CN112282368B - A park body-building apparatus fixed mounting equipment for municipal works - Google Patents

A park body-building apparatus fixed mounting equipment for municipal works Download PDF

Info

Publication number
CN112282368B
CN112282368B CN202011203097.8A CN202011203097A CN112282368B CN 112282368 B CN112282368 B CN 112282368B CN 202011203097 A CN202011203097 A CN 202011203097A CN 112282368 B CN112282368 B CN 112282368B
Authority
CN
China
Prior art keywords
gear
fixedly arranged
cement
cavity
machine body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011203097.8A
Other languages
Chinese (zh)
Other versions
CN112282368A (en
Inventor
宋新鲜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yiwu Gaoyang Construction Engineering Co ltd
Original Assignee
Yiwu Gaoyang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yiwu Gaoyang Construction Engineering Co ltd filed Critical Yiwu Gaoyang Construction Engineering Co ltd
Priority to CN202011203097.8A priority Critical patent/CN112282368B/en
Publication of CN112282368A publication Critical patent/CN112282368A/en
Application granted granted Critical
Publication of CN112282368B publication Critical patent/CN112282368B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/025Buckets specially adapted for use with concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0427Devices for both conveying and distributing with distribution hose on a static support, e.g. crane
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/06Solidifying concrete, e.g. by application of vacuum before hardening
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/10Devices for levelling, e.g. templates or boards
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The invention discloses a park fitness equipment fixing and mounting device for municipal engineering, which comprises a machine body, wherein a power cavity is arranged on the right side of the machine body, a control cavity is arranged on the left side of the machine body, two bilaterally symmetrical lifting cavities are arranged on the upper side of the machine body, a cement cavity is arranged on the lower side of each lifting cavity, a main motor and an air delivery pump are fixedly arranged on the upper side of the machine body, a pressing device for clamping and fixing equipment is arranged on the upper side of the machine body, each pressing device comprises a sliding block which is slidably mounted in each lifting cavity, a bearing plate is fixedly arranged in each sliding block, a cement device for laying cement is arranged on the right side of the machine body, and a flattening device for flattening the cement is arranged on the left side of the machine body.

Description

A park body-building apparatus fixed mounting equipment for municipal works
Technical Field
The invention relates to the relevant field of municipal engineering, in particular to fixed mounting equipment for park fitness equipment for municipal engineering.
Background
Along with people's quality of life improves, more and more people begin to pay attention to body-building, and the body-building apparatus in the park can make things convenient for people to take exercise body-building in daily vacant time, but fixed to the installation of body-building apparatus, generally through artifical installation, and this kind of mode wastes time and energy, the installation effectiveness is low, need the installer fixed and stable body-building apparatus, then lay cement, accomplish the installation after cement solidifies, the verticality of installation apparatus can't be guaranteed in artifical installation, and need consume plenty of time and cost of labor.
Disclosure of Invention
In order to solve the problems, the invention provides a park fitness equipment fixing and mounting device for municipal engineering.
The invention is realized by the following technical scheme.
The park body-building equipment fixing and mounting equipment for municipal engineering comprises a machine body, a power cavity is arranged on the right side of the machine body, a control cavity is arranged on the left side of the machine body, two bilaterally symmetrical lifting cavities are arranged on the upper side of the machine body, a cement cavity is arranged on the lower side of each lifting cavity, a main motor and an air delivery pump are fixedly arranged on the upper side face of the machine body, the power of the main motor is connected with a motor shaft, a first gear is fixedly arranged on the motor shaft, a fixing plate is fixedly arranged on the right side wall of the power cavity, the motor shaft rotates on the fixing plate, a first sliding plate is slidably connected in the fixing plate, a second rotating shaft is rotatably connected on the first sliding plate, a third gear is fixedly arranged on the second rotating shaft, and a compressing device for clamping and fixing equipment is arranged on the upper side of the machine body;
the compressing device comprises sliding blocks which are slidably arranged in each lifting cavity, a bearing plate is fixedly arranged in each sliding block, an upright post is fixedly arranged on the bearing plate, a compressing connecting rod is slidably connected to the upper side of each upright post, a compressing ring is fixedly arranged on one side of each compressing connecting rod, the other side of each compressing ring is higher than a moving plate, two sliding connecting rods which slide in the upright posts are fixedly arranged on the moving plate, the upper side and the lower side of the moving plate are respectively and rotatably connected with a pushing connecting rod, pushing blocks are slidably connected in the upright posts on the two sides of each compressing connecting rod, each pushing block is rotatably connected with the pushing connecting rods, a pushing spring is connected between each pushing block and the side wall of each upright post, the side wall of each lifting cavity is rotatably connected with a rotating shaft four, a belt pulley I is fixedly arranged on the rotating shaft four, a nut I is fixedly arranged in each belt pulley I, and a screw rod I which is in threaded connection with the nut I is rotatably arranged on the lower side of the bearing plate, the first screw rod rotates in the side wall between the lifting cavity and the cement cavity, a first rotating shaft is rotatably connected between the power cavity and the cement cavity, a first rotating shaft is rotatably connected between the control cavity and the cement cavity, a second gear meshed with the first gear is fixedly arranged on the upper side of the first rotating shaft in the power cavity, and a fourth gear capable of being meshed with the third gear is fixedly arranged in each of the two first rotating shafts;
the machine body right side is provided with a cement device for paving cement, and the machine body left side is provided with a leveling device for leveling cement.
Preferably, the side wall rotates on the control chamber to be connected with pivot two, every two upsides of pivot rotate and are connected with the pivot cover, the pivot cover right side has set firmly the removal connecting rod, power chamber right side wall with control chamber left side wall has set firmly the cylinder respectively, sliding connection have in the cylinder with remove connecting rod fixed connection's piston, every the cylinder with the gas transmission pump is connected with the trachea, two downside sliding connection of pivot have the universal joint, pivot two with be connected with piston spring between the universal joint, the universal joint downside rotates and is connected with pivot three, two pivot three respectively with the power chamber with side wall rotates under the control chamber and connects, set firmly band pulley two in the pivot three, band pulley two with correspond be connected with driving belt between the band pulley one.
