFER by using the NCL of the newly added village planning construction land to obtain a first BUFFER area result layer FJ-1-A, and then adding a first BUFFER area field FieldFJ1Calculating the area FJ-1-A;
s3-13, performing border clipping along the second BUFFER area layer FJ-2-BUFFER by using the NCL of the newly added village planning construction area to obtain a second BUFFER area result layer FJ-2-A, and then adding a second BUFFER area field FieldFJ2Calculating the area FJ-2-A;
s3-14, performing frame cutting along the geological disaster position map layer data FK by using the newly-added village planning and construction land NCL to obtain a geological disaster position result map layer FK-A, wherein the result comprises disaster points existing in the newly-added village planning and construction land NCL;
s3-15, comprehensive optimization result
Figure FDA0002763297310000041
The JSON file processed with Python is returned to the spatially large database.
8. The method of claim 1, wherein the agricultural land comprises: paddy field, irrigated water land, dry land, orchard, tea garden, other gardens, woodland, shrub woodland, natural pasture land, artificial pasture land, rural road, pool water surface, ditch, facility farming land, field ridge.
9. The method of claim 1, wherein the unutilized land comprises: river water, lake water, coastal water, inland mudflat, glacier and permanent snow, other grasslands, saline-alkali lands, marshlands, sandy lands and bare lands.
10. The method of claim 1, wherein the construction land comprises: village industrial land, village public service land, village residential land, road land and other independent construction land.
CN202011224830.4A 2020-11-05 2020-11-05 Optimized analysis method for planned village fruit production by using big data Active CN112288179B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011224830.4A CN112288179B (en) 2020-11-05 2020-11-05 Optimized analysis method for planned village fruit production by using big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011224830.4A CN112288179B (en) 2020-11-05 2020-11-05 Optimized analysis method for planned village fruit production by using big data

Publications (2)

Publication Number Publication Date
CN112288179A true CN112288179A (en) 2021-01-29
CN112288179B CN112288179B (en) 2021-08-03

Family

ID=74350598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011224830.4A Active CN112288179B (en) 2020-11-05 2020-11-05 Optimized analysis method for planned village fruit production by using big data

Country Status (1)

Country Link
CN (1) CN112288179B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113609237A (en) * 2021-07-15 2021-11-05 城乡院(广州)有限公司 Data processing method, device, equipment and medium for construction land change

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103049517A (en) * 2012-12-17 2013-04-17 上海市房屋土地资源信息中心 Method and system for discriminating changeable graphic spot in dynamic monitoring of present situation of land use
CN106530170A (en) * 2016-09-21 2017-03-22 环境保护部南京环境科学研究所 Method for boundary optimization of regional ecological protection red line
CN107862644A (en) * 2017-12-21 2018-03-30 武汉大学 A kind of analysis and evaluation method towards " three lines " conflict
CN108154221A (en) * 2017-12-21 2018-06-12 武汉大学 The population innovatory algorithm that one kind optimizes towards " three lines " collaboration
CN109726937A (en) * 2019-01-25 2019-05-07 福州大学 Quality of data degradation evaluation method is adjusted based on the land use planning that shape is estimated
CN109829024A (en) * 2019-01-21 2019-05-31 辽宁省国土资源调查规划局 A kind of space planning conflict diagnostic method and system
US20190171657A1 (en) * 2016-07-29 2019-06-06 Queensland Electricity Transmission Corporation Geospatial mapping system
CN110188632A (en) * 2019-05-14 2019-08-30 苏州嘉奕晟中小企业科技咨询有限公司 A kind of land used information census data processing system
CN110264547A (en) * 2019-06-24 2019-09-20 重庆佳渝测绘有限公司 A kind of translucent display methods of land data based on map overlay

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103049517A (en) * 2012-12-17 2013-04-17 上海市房屋土地资源信息中心 Method and system for discriminating changeable graphic spot in dynamic monitoring of present situation of land use
US20190171657A1 (en) * 2016-07-29 2019-06-06 Queensland Electricity Transmission Corporation Geospatial mapping system
CN106530170A (en) * 2016-09-21 2017-03-22 环境保护部南京环境科学研究所 Method for boundary optimization of regional ecological protection red line
CN107862644A (en) * 2017-12-21 2018-03-30 武汉大学 A kind of analysis and evaluation method towards " three lines " conflict
CN108154221A (en) * 2017-12-21 2018-06-12 武汉大学 The population innovatory algorithm that one kind optimizes towards " three lines " collaboration
CN109829024A (en) * 2019-01-21 2019-05-31 辽宁省国土资源调查规划局 A kind of space planning conflict diagnostic method and system
CN109726937A (en) * 2019-01-25 2019-05-07 福州大学 Quality of data degradation evaluation method is adjusted based on the land use planning that shape is estimated
CN110188632A (en) * 2019-05-14 2019-08-30 苏州嘉奕晟中小企业科技咨询有限公司 A kind of land used information census data processing system
CN110264547A (en) * 2019-06-24 2019-09-20 重庆佳渝测绘有限公司 A kind of translucent display methods of land data based on map overlay

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张敏等: ""重庆市城乡规划效能监察系统建设探索"", 《规划师》 *
程盼: ""GIS 支持下的县级‘多规合一’技术研"", 《中国优秀硕士学位论文全文数据库基础科学辑》 *
肖姚 等: ""土地利用视角下的旅游小城镇‘多规合一’实证研究", 《现代城市研究》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113609237A (en) * 2021-07-15 2021-11-05 城乡院(广州)有限公司 Data processing method, device, equipment and medium for construction land change
CN113609237B (en) * 2021-07-15 2024-04-05 城乡院(广州)有限公司 Construction land change data processing method, device, equipment and medium

Also Published As

Publication number Publication date
CN112288179B (en) 2021-08-03

Similar Documents

Publication Publication Date Title
Sarvestani et al. Three decades of urban growth in the city of Shiraz, Iran: A remote sensing and geographic information systems application
CN114240119A (en) Digital twin-based flood control and waterlogging prevention system and early warning method for whole elements of territorial universe
CN102103713A (en) Method and system for monitoring wetland resource and ecological environment
CN201853252U (en) Wetland resource and ecological environment supervising system
CN112700358B (en) Marine space resource intelligent supervision system for monitoring marine ecological piles
Ryberg et al. Methodological framework for determining the land eligibility of renewable energy sources
CN112288179B (en) Optimized analysis method for planned village fruit production by using big data
Piirisaar A multi-criteria GIS analysis for siting of utility-scale photovoltaic solar plants in county Kilkenny, Ireland
Aithal et al. Spatial patterns of urbanization in Mysore: emerging Tier II City in Karnataka
CN116863010B (en) Water and soil loss map spot comprehensive drawing method based on space aggregation analysis
CN111859613A (en) GIS-based bird damage risk level distribution map drawing method
Sarkar Analysis of human settlement patterns using RS and GIS in the plains of West Bengal
Zhang et al. Decision support system and monitoring of eco-agriculture based on WebGIS in Shule Basin
Cetin et al. Multitemporal assessment of land-use change in a rapidly urbanizing coastal region in Turkey using remote sensing
Popelková et al. Landscape changes mapping: Central part of Ostrava-Karviná mining district, Czech Republic
Ribeiro et al. Water demand of central pivot-irrigated areas in Bahia, Brazil: management of water resources applied to sustainable production
CN108804086A (en) A kind of cities and towns geological disaster digital management system
OZTURK et al. Determination of land use/cover and topographical/morphological features of river watershed for water resources management using remote sensing and GIS
Bobeck A GIS-based multi-criteria decision analysis of wind farm site suitability in New South Wales, Australia, from a sustainable development perspective
Zhang et al. High-precision Ecological Protection Red Line Boundary Optimization for Fangshan District, Beijing, China.
Kowalczyk et al. DATA SOURCES FOR THE IDENTIFICATION AND MODELLING OF OPEN SPACE STRUCTURES IN URBAN AREAS
Ozen et al. Impact of Land Use Changes on Agricultural Ecosystem: A Case Study of Kemalpasa-Izmir
Jadain An archaeological survey north of the 6th Cataract: GIS study of Sabaloka East
Reba et al. Determination of sustainable land potential based on priority ranking: multi-criteria analysis (MCA) technique
Ahmed et al. Spatial Analysis of Land Use Land Cover Change in Hadejia Metropolis from 1989-2019

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant