CN112160510A - Construction method of waterproof coiled material - Google Patents
Construction method of waterproof coiled material Download PDFInfo
- Publication number
- CN112160510A CN112160510A CN202011020584.0A CN202011020584A CN112160510A CN 112160510 A CN112160510 A CN 112160510A CN 202011020584 A CN202011020584 A CN 202011020584A CN 112160510 A CN112160510 A CN 112160510A
- Authority
- CN
- China
- Prior art keywords
- fixing
- self
- layer
- base layer
- waterproof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D11/00—Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
- E04D11/02—Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D5/00—Roof covering by making use of flexible material, e.g. supplied in roll form
- E04D5/06—Roof covering by making use of flexible material, e.g. supplied in roll form by making use of plastics
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The invention discloses a construction method of a waterproof coiled material, which comprises the following steps: after the waterproof coiled material is laid and fixed on the base layer, a self-cleaning material is sprayed on the upper surface of the waterproof coiled material. According to the construction method of the waterproof coiled material, after the waterproof coiled material is constructed, the self-cleaning material is sprayed on the surface of the waterproof coiled material, so that the stain resistance of the waterproof coiled material is greatly improved.
Description
Technical Field
The invention relates to the field of building construction, in particular to a construction method of a waterproof coiled material.
Background
In recent years, environmental problems are increasingly highlighted, and various pollutants are discharged and suspended in the atmosphere in the form of fine particles through a series of physical and chemical processes, so that when the surface of a material is exposed outdoors, harmful substances in the air are easily adsorbed due to electrostatic action, the attractiveness of the material is affected, and the health of people is threatened. For example, Thermoplastic Polyolefin (TPO) waterproofing membrane is widely used for constructing a roof waterproofing system as one of the most important building waterproofing materials at present, and when the TPO waterproofing membrane is used outdoors, a large amount of dust and other pollutants are often adsorbed due to the fact that the traditional TPO waterproofing membrane has no self-cleaning function.
The current solution to the above problem is to apply a self-cleaning coating on the surface of the material to form a self-cleaning surface. Generally, a self-cleaning surface refers to a surface on which contaminants or dust on the surface can automatically fall off or be degraded under the action of gravity or external force such as rain or wind. After the self-cleaning material is coated to form a self-cleaning surface, the surface of the material can be kept clean under natural conditions without manual cleaning, so that the cleaning cost and the labor intensity of workers are greatly reduced, and the potential safety hazard caused by manual cleaning is reduced. At present, more self-cleaning materials are researched, have building, pipeline transportation, traffic and the like related to industrial production, and show wide application prospects.
However, most of self-cleaning materials in the prior art, such as self-cleaning TPO waterproof rolls, have self-cleaning layers coated on the surfaces before leaving factories, so that the phenomena of partial abrasion and damage of the self-cleaning layers on the surfaces exist in the transportation and construction processes of the materials, the self-cleaning effect of the surfaces is reduced, and even the self-cleaning effect is lost.
Disclosure of Invention
In view of the above, in order to overcome the defects of the prior art, the invention aims to provide a construction method of a waterproof roll, which greatly improves the stain resistance of the waterproof roll, avoids the damage of objective factors to a self-cleaning layer of the waterproof roll, and effectively solves the problem that the traditional waterproof roll is difficult to clean after being exposed outdoors for a long time.
In order to achieve the purpose, the invention adopts the following technical scheme:
a construction method of a waterproof coiled material comprises the following steps: after the waterproof coiled material is laid and fixed on the base layer, a self-cleaning material is sprayed on the upper surface of the waterproof coiled material.
Preferably, the self-cleaning material is sprayed with: and uniformly spraying the self-cleaning material on the surface of the waterproof roll for 2-3 times, wherein each kilogram of the self-cleaning material is sprayed for 10-30 square meters.
Preferably, the self-cleaning material is a liquid containing silicon and/or fluorine.
Preferably, the material of the waterproof coiled material is thermoplastic polyolefin.
Preferably, the base layer is a steel plate, concrete, cement mortar or wood board.
Specifically, the steps specifically include:
1) preparing a base layer: leveling and cleaning the base layer;
2) laying an isolation layer: paving a release material on the surface of the base layer which is made of hard material and is rougher;
3) laying a heat insulation layer: constructing by using a mechanical fixing method, keeping the fixing gasket of the heat-insulating layer flush with the surface of the heat-insulating plate, and vertically fixing the fixing piece on the stress layer and at least embedding the fixing piece into the base layer by 20 mm; if the base layer is a steel plate, the fixing piece penetrates through the steel plate by 25 mm; if the base layer is made of concrete, the fixing piece is embedded into the concrete base layer by 30 mm;
4) laying an isolation layer again: carrying out the operation of the step 2) again;
5) laying and fixing the waterproof roll: fixing the waterproof roll by selecting point fixing or linear fixing;
6) detail processing and closing processing;
7) spraying a self-cleaning material: uniformly spraying the self-cleaning material on the surface of the waterproof coiled material for 2-3 times, wherein each kilogram of the self-cleaning material is sprayed for 10-30 square meters;
8) checking and accepting.
Preferably, the leveling of the substrate in step 1) is performed so as to keep the substrate at an angle of 15 ° or more with respect to the horizontal plane.
Preferably, the isolation material in the step 2) and the step 4) is made of a material which is compatible with the waterproof coiled material and is soft.
More preferably, the barrier material is a polyethylene vapour barrier film of 0.3mm thickness.
Preferably, the waterproof roll material in the step 5) is fixedly installed by adopting a special fixing piece, and the waterproof layer cannot be temporarily fixed by adopting an electric welding mode in the construction.
Compared with the prior art, the invention has the advantages that: according to the construction method of the waterproof coiled material, after the waterproof coiled material is laid, the self-cleaning material is sprayed on the surface of the waterproof coiled material, so that the stain resistance of the waterproof coiled material is greatly improved.
Drawings
Fig. 1 is a flow chart of a construction method of a waterproof roll in a preferred embodiment of the present invention.
Detailed Description
Preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
Referring to fig. 1, a construction method of a waterproof roll includes spraying a self-cleaning material on an upper surface of a waterproof roll after the waterproof roll is laid and fixed on a base layer.
The method specifically comprises the following steps:
step S1: preparing the base layer
And leveling and cleaning the base layer.
Leveling the base layer to keep the included angle between the base layer and the horizontal plane to be more than or equal to 15 degrees.
In specific implementation applications, the substrate may be steel plate, concrete, cement mortar, wood board, or other hard material.
Step S2: laying isolation layer
And laying a release material on the surface of the base layer which is hard and rough. The isolation material is made of a material which is compatible with the waterproof coiled material and is soft. The barrier material in this example is a polyethylene vapor barrier film of 0.3mm thickness.
The isolation layer is used for controlling condensation, saving energy and improving the durability of the system, and is a component of a roof system. A 0.3mm thick Polyethylene (PE) vapor barrier film was sealed with butyl tape at the overlap and the closure to form a tight air barrier and a continuous barrier layer that was suitable for most mechanical fastening systems.
Step S3: laying heat-insulating layer
And (3) constructing by using a mechanical fixing method, keeping the fixing gasket of the heat-insulating layer flush with the surface of the heat-insulating plate, and vertically fixing the fixing piece on the stressed layer and at least embedding the fixing piece into the base layer by 20 mm.
If the base layer is a steel plate, the fixing piece penetrates through the steel plate by 25 mm; if the base layer is made of concrete, the fixing piece is embedded into the concrete base layer by 30 mm.
Step S4: laying the isolation layer again
The operation of step S2 is repeated again to perform laying of the vapor barrier.
Step S5: laying and fixing waterproof roll
The material of the waterproof roll in this embodiment is thermoplastic polyolefin, i.e., TPO. Select fixed or linear fixed TPO waterproofing membrane of point type to fix, adopt special mounting to carry out fixed mounting, must not adopt the temporary fixed waterproof layer of electric welding mode in the construction.
The special fixing piece comprises a fixing screw, a metal gasket, a fixing pressing strip, a closing-up pressing strip and the like.
The spot-type fixing operation is as follows: the waterproof roll material longitudinally overlapped width was 120mm, and 50mm of the waterproof roll material was used for covering the fixing member (metal gasket and screw). Directly screwing the fixing piece into the profiled steel sheet roof by using an electric screwdriver according to the designed interval; on the concrete structure layer roof, firstly, an electric hammer is used for drilling holes (the diameter of a drill bit is 5.0/5.5mm), the drilling depth is 25mm deeper than the depth of a screw, then, an electric screwdriver is used for screwing in the fixing piece, and then, the circulation operation is carried out.
The linear fixation operation is as follows: the longitudinal lap joint width of the waterproof coiled material is 80mm, after welding, metal battens are reasonably arranged according to the designed interval, and the fixing piece is directly screwed in by an electric screwdriver on the profiled steel sheet roof; on the concrete structure layer roof, firstly, an electric hammer is used for drilling holes (the diameter of a drill bit is 5.0/5.5mm), the drilling depth is 25mm deeper than the depth of a screw, then, an electric screwdriver is used for screwing in the fixing piece, and then, the circulation operation is carried out.
Step S6: detail treatment and closing treatment
Including detail and partial necking of the waterproofing web, are conventional techniques well known to those skilled in the art and will not be described herein.
Step S7: self-cleaning material for spraying
And (3) uniformly spraying the self-cleaning material on the surface of the waterproof coiled material for 2-3 times, so that each kilogram of the self-cleaning material is sprayed for 10-30 square meters to ensure the self-cleaning effect.
The self-cleaning material in this embodiment is a liquid containing silicon and/or fluorine.
Step S8: inspection acceptance
The construction acceptance of the waterproof layer mainly comprises that the waterproof coiled material is laid smoothly and straightly without distortion; the weld must be cleaned, dried, etc., as is well known to those skilled in the art.
According to the construction method of the waterproof coiled material, after the waterproof coiled material is laid, the self-cleaning material is sprayed on the surface of the waterproof coiled material, so that the stain resistance of the waterproof coiled material is greatly improved.
The above embodiments are merely illustrative of the technical concept and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the content of the present invention and implement the invention, and not to limit the scope of the invention, and all equivalent changes or modifications made according to the spirit of the present invention should be covered by the scope of the present invention.
Claims (10)
1. The construction method of the waterproof roll is characterized by comprising the following steps: preparing the base layer, laying the isolation layer, laying the heat preservation layer, laying the isolation layer again, laying and fixing the waterproof coiled material in turn from bottom to top, then spraying self-cleaning material on the waterproof coiled material, the spraying self-cleaning material is for evenly spraying the self-cleaning material on the surface of the waterproof coiled material, the spraying is 2-3 times, and 10-30 square meters of spraying per kilogram of self-cleaning material is applied to the waterproof coiled material.
2. The construction method of the waterproof roll material as claimed in claim 1, wherein the steps specifically include:
1) preparing a base layer: leveling and cleaning the base layer;
2) laying an isolation layer: paving an isolation material on the surface of the base layer;
3) laying a heat insulation layer: constructing by using a mechanical fixing method, keeping the fixing gasket of the heat-insulating layer flush with the surface of the heat-insulating plate, and vertically fixing the fixing piece on the stress layer and at least embedding the fixing piece into the base layer by 20 mm;
4) laying an isolation layer again: carrying out the operation of the step 2) again;
5) laying and fixing the waterproof roll: fixing the waterproof roll by selecting point fixing or linear fixing;
6) detail processing and closing processing;
7) spraying a self-cleaning material: uniformly spraying the self-cleaning material on the surface of the waterproof coiled material for 2-3 times, wherein each kilogram of the self-cleaning material is sprayed for 10-30 square meters;
8) checking and accepting.
3. The construction method of the waterproof roll material as claimed in claim 1, wherein the waterproof roll material is thermoplastic polyolefin; the self-cleaning material is a liquid containing silicon and/or fluorine.
4. The waterproofing membrane construction method according to claim 2, wherein the base layer is leveled in step 1) so as to maintain an angle of 15 ° or more with respect to a horizontal plane.
5. The method of claim 2, wherein the isolation material in step 2) and step 4) is made of a material compatible with and soft to the waterproofing membrane.
6. The method of claim 5, wherein the insulating material is a polyethylene vapor barrier film with a thickness of 0.3 mm.
7. The method of claim 6, wherein the polyethylene vapor barrier film is sealed at the overlapping and closing positions by butyl tape to form a barrier layer.
8. The method for constructing a waterproof roll according to claim 2, wherein the base layer is made of steel plate, concrete, cement mortar or wood board.
9. The method for constructing a waterproof roll as claimed in claim 8, wherein in step 3), if the substrate is a steel plate, the fixing member penetrates through the steel plate by at least 25 mm; if the base layer is made of concrete, the fixing piece is embedded into the concrete base layer by at least 30 mm.
10. The construction method of the waterproof roll according to claim 1, wherein the waterproof roll in step 5) is fixedly installed by using a special fixing member, and the waterproof layer cannot be temporarily fixed by using an electric welding manner in the construction; the special fixing piece comprises a fixing screw, a metal gasket, a fixing pressing strip and a closing-up pressing strip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011020584.0A CN112160510A (en) | 2017-12-12 | 2017-12-12 | Construction method of waterproof coiled material |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711315333.3A CN108204125B (en) | 2017-12-12 | 2017-12-12 | Construction method of waterproof coiled material |
CN202011020584.0A CN112160510A (en) | 2017-12-12 | 2017-12-12 | Construction method of waterproof coiled material |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711315333.3A Division CN108204125B (en) | 2017-12-12 | 2017-12-12 | Construction method of waterproof coiled material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112160510A true CN112160510A (en) | 2021-01-01 |
Family
ID=62604670
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011020584.0A Pending CN112160510A (en) | 2017-12-12 | 2017-12-12 | Construction method of waterproof coiled material |
CN201711315333.3A Active CN108204125B (en) | 2017-12-12 | 2017-12-12 | Construction method of waterproof coiled material |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711315333.3A Active CN108204125B (en) | 2017-12-12 | 2017-12-12 | Construction method of waterproof coiled material |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN112160510A (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112160510A (en) * | 2017-12-12 | 2021-01-01 | 江苏凯伦建材股份有限公司 | Construction method of waterproof coiled material |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101962458A (en) * | 2010-10-11 | 2011-02-02 | 北京立高科技股份有限公司 | PVC waterproof coiled material and preparation process thereof |
CN202324392U (en) * | 2011-10-08 | 2012-07-11 | 唐山德生防水材料有限公司 | Self-cleaning TPO (thermoplastic polyolefin) self-adhesive composite water-proof coiled material |
CN102661015A (en) * | 2012-05-16 | 2012-09-12 | 中国江苏国际经济技术合作公司 | Single-layer waterproof prepared roofing and construction method thereof |
US20140345230A1 (en) * | 2012-04-05 | 2014-11-27 | Carlisle Intangible Company | Single ply roofing membranes with multifunctional biodegradable release liner |
CN104612334A (en) * | 2015-02-09 | 2015-05-13 | 海南红杉科创实业有限公司 | Light roof system |
CN204804194U (en) * | 2015-02-09 | 2015-11-25 | 海南红杉科创实业有限公司 | Light roof system |
CN108204125B (en) * | 2017-12-12 | 2020-10-02 | 江苏凯伦建材股份有限公司 | Construction method of waterproof coiled material |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103059713A (en) * | 2011-10-20 | 2013-04-24 | 珠海东诚光固化材料有限公司 | Ultraviolet light-cured self-cleaning coating, and preparation method and application thereof |
CN204023852U (en) * | 2014-07-18 | 2014-12-17 | 梅州市广宇建筑工程有限公司 | A kind of building curtain wall |
CN107355079A (en) * | 2017-07-13 | 2017-11-17 | 郭春未 | A kind of shed deckhead waterproof construction method |
-
2017
- 2017-12-12 CN CN202011020584.0A patent/CN112160510A/en active Pending
- 2017-12-12 CN CN201711315333.3A patent/CN108204125B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101962458A (en) * | 2010-10-11 | 2011-02-02 | 北京立高科技股份有限公司 | PVC waterproof coiled material and preparation process thereof |
CN202324392U (en) * | 2011-10-08 | 2012-07-11 | 唐山德生防水材料有限公司 | Self-cleaning TPO (thermoplastic polyolefin) self-adhesive composite water-proof coiled material |
US20140345230A1 (en) * | 2012-04-05 | 2014-11-27 | Carlisle Intangible Company | Single ply roofing membranes with multifunctional biodegradable release liner |
CN102661015A (en) * | 2012-05-16 | 2012-09-12 | 中国江苏国际经济技术合作公司 | Single-layer waterproof prepared roofing and construction method thereof |
CN104612334A (en) * | 2015-02-09 | 2015-05-13 | 海南红杉科创实业有限公司 | Light roof system |
CN204804194U (en) * | 2015-02-09 | 2015-11-25 | 海南红杉科创实业有限公司 | Light roof system |
CN108204125B (en) * | 2017-12-12 | 2020-10-02 | 江苏凯伦建材股份有限公司 | Construction method of waterproof coiled material |
Non-Patent Citations (1)
Title |
---|
本书编委会: "《建筑业10项新技术(2010)应用指南(修订版)》", 31 March 2014 * |
Also Published As
Publication number | Publication date |
---|---|
CN108204125A (en) | 2018-06-26 |
CN108204125B (en) | 2020-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Mydin et al. | Assessment of significant causes to school building defects | |
US20140109500A1 (en) | Modular roof panels | |
Sulakatko et al. | Increasing construction quality of external thermal insulation composite system (ETICS) by revealing on-site degradation factors | |
CN108204125B (en) | Construction method of waterproof coiled material | |
Chew | Building facades: a guide to common defects in tropical climates | |
Kalbe et al. | Identification and improvement of critical joints in CLT construction without weather protection | |
CN110469062A (en) | A kind of construction method of building roofing waterproof layer | |
CN111549986B (en) | Waterproof construction method for parapet flashing and dry-hanging stone coping buckle joint | |
JP3176298B2 (en) | Waterproof / outside insulation method and insulation ceramic coating agent | |
Ustinovichius et al. | Analysis of waterproofing defects and technology development for car parking roofs: Lithuanian case | |
CN105239732B (en) | A kind of construction method of the stretching roofing pipe of rainwater leakage prevention | |
CN201952988U (en) | Waterproof system for GRC roof decorating plate | |
KR101466644B1 (en) | The construction method for root | |
CN209457196U (en) | Wall body structure and building | |
CN109109398A (en) | A kind of waterproof roll with fire resistant anticorrosive | |
Chan | Improving building safety in property maintenance | |
Nazari et al. | Protection of high-tech buildings facades and envelopes with one sided nano-coatings | |
de Brito et al. | Repair Techniques | |
CN205206153U (en) | Various steel tile roof waterproof structure | |
JP3029906U (en) | Incombustible inorganic waterproof plate | |
CN209129174U (en) | A kind of inverted roof inspection manhole node waterproof structure | |
CN107587629A (en) | Anti-corrosion damp type air-tightness plugging structure | |
JP2997627B2 (en) | External steel frame fireproof coating laminated structure | |
CN207582826U (en) | A kind of trash repository roofing sealing structure | |
TWI539067B (en) | Waterproofing construction method for external wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210101 |