CN1122442A - Burden preheating furnace for electric furnace - Google Patents

Burden preheating furnace for electric furnace Download PDF

Info

Publication number
CN1122442A
CN1122442A CN 95100486 CN95100486A CN1122442A CN 1122442 A CN1122442 A CN 1122442A CN 95100486 CN95100486 CN 95100486 CN 95100486 A CN95100486 A CN 95100486A CN 1122442 A CN1122442 A CN 1122442A
Authority
CN
China
Prior art keywords
furnace
preheating
electric
smelting
burden
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 95100486
Other languages
Chinese (zh)
Inventor
李耀中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95100486 priority Critical patent/CN1122442A/en
Publication of CN1122442A publication Critical patent/CN1122442A/en
Pending legal-status Critical Current

Links

Images

Abstract

The burden preheating furnace preheats the burden for electric furnace including calcium carbide, silicon, manganese, copper, iron, etc. to one required temp. The preheated burden is discharged from the outlet of the preheating furnace bottom and fed to the feeding port of electric furnace. The use of the preheating furnace can decrease power consumption and raise efficiency in electric furnace steel-smelting.

Description

Burden preheating furnace for electric furnace
The present invention relates to the charge preheating smelting process of a kind of electric furnace smelting calcium carbide, ferrosilicon, ferromanganese, copper, aluminium and steel-making, metal, electric smelting such as nonmetal.
Existing production calcium carbide, ferrosilicon, ferromanganese, copper, aluminium and steel-making.All manufacturers are single smelting with electrical heating entirely.Its power consumption is very big, makes finished product high.Supply falls short of demand owing to electric power, and some producer does not always just have the guarantee of ordinary production, often is in occurrence in half a lifetime attitude.Normal causing to each side diminishes unhelpful situation.
Purpose of the present invention is exactly in order to overcome above-mentioned existing technical deficiency, and a kind of device for preheating charging stock is provided, and needed furnace charge is preheated to preference temperature with coal combustion process earlier changes electric furnace smelting again over to.Make electric furnace in smelting process, reduce the consumption of electric energy heat, extenuate the power shortage situation.Shorten the duration of heat in the electric furnace.Accelerate smelting speed, improved electric furnace smelting efficient, reduced product cost.For country increases wealth.
The present invention can realize by following scheme.Near the side charge door of electric furnace, (near being advisable), the calcium carbide shown in Figure of description one was smelted preheating furnace by adorning a device for preheating charging stock, (body of heater is to go up garden shape, square down) and electric arc furnaces operation schematic construction.Furnace charge is delivered to by conveyer belt and is fallen into preheating in the stove in the preheating furnace furnace roof end charging hopper.Be preheated to 850 ℃ through preheating furnace, pack the electric furnace charging mouth into to cupola well material level line through preheating furnace lower curtate funnel discharging opening again, at this moment electric furnace begins the starting smelting.Delivery bag is the dried preheating furnace of feed constantly, behind the charge preheating ceaselessly power supply stove smelt to constitute the smelting production line of a system.(especially big electric furnace can and connect feed with two preheating furnaces).Figure two: be the preheating furnace for steel-making usefulness, large-scale electric arc furnaces can be established the ceaselessly reinforced preheating of three device for preheating charging stock rounds in specie; Figure three: can only use for a power frequency or middle frequency furnace by a device for preheating charging stock.Establish on power frequency or the middle frequency furnace table one with the same big movable fire-resistant preheating ring of stove crucible bore, highly be suitable for to appropriate, furnace charge is contained in and rotates the preheating grate in the fire-resistant preheating ring and adjust bocca preheating furnace charge arbitrarily.The preheat temperature of various furnace charges, 850 ℃ in calcium carbide furnace charge, 1100 ℃ of ferrosilicon, 950 ℃ in ferromanganese is made steel 800 ℃, 750 ℃ of copper, 400 ℃ in aluminium.Preheat temperature is can not Tai Gaotai low.
By the figure construction, be mainly electric welding after plate is good down.Preheating furnace furnace wall refractory brick, heating furnace tracery wall quirk high-alumina brick.Have nothing in common with each other in the combustion chamber of figure one, figure one, figure three, as shown in the figure.Figure one, figure two are Coal powder spray heatings.Figure three is that coal is piled up the blast roasting heating.To adjust the heating clamber fire box temperature at any time in a word, guarantee that all the time the preheat temperature that needs of supplying with furnace charge is as the criterion.
The present invention and single power supply, singlely smelt in electric furnace, one ton of calcium carbide of every production is an example, can reduce power consumption 1/3rd, and efficient improves more than 1/4th.Other silicomanganese copper aluminium and steel-making all are higher than or approximate this numeral.Can be described as one " not electricity consumption of low temperature, high temperature refines fast." the power-economizing method of production skilful use electricity.Product cost has obviously reduced.The power shortage situation will inevitably be slowed down a step.
Figure of description figure two explanations.
Figure one, 1, electric furnace, 2, electrode, 3, blow tank, 4, coal-ash spraying tube, 5, combustion chamber bocca, 6, refractory brick, 7, the wind band, 8, internal protecting wall, 9, shaft, 10, dust removing tube, 11, material-falling hopper, 12, conveyer belt, 13, furnace wall refractory brick, 14, discharge pipe, 15, tracery wall quirk, 16, refractory brick, 17, table, 18, shaft support column, 19, the discharging opening liner plate, 20, combustion chamber.
Figure two, 1, advance burner, 2, the combustion chamber, 3, the preheating material, 4, furnace wall refractory brick, 5, the stove inwall, 6, charge door, 7, hanger, 8, shaft, 9, the combustion chamber loam cake, 10, Coal powder spray input pipe, 11, heater profile, 12, arm-tie at the bottom of the ash disposal, 13, hinge, 14, take off the furnace charge bottom door, 15, hook.
Figure three, 1, intermediate frequency furnace or main frequency furnace, 2, fire door, 3, furnace bottom, 4, fire bars, 5, furnace wall refractory brick, 6, burner hearth, 7, bocca, add the coal mouth, 8, chain sling, 9, channel-section steel, 10, roller, 11, the preheating furnace top cover, 12, hole, position, stove rotational angle chamber, 13, preheating shaft, 14, fresh air inlet, 15, the refractory brick circle, 16, the preheating active ring.

Claims (2)

1, a kind of burden preheating furnace for electric furnace, particularly smelt the electric furnace smelting stove of calcium carbide, ferrosilicon, in the burner hearth wall (1) of smelting furnace, the method for (2) heat supply preheating furnace charge, obviously improved smelting speed, it is characterized in that the heat that furnace charge is packed into behind the coal dust firing that is sprayed into by heat supply hole (1) behind the burner hearth is preheated to more than 1000 ℃, has reduced the electric heating loss of electric furnace in smelting.
2, burden preheating furnace for electric furnace according to claim 1 is characterized in that being heated to more than 800 ℃ in preheating furnace bocca (7) the rotary alignment furnace charge circle (16), intermediate frequency furnace send electric smelting the furnace charge power frequency intermediate frequency furnace of packing into.
CN 95100486 1995-03-03 1995-03-03 Burden preheating furnace for electric furnace Pending CN1122442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95100486 CN1122442A (en) 1995-03-03 1995-03-03 Burden preheating furnace for electric furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95100486 CN1122442A (en) 1995-03-03 1995-03-03 Burden preheating furnace for electric furnace

Publications (1)

Publication Number Publication Date
CN1122442A true CN1122442A (en) 1996-05-15

Family

ID=5073470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95100486 Pending CN1122442A (en) 1995-03-03 1995-03-03 Burden preheating furnace for electric furnace

Country Status (1)

Country Link
CN (1) CN1122442A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889944A (en) * 2012-09-17 2013-01-23 许继集团有限公司 Calcium carbide production furnace temperature monitoring method
CN104938510A (en) * 2015-07-08 2015-09-30 安徽省农业科学院植物保护与农产品质量安全研究所 Sterilization composition containing pyraclostrobin and thiabendazole
CN106979686A (en) * 2017-05-02 2017-07-25 高金彦 Two-period form smelting furnace
CN107760890A (en) * 2016-08-18 2018-03-06 荣泽发动机零部件(常熟)有限公司 A kind of duplex practice evaporative pattern aluminum process

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102889944A (en) * 2012-09-17 2013-01-23 许继集团有限公司 Calcium carbide production furnace temperature monitoring method
CN104938510A (en) * 2015-07-08 2015-09-30 安徽省农业科学院植物保护与农产品质量安全研究所 Sterilization composition containing pyraclostrobin and thiabendazole
CN107760890A (en) * 2016-08-18 2018-03-06 荣泽发动机零部件(常熟)有限公司 A kind of duplex practice evaporative pattern aluminum process
CN106979686A (en) * 2017-05-02 2017-07-25 高金彦 Two-period form smelting furnace

Similar Documents

Publication Publication Date Title
EP0122768A2 (en) An electric arc fired cupola for remelting of metal chips
CN201273767Y (en) Multifunctional industrial furnace and continuous smelting system comprising the industrial furnace
WO2010106466A1 (en) Steel production facility
CN111321272A (en) Steelmaking device and process for continuously preheating scrap steel
US8114185B2 (en) Method of melting a mixture of scrap metal using scrap rubber
CN107267746A (en) The method and its device of a kind of lateritic nickel ore direct-reduction-top blow smelting production ferronickel
CN100580097C (en) Supplying of solid feed materials for direct smelting process
CN209227012U (en) A kind of steel-smelting device of continuously pre-heating steel scrap
CN104357655A (en) Continuous ore reduction and hot-charging steelmaking device
CN1122442A (en) Burden preheating furnace for electric furnace
CN101749931A (en) Smelting furnace
CN101921888B (en) Production method of direct reduced iron and reduction roasting device
US4032121A (en) Process for the production of iron from iron ores and apparatus for carrying out said process
CN108411131A (en) Manganese-silicon production system and manganese-silicon production technology
US3669436A (en) Apparatus for preheating scrap
CN104089476B (en) A kind of method of induction furnace ferroalloy smelting
CN101643807A (en) Melting and iron-smelting device of heat storage type electric arc furnace
EP0034109B1 (en) Atmosphere controlled electric melting furnace
CN201762357U (en) Reduction roasting device
CN210638480U (en) Cupola type electric furnace for producing mineral wool
CN1017628B (en) Method for smelting molten iron directly from powdered coal and iron ore
CN1166532A (en) Magnesium-smelting reducer with vertical reducing chamber and continuous charger and relevant technological process
CN1072212A (en) A kind of method of accelerated melting steel scrap by steel-smelting electric-arc furnace
CN212720811U (en) Energy-saving environment-friendly rotary kiln for cement production
CN218666125U (en) Loading attachment for blast furnace

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication