CN112212316B - Method for setting operating water level limit value of natural circulation steam generator of sea nuclear platform - Google Patents
Method for setting operating water level limit value of natural circulation steam generator of sea nuclear platform Download PDFInfo
- Publication number
- CN112212316B CN112212316B CN202010929466.5A CN202010929466A CN112212316B CN 112212316 B CN112212316 B CN 112212316B CN 202010929466 A CN202010929466 A CN 202010929466A CN 112212316 B CN112212316 B CN 112212316B
- Authority
- CN
- China
- Prior art keywords
- water level
- limit value
- steam generator
- swing
- circle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/42—Applications, arrangements, or dispositions of alarm or automatic safety devices
- F22B37/46—Applications, arrangements, or dispositions of alarm or automatic safety devices responsive to low or high water level, e.g. for checking, suppressing, extinguishing combustion in boilers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/26—Steam-separating arrangements
- F22B37/268—Steam-separating arrangements specially adapted for steam generators of nuclear power plants
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D1/00—Details of nuclear power plant
- G21D1/006—Details of nuclear power plant primary side of steam generators
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- High Energy & Nuclear Physics (AREA)
- Thermal Sciences (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Combustion & Propulsion (AREA)
- Plasma & Fusion (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
The application relates to a method for setting an operating water level limit value of a natural circulation steam generator of a sea-nuclear platform, which relates to the technical field of steam power systems and comprises the following steps: obtaining the water level h at the top of the steam-water separation cylinderupAnd the height h of the water level at the top of the water supply spray pipednAnd h isupAnd hdnRespectively as the upper limit value L of the operation reference water level of the steam generatormax0And a lower limit value L of the operation reference water levelmin0(ii) a Obtaining the diameter d of the first circle1And diameter d of the second circle2And respectively calculating and obtaining the upper limit value of the swing additional water level at the T moment of the sea nucleus platform at the swing angle theta at the T momentAnd additional lower limit of swing levelAccording to Lmax0Andcalculating and obtaining the upper limit value of the operating water level of the steam generator at the moment TAnd will beSetting a turbine shutdown water level limit value; according to Lmin0Andcalculating and obtaining the lower limit value of the operating water level of the steam generator at the moment TAnd will beSet to the steam generator shutdown water level limit.
Description
Technical Field
The application relates to the technical field of steam power systems, in particular to a method for setting a limit value of an operating water level of a natural circulation steam generator of a marine nuclear platform.
Background
In a steam power system of a marine nuclear platform, the water level of a natural circulation steam generator plays an important role in the safe operation of a steam turbine and even a reactor.
When the water level of the steam generator is high enough to submerge the steam-water separator, the quality of steam can be rapidly deteriorated, so that the dryness of the steam entering the steam turbine is not satisfactory, the steam turbine blades are damaged, and the safe and stable operation of the steam turbine is influenced. Therefore, when the water level of the steam generator is too high, the operation of the steam turbine needs to be stopped in order to ensure the operation safety of the steam turbine.
When the steam generator operating water level is too low, the following effects may occur: 1) the top of the U-shaped pipe is exposed, so that the heat transfer of the heat transfer pipe is deteriorated, the fluctuation of the water level has adverse effect on the structure and influences the service life of the heat transfer pipe, and the heat transfer pipe is damaged due to thermal stress or thermal fatigue under the limit condition, so that radioactive leakage and primary circuit pressure fluctuation are caused, and the nuclear safety is influenced; 2) the water supply pipe mouth is exposed, may lead to the water hammer phenomenon to appear in the water supply line, leads to the waste heat derivation function's of reactor core deterioration. Therefore, the operating water level of the steam generator cannot be too low to ensure safe operation and nuclear safety of the steam generator.
Different with land nuclear power plant natural circulation steam generator's the operation water level measurement mode, the marine nuclear platform natural circulation steam generator generally adopts two water level reference pipe measuring modes, adopts two water level reference pipe measurement and calculates steam generator's operation water level promptly at steam generator center, can eliminate marine environment to water level measurement's influence.
The upper limit value of the operating water level of the steam generator is generally set to hup(ii) a Setting the lower limit value of the operating water level of the steam generator to hdnWherein h isupAnd hdnThe water level height of the top of the steam-water separation cylinder and the water level height of the top of the water supply spray pipe are respectively. However, due to the limitations of cabin space size and arrangement, the steam generator has large differences in its structure, water capacity, height, etc. from the onshore nuclear power plant steam generator.
However, in the normal operation and operation transient process of the steam generator, due to the influence of the water level measurement error, the measured water level value may not exceed the upper limit value of the operation water level, but the actual water level value exceeds the upper limit value of the operation water level, so that the operation safety of the steam turbine is influenced by the overhigh water level; alternatively, it may happen that the measured water level value does not exceed the lower operating water level limit, but the actual water level value exceeds the lower operating water level limit, resulting in a too low water level affecting the operational safety and nuclear safety of the steam generator. And the local water level of the steam generator is too high but the measured water level does not exceed the upper limit value of the operating water level due to the swinging inclination, or the local water level of the steam generator is too low but the measured water level does not exceed the lower limit value of the operating water level, thereby influencing the actual operation safety of the steam turbine.
Disclosure of Invention
The embodiment of the application provides a method for setting the operating water level limit value of a natural circulation steam generator of a marine nuclear platform, and aims to solve the problems that in the related art, the steam generator has overhigh local water level due to swing and inclination, but the measured water level does not exceed the operating water level upper limit value, so that the operating safety of a steam turbine is influenced, or the steam generator has overlow local water level, but the measured water level does not exceed the operating water level lower limit value, so that the operating safety and the nuclear safety of the steam generator are influenced.
In a first aspect, a method for setting an operating water level limit value of a natural circulation steam generator of a marine nuclear platform is provided, which comprises the following steps:
obtaining the water level h at the top of the steam-water separation cylinderupAnd the height h of the water level at the top of the water supply spray pipednAnd h isupAnd hdnRespectively as the upper limit value L of the operation reference water level of the steam generatormax0And a lower limit value L of the operation reference water levelmin0;
Obtaining the diameter d of the first circle1And diameter d of the second circle2And respectively calculating and obtaining the upper limit value of the swing additional water level at the T moment of the sea nucleus platform at the swing angle theta at the T momentAnd additional lower limit of swing levelWherein the first circle satisfies: all the steam-water separation cylinders are positioned in the first circle and tangent to the first circle; the second circle satisfies: all the water feed nozzles are located within and tangent to the second circle;
according to Lmax0Andcalculating and obtaining the upper limit value of the operating water level of the steam generator at the moment TAnd will beSetting a turbine shutdown water level limit value;
according to Lmin0Andcalculating and obtaining the lower limit value of the operating water level of the steam generator at the moment TAnd will beSet to the steam generator shutdown water level limit.
In some embodiments, the diameter d of the first circle is taken1And diameter d of the second circle2And respectively calculating and obtaining the upper limit value of the swing additional water level at the T moment of the sea nucleus platform at the swing angle theta at the T momentAnd additional lower limit of swing levelThe method specifically comprises the following steps:
obtaining the diameter d of the first circle1And diameter d of the second circle2And roll angle value at time T of sea-nuclear platformAnd pitch angle valueRespectively calculating to obtain the upper limit value of the initial swing additional water level at the time TAnd initial swing additional water level lower limit
Respectively acquiring the upper limit values of the initial swing additional water level of the sea nucleus platform at the T-1 moment and the T-2 momentAndand according toAndcalculating the predicted value of the upper limit value of the swing additional water level at the time T
SelectingAndmaximum value of (1) as the upper limit value of the swing additional water level at time T
Respectively acquiring the lower limit values of the initial swing additional water level of the sea nucleus platform at the T-1 moment and the T-2 momentAndand according toAndcalculating the predicted value of the lower limit value of the swing additional water level at the time T
In some embodiments, the pairAndthe correction is carried out, and the method specifically comprises the following steps:
measuring range L of the measuring instrument according to the water levelmTheoretical error Δ LtInstrument error deltamSum signal acquisition error deltacAnd calculating to obtain the additional water level value delta L of the water level measurement errorm;
According to Δ LmAre respectively aligned withAndcorrecting, calculating and obtaining the upper limit value of the corrected operation water level of the steam generator at the time TAnd correcting the lower limit value of the operating water level
In some embodiments, Δ L is calculated using the following formulam:
The beneficial effect that technical scheme that this application provided brought includes: the application is realized by the upper limit value L of the operation benchmark water level of the steam generatormax0And a lower limit value L of the operation reference water levelmin0Re-setting to obtain the upper limit value of the operating water level of the steam generator at the T momentAnd lower limit of operating water levelEliminating the swing additional water level upper limit value caused by the actual operation water level generated when the swing is inclined by the angle theta at the moment TAnd additional lower limit of swing levelThus rocking at time T of the sea-nuclear platformWhen the swing angle is theta, once the highest position of the actual operation water level of the steam generator reaches Lmax0The measured value of the operating water level isThe limit value of the stop water level of the steam turbine can be reached, and the operation of stopping the steam turbine is further adopted, so that the effect of protecting the safe operation of the steam turbine is achieved; and once the lowest part of the actual operating water level of the steam generator reaches Lmin0The measured value of the operating water level isThe water level limit of the shutdown of the steam generator can be reached, and the shutdown operation is adopted, so that the effect of protecting the safe operation of the steam generator is achieved.
The embodiment of the application provides a method for setting the operating water level limit value of a natural circulation steam generator of a marine nuclear platformmax0And a lower limit value L of the operation reference water levelmin0Re-setting to obtain the upper limit value of the operating water level of the steam generator at the T momentAnd lower limit of operating water levelEliminating the swing additional water level upper limit value caused by the actual operation water level generated when the swing is inclined by the angle theta at the moment TAnd additional lower limit of swing levelTherefore, when the swing angle of the sea-nuclear platform at the time T is θ, once the highest position of the actual operation water level of the steam generator reaches Lmax0The measured value of the operating water level isThe limit value of the stop water level of the steam turbine can be reached, and the operation of stopping the steam turbine is further adopted, so that the effect of protecting the safe operation of the steam turbine is achieved; and once the lowest part of the actual operating water level of the steam generator reaches Lmin0The measured value of the operating water level isThe water level limit of the shutdown of the steam generator can be reached, and the shutdown operation is adopted, so that the effect of protecting the safe operation of the steam generator is achieved.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
Fig. 1 is a flowchart of a method for setting an operating water level limit of a natural circulation steam generator of a marine nuclear platform according to an embodiment of the present application;
FIG. 2 is a detailed flowchart of step 101;
FIG. 3 is a schematic diagram illustrating a method for setting a steam generator operational water level limit according to an embodiment of the present disclosure;
FIG. 4 is a schematic view of a first circle;
fig. 5 is a schematic view of a second circle.
In the figure: 1. a steam-water separation cylinder; 2. a water supply spray pipe; 3. a steam generator.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
Referring to fig. 1, an embodiment of the present application provides a method for setting an operating water level limit of a natural circulation steam generator of a marine nuclear platform, which includes the following steps:
100: referring to FIG. 3, the water level h at the top of the steam-water separation cylinder 1 is obtainedupAnd the height h of the water level at the top of the water supply spray pipe 2dnWater level h at the top of the steam-water separation cylinder 1upAnd the height h of the water level at the top of the water supply spray pipe 2dnThe height of the water level is when the water level is level with the top of the steam-water separation cylinder 1, and the height of the water level is when the water level is level with the top of the water supply spray pipe 2. And h isupAnd hdnRespectively as an upper limit value L of the operating reference water level of the steam generator 3max0And a lower limit value L of the operation reference water levelmin0If the operating water level of the steam generator 3 exceeds the operating reference water level upper limit value Lmax0In the process, the steam-water separation cylinder 1 is submerged, the quality of steam is rapidly deteriorated, so that the dryness of the steam entering the steam turbine does not meet the requirement, the blades of the steam turbine are damaged, and the safe and stable operation of the steam turbine is influenced; if the operating water level of the steam generator 3 is lower than the lower limit value L of the operating reference water levelmin0In the process, the pipe orifice of the water supply spray pipe 2 is exposed, so that the water hammer phenomenon of a water supply pipeline can occur, and the waste heat deriving function of the reactor core is deteriorated. Therefore, the water level h at the top of the steam-water separation cylinder 1 is usedupAnd the height h of the water level at the top of the water supply spray pipe 2dnAs a reference for the operating water level, preventing the operating water level from exceeding Lmin0~Lmax0Is outside the range of (1).
101: referring to fig. 3-5, the diameter d of the first circle is obtained1And diameter d of the second circle2And respectively calculating and obtaining the upper limit value of the swing additional water level at the T moment of the sea nucleus platform at the swing angle theta at the T momentAnd additional lower limit of swing levelWherein the first circle satisfies: all the steam-water separation cylinders 1 are positioned in a first circle and tangent to the first circle; the second circle satisfies: all the water supply nozzles 2 are located within and tangent to the second circle; the operation water level of the steam generator 3 is inclined due to the swinging and inclination of the platform, but when the operation water level is measured, the central water level of the inclined water level is measured, and whether the operation water level exceeds L or not is judged according to the central water levelmin0~Lmax0Is outside the range of (1). It may therefore occur that the measured operating water level does not exceed Lmax0But the highest bit of the actual operating water level has exceeded Lmax0Resulting in the actual operating water level being higher than Lmax0The quality of the steam is reduced, so that the operation safety of the steam turbine is influenced; or the measured operation water level is not lower than Lmin0But the lowest level of the actual operating water level is already below Lmin0Resulting in the actual operating water level being below Lmin0Thereby exposing the feed water spray pipe and affecting the operation safety of the steam generator 3. The upper limit value of the swing additional water level calculated in the stepNamely, when the swing angle of the sea-nuclear platform is theta, namely the inclination of the actual operation water level is theta, the highest position of the actual operation water level just reaches Lmax0When L ismax0The distance from the center water level of the actual operation water level; lower limit of swing-added water levelThat is, when the swing angle of the sea-nuclear platform is calculated to be theta, the lowest position of the actual operation water level just reaches Lmin0When L ismin0The distance from the center water level of the actual operation water level.
102: according to Lmax0Andcalculating and obtaining the upper limit value of the operating water level of the steam generator 3 at the moment TAnd will beSetting a turbine shutdown water level limit value; upper limit of operating water levelIs to Lmax0Re-adjusting the value of Lmax0Move downAs an upper limit value of the operation water level of the steam generator 3When the swing angle of the sea-nuclear platform at the moment T is theta, once the highest position of the actual operation water level of the steam generator 3 reaches Lmax0The measured value of the operating water level isThe water level limit value of the stop of the steam turbine can be reached, and the operation of stopping the steam turbine is further adopted, so that the effect of protecting the safe operation of the steam turbine is achieved.
103: according to Lmin0Andcalculating and obtaining the lower limit value of the operating water level of the steam generator 3 at the moment TAnd will beA shutdown water level limit for the steam generator 3 is set. Lower limit of operating water levelIs to Lmin0Re-adjusting the value of Lmin0Upward movementAs a lower limit value of the operating water level of the steam generator 3When the swing angle of the sea-nuclear platform at the moment T is theta, once the lowest position of the actual operation water level of the steam generator 3 reaches Lmin0The measured value of the operating water level isThe shutdown water level limit of the steam generator 3 is reached, and the shutdown operation is adopted, so that the steam generator 3 is protected to safely operate.
The embodiment of the application has the advantages that the upper limit value L of the operation reference water level of the steam generator 3 is adjustedmax0And a lower limit value L of the operation reference water levelmin0Re-setting to obtain the upper limit value of the operating water level of the steam generator 3 at the T momentAnd operating water level lower limitEliminating the swing additional water level upper limit value caused by the actual operation water level generated when the swing is inclined by the angle theta at the moment TAnd additional lower limit of swing levelTherefore, when the swing angle of the sea-nuclear platform T is θ, once the highest position of the actual operation water level of the steam generator 3 reaches Lmax0The measured value of the operating water level isThe limit value of the stop water level of the steam turbine can be reached, and the operation of stopping the steam turbine is further adopted, so that the safe operation of the steam turbine is protectedThe function of (1); and once the lowest of the actual operating water level of the steam generator 3 reaches Lmin0The measured value of the operating water level isThe water level limit of the steam generator 3 shutdown can be reached, and the shutdown operation is adopted, so that the steam generator and even the nuclear power device can be protected to safely operate.
Referring to FIG. 2, the diameter d of the first circle is obtained1And diameter d of the second circle2And respectively calculating and obtaining the upper limit value of the swing additional water level at the T moment of the sea nucleus platform at the swing angle theta at the T momentAnd additional lower limit of swing levelThe method specifically comprises the following steps:
200: obtaining the diameter d of the first circle1And diameter d of the second circle2And roll angle value at time T of sea-nuclear platformAnd pitch angle valueRespectively calculating to obtain the upper limit value of the initial swing additional water level at the time TAnd initial swing additional water level lower limitWherein:and calculated by the following formulaAnd
201: respectively acquiring the upper limit values of the initial swing additional water level of the sea nucleus platform at the T-1 moment and the T-2 momentAndand according toAndcalculating the predicted value of the upper limit value of the swing additional water level at the time TCalculated by the following formula
202: selectingAndmaximum value of (1) as the upper limit value of the swing additional water level at time TBecause the swing angle theta is given by the attitude measuring instrument of the marine nuclear platform, and the swing angle is transmitted from the measurement and signal transmission to the calculation, a certain time lag exists, and the initial swing additional water level upper limit value calculated according to the swing angle measured at the moment T is added to the upper limit value of the water levelPossibly less than the upper limit value of the actual initial swing additional water level, adoptingAndthe larger value of the water level is used as the upper limit value of the swing additional water levelThat is, mixing Lmax0Maximum downward movement, once the upper limit of the operating water level of the steam generator 3 is reachedA shutdown can be triggered in advance, and by means of this conservative procedure, the turbine can be ensured to be in an absolutely safe operating state.
203: respectively acquiring the lower limit values of the initial swing additional water level of the sea nucleus platform at the T-1 moment and the T-2 momentAndand according toAndcalculating the predicted value of the lower limit value of the swing additional water level at the time TCalculated by the following formula
204: selectingAndmaximum value of (1), as swing additional water level lower limit value at time TAs described above, the lower limit value of the initial swing additional water level calculated due to the swing angle measured at time TPossibly less than the lower limit value of the actual initial swing additional water level, adoptingAndthe larger value of the water level is used as a lower limit value of the swing additional water levelThat is, mixing Lmin0Is moved up to the maximum limit so that the lower limit value of the operation water level of the steam generator 3 is reached onceA shutdown can be triggered early (and at the same time the turbine is also shut down), and by this conservative treatment it is possible to ensure a safe operating state of the nuclear power plant.
Preferably, the tuning method further comprises the step of adjustingAndand performing correction. The method specifically comprises the following steps:
104: measuring range L of the measuring instrument according to the water levelmTheoretical error Δ LtError delta of instrumentmSum signal acquisition error deltacAnd calculating to obtain the additional water level value delta L of the water level measurement errorm(ii) a For a specific water level measuring instrument, the theoretical error delta LtError delta of instrumentmSum signal acquisition error deltacIs determined. The water level measurement has a certain error, the error magnitude and the range LmRelated, range LmThe wider the error, the range LmThe smaller the error. The natural circulation steam generator of the sea-nuclear platform of the embodiment of the application adopts two measuring modes of narrow range and wide range, adopts the water level measured by the narrow range water level meter during normal operation, and only when the water level exceeds the measuring range of the narrow range meter during abnormal operation (such as the starting of the steam generator) is the water level of the steam generator 3 adopts the measuring value of the wide range water level meter. If L ismax0If the range of the narrow-range water level meter is exceeded, the water level measuring meter at the position selects the wide-range water level meter for calculation, and if L is exceeded, the wide-range water level meter is selected for calculationmax0If the measuring range of the narrow-range water level meter is not exceeded, the water level measuring meter at the position selects the narrow-range water level meter for calculation; if L ismin0If the range of the narrow-range water level meter is exceeded, the water level measuring meter at the position selects the wide-range water level meter for calculation, and if L is exceeded, the wide-range water level meter is selected for calculationmin0And if the measuring range of the narrow-range water level meter is not exceeded, the water level measuring meter at the position selects the narrow-range water level meter for calculation.
105: according to Δ LmAre respectively aligned withAndcorrecting, calculating and obtaining the upper limit value of the corrected operation water level of the steam generator 3 at the time TAnd correcting the lower limit value of the operating water levelWater level measurement error additional water level value delta LmIt may result in the measured operating water level being higher or lower than the actual operating water level. When the actual operating water level exceedsWhile, the water level measurement error adds the water level value Delta LmThe measured operating water level may be lowered, which is detrimental to the safety of the operation of the turbine, and it is therefore necessary to avoid this situation, forCorrecting to eliminate error caused by water level measurement, and calculating with the following formula
When the actual operating water level is lower thanWhile, the water level measurement error adds the water level value Delta LmThe measured operating water level may be increased, which is detrimental to the operational safety of the steam generator 3, and therefore it is desirable to avoid this situation, forThe correction is made and calculated by the following formula
Wherein: theoretical error delta L of water leveltError delta of instrumentmSum signal acquisition error deltacVarious errors are eliminated to obtain more accurate upper limit value of corrected operation water levelAnd correcting the lower limit value of the operating water levelAnd calculating Δ L using the following formulam:
In the description of the present application, it should be noted that the terms "upper", "lower", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are only for convenience in describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and operate, and thus, should not be construed as limiting the present application. Unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are intended to be inclusive and mean, for example, that they may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
It is noted that, in the present application, relational terms such as "first" and "second", and the like, are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in the process, method, article, or apparatus that comprises the element.
The above description is merely exemplary of the present application and is presented to enable those skilled in the art to understand and practice the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims (9)
1. A method for setting the limit value of the operating water level of a natural circulation steam generator of a marine nuclear platform is characterized by comprising the following steps:
obtaining the water level h at the top of the steam-water separation cylinder (1)upAnd the water level height h at the top of the water supply spray pipe (2)dnAnd h isupAnd hdnRespectively as the upper limit value L of the operation reference water level of the steam generator (3)max0And a lower limit value L of the operation reference water levelmin0;
Obtaining the diameter d of the first circle1And diameter d of the second circle2And respectively calculating and obtaining the upper limit value of the swing additional water level at the T moment of the sea nucleus platform at the swing angle theta at the T momentAnd additional lower limit of swing levelWherein the first circle satisfies: all the steam-water separation cylinders (1) are positioned in the first circle and tangent to the first circle; the second circle satisfies: all the water feed nozzles (2) are located within and tangent to the second circle;
according to Lmax0Andcalculating and obtaining the upper limit value of the operating water level of the steam generator (3) at the time TAnd will beSetting a turbine shutdown water level limit value;
2. The tuning method according to claim 1, wherein the diameter d of the first circle is obtained1And diameter d of the second circle2And respectively calculating and obtaining the upper limit value of the swing additional water level at the T moment of the sea nucleus platform at the swing angle theta at the T momentAnd additional lower limit of swing levelThe method specifically comprises the following steps:
obtaining the diameter d of the first circle1And diameter d of the second circle2And roll angle value at time T of sea-nuclear platformAnd pitch angle valueRespectively calculating to obtain the upper limit value of the initial swing additional water level at the time TAnd initial swing additional water level lower limit
Respectively acquiring the upper limit values of the initial swing additional water level of the sea nucleus platform at the T-1 moment and the T-2 momentAndand according toAndcalculating the predicted value of the upper limit value of the swing additional water level at the time T
SelectingAndmaximum value of (1) as the upper limit value of the swing additional water level at time T
Respectively acquiring the lower limit values of the initial swing additional water level of the sea nucleus platform at the T-1 moment and the T-2 momentAndand according toAndcalculating the predicted value of the lower limit value of the swing additional water level at the time T
6. The tuning method of claim 5, whereinAndthe correction is carried out, and the method specifically comprises the following steps:
measuring range L of the measuring instrument according to the water levelmTheoretical error Δ LtError delta of instrumentmSum signal acquisition error deltacAnd calculating to obtain the additional water level value delta L of the water level measurement errorm;
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010929466.5A CN112212316B (en) | 2020-09-07 | 2020-09-07 | Method for setting operating water level limit value of natural circulation steam generator of sea nuclear platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010929466.5A CN112212316B (en) | 2020-09-07 | 2020-09-07 | Method for setting operating water level limit value of natural circulation steam generator of sea nuclear platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112212316A CN112212316A (en) | 2021-01-12 |
CN112212316B true CN112212316B (en) | 2022-05-03 |
Family
ID=74050275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010929466.5A Active CN112212316B (en) | 2020-09-07 | 2020-09-07 | Method for setting operating water level limit value of natural circulation steam generator of sea nuclear platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112212316B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112053793B (en) * | 2020-09-07 | 2022-04-01 | 武汉第二船舶设计研究所(中国船舶重工集团公司第七一九研究所) | Setting method for operating water level of sea nuclear platform voltage stabilizer |
CN113436768B (en) * | 2021-06-23 | 2022-05-20 | 中国核动力研究设计院 | Method for determining water level setting value of nuclear power plant voltage stabilizer |
CN115183224B (en) * | 2022-04-14 | 2024-05-31 | 哈尔滨工程大学 | Agent model-based natural circulation steam generator water supply control method and system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101586800A (en) * | 2009-06-25 | 2009-11-25 | 克雷登热能设备(浙江)有限公司 | Quick steam generator for ships |
CN109974967A (en) * | 2019-03-18 | 2019-07-05 | 哈尔滨工程大学 | One kind being suitable for research voltage-stablizer and waves water level and pressure oscillation measurement experiment system |
CN110057865A (en) * | 2019-05-14 | 2019-07-26 | 哈尔滨工程大学 | Marine vapor generator secondary side boiling heat transfer analytical equipment |
-
2020
- 2020-09-07 CN CN202010929466.5A patent/CN112212316B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101586800A (en) * | 2009-06-25 | 2009-11-25 | 克雷登热能设备(浙江)有限公司 | Quick steam generator for ships |
CN109974967A (en) * | 2019-03-18 | 2019-07-05 | 哈尔滨工程大学 | One kind being suitable for research voltage-stablizer and waves water level and pressure oscillation measurement experiment system |
CN110057865A (en) * | 2019-05-14 | 2019-07-26 | 哈尔滨工程大学 | Marine vapor generator secondary side boiling heat transfer analytical equipment |
Non-Patent Citations (3)
Title |
---|
倾斜与摇摆条件下一体化反应堆自然循环特性研究;王冰等;《原子能科学技术》;20170520(第05期);全文 * |
摇摆条件对反应堆系统热工水力特性的影响;蔡容等;《科学技术与工程》;20200828(第24期);全文 * |
船用蒸汽发生器给水控制系统仿真试验平台的设计与实现;邱志强等;《舰船科学技术》;20080215(第01期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN112212316A (en) | 2021-01-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112212316B (en) | Method for setting operating water level limit value of natural circulation steam generator of sea nuclear platform | |
KR100607914B1 (en) | Tower oscillation monitoring device | |
US6744840B2 (en) | Incore monitoring method and incore monitoring equipment | |
CN103717886A (en) | System and method for controlling power output from a wind turbine or wind power plant | |
US11837372B2 (en) | Methods for protection of nuclear reactors from thermal hydraulic/neutronic core instability | |
US6938584B2 (en) | Feedwater control system considering pressure drop of feedwater control valve in nuclear power plant and control method therefor | |
US4877574A (en) | Method of and apparatus for controlling power of natural circulation reactor | |
CN112771701B (en) | Fuel cell for preventing pressure imbalance | |
EP1762830A2 (en) | Liquid level measurement system comprising an improved condensing chamber design | |
CN112133461B (en) | Reactor core average quadrant power inclination ratio calibration system and method | |
JP3182293B2 (en) | Water level measurement system | |
KR20100007716A (en) | Enhanced steam dump control system | |
CN112053793B (en) | Setting method for operating water level of sea nuclear platform voltage stabilizer | |
US20200300221A1 (en) | Control method for a wind turbine | |
CN112908500A (en) | Volume control method for non-condensable gas at top of pressure container | |
US7596199B2 (en) | Method and device for stabilizing a steam dryer assembly in nuclear reactor pressure vessel | |
CN112786223B (en) | Waste heat discharging system and flow stabilizing method | |
CN114251645A (en) | Water level control system and control method for steam generator | |
JPH07103404A (en) | Deciding method for silic-blowing of drum water in drum type boiler plant | |
JP4064775B2 (en) | Core monitoring method | |
CN115199350A (en) | Pressurized water reactor steam turbine protection device, system and method | |
KR101216887B1 (en) | Method and apparatus for control equipment of steam generator of nuclear power plant with invaded process measurement accuracy compensation | |
KR102512542B1 (en) | Control System for Auxiliary Spray System to prevent high level of steam generator | |
CN109192337A (en) | The G of pressurized water reactor out-pile nuclear measurement systemkParameter verification method and device | |
CN114743700A (en) | Method for determining Doppler heating point power of high-temperature gas cooled reactor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |