CN112139124A CN202011076443.0A CN202011076443A CN112139124A CN 112139124 A CN112139124 A CN 112139124A CN 202011076443 A CN202011076443 A CN 202011076443A CN 112139124 A CN112139124 A CN 112139124A
Authority
CN
China
Prior art keywords
auxiliary
pipeline
valve
energy meter
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011076443.0A
Other languages
Chinese (zh)
Other versions
CN112139124B (en
Inventor
高智亮
王小成
董凯
李翔
周忠海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011076443.0A priority Critical patent/CN112139124B/en
Publication of CN112139124A publication Critical patent/CN112139124A/en
Application granted granted Critical
Publication of CN112139124B publication Critical patent/CN112139124B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B13/00Accessories or details of general applicability for machines or apparatus for cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • B08B3/08Cleaning involving contact with liquid the liquid having chemical or dissolving effect
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • B08B3/10Cleaning involving contact with liquid with additional treatment of the liquid or of the object being cleaned, e.g. by heat, by electricity or by vibration
    • B08B3/14Removing waste, e.g. labels, from cleaning liquid; Regenerating cleaning liquids
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01KMEASURING TEMPERATURE; MEASURING QUANTITY OF HEAT; THERMALLY-SENSITIVE ELEMENTS NOT OTHERWISE PROVIDED FOR
    • G01K19/00Testing or calibrating calorimeters

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The comprehensive washing and checking platform for the heat energy meter comprises a main installation box, wherein a main operation installation panel is arranged at the top of the main installation box, a left auxiliary box is arranged on the left side of the main installation box, and a right auxiliary box is arranged on the right side of the main installation box; an acid liquid storage tank and a clear water storage tank are arranged inside the main mounting box. According to the comprehensive washing and checking platform for the heat energy meter, after the heat energy meter to be detected is installed and fixed, acid cleaning operation and clear water cleaning operation are carried out on the heat energy meter to be detected, after the acid cleaning operation and the clear water cleaning operation are completed, tests of heat, flow rate and pressure values can be carried out on the heat energy meter, and verification tests of the heat energy meter are achieved through comparison with the values of a standard meter.

Description

Comprehensive washing and checking platform for heat energy meter
Technical Field
The invention belongs to the technical field of heat energy meter test equipment, and particularly relates to a comprehensive washing and checking platform for a heat energy meter.
Background
A heat energy meter is an instrument suitable for measuring the heat energy absorbed or converted by the liquid called heat-carrying liquid in heat exchange loop, and is composed of flow sensor, temp. sensor and heat energy integrating instrument. The national policy stipulates that forced annual inspection is required after the heat energy meter is used for three years, and the purpose is to detect whether each detection index of the heat energy meter meets the specification or not. Thus. The design is a heat energy meter and is synthesized and washed check-up platform, can wash some incrustations in the heat energy meter inner channel earlier, can accomplish the test at test platform after having washd the incrustation scale, and becomes the technical problem that remains to be solved at present.
Disclosure of Invention
The comprehensive washing and checking platform for the heat energy meter, provided by the invention, is used for carrying out acid cleaning operation and clear water cleaning operation on the heat energy meter to be detected after the heat energy meter to be detected is well installed and fixed, testing the heat, flow rate and pressure values of the heat energy meter can be carried out after the acid cleaning operation and the clear water cleaning operation are finished, and the verification test of the heat energy meter is realized by comparing the values with the values of a standard meter.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows:
the comprehensive washing and checking platform for the heat energy meter comprises a main installation box, wherein a main operation installation panel is arranged at the top of the main installation box, a left auxiliary box is arranged on the left side of the main installation box, and a right auxiliary box is arranged on the right side of the main installation box; an acid liquid storage tank and a clear water storage tank are arranged inside the main mounting box; a first three-way valve is arranged inside the left auxiliary box, a left upper connector and a left lower connector are arranged on the right side of the left auxiliary box, the interfaces of the left upper connector and the left lower connector are arranged rightwards, and two valve ports of the first three-way valve are respectively connected with the left upper connector and the left lower connector through pipelines; a second three-way valve is arranged inside the right auxiliary box, a right upper telescopic rod and a right lower telescopic rod are arranged on the upper side of the second three-way valve, the telescopic ends of the right upper telescopic rod and the right lower telescopic rod are horizontally arranged leftwards, the telescopic end of the right upper telescopic rod is provided with a right upper movable connector arranged leftwards, the telescopic end of the right lower telescopic rod is provided with a right lower movable connector arranged leftwards, the interfaces of the right upper movable connector and the right lower movable connector are arranged leftwards, and two valve ports of the second three-way valve are respectively connected with the right upper movable connector and the right lower movable connector through pipelines; a main pipeline is arranged between the first three-way valve and the second three-way valve, a first water pump and a second water pump are arranged in the acid liquid storage tank, the first water pump is connected with the main pipeline through a first auxiliary pipeline, a first valve is arranged on the first auxiliary pipeline, the second water pump is connected with the main pipeline through a second auxiliary pipeline, a second valve is arranged on the second auxiliary pipeline, a third valve is arranged on the main pipeline between the first auxiliary pipeline and the second auxiliary pipeline, a third water pump and a fourth water pump are arranged in the clear water storage tank, the third water pump is connected with the main pipeline through a third auxiliary pipeline, a fourth valve is arranged on the third auxiliary pipeline, the fourth water pump is connected with the main pipeline through a fourth auxiliary pipeline, a fifth valve is arranged on the fourth auxiliary pipeline, and a sixth valve is arranged on the main pipeline between the third auxiliary pipeline and; the main operation installation panel is provided with an upper horizontal installation rail and a lower horizontal installation rail, the upper left connector and the upper right movable connector are located in the same plane, the lower horizontal installation rail, the lower left connector and the lower right movable connector are located in the same plane, the upper horizontal installation rail and the lower horizontal installation rail are provided with a plurality of installation frames capable of moving horizontally, and each installation frame is provided with a two-way connector.
Still be equipped with the filter chamber in the acidizing fluid liquid reserve tank, be equipped with the filter screen between filter chamber and the acidizing fluid liquid reserve tank, be equipped with the fifth auxiliary line between filter chamber and the trunk line, be equipped with the seventh valve on the fifth auxiliary line.
The bottom of left side auxiliary tank is equipped with the air pump, is equipped with sixth auxiliary pipeline between air pump and the trunk line, is equipped with the eighth valve on the sixth auxiliary pipeline.
And a flow sensor, a temperature sensor and a pressure sensor are arranged on the main pipeline.
And a heating rod is respectively arranged in the acid liquid storage tank and the clear water storage tank.
The mounting bracket is equipped with the draw-in groove, and the mounting bracket passes through draw-in groove slidable mounting at last horizontal installation track and lower horizontal installation track, and the two-way joint passes through holding screw can dismantle the installation of connection on the mounting bracket.
All the water pumps are variable frequency water pumps.
By adopting the technical scheme, the invention has the following beneficial effects:
the heat energy meter to be tested is butted among the upper left connector, the two-way connector of the mounting frame and the upper right movable connector, similarly, the heat energy meter to be tested is also butted among the lower left connector, the two-way connector of the mounting frame and the lower right movable connector, the upper right telescopic rod and the lower right telescopic rod are controlled, the upper right telescopic rod and the lower right telescopic rod respectively push the upper right movable connector and the lower right movable connector to move leftwards to clamp the heat energy meter to be tested, so that the heat energy meter is in a state to be tested, scale can be formed in the internal channel of the heat energy meter to be tested in the using process, therefore, acid cleaning operation is firstly carried out on the interior of the heat energy meter to be tested, only the first valve on the first auxiliary pipeline and the second valve on the second auxiliary pipeline are opened in all the valves on all pipelines, the first three-way valve and the second three-way valve are opened, and all the rest valves, starting a first water pump in the acid liquid storage tank, wherein acid liquid in the acid liquid storage tank flows through a first auxiliary pipeline, a main pipeline and a first three-way valve in a shunting manner respectively from the insides of two rows of heat energy meters clamped on a main operation mounting panel, then flows back into the acid liquid storage tank from the main pipeline and a second auxiliary pipeline in a converging manner through a second three-way valve, scale inside the heat energy meters can be cleaned when the acid liquid flows through the insides of the two rows of clamped heat energy meters, and the flowing direction of the acid liquid can be controlled by controlling the operation of the first water pump or the operation of the second water pump; when the scale in the heat energy meter is more, during flushing, only the first valve on the first auxiliary pipeline and the seventh valve on the fifth auxiliary pipeline in the valves on all pipelines are opened, the first three-way valve and the second three-way valve are opened, the other valves are all closed, the acid liquor containing the scale which is flushed and refluxed flows back to the filter cavity of the acid liquor storage tank through the fifth auxiliary pipeline, the scale in the acid liquor is filtered in the filter cavity by the filter screen, and the acid liquor which is conveyed by the first water pump is ensured not to contain the scale;
after the heat energy meter is subjected to acid cleaning, opening only an eighth valve on a sixth auxiliary pipeline and a seventh valve on a fifth auxiliary pipeline in valves on all pipelines, starting an air pump to inflate the main pipeline through the sixth auxiliary pipeline, so that acid liquor remaining in the pipelines, the valves, the joints and the heat energy meter is blown back to the acid liquor storage tank, and the fact that no acid liquor remains in the pipelines, the valves, the joints and the heat energy meter is guaranteed;
when the heat energy meters are washed by acid, the washing operation can be started, when the water system operates, only a fourth valve on a third auxiliary pipeline and a fifth valve on a fourth auxiliary pipeline in valves on all pipelines are opened, a first three-way valve and a second three-way valve are opened, the other valves are all closed, a third water pump in a clean water liquid storage tank is started, clean water in the clean water liquid storage tank flows through the third auxiliary pipeline, a main pipeline and a first three-way valve respectively from the insides of two rows of heat energy meters clamped on a main operation installation panel, then flows back into the clean water liquid storage tank from the main pipeline and the fourth auxiliary pipeline through confluence of the second three-way valve, the inside of the heat energy meters can be further washed when the clean water flows through the insides of the two rows of heat energy meters clamped, the cleanness of the inside of the heat energy meters is ensured, and the running direction of the clean water can be controlled by;
clear water in the clear water liquid storage tank can clean two rows of heat energy meters clamped on the main operation mounting panel, clear water in the clear water liquid storage tank can be heated to a specified temperature through the heating pipe, the third water pump or the fourth water pump is controlled to operate, the opening degree of the valve and the rotating speed of the variable frequency water pump are adjusted, the flow of the clear water in the pipeline is adjusted to a set flow point, the clear water stops after operating for a period of time, and the clear water is compared with various numerical values of the tested heat energy meters through displaying heat, flow rate and pressure numerical values of a standard meter on a main pipeline, so that verification and test of the heat energy meters are realized.
In summary, according to the comprehensive washing and checking platform for the heat energy meter, after the heat energy meter to be detected is installed and fixed, acid cleaning operation and clean water cleaning operation are performed on the heat energy meter to be detected, after the acid cleaning operation and the clean water cleaning operation are completed, tests of heat, flow rate and pressure values can be performed on the heat energy meter, and verification tests of the heat energy meter can be realized through comparison with the values of the standard meter.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of the upper left connecting head of the present invention;
FIG. 3 is a right side view of FIG. 2;
FIG. 4 is a schematic structural view of a mount of the present invention;
fig. 5 is a right side view of fig. 4.
Detailed Description
The following detailed description of embodiments of the invention is provided in conjunction with the appended drawings:
as shown in fig. 1-5, the comprehensive washing and checking platform for the heat energy meter comprises a main installation box 1, a main operation installation panel 2 is arranged at the top of the main installation box 1, a left auxiliary box 3 is arranged at the left side of the main installation box 1, and a right auxiliary box 4 is arranged at the right side of the main installation box 1; an acid liquid storage tank 5 and a clear water storage tank 6 are arranged inside the main installation box 1; a first three-way valve 7 is arranged inside the left auxiliary box 3, a left upper connector 8 and a left lower connector 9 are arranged on the right side of the left auxiliary box 3, the interfaces of the left upper connector 8 and the left lower connector 9 are arranged rightwards, and two valve ports of the first three-way valve 7 are respectively connected with the left upper connector 8 and the left lower connector 9 through pipelines; a second three-way valve 10 is arranged inside the right auxiliary box 4, a right upper telescopic rod 11 and a right lower telescopic rod 12 are arranged on the upper side of the second three-way valve 10, the telescopic ends of the right upper telescopic rod 11 and the right lower telescopic rod 12 are horizontally arranged leftwards, a right upper movable connector 13 arranged leftwards is arranged at the telescopic end of the right upper telescopic rod 11, a right lower movable connector 14 arranged leftwards is arranged at the telescopic end of the right lower telescopic rod 12, the interfaces of the right upper movable connector 13 and the right lower movable connector 14 are arranged leftwards, and two valve ports of the second three-way valve 10 are respectively connected with the right upper movable connector 13 and the right lower movable connector 14 through telescopic hose lines; a main pipeline 15 is arranged between the first three-way valve 7 and the second three-way valve 10, a first water pump 16 and a second water pump 17 are arranged in the acid liquid storage tank 5, the first water pump 16 is connected with the main pipeline 15 through a first auxiliary pipeline 18, a first valve 19 is arranged on the first auxiliary pipeline 18, the second water pump 17 is connected with the main pipeline 15 through a second auxiliary pipeline 20, a second valve 21 is arranged on the second auxiliary pipeline 20, a third valve 22 is arranged on the main pipeline 15 between the first auxiliary pipeline 18 and the second auxiliary pipeline 20, a third water pump 23 and a fourth water pump 24 are arranged in the clear water storage tank 6, the third water pump 23 is connected with the main pipeline 15 through a third auxiliary pipeline 25, a fourth valve 26 is arranged on the third auxiliary pipeline 25, the fourth water pump 24 is connected with the main pipeline 15 through a fourth auxiliary pipeline 27, a fifth valve 28 is arranged on the fourth auxiliary pipeline 27, and a sixth valve 29 is arranged on the main pipeline 15 between the third auxiliary pipeline 25 and the fourth; the main operation installation panel 2 is provided with an upper horizontal installation rail 30 and a lower horizontal installation rail 31, the upper horizontal installation rail 30, the upper left connector 8 and the upper right movable connector 13 are located in the same plane, the lower horizontal installation rail 31, the lower left connector 9 and the lower right movable connector 14 are located in the same plane, the upper horizontal installation rail 30 and the lower horizontal installation rail 31 are provided with a plurality of installation frames 32 capable of horizontally moving, and each installation frame 32 is provided with a two-way connector 33.
Still be equipped with filter chamber 34 in the acidizing fluid liquid reserve tank 5, be equipped with filter screen 35 between filter chamber 34 and acidizing fluid liquid reserve tank 5, be equipped with fifth auxiliary pipeline 36 between filter chamber 34 and main pipeline 15, be equipped with seventh valve 37 on the fifth auxiliary pipeline 36.
An air pump 38 is arranged at the bottom of the left auxiliary tank 3, a sixth auxiliary pipeline 39 is arranged between the air pump 38 and the main pipeline 15, and an eighth valve 40 is arranged on the sixth auxiliary pipeline 39.
And a flow sensor, a temperature sensor and a pressure sensor are arranged on the main pipeline 15.
The acid liquor storage tank 5 and the clear water storage tank 6 are respectively provided with a heating rod 41, so that the acid liquor and the clear water can be heated according to actual needs.
The mounting bracket 32 is equipped with draw-in groove 42, and mounting bracket 32 passes through draw-in groove 42 slidable mounting at last horizontal installation track 30 and lower horizontal installation track 31, and two-way joint 33 can dismantle the installation of connection on mounting bracket 32 through holding screw 43, and two-way joint 33 is for dismantling the connection, and when the joint diameter of the heat energy meter that is detected is great or less, removable two-way joint 33 for rather than joint diameter looks adaptation size, the heat energy meter of the different specifications of platform test of being convenient for.
All the water pumps are variable frequency water pumps.
By adopting the technical scheme, the invention has the following beneficial effects:
the heat energy meter to be tested is butted among the upper left connector 8, the two-way connector 33 of the mounting frame 32 and the upper right movable connector 13, similarly, the heat energy meter to be tested is also butted among the lower left connector 9, the two-way connector 33 of the mounting frame 32 and the lower right movable connector 14, the upper right telescopic rod 11 and the lower right telescopic rod 12 are controlled, the upper right telescopic rod 11 and the lower right telescopic rod 12 respectively push the upper right movable connector 13 and the lower right movable connector 14 to move leftwards to clamp the heat energy meter to be tested, so that the heat energy meter is in a state to be tested, scale is left in the heat energy meter to be tested, therefore, acid cleaning operation is firstly carried out on the interior of the heat energy meter to be tested, only the first valve 19 on the first auxiliary pipeline 18 and the second valve 21 on the second auxiliary pipeline 20 in all the valves on the pipelines are opened, the first three-way valve 7 and the second three-way valve 10 are opened, the sixth valve 29 is opened, the other valves are all closed, the first water pump 16 in the acid liquid storage tank 5 is started, acid liquid in the acid liquid storage tank 5 flows through the first auxiliary pipeline 18, the main pipeline 15 and the two rows of heat energy meters clamped on the main operation mounting panel 2 respectively in a shunting manner through the first three-way valve 7, then flows back into the acid liquid storage tank 5 from the main pipeline 15 and the second auxiliary pipeline 20 in a confluence manner through the second three-way valve 10, scale in the heat energy meters can be cleaned when the acid liquid flows through the two rows of clamped heat energy meters, and the flowing direction of the acid liquid can be controlled by controlling the first water pump 16 or the second water pump 17 to operate; when the scale in the heat energy meter is large, during flushing, only the first valve 19 on the first auxiliary pipeline 18 and the seventh valve 37 on the fifth auxiliary pipeline 36 in the valves on all the pipelines are opened, the first three-way valve 7 and the second three-way valve 10 are opened, the sixth valve 29 is opened, the rest valves are all closed, the acid liquor containing the scale which is flushed and returned flows back to the filter cavity 34 of the acid liquor storage tank 5 through the fifth auxiliary pipeline 36, the scale in the acid liquor is filtered in the filter cavity 34 through the filter screen 35, and the acid liquor which is conveyed by the first water pump 16 is ensured not to contain the scale;
after the heat energy meter is pickled, only the eighth valve 40 on the sixth auxiliary pipeline 39 and the seventh valve 37 on the fifth auxiliary pipeline 36 in the valves on all the pipelines are opened, the air pump 38 is started to inflate the main pipeline 15 through the sixth auxiliary pipeline 39, so that the acid liquor remained in the pipelines, the valves, the joints and the heat energy meter is blown back to the acid liquor storage tank 5, and the situation that no acid liquor remained in the pipelines, the valves, the joints and the heat energy meter is ensured;
when the heat meter is washed with acid, the washing operation can be started, and when the water system operation is performed, only the fourth valve 26 on the third auxiliary pipeline 25 and the fifth valve 28 on the fourth auxiliary pipeline 27 in the valves on all the pipelines are opened, the first three-way valve 7 and the second three-way valve 10 are opened, the third valve 22 is opened, all other valves are closed, the third water pump 23 in the clean water liquid storage tank 6 is started, clean water in the clean water liquid storage tank 6 flows through the third auxiliary pipeline 25, the main pipeline 15 and the first three-way valve 7 respectively from the inner parts of the two rows of heat energy meters clamped on the main operation mounting panel 2, then the clear water flows back to the clear water storage tank 6 from the main pipeline 15 and the fourth auxiliary pipeline 27 through confluence of the second three-way valve 10, the clear water can further clean the interior of the heat energy meter when flowing through the interior of the two rows of clamped heat energy meters, the interior of the heat energy meter is ensured to be clean, and the flow direction of the clear water can be controlled by controlling the operation of the third water pump 23 or the operation of the fourth water pump 24;
clear water in the clear water liquid storage tank 6 can clean two rows of heat energy meters clamped on the main operation mounting panel 2, clear water in the clear water liquid storage tank 6 can be heated to a specified temperature through the heating pipe, the operation of the third water pump 23 or the fourth water pump 24 is controlled, the opening degree of the valve and the rotating speed of the variable frequency water pump are adjusted, the flow of the clear water in the pipeline is adjusted to a set flow point and is stopped after the clear water is operated for a period of time, and the clear water is compared with various numerical values of the tested heat energy meters through the display of heat, flow speed and pressure numerical values of the standard meter on the main pipeline 15 to realize the verification test of the heat energy meters.
After the clean water test is finished, the residual clean water in the pipeline, the valve, the joint and the heat energy meter can be blown clean by the air pump.
In summary, according to the comprehensive washing and checking platform for the heat energy meter, after the heat energy meter to be detected is installed and fixed, acid cleaning operation and clean water cleaning operation are performed on the heat energy meter to be detected, after the acid cleaning operation and the clean water cleaning operation are completed, tests of heat, flow rate and pressure values can be performed on the heat energy meter, and verification tests of the heat energy meter can be realized through comparison with the values of the standard meter.
The variable-frequency water pump, the three-way valve, the telescopic rod, the flow sensor, the temperature sensor and the pressure sensor used in the invention are all conventional technologies, and the specific structures of the variable-frequency water pump, the three-way valve, the telescopic rod, the flow sensor, the temperature sensor and the pressure sensor are not described in detail.
The present embodiment is not intended to limit the shape, material, structure, etc. of the present invention in any way, and any simple modification, equivalent change and modification made to the above embodiments according to the technical spirit of the present invention are within the scope of the technical solution of the present invention.

Claims (7)

1. The heat energy meter is synthesized and is washed check-up platform, its characterized in that: the device comprises a main installation box, wherein a main operation installation panel is arranged at the top of the main installation box, a left auxiliary box is arranged on the left side of the main installation box, and a right auxiliary box is arranged on the right side of the main installation box; an acid liquid storage tank and a clear water storage tank are arranged inside the main mounting box; a first three-way valve is arranged inside the left auxiliary box, a left upper connector and a left lower connector are arranged on the right side of the left auxiliary box, the interfaces of the left upper connector and the left lower connector are arranged rightwards, and two valve ports of the first three-way valve are respectively connected with the left upper connector and the left lower connector through pipelines; a second three-way valve is arranged inside the right auxiliary box, a right upper telescopic rod and a right lower telescopic rod are arranged on the upper side of the second three-way valve, the telescopic ends of the right upper telescopic rod and the right lower telescopic rod are horizontally arranged leftwards, the telescopic end of the right upper telescopic rod is provided with a right upper movable connector arranged leftwards, the telescopic end of the right lower telescopic rod is provided with a right lower movable connector arranged leftwards, the interfaces of the right upper movable connector and the right lower movable connector are arranged leftwards, and two valve ports of the second three-way valve are respectively connected with the right upper movable connector and the right lower movable connector through pipelines; a main pipeline is arranged between the first three-way valve and the second three-way valve, a first water pump and a second water pump are arranged in the acid liquid storage tank, the first water pump is connected with the main pipeline through a first auxiliary pipeline, a first valve is arranged on the first auxiliary pipeline, the second water pump is connected with the main pipeline through a second auxiliary pipeline, a second valve is arranged on the second auxiliary pipeline, a third valve is arranged on the main pipeline between the first auxiliary pipeline and the second auxiliary pipeline, a third water pump and a fourth water pump are arranged in the clear water storage tank, the third water pump is connected with the main pipeline through a third auxiliary pipeline, a fourth valve is arranged on the third auxiliary pipeline, the fourth water pump is connected with the main pipeline through a fourth auxiliary pipeline, a fifth valve is arranged on the fourth auxiliary pipeline, and a sixth valve is arranged on the main pipeline between the third auxiliary pipeline and; the main operation installation panel is provided with an upper horizontal installation rail and a lower horizontal installation rail, the upper left connector and the upper right movable connector are located in the same plane, the lower horizontal installation rail, the lower left connector and the lower right movable connector are located in the same plane, the upper horizontal installation rail and the lower horizontal installation rail are provided with a plurality of installation frames capable of moving horizontally, and each installation frame is provided with a two-way connector.
2. The thermal energy meter integrated flushing verification platform of claim 1, wherein: still be equipped with the filter chamber in the acidizing fluid liquid reserve tank, be equipped with the filter screen between filter chamber and the acidizing fluid liquid reserve tank, be equipped with the fifth auxiliary line between filter chamber and the trunk line, be equipped with the seventh valve on the fifth auxiliary line.
3. The thermal energy meter integrated flushing verification platform of claim 2, wherein: the bottom of left side auxiliary tank is equipped with the air pump, is equipped with sixth auxiliary pipeline between air pump and the trunk line, is equipped with the eighth valve on the sixth auxiliary pipeline.
4. The thermal energy meter integrated flushing verification platform of claim 3, wherein: and a flow sensor, a temperature sensor and a pressure sensor are arranged on the main pipeline.
5. The thermal energy meter integrated flushing verification platform of claim 4, wherein: and a heating rod is respectively arranged in the acid liquid storage tank and the clear water storage tank.
6. The thermal energy meter integrated flushing verification platform of claim 5, wherein: the mounting bracket is equipped with the draw-in groove, and the mounting bracket passes through draw-in groove slidable mounting at last horizontal installation track and lower horizontal installation track, and the two-way joint passes through holding screw can dismantle the installation of connection on the mounting bracket.
7. The thermal energy meter integrated flushing verification platform of claim 6, wherein: all the water pumps are variable frequency water pumps.
CN202011076443.0A 2020-10-10 2020-10-10 Comprehensive flushing and checking platform for heat energy meter Active CN112139124B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011076443.0A CN112139124B (en) 2020-10-10 2020-10-10 Comprehensive flushing and checking platform for heat energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011076443.0A CN112139124B (en) 2020-10-10 2020-10-10 Comprehensive flushing and checking platform for heat energy meter

Publications (2)

Publication Number Publication Date
CN112139124A true CN112139124A (en) 2020-12-29
CN112139124B CN112139124B (en) 2024-05-07

Family

ID=73952817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011076443.0A Active CN112139124B (en) 2020-10-10 2020-10-10 Comprehensive flushing and checking platform for heat energy meter

Country Status (1)

Country Link
CN (1) CN112139124B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6619104B1 (en) * 2002-06-12 2003-09-16 Kuo Toon International Co., Ltd. Continuous testing device for water pipe
CN1529139A (en) * 2003-09-29 2004-09-15 天津市赛恩投资集团有限公司 Automatic calibrating system for heat meter
FR2915577A1 (en) * 2007-04-24 2008-10-31 Renault Sas INTERNAL COMBUSTION ENGINE TEST BENCH WITH FAST ENGINE COOLING MEANS
CN204007943U (en) * 2014-08-01 2014-12-10 辽宁恒通电子科技有限公司 Calorimeter intelligent detection device
CN205719344U (en) * 2016-05-30 2016-11-23 济南三宇仪表设备有限公司 A kind of heat meter calibrating apparatus
CN206168059U (en) * 2016-09-26 2017-05-17 宋景颇 Water treatment filter cleaning detection device
CN206779091U (en) * 2017-05-08 2017-12-22 重庆医科大学附属永川医院 Anesthesia machine tracheae cleaning machine
CN207695217U (en) * 2017-12-05 2018-08-07 北京市热力集团有限责任公司 Calorimeter cleaning device
CN108426656A (en) * 2018-06-14 2018-08-21 焦作市质量技术监督检验测试中心 A kind of cleaning of heat energy meter, Withstand test device
CN209349146U (en) * 2018-12-19 2019-09-06 上海裕沛电子科技有限公司 A kind of calorimeter cleaning device
CN111337164A (en) * 2020-04-24 2020-06-26 泉州七洋机电有限公司 Heat meter fixing device for heat meter verification
CN213435946U (en) * 2020-10-10 2021-06-15 高智亮 Comprehensive washing and checking platform for heat energy meter

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6619104B1 (en) * 2002-06-12 2003-09-16 Kuo Toon International Co., Ltd. Continuous testing device for water pipe
CN1529139A (en) * 2003-09-29 2004-09-15 天津市赛恩投资集团有限公司 Automatic calibrating system for heat meter
FR2915577A1 (en) * 2007-04-24 2008-10-31 Renault Sas INTERNAL COMBUSTION ENGINE TEST BENCH WITH FAST ENGINE COOLING MEANS
CN204007943U (en) * 2014-08-01 2014-12-10 辽宁恒通电子科技有限公司 Calorimeter intelligent detection device
CN205719344U (en) * 2016-05-30 2016-11-23 济南三宇仪表设备有限公司 A kind of heat meter calibrating apparatus
CN206168059U (en) * 2016-09-26 2017-05-17 宋景颇 Water treatment filter cleaning detection device
CN206779091U (en) * 2017-05-08 2017-12-22 重庆医科大学附属永川医院 Anesthesia machine tracheae cleaning machine
CN207695217U (en) * 2017-12-05 2018-08-07 北京市热力集团有限责任公司 Calorimeter cleaning device
CN108426656A (en) * 2018-06-14 2018-08-21 焦作市质量技术监督检验测试中心 A kind of cleaning of heat energy meter, Withstand test device
CN209349146U (en) * 2018-12-19 2019-09-06 上海裕沛电子科技有限公司 A kind of calorimeter cleaning device
CN111337164A (en) * 2020-04-24 2020-06-26 泉州七洋机电有限公司 Heat meter fixing device for heat meter verification
CN213435946U (en) * 2020-10-10 2021-06-15 高智亮 Comprehensive washing and checking platform for heat energy meter

Also Published As

Publication number Publication date
CN112139124B (en) 2024-05-07

Similar Documents

Publication Publication Date Title
CN202962981U (en) Cleaning machine for pulse water flow pipeline
CN104646361B (en) ship pipeline cleaning method
CN102401725A (en) Method and device for washing and seal detecting of railway vehicle braking lines
CN206095596U (en) Intelligent valve examines test table
CN213435946U (en) Comprehensive washing and checking platform for heat energy meter
CN109506743B (en) Flowmeter online calibration device and calibration method
KR102416975B1 (en) Heat exchange system
CN112139124A (en) Comprehensive washing and checking platform for heat energy meter
CN106089533B (en) A kind of cleaning of fuel gas injection valve and gas leakage detection device and detection method
CN113323945A (en) High cleanliness hydraulic pipeline cleaning system
CN206168059U (en) Water treatment filter cleaning detection device
CN218470102U (en) Sealing detector for plate-fin heat exchanger
KR102420454B1 (en) Heat exchange system including oxygen exhausting line
CN116448576A (en) Metal tube blasting water pressure testing device
KR102420446B1 (en) Apparatus for reducing expanded water
CN103084361B (en) Inertia type instrument closed structure internal recycling cleaning device
CN109604267A (en) A kind of die waterway bidirectional cleaning device
CN213134318U (en) Air compressor cooler cleaning system
CN211234865U (en) Online leak detector
CN203196964U (en) Movable pot cleaning machine for pharmaceutical factory
CN208260337U (en) Aircraft oily filter cartridge cleaning device
KR102420451B1 (en) Expanded water reduction apparatus including multi-pump
CN205940270U (en) Plate heat exchanger convenient to wash
CN217930477U (en) Magnetic floater level gauge calibrating installation
CN217990291U (en) Cleaning device for flowmeter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant