CN112175638A - Coke oven double-layer resistance wall construction structure and construction method thereof - Google Patents
Coke oven double-layer resistance wall construction structure and construction method thereof Download PDFInfo
- Publication number
- CN112175638A CN112175638A CN202010906990.0A CN202010906990A CN112175638A CN 112175638 A CN112175638 A CN 112175638A CN 202010906990 A CN202010906990 A CN 202010906990A CN 112175638 A CN112175638 A CN 112175638A
- Authority
- CN
- China
- Prior art keywords
- construction
- resistance wall
- coke oven
- layer
- fastening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B29/00—Other details of coke ovens
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Organic Chemistry (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
A coke oven double-layer resistance wall construction structure and a construction method thereof are provided, wherein the construction structure comprises: the construction member of lower floor, upper strata construction component, supporting member, fastening member and connecting element. According to the coke oven double-layer resistance wall construction structure and the construction method thereof, synchronous construction of the coke oven lower-layer resistance wall and the coke oven upper-layer resistance wall can be performed on the construction structure, the construction period is shortened, construction of a coke oven top plate is not affected, the quality of one-time pouring of the coke oven resistance wall is improved, and the coke oven construction flow line work is smoother.
Description
Technical Field
The invention belongs to the technical field of coke oven double-layer resistance wall construction, and particularly relates to a coke oven double-layer resistance wall construction structure and a construction method thereof.
Background
The scale of the furnace body structure of the large-volume coke oven at the present stage is enlarged, the structure of the resistance wall of the coke oven is upgraded from the earliest hung prefabricated plate structure to a single-layer cast-in-place reinforced concrete structure until the double-layer cast-in-place reinforced concrete structure at the present stage, so that the construction period is prolonged, the whole cast-in-place construction of the top plate of the coke oven is changed into the sectional construction, so that the cross operation is more, and the traditional construction structure and construction method are not suitable for the furnace body structure of the large-.
Disclosure of Invention
In order to solve the problems, the invention provides a double-layer resistance wall construction structure of a coke oven, which comprises the following components:
the lower-layer construction component is used for constructing a coke oven lower-layer resistance wall; the lower-layer construction member is arranged adjacent to the resistance wall and is lower than a beam of the resistance wall;
the upper construction component is used for constructing an upper resistance wall of the coke oven; the upper-layer construction member is respectively arranged adjacent to the resistance wall and the lower-layer construction member;
a support member for supporting the upper layer construction member; the supporting member is arranged at the first beam and supports the upper construction member;
a fastening member for fastening the upper layer construction member; the fastening members are arranged at the two beams of the resistance wall and fasten the upper construction member;
a connecting member for connecting the fastening member and the supporting member; the connecting members connect the fastening members and the supporting members, respectively.
Preferably, the lower construction member includes: foundation bedplate, frame post, frame roof beam and basic roof, wherein, the first end support of frame post connect in on the foundation bedplate and the second end supports and connects the frame roof beam, frame roof beam support connect in on the frame post, and with the foundation bedplate is relative, basic roof support connect in on the frame roof beam, and with the foundation bedplate is relative, resist the wall support in on the foundation bedplate.
Preferably, the upper layer construction member includes: the scaffold is arranged on the supporting member and is arranged opposite to the resistance wall, the cantilever frame is arranged opposite to the resistance wall, and the fastening member is respectively connected with the scaffold and the cantilever frame.
Preferably, the support member includes: i-steel and pre-buried anchor ring of encorbelmenting, wherein, pre-buried anchor ring passes through I-steel of encorbelmenting is fixed in one roof beam department, scaffold frame in the upper construction component support in on the I-steel of encorbelmenting.
Preferably, the support member further comprises: the cantilever beam comprises a wedge-shaped wood block, wherein a pre-buried fixing hole is formed in one beam, and the wedge-shaped wood block is fastened in the pre-buried fixing hole and fastens the cantilever I-shaped steel.
Preferably, the fastening member includes: the bolt penetrates through an overhanging frame in the upper construction component and is fastened at the position of the two beams, and the hanging ring is arranged at the position of the two beams and is connected with the connecting component.
Preferably, the connection member includes: and the first end of the cable-stayed steel wire rope is connected with the overhanging I-shaped steel in the supporting member, and the second end of the cable-stayed steel wire rope is connected with the hanging ring in the fastening member.
The invention also provides a construction method of the coke oven double-layer resistance wall construction structure, the coke oven double-layer resistance wall construction structure comprises any one of the coke oven double-layer resistance wall construction structures, and the method comprises the following steps:
constructing a lower-layer construction member lower than one beam at the position of the resistance wall;
building a support member at one of the beams of the resistance wall;
building fastening members at the two beams of the resistance wall;
building an upper construction member at the resistance wall at least partially supported on the support member;
fastening the upper layer construction member using the fastening member;
connecting the fastening member and the supporting member using a connecting member.
According to the coke oven double-layer resistance wall construction structure and the construction method thereof, synchronous construction of the coke oven lower-layer resistance wall and the coke oven upper-layer resistance wall can be performed on the construction structure, the construction period is shortened, construction of a coke oven top plate is not affected, the quality of one-time pouring of the coke oven resistance wall is improved, and the coke oven construction flow line work is smoother.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic front view of a double-layer resistance wall construction structure of a coke oven provided by the invention;
FIG. 2 is a partial structural schematic view of a double-layer resistance wall construction structure of a coke oven provided by the invention;
FIG. 3 is a schematic front view of a double-layer resistance wall construction structure of a coke oven provided by the invention;
FIG. 4 is a schematic side view of a double-layer resistance wall construction structure of a coke oven provided by the invention;
FIG. 5 is a schematic structural view of a cantilever I-shaped steel in a double-layer resistance wall construction structure of a coke oven provided by the invention;
FIG. 6 is a schematic structural view of an anchor ring embedded in a double-layer resistance wall construction structure of a coke oven provided by the invention;
FIG. 7 is a schematic structural view of a pre-buried fixing hole in a double-layer resistance wall construction structure of a coke oven provided by the invention;
FIG. 8 is a schematic structural view of a bolt in a double-layer resistance wall construction structure of a coke oven provided by the invention;
FIG. 9 is a schematic structural diagram of a lifting ring in a double-layer resistance wall construction structure of a coke oven provided by the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings in conjunction with the following detailed description. It should be understood that the description is intended to be exemplary only, and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
Referring to fig. 1 to 9, in an embodiment of the present application, the present invention provides a double-layer resistant wall construction structure of a coke oven, including: the lower construction member 10, the upper construction member 20, the support member 30, the fastening member 40, and the connection member 50, each of which will be described in detail below.
Referring to fig. 1 to 9, in an embodiment of the present application, a double-layer resistant wall construction structure of a coke oven provided by the present invention includes:
the lower layer construction component 10 is used for constructing a lower layer resistance wall of the coke oven; the lower construction member 10 is arranged adjacent to the resistance wall 50 and lower than a beam 51 of the resistance wall 50;
the upper construction component 20 is used for constructing an upper resistance wall of the coke oven; the upper construction member 20 is disposed adjacent to the resistance wall 50 and the lower construction member 10, respectively;
a support member 30 for supporting the upper layer construction member 20; the supporting member 30 is disposed at the one beam 51 and supports the upper construction member 20;
a fastening member 40 for fastening the upper layer construction member 20; the fastening member 40 is provided at the second girder 52 of the resistance wall 50, and fastens the upper construction member 20;
a connecting member 50 for connecting the fastening member 40 and the supporting member 30; the connecting members 50 connect the fastening members 40 and the supporting members 30, respectively.
When the double-layer resistance wall construction structure of the coke oven is used, firstly, the position of the resistance wall 50, and the positions of the first beam 51 and the second beam 52 on the resistance wall 50 are predetermined according to requirements; then, constructing a lower construction member 10 at the position of the resistance wall 50, wherein the lower construction member 10 is lower than one beam 51 of the resistance wall 50; simultaneously building a support member 30 at one beam 51, building a fastening member 40 at a second beam 52, and building a connecting member 50 to connect the fastening member 40 and the support member 30; after the supporting member 30 is built, the upper construction member 20 is built on the supporting member 30, and after the lower construction member 10 and the upper construction member 20 are built, construction of a coke oven lower-layer resistance wall and construction of a coke oven upper-layer resistance wall can be simultaneously and respectively carried out on the lower construction member 10 and the upper construction member 20, so that the construction time is greatly shortened compared with the traditional construction method, and the construction efficiency is improved.
As shown in fig. 1 to 9, in the embodiment of the present application, the lower construction member 10 includes: foundation slab 11, frame post 12, frame roof beam 13 and basic roof plate 14, wherein, the first end of frame post 12 support connect in on the foundation slab 11 and the second end supports the connection frame roof beam 13, frame roof beam 13 support connect in on the frame post 12, and with foundation slab 11 is relative, basic roof plate 14 support connect in on the frame roof beam 13, and with foundation slab 11 is relative, resist wall 50 support in on the foundation slab 11.
In the embodiment of the application, the frame columns 12 are fixed on the foundation bottom plate 11 through screws and are connected with the frame beams 13 through screws, the frame beams 13 support the foundation top plate 14, and constructors can stand on the foundation top plate 14 to construct the lower-layer resisting wall of the coke oven.
As shown in fig. 1 to 9, in the embodiment of the present application, the upper layer construction member 20 includes: a scaffold 21 and a cantilever 22, wherein the scaffold 21 is disposed on the support member 30 and is disposed opposite to the resistance wall 50, the cantilever 22 is disposed opposite to the resistance wall 50, and the fastening member 40 connects the scaffold 21 and the cantilever 22, respectively.
In the embodiment of the application, the scaffold 21 and the cantilever frame 22 are made of round steel, the scaffold 21 is supported on the supporting member 30, construction workers can stand on the scaffold 21 to construct the upper-layer resistance wall of the coke oven, the cantilever frame 22 is arranged relative to the resistance wall 50, the bottom of the cantilever frame is buried in the ground, the whole structure is net-shaped, the scaffold 21 can be located between the cantilever frame 22 and the resistance wall 50, the cantilever frame 22 can support the scaffold 21, and the protection effect can be achieved for constructors on the scaffold 21.
As shown in fig. 1 to 9, in the present embodiment, the support member 30 includes: the cantilever beam comprises cantilever I-shaped steel 31 and an embedded anchor ring 32, wherein the embedded anchor ring 32 is fixed at the position of one beam 51 through the cantilever I-shaped steel 31, and a scaffold 21 in the upper-layer construction member 20 is supported on the cantilever I-shaped steel 31.
In the embodiment of the application, the overhanging i-beam 31 is made of i-beams, the pre-embedded anchor ring 32 is made of round steel, the pre-embedded anchor ring 32 is sleeved on the overhanging i-beam 31 and fixed on one beam 51, the pre-embedded anchor rings 32 are arranged at two ends of the overhanging i-beam 31 and supported and fastened by all the pre-embedded anchor rings 32.
As shown in fig. 1 to 9, in the embodiment of the present application, the supporting member 30 further includes: and the wedge-shaped wood block is fixedly fastened in the embedded fixing hole 33 and fastens the cantilever I-shaped steel 31.
In the embodiment of the application, a pre-buried fixing hole 33 is formed in one beam 51, the wedge-shaped wood blocks are sleeved on the overhanging i-beam 31 and fixed in the pre-buried fixing hole 33, and wedge-shaped wood blocks are arranged at two ends of the overhanging i-beam 31 and supported and fastened by all the wedge-shaped wood blocks.
As shown in fig. 1 to 9, in the present embodiment, the fastening member 40 includes: a bolt 41 and a hanging ring 42, wherein the bolt 41 is fastened to the second beam 52 through the cantilever 22 of the upper construction member 20, and the hanging ring 42 is disposed at the second beam 52 and connected to the connection member 50.
In the embodiment of the application, the bolt 41 and the suspension ring 42 are made of round steel, the bolt 41 can fasten the cantilever frame 22 on the second beam 52, and the suspension ring 42 is used for obliquely pulling the cantilever i-steel 31, so that the cantilever i-steel 31 can be stabilized and kept stable on the first beam 51. The overhanging i-steel 31 and the hanging ring 42 are connected through a connecting member 50.
As shown in fig. 1 to 9, in the embodiment of the present application, the connection member 50 includes: and a diagonal cable 51, a first end of the diagonal cable 51 being connected to the cantilever i-beam 31 of the support member 30 and a second end thereof being connected to the suspension ring 42 of the fastening member 40.
In the embodiment of the application, the two ends of the diagonal steel wire rope 51 are respectively connected with the cantilever i-steel 31 and the hanging ring 42, so that the cantilever i-steel 31 can be kept stable at one beam 51.
The invention also provides a construction method of the coke oven double-layer resistance wall construction structure, the coke oven double-layer resistance wall construction structure comprises the coke oven double-layer resistance wall construction structure shown in the figures 1-9, and the method comprises the following steps:
constructing a lower construction member 10 lower than one beam 51 at the resistance wall 50;
building a support member 30 at one beam 51 of the resistance wall 50;
building fastening members 40 at the second girders 52 of the resistance wall 50;
building an upper construction member 20 at least partially supported on the support member 30 at the resistance wall 50;
fastening the upper layer construction member 20 using the fastening member 40;
the fastening member 40 and the supporting member 30 are connected using a connecting member 50.
According to the coke oven double-layer resistance wall construction structure and the construction method thereof, synchronous construction of the coke oven lower-layer resistance wall and the coke oven upper-layer resistance wall can be performed on the construction structure, the construction period is shortened, construction of a coke oven top plate is not affected, the quality of one-time pouring of the coke oven resistance wall is improved, and the coke oven construction flow line work is smoother.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.
Claims (8)
1. A coke oven double-layer resistance wall construction structure is characterized by comprising:
the lower-layer construction component is used for constructing a coke oven lower-layer resistance wall; the lower-layer construction member is arranged adjacent to the resistance wall and is lower than a beam of the resistance wall;
the upper construction component is used for constructing an upper resistance wall of the coke oven; the upper-layer construction member is respectively arranged adjacent to the resistance wall and the lower-layer construction member;
a support member for supporting the upper layer construction member; the supporting member is arranged at the first beam and supports the upper construction member;
a fastening member for fastening the upper layer construction member; the fastening members are arranged at the two beams of the resistance wall and fasten the upper construction member;
a connecting member for connecting the fastening member and the supporting member; the connecting members connect the fastening members and the supporting members, respectively.
2. The coke oven double-layer resistance wall construction structure of claim 1, wherein the lower layer construction member comprises: foundation bedplate, frame post, frame roof beam and basic roof, wherein, the first end support of frame post connect in on the foundation bedplate and the second end supports and connects the frame roof beam, frame roof beam support connect in on the frame post, and with the foundation bedplate is relative, basic roof support connect in on the frame roof beam, and with the foundation bedplate is relative, resist the wall support in on the foundation bedplate.
3. The coke oven double-decker resistance wall construction structure of claim 1, wherein the upper-decker construction member comprises: the scaffold is arranged on the supporting member and is arranged opposite to the resistance wall, the cantilever frame is arranged opposite to the resistance wall, and the fastening member is respectively connected with the scaffold and the cantilever frame.
4. The coke oven double-decker resistance wall construction structure of claim 1, wherein the support member comprises: i-steel and pre-buried anchor ring of encorbelmenting, wherein, pre-buried anchor ring passes through I-steel of encorbelmenting is fixed in one roof beam department, scaffold frame in the upper construction component support in on the I-steel of encorbelmenting.
5. The coke oven double-decker resistance wall construction structure of claim 4, wherein the support member further comprises: the cantilever beam comprises a wedge-shaped wood block, wherein a pre-buried fixing hole is formed in one beam, and the wedge-shaped wood block is fastened in the pre-buried fixing hole and fastens the cantilever I-shaped steel.
6. The coke oven double-decker resistance wall construction structure of claim 1, wherein the fastening member comprises: the bolt penetrates through an overhanging frame in the upper construction component and is fastened at the position of the two beams, and the hanging ring is arranged at the position of the two beams and is connected with the connecting component.
7. The coke oven double-decker resistance wall construction structure of claim 1, wherein the connecting member comprises: and the first end of the cable-stayed steel wire rope is connected with the overhanging I-shaped steel in the supporting member, and the second end of the cable-stayed steel wire rope is connected with the hanging ring in the fastening member.
8. A method for constructing a coke oven double-layer resistance wall construction structure, which is characterized by comprising the coke oven double-layer resistance wall construction structure as defined in any one of claims 1 to 7, the method comprising the steps of:
constructing a lower-layer construction member lower than one beam at the position of the resistance wall;
building a support member at one of the beams of the resistance wall;
building fastening members at the two beams of the resistance wall;
building an upper construction member at the resistance wall at least partially supported on the support member;
fastening the upper layer construction member using the fastening member;
connecting the fastening member and the supporting member using a connecting member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010906990.0A CN112175638A (en) | 2020-09-01 | 2020-09-01 | Coke oven double-layer resistance wall construction structure and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010906990.0A CN112175638A (en) | 2020-09-01 | 2020-09-01 | Coke oven double-layer resistance wall construction structure and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112175638A true CN112175638A (en) | 2021-01-05 |
Family
ID=73924046
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010906990.0A Pending CN112175638A (en) | 2020-09-01 | 2020-09-01 | Coke oven double-layer resistance wall construction structure and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112175638A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1992021838A1 (en) * | 1991-05-28 | 1992-12-10 | Bokarn Pty. Ltd. | Work platform system for multi-storey buildings |
CN104032966A (en) * | 2014-06-27 | 2014-09-10 | 中国十九冶集团(防城港)设备结构有限公司 | Partitioning, hoisting, overhead closing and mounting method for arc-shaped double-layer net racks |
CN104695692A (en) * | 2015-02-13 | 2015-06-10 | 中国五冶集团有限公司 | Scaffold on basis of resistance wall of coke oven |
CN106499226A (en) * | 2016-11-14 | 2017-03-15 | 中国能源建设集团江苏省电力建设第三工程有限公司 | A kind of method of main building construction in layer |
CN106703407A (en) * | 2017-02-17 | 2017-05-24 | 四川省第六建筑有限公司 | Construction method of double-layered shape steel supporting rack of cantilever beam plate |
CN107558605A (en) * | 2017-10-24 | 2018-01-09 | 上海欧本钢结构有限公司 | A kind of full truss-like building system |
CN108264908A (en) * | 2016-12-30 | 2018-07-10 | 北京华泰焦化工程技术有限公司 | Base structure of coke oven and coke oven |
CN109629810A (en) * | 2018-12-29 | 2019-04-16 | 杭州江润科技有限公司 | Closed builder's jack system and construction method |
CN111424948A (en) * | 2020-04-23 | 2020-07-17 | 中国建筑第四工程局有限公司 | Construction method and construction platform for cantilever structure layer of high-rise building |
-
2020
- 2020-09-01 CN CN202010906990.0A patent/CN112175638A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1992021838A1 (en) * | 1991-05-28 | 1992-12-10 | Bokarn Pty. Ltd. | Work platform system for multi-storey buildings |
CN104032966A (en) * | 2014-06-27 | 2014-09-10 | 中国十九冶集团(防城港)设备结构有限公司 | Partitioning, hoisting, overhead closing and mounting method for arc-shaped double-layer net racks |
CN104695692A (en) * | 2015-02-13 | 2015-06-10 | 中国五冶集团有限公司 | Scaffold on basis of resistance wall of coke oven |
CN106499226A (en) * | 2016-11-14 | 2017-03-15 | 中国能源建设集团江苏省电力建设第三工程有限公司 | A kind of method of main building construction in layer |
CN108264908A (en) * | 2016-12-30 | 2018-07-10 | 北京华泰焦化工程技术有限公司 | Base structure of coke oven and coke oven |
CN106703407A (en) * | 2017-02-17 | 2017-05-24 | 四川省第六建筑有限公司 | Construction method of double-layered shape steel supporting rack of cantilever beam plate |
CN107558605A (en) * | 2017-10-24 | 2018-01-09 | 上海欧本钢结构有限公司 | A kind of full truss-like building system |
CN109629810A (en) * | 2018-12-29 | 2019-04-16 | 杭州江润科技有限公司 | Closed builder's jack system and construction method |
CN111424948A (en) * | 2020-04-23 | 2020-07-17 | 中国建筑第四工程局有限公司 | Construction method and construction platform for cantilever structure layer of high-rise building |
Non-Patent Citations (4)
Title |
---|
周彬: "焦炉抵抗墙整体浇筑成型施工技术", 《城市建设理论研究(电子版)》 * |
张永平,张朝春主编: "《建筑与装饰施工工艺》", 30 September 2018, 北京:北京理工大学出版社 * |
许富华主编: "《地基与基础工程施》", 31 August 2011, 北京:北京理工大学出版社 * |
郑垒等: "高空双层超长悬挑钢筋混凝土结构施工技术", 《建筑施工》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235285B (en) | Cantilever pouring system and construction method for reinforced concrete arch bridge of large-span railway | |
CN101649604B (en) | Construction bracket of 1# block of inclined pull bridge and constructing method thereof | |
CN105781099A (en) | Movable combined type one-sided large template structure and construction method thereof | |
CN205857032U (en) | The toughened internal stress Construction Support device that a kind of floor stand combines with shelf bracket | |
CN104314167B (en) | Prestressed assembly type building and assembly method thereof | |
CN110387822A (en) | Cast-in-place Bent Cap assembled steel pipe holder and its construction method | |
CN107882328B (en) | Construction method of large-span steel truss suspension structure | |
JPH11181725A (en) | Method for constructing horizontal beam of main tower made of concrete | |
CN209456892U (en) | Cable-stayed bridge steel overhangs structure of sidewalk | |
CN101403246B (en) | Large-tonnage hoisting machine one-storied factory combination column and production method thereof | |
CN204080843U (en) | Movable plank house foundation structure | |
CN112878171A (en) | Large-span steel structure arch bridge and construction method | |
CN204199434U (en) | Prestressing force assembled architecture | |
CN112175638A (en) | Coke oven double-layer resistance wall construction structure and construction method thereof | |
CN213682477U (en) | Upper cover structure system applied to track operation line | |
CN211312154U (en) | Steel web box girder installation system | |
CN111535336A (en) | Deep foundation pit inverted arch prestressed concrete support structure and construction method thereof | |
CN112854702A (en) | Large-span silo roof construction platform and erection method | |
CN206693070U (en) | Hybrid structure of arch and beam formula continuous rigid frame bridge winds up walking cradle construction device | |
CN215160354U (en) | Concrete crane beam structure | |
CN209114976U (en) | A kind of dismountable environment protection fence | |
CN115538678B (en) | Construction method for small side surface platform of large-angle overhanging view platform | |
CN211897858U (en) | Cast-in-place continuous box girder support system of bar basis | |
CN212128891U (en) | Modular anchor system behind bridge hanging basket | |
CN214573404U (en) | Prestressed steel concrete combination box girder suspension splicing construction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210105 |