Preferably, the cement device comprises five gears fixedly arranged on the lower sides of the first rotating shafts respectively, the lower side wall of the pressing connecting rod is rotatably connected with a gear ring meshed with the two rotating shafts, two bilaterally symmetrical auxiliary motors are fixedly arranged on the upper side surface of the gear ring, each auxiliary motor is in power connection with an auxiliary motor shaft, a gear seventh is fixedly arranged on a shaft of the auxiliary motor, a first rotating block is fixedly arranged in the right side of the gear ring, a sixth gear meshed with the gear seventh is rotatably connected in the first rotating block, a second nut is fixedly arranged in the sixth gear, a second screw rod is connected to the second nut through threads, a first telescopic block which slides in the first rotary block is fixedly arranged on the left side of the second screw rod, the left side of the first telescopic block is fixedly provided with a rotating plate, a cement pipe is fixedly arranged in the rotating plate, the upper side of the cement pipe is fixedly provided with a communicated hose, and the hose is connected with an external cement pump.
Preferably, it includes fixed mounting to level and smooth the device the left rotatory piece two of ring gear, swivelling joint has gear eight in the rotatory piece two, gear eight and left seven meshing of gear, nut three has set firmly in the gear eight, sliding connection has flexible piece two in the rotatory piece two, two left sides of flexible piece have set firmly threaded connection's lead screw three in the nut three, two right sides of flexible piece rotate and are connected with the leveling plate, two upsides of flexible piece have set firmly the connecting rod, two upsides of rotatory piece have set firmly the dead lever, the dead lever upside has set firmly fixed cover, sliding connection has the push pump in the fixed cover, power connection has the catch bar in the push pump, the catch bar with the leveling plate rotates to be connected, the push pump with connecting rod fixed connection.
The beneficial effects are that: the utility model provides a park body-building apparatus fixed mounting equipment for municipal works, wherein closing device can the centre gripping and the equipment that the support column needs the installation, and can adjust and press from both sides tight height, stabilize the focus of equipment, the cement device can be around the equipment rotation and the blowout cement, fix the equipment on ground, it can strickle off cement to level and smooth the device, and according to the height of equipment height weight adjustment cement, fix with guaranteeing that the equipment is stable, body-building apparatus's fixed mounting in the park can be accomplished fast to this equipment, need not the artifical cement of wasting time and energy of laying, installation equipment, the cost of labor and time consume has been saved greatly, and can guarantee the firm and the verticality of equipment.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the invention, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is an enlarged schematic view of the embodiment of the present invention at A in FIG. 1;
FIG. 3 is an enlarged schematic view of the embodiment of the present invention at B in FIG. 1;
FIG. 4 is a cross-sectional view taken along the direction C-C in FIG. 1 according to an embodiment of the present invention.
Detailed Description
The invention will now be described in detail with reference to fig. 1-4, wherein for ease of description the orientations described below are now defined as follows: the up, down, left, right, and front-back directions described below correspond to the up, down, left, right, and front-back directions in the projection relationship of fig. 1 itself.
The invention relates to a park fitness equipment fixing and mounting device for municipal engineering, which comprises a machine body 10, wherein a power cavity 75 is arranged on the right side of the machine body 10, a control cavity 78 is arranged on the left side of the machine body 10, two bilaterally symmetrical lifting cavities 76 are arranged on the upper side of the machine body 10, a cement cavity 77 is arranged on the lower side of each lifting cavity 76, a main motor 11 and an air delivery pump 57 are fixedly arranged on the upper side of the machine body 10, the main motor 11 is in power connection with a motor shaft 12, a gear I13 is fixedly arranged on the motor shaft 12, a fixing plate 14 is fixedly arranged on the right side wall of each power cavity 75, the motor shaft 12 rotates on the fixing plate 14, a sliding plate I17 is slidably connected in each fixing plate 14, a rotating shaft II 18 is rotatably connected on each sliding plate I17, a gear III 23 is fixedly arranged on each rotating shaft II 18, a pressing device 79 for clamping and fixing equipment is arranged on the upper side of the machine body 10, each pressing device 79 comprises a sliding block 37 slidably mounted in each lifting cavity 76, a bearing plate 36 is fixedly arranged in each sliding block 37, an upright post 38 is fixedly arranged on the bearing plate 36, a pressing connecting rod 70 is connected to the upper side of each upright post 38 in a sliding manner, a pressing ring 71 is fixedly arranged on one side of the pressing connecting rod 70, the other side of the pressing ring 71 is higher than the moving plate 43, two sliding connecting rods 42 sliding in the upright posts 38 are fixedly arranged on the moving plate 43, pushing connecting rods 41 are respectively and rotatably connected to the upper side and the lower side of the moving plate 43, pushing blocks 40 are respectively and rotatably connected to the upright posts 38 on the two sides of the pressing connecting rod 70, each pushing block 40 is rotatably connected with the pushing connecting rod 41, a pushing spring 39 is connected between the pushing block 40 and the side wall of the upright post 38, a rotating shaft four 34 is rotatably connected to the lower side wall of each lifting cavity 76, a belt wheel 32 is fixedly arranged on the rotating shaft four 34, and a nut 33 is fixedly arranged in the belt wheel 32, the lower side of the bearing plate 36 is rotatably connected with a first screw rod 35 in threaded connection with a first nut 33, the first screw rod 35 is arranged on the side wall between the lifting cavity 76 and the cement cavity 77 and rotates, the power cavity 75 is connected with a first rotating shaft 15 between the cement cavity 77 and rotates, the control cavity 78 is connected with a first rotating shaft 15 between the cement cavity 77 and rotates, a second gear 16 meshed with the first gear 13 is fixedly arranged on the upper side of the first rotating shaft 15 in the power cavity 75, two gears four 28 meshed with the third gear 23 are fixedly arranged in the first rotating shaft 15 respectively, a cement device 80 for paving cement is arranged on the right side of the machine body 10, and a leveling device 81 for leveling cement is arranged on the left side of the machine body 10.
Beneficially, the second rotating shaft 18 is rotatably connected to the upper side wall of the control chamber 78, the second rotating shaft 18 is rotatably connected to the upper side of each second rotating shaft 18, a moving connecting rod 20 is fixedly arranged on the right side of the second rotating shaft 19, air cylinders 21 are respectively and fixedly arranged on the right side wall of the power chamber 75 and the left side wall of the control chamber 78, pistons 22 fixedly connected with the moving connecting rods 20 are slidably connected in the air cylinders 21, an air pipe is connected to each air cylinder 21 and the air delivery pump 57, a universal joint 25 is slidably connected to the lower side of the second rotating shaft 18, a piston spring 24 is connected between the second rotating shaft 18 and the universal joint 25, a third rotating shaft 26 is rotatably connected to the lower side of the universal joint 25, the two third rotating shafts 26 are respectively and rotatably connected to the lower side walls of the power chamber 75 and the control chamber 78, a second belt wheel 27 is fixedly arranged in the third rotating shaft 26, and a transmission belt 29 is connected between the second belt wheel 27 and the corresponding first belt wheel 32, thereby, a device support is placed in the machine body 10, the pressing rings 71 are pushed away manually, the pressing connecting rods 70 slide in the vertical columns 38, the moving plate 43 and the sliding connecting rods 42 move, the moving plate 43 drives the pushing connecting rods 41 and the pushing blocks 40, the pushing blocks 40 slide up and down in the vertical columns 38, the pushing springs 39 are stretched, the device support is placed between the two pressing rings 71, the pushing springs 39 push the pushing blocks 40 to move, the moving plate 43 and the pressing connecting rods 70 are driven to move, the pressing rings 71 approach each other, the pressing rings 71 clamp the support, the main motor 11 and the air delivery pump 57 are started, the main motor 11 drives the motor shaft 12 to rotate, the first gear 13 drives the second gear 16 and the first rotating shaft 15 to rotate, the first rotating shaft 15 drives the fourth gear 28 to rotate, the air pump 57 delivers high pressure to the two air cylinders 21 to push the piston 22, so that the movable connecting rod 20 moves to drive the second rotating shaft 18 to move, the first sliding plate 17 slides in the fixed plate 14, the third gear 23 moves to be engaged with the fourth gear 28, the fourth gear 28 drives the third gear 23 and the second rotating shaft 18 to rotate, the second rotating shaft 18 drives the universal joint 25 to rotate when moving, the piston spring 24 is stretched, the second rotating shaft 18 rotates to drive the universal joint 25 to rotate, the third rotating shaft 26 and the second belt wheel 27 are driven to rotate, the first belt wheel 32 is driven to rotate by the driving belt 29, the first belt wheel 32 drives the first nut 33 to rotate, the first nut 33 drives the first screw rod 35 to move up and down, so that the bearing plate 36 and the upright post 38 move up and down, and the sliding block 37 slides on the side wall of the lifting cavity 76, the height of the pressing ring 71 is adjusted by lifting the upright column 38 so as to adapt to fixation of equipment with different heights and ensure stability of the equipment.
Advantageously, the cement device 80 comprises a gear five 30 fixedly installed on the lower side of each of the two first rotating shafts 15, a gear ring 31 engaged with the two first rotating shafts 15 is rotatably connected to the lower side wall of the pressing link 70, two bilaterally symmetrical secondary motors 49 are fixedly installed on the upper side of the gear ring 31, a secondary motor shaft 50 is dynamically connected to each secondary motor 49, a gear seven 51 is fixedly installed on the secondary motor shaft 50, a rotating block one 44 is fixedly installed in the right side of the gear ring 31, a gear six 48 engaged with the gear seven 51 is rotatably connected to the rotating block one 44, a nut two 47 is fixedly installed in the gear six 48, a screw rod two 46 is threadedly connected to the nut two 47, a telescopic block one 45 sliding in the rotating block one 44 is fixedly installed on the left side of the screw rod two 46, a rotating plate 53 is fixedly installed on the left side of the telescopic block one 45, a cement pipe 54 is fixedly installed in the rotating plate 53, the hose 55 is fixedly connected to the upper side of the cement pipe 54, the hose 55 is connected to an external cement pump, so that when the first rotating shaft 15 in the power cavity 75 rotates, the fifth gear 30 on the right side is driven to rotate, the gear ring 31 is driven to rotate, the fifth gear 30 on the left side and the first rotating shaft 15 are driven to rotate by the gear ring 31, the first rotating block 44 rotates along with the gear ring 31, the first telescopic block 45, the rotating plate 53 and the cement pipe 54 are driven to rotate, the secondary motor 49 rotates along with the gear ring 31, when the secondary motor 49 on the right side is started, the secondary motor shaft 50 rotates, the seventh gear 51 is driven to rotate, the sixth gear 48 and the second nut 47 rotate, the second nut 47 drives the second screw rod 46 and the first telescopic block 45 to move, and the rotating plate 53 and the cement pipe 54 are driven to move, the position of the cement pipe 54 is changed according to the size of the strut, cement is delivered from the hose 55 and the cement pipe 54, and the strut is fixed after the cement is solidified.
Beneficially, the leveling device 81 includes a second rotating block 58 fixedly installed on the left side of the gear ring 31, a second gear 62 is rotatably connected in the second rotating block 58, the second gear 62 is engaged with the seventh gear 51 on the left side, a third nut 61 is fixedly installed in the third gear 62, a second telescopic block 59 is slidably connected in the second rotating block 58, a third screw rod 60 which is screwed in the third nut 61 is fixedly installed on the left side of the second telescopic block 59, a leveling plate 69 is rotatably connected on the right side of the second telescopic block 59, a connecting rod 64 is fixedly installed on the upper side of the second telescopic block 59, a fixing rod 65 is fixedly installed on the upper side of the second rotating block 58, a fixing sleeve 66 is fixedly installed on the upper side of the fixing rod 65, a push pump 67 is slidably connected in the fixing sleeve 66, a push rod 68 is dynamically connected in the push pump 67, the push rod 68 is rotatably connected with the leveling plate 69, and the push pump 67 is fixedly connected with the connecting rod 64, thereby starting the push pump 67, the push pump 67 pushes the push rod 68, the leveling plate 69 is pushed to rotate on the second telescopic block 59, the inclination angle of the leveling plate 69 is changed, the second rotary block 58 rotates along with the gear ring 31, so that the leveling plate 69 rotates, the auxiliary motor 49 on the left side drives the gear seven 51 on the left side to rotate, the gear seven 51 on the left side drives the gear eight 62 and the nut three 61 to rotate, the nut three 61 drives the screw rod three 60 and the second telescopic block 59 to move, the connecting rod 64 drives the push pump 67 to move, the second telescopic block 59 drives the leveling plate 69 to move, the position of the leveling plate 69 is changed according to the size of the support column, the leveling plate 69 scrapes the cement, the inclination angle of the leveling plate 69 is changed to control the height and the angle of the cement, so as to fix the support column, after the fixing is completed, the body 10 is moved to be separated from the support.
In the initial state, the main motor 11, the sub-motor 49, the air pump 57, and the push pump 67 are not started, and the gear three 23 is separated from the gear four 28.
When the machine starts working, the equipment support is placed in the machine body 10, the pressing rings 71 are manually pushed open, the pressing connecting rods 70 slide in the vertical columns 38, the moving plate 43 and the sliding connecting rods 42 move, the moving plate 43 drives the pushing connecting rods 41 and the pushing blocks 40, the pushing blocks 40 slide up and down in the vertical columns 38, the pushing springs 39 are stretched, the equipment support is placed between the two pressing rings 71, the pushing springs 39 push the pushing blocks 40 to move, the moving plate 43 and the pressing connecting rods 70 move, the pressing rings 71 approach each other, the pressing rings 71 clamp the support, the main motor 11 and the air pump 57 are started, the main motor 11 drives the motor shaft 12 to rotate, the gear one 13 drives the gear two 16 and the rotating shaft one 15 to rotate, the rotating shaft one 15 drives the gear four 28 to rotate, the air pump 57 conveys high pressure into the two air cylinders 21, the piston 22 is pushed, the moving connecting rods 20 move, the rotating shaft two rotating shaft 18 is driven to move, the first sliding plate 17 slides in the fixed plate 14, the third gear 23 moves and is engaged with the fourth gear 28, the fourth gear 28 drives the third gear 23 and the second rotating shaft 18 to rotate, the second rotating shaft 18 drives the universal joint 25 to rotate, the piston spring 24 is stretched, the second rotating shaft 18 rotates to drive the universal joint 25 to rotate, the third rotating shaft 26 and the second belt wheel 27 to rotate, the first belt wheel 32 is driven to rotate by the transmission belt 29, the first belt wheel 32 drives the first nut 33 to rotate, the first nut 33 drives the first screw rod 35 to move up and down, so that the bearing plate 36 and the upright post 38 ascend and descend, the sliding block 37 slides on the side wall of the ascending and descending cavity 76, the upright post 38 ascends and descends to adjust the height of the pressing ring 71 so as to adapt to fixation of equipment with different heights, so as to ensure the stability of the equipment, when the first rotating shaft 15 in the power cavity 75 rotates, the fifth gear 30 on the right side is driven to rotate, the gear ring 31 drives the fifth gear 30 on the left side and the first rotating shaft 15 to rotate, the first rotating block 44 rotates along with the gear ring 31 to drive the first telescopic block 45, the rotating plate 53 and the cement pipe 54 to rotate, the secondary motor 49 rotates along with the gear ring 31, when the secondary motor 49 on the right side is started, the secondary motor shaft 50 rotates to drive the seventh gear 51 to rotate, the sixth gear 48 and the second nut 47 rotate, the second nut 47 drives the second screw rod 46 and the first telescopic block 45 to move to drive the rotating plate 53 and the cement pipe 54 to move, the position of the cement pipe 54 is changed according to the size of a support column, cement is conveyed from the hose 55 and the cement pipe 54, the support column is fixed after the cement is solidified, the push pump 67 is started, the push pump 67 pushes the push rod 68 to push the leveling plate 69 to rotate on the second telescopic block 59, the inclination angle of the leveling plate 69 is changed, the second rotating block 58 rotates along with the gear ring 31 to enable the leveling plate 69 to rotate, the seventh gear 51 on the left side drives the eighth gear 62 and the third nut 61 to rotate, the third nut 61 drives the third screw rod 60 and the second telescopic block 59 to move, the push pump 67 is driven to move through the connecting rod 64, the second telescopic block 59 drives the leveling plate 69 to move, the leveling plate 69 is scraped to cement according to the position of the support column, the inclination angle of the leveling plate 69 is changed to control the height and the angle of the cement, so that the support column is fixed, the machine body 10 is moved after the fixing is completed, and the support column is separated.
The above embodiments are merely illustrative of the technical ideas and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and implement the present invention, and not to limit the protection scope of the present invention. All equivalent changes and modifications made according to the spirit of the present invention should be covered in the protection scope of the present invention.

Claims (4)

1. The utility model provides a park body-building apparatus fixed mounting equipment for municipal works, includes the organism, its characterized in that: the cement mixing machine comprises a machine body, wherein a power cavity is formed in the right side of the machine body, a control cavity is formed in the left side of the machine body, two lifting cavities which are bilaterally symmetrical are formed in the upper side of the machine body, a cement cavity is formed in the lower side of each lifting cavity, a main motor and an air transmission pump are fixedly arranged on the upper side surface of the machine body, the main motor is in power connection with a motor shaft, a first gear is fixedly arranged on the motor shaft, a fixed plate is fixedly arranged on the right side wall of each power cavity, the motor shaft rotates on the fixed plate, a first sliding plate is slidably connected in the fixed plate, a second rotating shaft is rotatably connected to the first sliding plate, a third gear is fixedly arranged on the second rotating shaft, and a compressing device for clamping and fixing equipment is arranged on the upper side of the machine body;
the compressing device comprises sliding blocks which are slidably arranged in each lifting cavity, a bearing plate is fixedly arranged in each sliding block, an upright post is fixedly arranged on the bearing plate, a compressing connecting rod is slidably connected to the upper side of each upright post, a compressing ring is fixedly arranged on one side of each compressing connecting rod, the other side of each compressing ring is higher than a moving plate, two sliding connecting rods which slide in the upright posts are fixedly arranged on the moving plate, the upper side and the lower side of the moving plate are respectively and rotatably connected with a pushing connecting rod, pushing blocks are slidably connected in the upright posts on the two sides of each compressing connecting rod, each pushing block is rotatably connected with the pushing connecting rods, a pushing spring is connected between each pushing block and the side wall of each upright post, the side wall of each lifting cavity is rotatably connected with a rotating shaft four, a belt pulley I is fixedly arranged on the rotating shaft four, a nut I is fixedly arranged in each belt pulley I, and a screw rod I which is in threaded connection with the nut I is rotatably arranged on the lower side of the bearing plate, the first screw rod rotates in the side wall between the lifting cavity and the cement cavity, a first rotating shaft is rotatably connected between the power cavity and the cement cavity, a first rotating shaft is rotatably connected between the control cavity and the cement cavity, a second gear meshed with the first gear is fixedly arranged on the upper side of the first rotating shaft in the power cavity, and a fourth gear capable of being meshed with the third gear is fixedly arranged in each of the two first rotating shafts;
the machine body right side is provided with a cement device for paving cement, and the machine body left side is provided with a leveling device for leveling cement.
2. The park fitness equipment fixed mounting device for municipal engineering according to claim 1, wherein: the side wall rotates on the control chamber to be connected with pivot two, every two upsides of pivot rotate and are connected with the pivot cover, the pivot cover right side has set firmly the removal connecting rod, power chamber right side wall with the control chamber left side wall has set firmly the cylinder respectively, sliding connection has in the cylinder with remove connecting rod fixed connection's piston, every the cylinder with the gas transmission pump is connected with the trachea, two downside sliding connection of pivot have the universal joint, pivot two with be connected with piston spring between the universal joint, the universal joint downside rotates and is connected with pivot three, two pivot three respectively with the power chamber with the side wall rotates under the control chamber to be connected, set firmly band pulley two in the pivot three, band pulley two with correspond be connected with driving belt between the band pulley one.
3. The park fitness equipment fixed mounting device for municipal engineering according to claim 2, wherein: the cement device comprises five gears which are respectively and fixedly arranged on the lower sides of the first rotating shafts, the lower side wall of the pressing connecting rod is rotatably connected with a gear ring which is meshed with the first rotating shafts, two bilaterally symmetrical auxiliary motors are fixedly arranged on the upper side surface of the gear ring, each auxiliary motor is in power connection with an auxiliary motor shaft, a gear seventh is fixedly arranged on a shaft of the auxiliary motor, a first rotating block is fixedly arranged in the right side of the gear ring, a sixth gear meshed with the gear seventh is rotatably connected in the first rotating block, a second nut is fixedly arranged in the sixth gear, a second screw rod is connected to the second nut through threads, a first telescopic block which slides in the first rotary block is fixedly arranged on the left side of the second screw rod, the left side of the first telescopic block is fixedly provided with a rotating plate, a cement pipe is fixedly arranged in the rotating plate, the upper side of the cement pipe is fixedly provided with a communicated hose, and the hose is connected with an external cement pump.
4. The park fitness equipment fixed mounting device for municipal engineering according to claim 3, wherein: level and smooth device includes fixed mounting and is in the left rotatory piece two of ring gear, swivelling joint has gear eight in the rotatory piece two, gear eight and left seven meshing of gear, nut three has set firmly in the gear eight, sliding connection has flexible piece two in the rotatory piece two, two left sides of flexible piece have set firmly threaded connection's lead screw three in the nut three, two right sides of flexible piece are rotated and are connected with the aligning plate, two upsides of flexible piece have set firmly the connecting rod, two upsides of rotatory piece have set firmly the dead lever, the dead lever upside has set firmly fixed cover, sliding connection has the push pump in the fixed cover, power is connected with the catch bar in the push pump, the catch bar with the aligning plate rotates to be connected, the push pump with connecting rod fixed connection.
CN202011203097.8A 2020-11-02 2020-11-02 A park body-building apparatus fixed mounting equipment for municipal works Active CN112282368B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011203097.8A CN112282368B (en) 2020-11-02 2020-11-02 A park body-building apparatus fixed mounting equipment for municipal works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011203097.8A CN112282368B (en) 2020-11-02 2020-11-02 A park body-building apparatus fixed mounting equipment for municipal works

Publications (2)

Publication Number Publication Date
CN112282368A CN112282368A (en) 2021-01-29
CN112282368B true CN112282368B (en) 2022-08-19

Family

ID=74353913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011203097.8A Active CN112282368B (en) 2020-11-02 2020-11-02 A park body-building apparatus fixed mounting equipment for municipal works

Country Status (1)

Country Link
CN (1) CN112282368B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327202A (en) * 2017-08-01 2017-11-07 南昌叁润科技有限公司 It is a kind of that the vertical equipment directly installed can be carried out to concrete wire pole
CN107386761A (en) * 2017-07-19 2017-11-24 南昌叁润科技有限公司 A kind of concrete wire pole efficient transportation and installation equipment
CN108222639A (en) * 2017-12-06 2018-06-29 肖笃康 A kind of grooving for concrete wire pole is with stablizing installation equipment
CN108442673A (en) * 2018-03-02 2018-08-24 汤国英 It is a kind of to be efficiently laid with ground cement device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386761A (en) * 2017-07-19 2017-11-24 南昌叁润科技有限公司 A kind of concrete wire pole efficient transportation and installation equipment
CN107327202A (en) * 2017-08-01 2017-11-07 南昌叁润科技有限公司 It is a kind of that the vertical equipment directly installed can be carried out to concrete wire pole
CN108222639A (en) * 2017-12-06 2018-06-29 肖笃康 A kind of grooving for concrete wire pole is with stablizing installation equipment
CN108442673A (en) * 2018-03-02 2018-08-24 汤国英 It is a kind of to be efficiently laid with ground cement device

Also Published As

Publication number Publication date
CN112282368A (en) 2021-01-29

Similar Documents

Publication Publication Date Title
CN105730543B (en) Automatic pole-climbing device
CN109736626A (en) A kind of electric power tower of adjustable height and angle
CN108658004A (en) A kind of hydraulic engineering pipeline transportation transferring device
CN112282368B (en) A park body-building apparatus fixed mounting equipment for municipal works
CN210482961U (en) Workstation convenient to adjust for building construction
CN113356675B (en) Bearing platform type electric tower installation construction system and installation method
CN108937729A (en) A kind of old residential area stair step prosthetic device
CN112554537A (en) Building external climbing type building construction operation platform
CN207671646U (en) A kind of liftable automotive chassis for building
CN215318386U (en) Swash plate assembling tool of booster pump
CN108316672A (en) A kind of fixing device of the building template installation convenient for adjusting height
CN110700628A (en) Steel bearing structure that stability is high
CN112630028A (en) Be used for withstand voltage simulation check out test set of different concrete ratio building road surfaces
CN214006304U (en) Hydraulic and hydroelectric engineering is with changeing ladder
CN216809450U (en) Tamping equipment for road construction
CN112227158A (en) Tile work mechanism of high-efficient tile work machine
CN110917582A (en) Single climbing device used during transformer maintenance
CN214326510U (en) Concrete loading attachment for building
CN220886871U (en) Anti-corrosion pipeline installation butt joint device
CN219034112U (en) Light wallboard combination formula mount convenient to adjust
CN220149087U (en) Auxiliary moving device convenient for fixing diesel generator set
CN220909158U (en) Floor elevation controller
CN214294441U (en) A level and smooth equipment for fine tile child base of glass
CN220585850U (en) Adjustable cable erection device for electromechanical installation of building
CN218205916U (en) Support arrangement for building steel construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220729

Address after: 322000 room 7222, 7th floor, 248 Huangyuan Road, Jiangdong Street, Yiwu City, Jinhua City, Zhejiang Province

Applicant after: Yiwu Gaoyang Construction Engineering Co.,Ltd.

Address before: No.1750, Changyang Road, Yangpu District, Shanghai 200090

Applicant before: Song Xinxian

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant