CN112253174A - Construction method for adjustable support of ditch cable trough template in tunnel - Google Patents

Construction method for adjustable support of ditch cable trough template in tunnel Download PDF

Info

Publication number
CN112253174A
CN112253174A CN202011161457.2A CN202011161457A CN112253174A CN 112253174 A CN112253174 A CN 112253174A CN 202011161457 A CN202011161457 A CN 202011161457A CN 112253174 A CN112253174 A CN 112253174A
Authority
CN
China
Prior art keywords
support
ditch
template
adjustable
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011161457.2A
Other languages
Chinese (zh)
Inventor
许维青
王轩
杨娟
翟志国
古艳旗
宋爽
张华�
杨成春
董书滨
刘超骏
苏清贵
陈强
代勇
何博
邓业华
赵剑锋
莫松
杨振朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN202011161457.2A priority Critical patent/CN112253174A/en
Publication of CN112253174A publication Critical patent/CN112253174A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A construction method for adjustable supports of a tunnel ditch cable trough template uses a plurality of sets of adjustable supports, the adjustable supports are arranged at a certain interval along the longitudinal direction of the tunnel during construction, each set of adjustable support is respectively connected with a first connecting frame and a second connecting frame through a plurality of cross braces, the adjustable supports are mutually connected in series through the plurality of cross braces and ensure the relative fixation of each set of adjustable support, then the verticality of a vertical support is kept through the adjustment of an adjusting bolt, meanwhile, a plurality of parallel plane templates are connected at the inner side of the vertical support through bolt holes, a ditch template and a cable trough template are connected at the lower end of a horizontal cross frame, finally, the height of the horizontal cross frame is adjusted according to the elevation design of a water and electricity ditch foundation, the horizontal cross frame is kept relatively fixed through the fastening of the adjusting bolt, after the adjustment of the plurality sets of adjustable supports is completed according to the adjustment, the foundation pouring of the water and electricity ditch can be implemented on the ditch cable trough in the tunnel by referring to the conventional technology.

Description

Construction method for adjustable support of ditch cable trough template in tunnel
Technical Field
The invention belongs to the technical field of concrete template construction, and particularly relates to a construction method for adjustable support of a cable trough template of a ditch in a tunnel.
Background
Ditch cable duct template construction is very general in the tunnel, and conventional construction mode is to build the water and electricity ditch basis after the plank sheathing, and this kind of mode cost of artificially building the plank sheathing is higher, and the plank sheathing construction mode is extravagant construction material more, can not reuse after the plank sheathing uses because of the material reason.
At present, no relevant report is found on a construction method for utilizing the adjustable support of the cable trough template of the ditch in the tunnel.
Disclosure of Invention
In order to solve the problems, the invention provides a construction method of adjustable supports for a tunnel ditch cable trough template.
In order to achieve the purpose, the invention adopts the following technical scheme:
a construction method for adjustable supports of a ditch cable trough template in a tunnel uses a plurality of sets of adjustable supports, each set of adjustable support comprises a first connecting frame, a horizontal cross frame, an inclined support, a tightening bolt, a second connecting frame, a large support, a vertical support, an adjusting bolt and an adjusting pad, and the ditch template and the cable trough template have corresponding specification and size according to design requirements and are characterized in that;
in each set of adjustable support, a vertical support with a certain height is connected with an inclined bottom plate at the bottom of the left side of the vertical support, a large support is connected between the bottom plate and the vertical support, an internal thread hole is arranged at the left end of the bottom plate, an adjusting bolt is connected in the internal thread hole, the bottom of the adjusting bolt is connected with an adjusting pad capable of adjusting a certain angle, the upper end of the large support is connected with a second connecting frame, a plurality of bolt holes with equal intervals are drilled on the vertical support, the right side of the vertical support is connected with a horizontal cross frame capable of moving up and down through a sleeve, an inclined support is connected on the horizontal cross frame, the left side of the inclined support is connected with the sleeve, the upper end and the lower end of the sleeve are respectively screwed with a tightening bolt, and the rightmost end of the horizontal cross frame;
the tunnel is vertically followed during the construction and is counted the cover according to the determining deviation range adjustable support, every set adjustable support passes through the several stull respectively with first link and the hookup of second link, through the several the stull can be with several sets adjustable support concatenates each other and guarantees every set adjustable support's relatively fixed, secondly the adjustment of rethread adjusting bolt is in order to keep the straightness that hangs down of erecting the support, simultaneously in the inboard of erecting the support through the bolt hole hookup has parallel several plane template, and the lower extreme hookup of horizontal crossbearer has ditch template and cable duct template, and the relative position and the quantity of ditch template and cable duct template are decided according to the design requirement, adjust the height of horizontal crossbearer according to the elevation design of water and electricity ditch basis at last, and rethread fastening of tightening bolt makes horizontal crossbearer keep relative fixed, and when the adjustable support of number cover all accomplish according to above-mentioned adjustment, the foundation pouring of the water and electricity ditch can be implemented on the ditch cable trough in the tunnel by referring to the conventional technology.
Due to the adoption of the technical scheme, the invention has the following positive effects:
1. the construction method of the adjustable support for the cable trough template of the ditch can save manpower and material resources for manufacturing the wooden template on site, and save construction cost.
2. The adjustable support for the cable trough template of the ditch has the characteristics of simple structure, reusability, safe operation and low cost.
Drawings
FIG. 1 is a schematic diagram of the construction of an adjustable support of the present invention.
In fig. 1: 1-water electric ditch foundation; 2-a ditch template; 3-cable trough template; 4-a duct piece; 5-a first connecting frame; 6-horizontal cross frame; 7-a diagonal brace; 8-preparing a fastening bolt; 9-a second connecting frame; 10-large scaffold; 11-vertical support; 12-adjusting the bolt; 13-adjusting the pad; 14-planar template.
Detailed Description
The invention relates to a construction method of adjustable supports for a cable trough template of a ditch in a tunnel, which realizes the foundation construction of a hydroelectric trough in the tunnel by mutually fixing a plurality of sets of adjustable supports.
Referring to fig. 1, in the construction method of the present invention, a plurality of sets of adjustable supports are used, each set of adjustable support includes a first connecting frame 5, a horizontal cross frame 6, an inclined support 7, a tightening bolt 8, a second connecting frame 9, a large support 10, a vertical support 11, an adjusting bolt 12 and an adjusting pad 13, and for structural connection of the adjustable supports, reference is made to the technical solution, which is not described in detail. It should be noted that: the adjustable support has the characteristics of simple structure, easy manufacture and repeated use in view of the structural connection relationship of the adjustable support.
The ditch template and the cable groove template have corresponding specification and size according to design requirements, the left side and the right side of the bottom of the tunnel are both provided with ditches and cable grooves, the arrangement number of the cable grooves is determined according to the construction design requirements, and fig. 1 is a schematic cross-sectional diagram of two cable grooves and one ditch arranged on the right side of the bottom of the tunnel and only needs to be described.
During normal construction, vertically arrange several sets according to the determining deviation along the tunnel adjustable support, every set adjustable support passes through the several stull and couples with first link 5 and second link 9 respectively, through the several the stull can be with several sets adjustable support concatenates each other and guarantees every set adjustable support's relatively fixed, also can adjust several sets adjustable support's interval through the several stull simultaneously.
Secondly, the verticality of the vertical support 11 is maintained through the adjustment of the adjusting bolt 12, the length of the vertical support 11 is determined according to the height of the foundation of the water and electricity ditch and meets the up-and-down displacement of the horizontal cross frame 6, the large support 10 is beneficial to enhancing the strength of the vertical support 11, while a plurality of parallel plane formworks 14 are coupled to the inner side of the vertical support 11 through the bolt holes, the lower end of the horizontal cross frame 6 is connected with the ditch template 2 and the cable trough template 3, the inclined bracket 7 is helpful for enhancing the tensile strength of the horizontal cross frame 6, the relative position and the number of the ditch template 2 and the cable trough template 3 are determined according to the design requirement, finally, the height of the horizontal cross frame 6 is adjusted according to the elevation design of the hydroelectric ditch foundation 1, and the horizontal cross frame 6 is kept relatively fixed through the fastening of the standby fastening bolt 8, after the plurality of sets of adjustable supports are adjusted according to the above steps, the hydroelectric ditch foundation pouring can be implemented on the ditch cable groove in the tunnel by referring to the conventional technology.

Claims (1)

1. A construction method of adjustable supports for a trench cable duct template in a tunnel uses a plurality of sets of adjustable supports, each set of adjustable support comprises a first connecting frame (5), a horizontal cross frame (6), an inclined support (7), a standby bolt (8), a second connecting frame (9), a large support (10), a vertical support (11), an adjusting bolt (12) and an adjusting pad (13), and the trench template and the cable duct template have corresponding specification sizes according to design requirements and are characterized in that;
in each set of the adjustable support, a vertical support (11) with a certain height is connected with an inclined bottom plate at the bottom of the left side of the vertical support, a large bracket (10) is connected between the bottom plate and a vertical bracket (11), an internal thread hole is arranged at the left end of the bottom plate, an adjusting bolt (12) is connected in the internal thread hole, an adjusting pad (13) capable of adjusting a certain angle is connected at the bottom of the adjusting bolt (12), the upper end of the large bracket (10) is connected with a second connecting frame (9), a plurality of bolt holes with equal intervals are drilled on the vertical bracket (11), the right side of the vertical bracket (11) is connected with a horizontal cross frame (6) which can move up and down through a sleeve, an inclined bracket (7) is connected on the horizontal cross frame (6), the left side of the inclined bracket (7) is connected with the sleeve, the upper end and the lower end of the sleeve are respectively screwed with a tightening bolt (8), and the rightmost end of the horizontal cross frame (6) is connected with a first connecting frame (5);
vertical several sets of according to the determining deviation range in tunnel during the construction adjustable support, every set adjustable support passes through the several stull respectively with first link (5) and second link (9) hookup, through the several the stull can be with several sets adjustable support concatenates each other and guarantees every set adjustable support's relatively fixed, and the regulation of rethread adjusting bolt (12) is in order to keep the straightness that erects support (11), is passing through in the inboard of erecting support (11) simultaneously the bolt hole hookup has parallel several plane template (14), and has ditch template (2) and cable duct template (3) at the lower extreme hookup of horizontal crossbearer (6), and the relative position and the quantity of ditch template (2) and cable duct template (3) are decided according to the design requirement, adjusts the height of horizontal crossbearer (6) according to the water and electricity design of ditch basis (1) at last, and then the horizontal cross frame (6) is kept relatively fixed by fastening the standby bolt (8), and after the plurality of sets of adjustable supports are adjusted according to the above steps, the hydroelectric ditch foundation pouring can be implemented on the ditch cable groove in the tunnel by referring to the conventional technology.
CN202011161457.2A 2020-10-27 2020-10-27 Construction method for adjustable support of ditch cable trough template in tunnel Pending CN112253174A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011161457.2A CN112253174A (en) 2020-10-27 2020-10-27 Construction method for adjustable support of ditch cable trough template in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011161457.2A CN112253174A (en) 2020-10-27 2020-10-27 Construction method for adjustable support of ditch cable trough template in tunnel

Publications (1)

Publication Number Publication Date
CN112253174A true CN112253174A (en) 2021-01-22

Family

ID=74261973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011161457.2A Pending CN112253174A (en) 2020-10-27 2020-10-27 Construction method for adjustable support of ditch cable trough template in tunnel

Country Status (1)

Country Link
CN (1) CN112253174A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114165259A (en) * 2021-11-06 2022-03-11 中建八局第二建设有限公司 Cable trough and side trough casting die device and method for tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114165259A (en) * 2021-11-06 2022-03-11 中建八局第二建设有限公司 Cable trough and side trough casting die device and method for tunnel
CN114165259B (en) * 2021-11-06 2024-01-12 中建八局第二建设有限公司 Cable trough and side trough casting mold device and method for tunnel

Similar Documents

Publication Publication Date Title
CN205676844U (en) A kind of for one-piece casting trench furrow bank with the molding sliding formwork of base plate
CN207513156U (en) Telescopic frame body for building
CN112253174A (en) Construction method for adjustable support of ditch cable trough template in tunnel
CN220414443U (en) Drainage ditch template
CN201883720U (en) Wind and solar hybrid power generation intensive self-supporting communication base station with adjustable verticality
CN212715040U (en) Assembled settlement joint of reinforced concrete apron culvert
CN109025259A (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN117569607A (en) Super high-rise adduction variable-section climbing frame construction method
CN210563363U (en) Pouring template without tie bar hole
CN218264577U (en) Assembly type building structure
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN208379847U (en) A kind of building prefabrication wallboard concrete pouring structure
KR101329662B1 (en) A base concrete structure for installation of solar panel
CN214531318U (en) Cast-in-place partition wall template structure
CN207974524U (en) The outer drawknot fixture of column cap beam forms
CN210563435U (en) Slope supporting device for top rising of inclined heavy-load steel net rack
CN212957589U (en) Cantilever frame wall fixing base with adjustable equipment
CN220889434U (en) A stull structure for scaffold
CN219060548U (en) Assembled roof node structure
CN215211485U (en) BIM assembled effluent water sump
CN213710663U (en) Novel assembled enclosure wall panel structure
CN216007787U (en) Template system is pour to double-deck shear force wall unilateral
CN220644116U (en) Fixing structure of large template
CN214993062U (en) Grouting template and assembled anticollision wall pouring system
CN110206162A (en) A kind of assembling type steel structure building connector and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination