CN112132417A - Multi-core power plant spare part overall planning and combined storage system - Google Patents

Multi-core power plant spare part overall planning and combined storage system Download PDF

Info

Publication number
CN112132417A
CN112132417A CN202010911195.0A CN202010911195A CN112132417A CN 112132417 A CN112132417 A CN 112132417A CN 202010911195 A CN202010911195 A CN 202010911195A CN 112132417 A CN112132417 A CN 112132417A
Authority
CN
China
Prior art keywords
power plant
spare part
nuclear power
entity
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010911195.0A
Other languages
Chinese (zh)
Inventor
谢宏志
谢策
邓孝林
王坤其
荣浪
陈白
邵家安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
CGN Power Co Ltd
China Nuclear Power Operation Co Ltd
Original Assignee
China General Nuclear Power Corp
CGN Power Co Ltd
China Nuclear Power Operation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, CGN Power Co Ltd, China Nuclear Power Operation Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN202010911195.0A priority Critical patent/CN112132417A/en
Publication of CN112132417A publication Critical patent/CN112132417A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a multi-core power plant spare part overall planning and combined storage system. The system comprises at least one entity combined storage power plant group, wherein the entity combined storage power plant group comprises at least two nuclear power plants, one of the nuclear power plants is selected as an entity combined storage power plant, and the distance between the entity combined storage power plant and each nuclear power plant in the entity combined storage power plant group is smaller than a preset distance; the entity joint storage power plant processes the aggregated spare part inventory data, reserved data and forward order data by using an MRP algorithm to obtain spare part MRP parameters and the quantity to be purchased, and the entity joint storage power plant purchases the spare part MRP parameters and the quantity to be purchased; when a certain nuclear power plant in the entity united storage power plant group needs to use spare parts, a spare part receiving request is sent to the entity united storage power plant, and the entity united storage power plant delivers according to the spare part receiving request. According to the invention, the stock parameters of the spare parts of the group factory are optimized through the operation of the MRP of the multiple power plants, so that the stock of the whole stock of the group factory is reduced, the concentration of the purchase application is improved, and the intensive benefit of the group factory spare part management is improved.

Description

Multi-core power plant spare part overall planning and combined storage system
Technical Field
The invention relates to the field of spare part management of nuclear power plants, in particular to a multi-core power plant spare part overall planning and combined storage system.
Background
In order to effectively improve the inventory management efficiency, a Material Requisition Planning (MRP) obtains the Requirement conditions of various related required materials through calculation according to the production plan, the bill of materials, the inventory records, and the undelivered orders, and proposes various new order replenishment suggestions, so as to control the inventory level of each Material (spare part).
Spare parts are the main material basis of nuclear power plant equipment maintenance, and the sufficiency of spare part storage and the effective management of spare parts can reduce equipment maintenance time and shorten the overhaul period of material change. The nuclear power plant has a plurality of spare parts, the code number of the spare parts of only one nuclear power plant reaches 8-10 ten thousands, the availability probability of different spare parts is different, and if each spare part is fully stored, the operation cost of the nuclear power plant can be increased; the inventory is not reserved, the reliability of equipment is reduced, the operation risk of a nuclear power plant is increased, and therefore the spare parts need to be classified and managed. According to the historical availability frequency of the spare parts, the spare parts are divided into high-availability spare parts and non-high-availability spare parts (according to the definition of a certain current nuclear power plant, the high-availability spare parts refer to the availability of two or more years in the last three years, or the availability of three or more years in the last five years, and the code quantity ratio of the high-availability spare parts is less than 20%), according to the historical availability condition of the spare parts, the future requirement of the spare parts is predicted, the MRP parameters of the spare parts are set according to the MRP parameters, and a certain amount of inventory is reserved.
Currently, nuclear power plants are operated in an MRP mode of a single power plant, namely, a supplement purchase suggestion of spare parts is calculated according to inventory, reservation, positive order, inventory parameters and the like of the single power plant. At present, with the increase of the operation of nuclear power plants, the intensive effect of cluster plants is more obvious, taking the quantity of spare parts to be reserved as an example, the availability probability of certain important spare parts is very low, if a single power plant is reserved, each power plant needs to reserve one stock, and if three power plants use the spare parts, one stock is reserved totally. The current MRP module can only operate with a single power plant, can not realize the condition of combined operation of multiple power plants, can only trigger purchase application by a certain power plant, and then initiates a spare part allocation flow to other power plants through manual review, and the efficiency is lower.
Disclosure of Invention
The technical problem to be solved by the present invention is to provide a system for integrally planning and storing spare parts of a multi-core power plant, aiming at the above-mentioned defects in the prior art.
The technical scheme adopted by the invention for solving the technical problems is as follows: constructing a multi-core power plant spare part overall planning and storage system, which comprises at least one entity combined storage power plant group, wherein the entity combined storage power plant group comprises at least two nuclear power plants, one of the nuclear power plants is selected as an entity combined storage power plant, and the distance between the entity combined storage power plant and each nuclear power plant in the entity combined storage power plant group is smaller than a preset distance;
the entity joint storage power plants are respectively in communication connection with each nuclear power plant in the entity joint storage power plant group, spare part inventory data, reserved data and forward-order data of each nuclear power plant are obtained, the collected spare part inventory data, reserved data and forward-order data are processed by an MRP algorithm to obtain spare part MRP parameters and the quantity to be purchased, and the entity joint storage power plants purchase the spare part MRP parameters and the quantity to be purchased;
a certain nuclear power plant in the entity allies oneself with stores up power plant group and sends spare part and receive the requirement extremely when needing to use spare part entity allies oneself with stores up power plant, entity allies oneself with stores up power plant basis spare part receives the requirement and carries out spare part delivery.
Further, in the system for integrally planning and storing spare parts of a multi-core power plant, the entity joint storage power plant also acquires historical spare part availability data of all nuclear power plants in the entity joint storage power plant group, and the MRP algorithm is used for processing the aggregated spare part inventory data, the reserved data, the forward order data and the historical spare part availability data to obtain the MRP parameters of the spare parts.
Further, in the system for integrally planning and storing spare parts of a multi-core power plant, historical receiving quantity sequencing is carried out on each nuclear power plant in the entity combined storage power plant group according to historical receiving data of the spare parts;
if only one nuclear power plant with the highest historical utilization quantity exists, selecting the nuclear power plant with the highest historical utilization quantity as an entity combined storage power plant;
and if the number of the nuclear power plants with the highest historical receiving quantity is at least two, calculating the ratio of the MRP triggered purchase amount after the combined storage corresponding to the nuclear power plant with the highest historical receiving quantity to the MRP triggered purchase amount before the combined storage, and selecting the nuclear power plant with the smallest ratio as the entity combined storage power plant.
In addition, the invention also provides a multi-core power plant spare part overall planning and combined storage system which comprises at least one virtual combined storage power plant group, wherein the virtual combined storage power plant group comprises a management terminal and at least two nuclear power plants, and the management terminal is respectively in communication connection with each nuclear power plant;
the management terminal acquires spare part inventory data, reserved data and forward-ordered data of each nuclear power plant, and the MRP algorithm is used for processing the aggregated spare part inventory data, reserved data and forward-ordered data to obtain spare part MRP parameters and the quantity to be purchased; and the management terminal distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchasing.
Further, in the system for integrally planning and storing the spare parts of the multi-core power plant, the management terminal acquires a historical procurement distribution list and a safety inventory storage list of each nuclear power plant in the virtual combined storage power plant group, and allocates the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchase by combining the inventory quantity, the reserved quantity and the forward order information of the spare parts in each nuclear power plant.
Further, in the system for integrally planning and storing spare parts of a multi-core power plant, the management terminal also obtains historical spare part availability data of all nuclear power plants in the virtual combined storage power plant group, and the MRP algorithm is used for processing the aggregated spare part inventory data, the reserved data, the forward order data and the historical spare part availability data to obtain the MRP parameters of the spare parts.
In addition, the invention also provides a multi-core power plant spare part overall planning and combined storage system which comprises at least one entity combined storage power plant group and at least one virtual combined storage power plant group, wherein the entity combined storage power plant group comprises at least two nuclear power plants, one of the nuclear power plants is selected as an entity combined storage power plant, and the distance between the entity combined storage power plant and each nuclear power plant in the entity combined storage power plant group is smaller than a preset distance; the virtual combined storage power plant group comprises a management terminal and at least two nuclear power plants, and the management terminal is respectively in communication connection with each nuclear power plant;
the entity joint storage power plants are respectively in communication connection with each nuclear power plant in the entity joint storage power plant group, spare part inventory data, reserved data and forward-order data of each nuclear power plant are obtained, the collected spare part inventory data, reserved data and forward-order data are processed by an MRP algorithm to obtain spare part MRP parameters and the quantity to be purchased, and the entity joint storage power plants purchase the spare part MRP parameters and the quantity to be purchased; when a nuclear power plant in the entity united storage power plant group needs to use spare parts, sending a spare part receiving request to the entity united storage power plant, and carrying out spare part distribution by the entity united storage power plant according to the spare part receiving request;
the management terminal acquires spare part inventory data, reserved data and forward-ordered data of each nuclear power plant, and the MRP algorithm is used for processing the aggregated spare part inventory data, reserved data and forward-ordered data to obtain spare part MRP parameters and the quantity to be purchased; and the management terminal distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchasing.
Further, in the system for comprehensively planning and storing the spare parts of the multi-core power plant, the virtual combined storage power plant group comprises a management terminal, at least two nuclear power plants and at least one entity combined storage power plant group, and the management terminal is respectively in communication connection with each nuclear power plant and the entity combined storage power plant of each entity combined storage power plant group.
Further, in the system for integrally planning and storing spare parts of a multi-core power plant, the entity joint storage power plant also acquires historical spare part availability data of all nuclear power plants in the entity joint storage power plant group, and the MRP algorithm is used for processing the aggregated spare part inventory data, the reserved data, the forward order data and the historical spare part availability data to obtain the MRP parameters of the spare parts.
Further, in the system for integrally planning and storing spare parts of a multi-core power plant, historical receiving quantity sequencing is carried out on each nuclear power plant in the entity combined storage power plant group according to historical receiving data of the spare parts; if only one nuclear power plant with the highest historical utilization quantity exists, selecting the nuclear power plant with the highest historical utilization quantity as an entity combined storage power plant; and if the number of the nuclear power plants with the highest historical receiving quantity is at least two, calculating the ratio of the MRP triggered purchase amount after the combined storage corresponding to the nuclear power plant with the highest historical receiving quantity to the MRP triggered purchase amount before the combined storage, and selecting the nuclear power plant with the smallest ratio as the entity combined storage power plant.
Further, in the system for integrally planning and storing the spare parts of the multi-core power plant, the management terminal acquires a historical procurement distribution list and a safety inventory storage list of each nuclear power plant in the virtual combined storage power plant group, and allocates the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchase by combining the inventory quantity, the reserved quantity and the forward order information of the spare parts in each nuclear power plant.
Further, in the system for integrally planning and storing spare parts of a multi-core power plant, the management terminal also obtains historical spare part availability data of all nuclear power plants in the virtual combined storage power plant group, and the MRP algorithm is used for processing the aggregated spare part inventory data, the reserved data, the forward order data and the historical spare part availability data to obtain the MRP parameters of the spare parts.
The multi-core power plant spare part overall co-storage system has the following beneficial effects: according to the invention, the stock parameters of the spare parts of the group factory are optimized through the operation of the MRP of the multiple power plants, so that the stock of the whole stock of the group factory is reduced, the concentration of the purchase application is improved, and the intensive benefit of the group factory spare part management is improved.
Drawings
The invention will be further described with reference to the accompanying drawings and examples, in which:
FIG. 1 is a schematic structural diagram of a multi-core power plant spare parts integrated storage system according to an embodiment;
FIG. 2 is a schematic structural diagram of a multi-core power plant spare parts integrated storage system according to an embodiment;
FIG. 3 is a schematic structural diagram of a multi-core power plant spare parts integrated storage system according to an embodiment;
FIG. 4 is a schematic structural diagram of a multi-core power plant spare parts integrated storage system according to an embodiment;
FIG. 5 is a flow chart of MRP parameter setting of the physical part of the coalition according to one embodiment;
FIG. 6 is a flow chart of an embodiment of MRP parameter setting for a virtual joint storage component;
FIG. 7 is a flowchart illustrating the allocation of a virtual joint storage procurement application according to an embodiment.
Detailed Description
For a more clear understanding of the technical features, objects and effects of the present invention, embodiments of the present invention will now be described in detail with reference to the accompanying drawings.
Example 1
Referring to fig. 1, the system for integrally planning and storing multi-nuclear power plant spare parts includes at least one entity-associated power plant group, where the entity-associated power plant group includes at least two nuclear power plants, one of the nuclear power plants is selected as an entity-associated power plant, and a distance between the entity-associated power plant and each of the nuclear power plants in the entity-associated power plant group is less than a preset distance.
The entity joint storage power plants are respectively in communication connection with each nuclear power plant in the entity joint storage power plant group, spare part inventory data, reserved data and forward ordering data of each nuclear power plant are obtained, the MRP algorithm is used for processing the summarized spare part inventory data, reserved data and forward ordering data to obtain spare part MRP parameters and the quantity to be purchased, and the entity joint storage power plants are used for purchasing. When a certain nuclear power plant in the entity united storage power plant group needs to use spare parts, a spare part receiving request is sent to the entity united storage power plant, and the entity united storage power plant carries out spare part distribution according to the spare part receiving request.
The entity joint storage power plant of the embodiment also acquires the spare part historical availability data of all nuclear power plants in the entity joint storage power plant group, and the MRP algorithm is used for processing the aggregated spare part inventory data, the reserved data, the forward order data and the spare part historical availability data to obtain the spare part MRP parameters.
In the multi-core power plant spare part overall planning and storage system, each nuclear power plant in the entity combined storage power plant group is subjected to historical utilization quantity sequencing according to historical utilization data of spare parts. And if only one nuclear power plant with the highest historical utilization quantity exists, selecting the nuclear power plant with the highest historical utilization quantity as the entity combined storage power plant. And if the number of the nuclear power plants with the highest historical receiving quantity is at least two, calculating the ratio of the MRP triggered purchase amount after the combined storage corresponding to the nuclear power plant with the highest historical receiving quantity to the MRP triggered purchase amount before the combined storage, and selecting the nuclear power plant with the smallest ratio as the entity combined storage power plant.
This embodiment optimizes the group factory spare parts inventory parameter through the operation of many power plant MRP, realizes that the stock of the whole deposit of group factory descends, and the concentration of purchase application promotes, improves the intensification income of the group factory spare parts management.
Example 2
Referring to fig. 2, the multi-core power plant spare part overall planning and storage system of the present embodiment includes at least one virtual combined storage power plant group, where the virtual combined storage power plant group includes a management terminal and at least two nuclear power plants, and the management terminal is respectively in communication connection with each nuclear power plant. The management terminal acquires spare part inventory data, reserved data and forward-ordered data of each nuclear power plant, and the MRP algorithm is used for processing the aggregated spare part inventory data, reserved data and forward-ordered data to obtain spare part MRP parameters and the quantity to be purchased; and the management terminal distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchase.
The management terminal of the embodiment acquires the historical procurement distribution list and the safety inventory storage list of each nuclear power plant in the virtual combined storage power plant group, and distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchase by combining the inventory quantity, the reserved quantity and the forward ordering information of spare parts in each nuclear power plant.
The management terminal of the embodiment also obtains the spare part historical availability data of all nuclear power plants in the virtual combined storage power plant group, and the MRP algorithm is used for processing the aggregated spare part inventory data, the reserved data, the forward order data and the spare part historical availability data to obtain the spare part MRP parameters.
Example 3
Referring to fig. 3, the embodiment further provides a system for overall planning and combined storage of multi-core power plant spare parts, which includes at least one entity combined storage power plant group and at least one virtual combined storage power plant group, where the entity combined storage power plant group includes at least two nuclear power plants, one of the nuclear power plants is selected as an entity combined storage power plant, and a distance from the entity combined storage power plant to each nuclear power plant in the entity combined storage power plant group is less than a preset distance; the virtual combined storage power plant group comprises a management terminal and at least two nuclear power plants, and the management terminal is in communication connection with each nuclear power plant.
The entity joint storage power plants are respectively in communication connection with each nuclear power plant in the entity joint storage power plant group, spare part inventory data, reserved data and forward order data of each nuclear power plant are obtained, the collected spare part inventory data, reserved data and forward order data are processed by an MRP algorithm to obtain spare part MRP parameters and the quantity to be purchased, and the entity joint storage power plants are used for purchasing; when a certain nuclear power plant in the entity united storage power plant group needs to use spare parts, a spare part receiving request is sent to the entity united storage power plant, and the entity united storage power plant carries out spare part distribution according to the spare part receiving request. The management terminal acquires spare part inventory data, reserved data and forward-ordered data of each nuclear power plant, and the MRP algorithm is used for processing the aggregated spare part inventory data, reserved data and forward-ordered data to obtain spare part MRP parameters and the quantity to be purchased; and the management terminal distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchase.
The virtual combined storage power plant group of this embodiment includes that management terminal, at least two nuclear power plants and at least one entity are combined storage power plant group, and management terminal is every nuclear power plant of communication connection and every entity of every entity and is combined storage power plant of storage power plant group respectively.
The entity joint storage power plant of the embodiment also acquires the spare part historical availability data of all nuclear power plants in the entity joint storage power plant group, and the MRP algorithm is used for processing the aggregated spare part inventory data, the reserved data, the forward order data and the spare part historical availability data to obtain the spare part MRP parameters.
In the multi-core power plant spare part overall planning and storage system, historical utilization quantity sequencing is carried out on each nuclear power plant in an entity combined storage power plant group according to historical utilization data of spare parts; if only one nuclear power plant with the highest historical utilization quantity exists, selecting the nuclear power plant with the highest historical utilization quantity as an entity combined storage power plant; and if the number of the nuclear power plants with the highest historical receiving quantity is at least two, calculating the ratio of the MRP triggered purchase amount after the combined storage corresponding to the nuclear power plant with the highest historical receiving quantity to the MRP triggered purchase amount before the combined storage, and selecting the nuclear power plant with the smallest ratio as the entity combined storage power plant.
The management terminal of the embodiment acquires the historical procurement distribution list and the safety inventory storage list of each nuclear power plant in the virtual combined storage power plant group, and distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchase by combining the inventory quantity, the reserved quantity and the forward ordering information of spare parts in each nuclear power plant.
The management terminal of the embodiment also obtains the spare part historical availability data of all nuclear power plants in the virtual combined storage power plant group, and the MRP algorithm is used for processing the aggregated spare part inventory data, the reserved data, the forward order data and the spare part historical availability data to obtain the spare part MRP parameters.
This embodiment optimizes the group factory spare parts inventory parameter through the operation of many power plant MRP, realizes that the stock of the whole deposit of group factory descends, and the concentration of purchase application promotes, improves the intensification income of the group factory spare parts management.
Example 4
Referring to fig. 4, in this embodiment, according to the actual situation of each nuclear power plant, the MRP operation mode of the multiple power plants is divided into an "entity joint storage power plant mode" and a "virtual joint storage power plant mode", where the entity joint storage power plant mode means that a spare part is shared by two or more power plants, and all the power plants shared originally have set inventory parameters, and perform autonomous purchasing and storage. The virtual combined storage power plant mode means that a certain spare part is shared by two or more power plants, all the power plants shared originally are provided with inventory parameters, independent purchasing and storage are carried out, after virtual combined storage, a group plant establishes a group plant virtual power plant for setting the inventory parameters, the virtual power plants aggregate the inventory, reservation and forward order of the group plant, the total quantity to be purchased is determined, distribution is carried out in each power plant, the power plants shared originally are provided and reserved with a certain quantity of safety inventory as required, and the maintenance requirement that the fault repair time of the part on site is shorter than the allocation time of the spare part group plant is met.
The entity allies oneself with the condition that stores up power plant mode is mainly used for the distance between the power plant is close, can accept large-scale cross power plant material receiving, is applicable to a plurality of units in the same nuclear power base because owner's share right reason usually, manages according to different nuclear power plants. The virtual cogeneration plant model is applicable to all nuclear power plants that use the same spare parts. The physical combined storage power plant mode can be used together with the virtual combined storage power plant mode. The operation methods of the physical cogeneration plant mode and the virtual cogeneration plant mode are explained further below.
4.1 method of operation in physical combined storage power plant mode.
The MRP parameter setting, purchasing and storing of spare parts of multiple power plants are integrated into a single power plant for management through a mode of running an entity combined storage power plant. Taking fig. 4 as an example, a certain spare part a is used in all of the nuclear power plant 1010, the nuclear power plant 1020 and the nuclear power plant 1030, and is stored in a united manner by the entity united storage power plant 2010, and is assigned to a fixed power plant (the nuclear power plant 1010 in the example of fig. 4) to be purchased and stored after a triggered purchase application, and when the nuclear power plant 1020 and the nuclear power plant 1030 need the spare part, the spare part a is taken from the nuclear power plant 1010 in a cross-power-plant material receiving manner.
And under the entity combined storage power plant mode, the combined storage MRP operation module determines the quantity to be purchased according to the spare part MRP parameter in the MRP parameter setting module by reading the summarized spare part inventory, reservation and forward order data, and outputs the quantity to the combined storage power plant determined by the spare part for purchase. In the embodiment, a factory code is established, for example, "2010", the factory of the code is regarded as an independent power plant, the related data of each original power plant is collected through the data collecting module, the MRP operation module can directly use the MRP module which is mature on the market currently, the MRP operation module reads the data in the collecting module, the purchase quantity of the spare parts is determined according to the MRP parameters of the spare parts in the MRP parameter setting module, and the purchase application distribution module determines the power plant for developing the purchase of the spare parts by reading the information of the combined storage power plant in the MRP parameter setting module. In the implementation process, the main difficulty is information supplement in the entity joint storage spare part MRP parameter setting module, including MRP inventory parameter setting of each spare part and allocation of purchased and stored power plants during joint storage of each power plant. It needs to achieve the following 3 goals:
1) the condition of spare parts used across the power plant is minimized, namely, the extra cost caused by the material receiving across the power plant is reduced;
2) after the entity power plant is stored in a united manner, the MRP triggering purchase amount is less than the sum of the MRP triggering purchase amounts before the power plants are stored in a united manner, namely the total stock required to be purchased and stored after the united storage is carried out is reduced;
3) the proportion of each power plant (MRP triggered purchase amount after combined storage/MRP triggered purchase amount before combined storage) is close, namely the income proportion of each power plant after combined storage is close.
Referring to fig. 5, how to calculate MRP inventory parameters of spare parts and allocate power plants for purchase and storage during combined storage is further explained below, and S401 is to recalculate MRP parameters of spare parts after integrating the procurement data of each power plant according to historical procurement data of spare parts in multiple power plants, so as to ensure that the sum of MRP trigger purchase amount after combined storage of entity power plants is less than the sum of MRP trigger purchase amount before combined storage of each power plant. And determining the calculated MRP parameter of the spare part as the MRP parameter of the entity combined storage power plant. The inventory parameter setting principle of the high-turnover spare parts is as follows: the re-ordering point is the receiving quantity in the purchasing period plus the safety stock, and the receiving quantity of economic ordering batches or one year is selected in the ordering batches; the inventory parameter setting principle of the non-high turnover spare parts is to set a certain amount of safety inventory by combining the future probability of receiving and the management requirement of the cargo availability. As long as the stock parameter setting principle is consistent before and after combined storage, the MRP triggered purchase amount after combined storage is less than the sum of the MRP triggered purchase amounts before combined storage of each power plant. For example, according to the historical availability records of spare parts, the reordering points of the nuclear power plant 1010, the nuclear power plant 1020 and the nuclear power plant 1030 are respectively 1.4, 0.7 and 0.8, and the stock parameters are basically set to be integers, so that the reordering points of the three nuclear power plants are respectively set to be 2, 1 and 1, and the sum of the reordering points is 4. After the combined storage, the calculation value of the re-ordering point is 2.9(1.4+0.7+0.8), the setting value of the re-ordering point is 3, and the MRP triggering purchase amount after the combined storage is less than the sum of the MRP triggering purchase amounts before the combined storage of each power plant. S402, selecting the power plant with the highest historical utilization number as the combined storage power plant according to the historical utilization number of the spare parts in the last 5 years, and reducing the condition that the spare parts are utilized across the power plants if the utilization numbers are different. And S403, calculating the MRP triggered purchase amount before combined storage of each power plant and the MRP triggered purchase amount after combined storage of each power plant. S404, aiming at spare parts with the same number in the last 5 years, selecting a power plant with a small numerical value of 'MRP triggered purchase amount after combined storage/MRP triggered purchase amount before combined storage' as a combined storage power plant, so that the gains obtained by all the power plants participating in the combined storage are close. S405, if the numerical values of 'MRP triggered purchase amount after combined storage/MRP triggered purchase amount before combined storage' of each power plant in combined storage are still obviously different (after initialization setting is finished), selecting part of spare parts with high value, and taking the power plant with small numerical value of 'MRP triggered purchase amount after combined storage/MRP triggered purchase amount before combined storage' as the combined storage power plant of the spare parts. When each power plant develops the physical combined storage power plant mode, the method for initializing allocation of spare parts of each power plant is used for calculating the MRP inventory parameters of the spare parts and allocating procurement and storage power plants, and for the follow-up newly-added common code spare parts, after the newly-added common code spare parts are summarized according to the month degree, the MRP inventory parameters of the spare parts and allocating procurement and storage power plants are calculated according to the method (without S405) of FIG. 5.
4.2 virtual combined storage power plant mode operation method
Through the mode of operating the virtual combined storage power plants, the MRP operation of a plurality of power plants is normalized to a virtual factory, the purchase application is triggered, and then the purchase application is distributed to each power plant for purchase. The combined storage MRP operation module under the triggering purchase application mode determines the quantity to be purchased according to the spare part MRP parameters in the MRP parameter setting module by reading the summarized spare part inventory, reservation and forward order data, and outputs the quantity to the combined storage power plant determined by the spare part for purchase. The example can adopt a factory code, such as '3010', as an independent power plant, summarize the related data of the original power plants through a data summarization module, the MRP operation module can directly use the current commercially mature MRP module, read the data in the summarization module, determine the purchase quantity of the spare parts according to the MRP parameters of the spare parts in the MRP parameter setting module, and the purchase application distribution module distributes the purchase application of the spare parts to each power plant by reading the historical pick-up distribution list and the safety stock reserve list in the MRP parameter setting module and combining the stock, reservation and forward order information of the spare parts in each power plant. In the implementation process, the main difficulty is information supplement in a spare part MRP parameter setting module and operation of a purchase application distribution module, wherein the spare part MRP parameter setting module comprises parameters of MRP inventory parameter setting, a historical pick-up distribution list, a safety inventory reserve list and the like of each spare part, and the purchase application distribution module comprises power plant combined storage contribution degree data. The development of virtual joint storage needs to achieve the following 3 goals:
1) the condition of spare parts used across the power plant is minimized, namely, the extra cost caused by the material receiving across the power plant is reduced;
2) the MRP triggering purchase amount after virtual power plant combined storage is less than the sum of the MRP triggering purchase amounts before each power plant combined storage; the total stock required to be purchased and stored is reduced after the joint storage is carried out;
3) the contribution degree of the combined storage of each power plant (the amount of the transferred power plant-the amount of the transferred power plant)/the amount of the combined storage of the power plants is close, namely the income obtaining proportion of each power plant after the combined storage is carried out is close.
With reference to fig. 6, how to calculate the virtual joint reserve MRP parameter setting module parameters is further explained below. S601 is that according to historical utilization data of spare parts in multiple power plants, the MRP parameters of the spare parts are recalculated, and the fact that the MRP triggering purchase amount of the virtual combined storage power plant is smaller than the sum of the MRP triggering purchase amounts before combined storage of all the power plants is ensured. And determining the calculated MRP parameter of the spare part as the MRP parameter of the virtual combined storage power plant of the spare part. S602, aiming at part of important spare parts, each power plant sets a certain amount of safety stock according to needs, and a spare part safety stock reserve list is established. The safety stock of each power plant does not participate in the inter-plant combined storage and allocation in principle. S603 is that according to historical availability data of spare parts in each power plant, the historical availability quantity proportion of the spare parts is determined, such as n1: n2: n3, a distribution list of historical availability of the spare parts is established, and the distribution list is updated regularly.
Referring to fig. 7, since the virtual combined storage power plant mode uniformly triggers a purchase application through the MRP parameters of the spare part group plant, the purchase application is distributed among the nuclear power plants through the purchase application distribution module. In the virtual joint storage spare part purchase application distribution module purchase application distribution method, S701 is to call a spare part safety stock inventory and supplement the difference value between the stock supplemented with actual stock and the safety stock set value of each power plant; s702, calling reserved, stocked and positively ordered data of each power plant, supplementing the difference value between the reserved and stocked + positively ordered data of each power plant, if the difference value of a certain power plant is greater than the purchase quantity triggered by demand combined storage, indicating that other power plants store/purchase redundant spare parts, and synchronously transferring the spare parts stored/purchased by other power plants to the power plant; s703, calling a historical procurement distribution list of spare parts, distributing the quantity to be purchased according to the historical procurement quantity proportion of the spare parts in each power plant, and only taking integers, for example, the quantity calculated by a certain power plant according to the historical procurement is 3.6, and only 3 are purchased at this stage; and S704, distributing the residual quantity to be purchased according to the joint storage sharing contribution degree of each power plant, for example, purchasing the power plant distributed to the lowest (transfer amount-transfer amount)/median value of the joint storage inventory of the power plants, thereby balancing the joint storage income of each power plant. The operation principle is further illustrated below, assuming that 3 nuclear power plants (a, b, and c, respectively) perform virtual combined storage, the safety stock to be stored in each plant is 1, the historical receiving quantity ratio is 2:1:1, no stock and a positive order are available at present, 2 reservations are available, the shared degree of combined storage of the nuclear power plant a is the lowest, and a purchase application triggered by a group plant is to purchase 20 spare parts. After S701, each power plant purchases 1 safety stock, and the rest 17 purchase applications of the group plants are to be distributed; after S702, each power plant purchases 2 spare parts through reservation and inventory + positive order calculation, the reservation requirement is met, and the rest 11 purchase applications of the group plants are to be distributed; after S703, respectively allocating 5, 2 and 2 purchases according to the historical utilization proportion of the power plant, and remaining 2 purchase applications of the group plant to be allocated; after step S704, the remaining 2 spare parts are purchased by the nuclear power plant a according to the joint storage sharing degree of the cluster plant. That is, 20 purchase applications are triggered by the group plants, and after entering the purchase application distribution module, 10, 5 and 5 are purchased by each power plant respectively.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The device disclosed by the embodiment corresponds to the method disclosed by the embodiment, so that the description is simple, and the relevant points can be referred to the method part for description.
Those of skill would further appreciate that the various illustrative elements and algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic hardware, computer software, or combinations of both, and that the various illustrative components and steps have been described above generally in terms of their functionality in order to clearly illustrate this interchangeability of hardware and software. Whether such functionality is implemented as hardware or software depends upon the particular application and design constraints imposed on the implementation. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present invention.
The steps of a method or algorithm described in connection with the embodiments disclosed herein may be embodied directly in hardware, in a software module executed by a processor, or in a combination of the two. A software module may reside in Random Access Memory (RAM), memory, Read Only Memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.
The above embodiments are merely illustrative of the technical ideas and features of the present invention, and are intended to enable those skilled in the art to understand the contents of the present invention and implement the present invention, and not to limit the scope of the present invention. All equivalent changes and modifications made within the scope of the claims of the present invention should be covered by the claims of the present invention.

Claims (12)

1. A multi-core power plant spare part overall planning and storage system is characterized by comprising at least one entity combined storage power plant group, wherein the entity combined storage power plant group comprises at least two nuclear power plants, one of the nuclear power plants is selected as an entity combined storage power plant, and the distance between the entity combined storage power plant and each nuclear power plant in the entity combined storage power plant group is smaller than a preset distance;
the entity joint storage power plants are respectively in communication connection with each nuclear power plant in the entity joint storage power plant group, spare part inventory data, reserved data and forward-order data of each nuclear power plant are obtained, the collected spare part inventory data, reserved data and forward-order data are processed by an MRP algorithm to obtain spare part MRP parameters and the quantity to be purchased, and the entity joint storage power plants purchase the spare part MRP parameters and the quantity to be purchased;
a certain nuclear power plant in the entity allies oneself with stores up power plant group and sends spare part and receive the requirement extremely when needing to use spare part entity allies oneself with stores up power plant, entity allies oneself with stores up power plant basis spare part receives the requirement and carries out spare part delivery.
2. The system for overall coordinated storage of spare parts for multi-core power plants according to claim 1, wherein the entity coupled storage power plant further obtains historical spare part availability data of all nuclear power plants in the entity coupled storage power plant group, and the MRP algorithm is used for processing the aggregated spare part inventory data, reserved data, forward order data and historical spare part availability data to obtain MRP parameters of the spare parts.
3. The multi-nuclear power plant spare parts overall pooling system of claim 2, wherein each nuclear power plant in the physical combined storage power plant group is sorted by historical pickup quantity according to the spare part historical pickup data;
if only one nuclear power plant with the highest historical utilization quantity exists, selecting the nuclear power plant with the highest historical utilization quantity as an entity combined storage power plant;
and if the number of the nuclear power plants with the highest historical receiving quantity is at least two, calculating the ratio of the MRP triggered purchase amount after the combined storage corresponding to the nuclear power plant with the highest historical receiving quantity to the MRP triggered purchase amount before the combined storage, and selecting the nuclear power plant with the smallest ratio as the entity combined storage power plant.
4. The multi-core power plant spare part overall planning and storage system is characterized by comprising at least one virtual combined storage power plant group, wherein the virtual combined storage power plant group comprises a management terminal and at least two nuclear power plants, and the management terminal is respectively in communication connection with each nuclear power plant;
the management terminal acquires spare part inventory data, reserved data and forward-ordered data of each nuclear power plant, and the MRP algorithm is used for processing the aggregated spare part inventory data, reserved data and forward-ordered data to obtain spare part MRP parameters and the quantity to be purchased; and the management terminal distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchasing.
5. The multi-core power plant spare part overall planning and storage system of claim 4, wherein the management terminal obtains a historical procurement distribution list and a safety inventory storage list of each nuclear power plant in the virtual combined storage power plant group, and distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchase in combination with the inventory quantity, the reserved quantity and the positive order information of spare parts at each nuclear power plant.
6. The multi-core power plant spare part overall planning and storage system of claim 4, wherein the management terminal further obtains spare part historical availability data of all nuclear power plants in the virtual combined storage power plant group, and processes the aggregated spare part inventory data, reserved data, forward order data and spare part historical availability data by using an MRP algorithm to obtain spare part MRP parameters.
7. A multi-core power plant spare part overall planning and storage system is characterized by comprising at least one entity combined storage power plant group and at least one virtual combined storage power plant group, wherein the entity combined storage power plant group comprises at least two nuclear power plants, one of the nuclear power plants is selected as an entity combined storage power plant, and the distance between the entity combined storage power plant and each nuclear power plant in the entity combined storage power plant group is smaller than a preset distance; the virtual combined storage power plant group comprises a management terminal and at least two nuclear power plants, and the management terminal is respectively in communication connection with each nuclear power plant;
the entity joint storage power plants are respectively in communication connection with each nuclear power plant in the entity joint storage power plant group, spare part inventory data, reserved data and forward-order data of each nuclear power plant are obtained, the collected spare part inventory data, reserved data and forward-order data are processed by an MRP algorithm to obtain spare part MRP parameters and the quantity to be purchased, and the entity joint storage power plants purchase the spare part MRP parameters and the quantity to be purchased; when a nuclear power plant in the entity united storage power plant group needs to use spare parts, sending a spare part receiving request to the entity united storage power plant, and carrying out spare part distribution by the entity united storage power plant according to the spare part receiving request;
the management terminal acquires spare part inventory data, reserved data and forward-ordered data of each nuclear power plant, and the MRP algorithm is used for processing the aggregated spare part inventory data, reserved data and forward-ordered data to obtain spare part MRP parameters and the quantity to be purchased; and the management terminal distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchasing.
8. The multi-nuclear power plant spare part overall planning and storage system of claim 7, wherein the virtual combined storage power plant group comprises a management terminal, at least two nuclear power plants and at least one entity combined storage power plant group, and the management terminal respectively communicatively connects each nuclear power plant and each entity combined storage power plant of the entity combined storage power plant group.
9. The system for comprehensively staging and storing multiple nuclear power plant spare parts according to claim 6 or 7, wherein the physically connected power plant further obtains the historical spare part availability data of all nuclear power plants in the physically connected power plant group, and the MRP algorithm is used to process the aggregated spare part inventory data, reserved data, forward order data and the historical spare part availability data to obtain the MRP parameter of the spare part.
10. The multi-nuclear power plant spare parts overall pooling system of claim 9, wherein each nuclear power plant in the physical combined storage power plant group is sorted by historical pickup quantity according to the spare part historical pickup data; if only one nuclear power plant with the highest historical utilization quantity exists, selecting the nuclear power plant with the highest historical utilization quantity as an entity combined storage power plant; and if the number of the nuclear power plants with the highest historical receiving quantity is at least two, calculating the ratio of the MRP triggered purchase amount after the combined storage corresponding to the nuclear power plant with the highest historical receiving quantity to the MRP triggered purchase amount before the combined storage, and selecting the nuclear power plant with the smallest ratio as the entity combined storage power plant.
11. The system for comprehensively planning and storing multiple nuclear power plant spare parts according to claim 6 or 7, wherein the management terminal acquires a historical procurement distribution list and a safety inventory storage list of each nuclear power plant in the virtual combined storage power plant group, and distributes the quantity to be purchased to each nuclear power plant in the virtual combined storage power plant group for purchase in combination with the inventory quantity, the reserved quantity and the positive order information of the spare parts at each nuclear power plant.
12. The system for comprehensively staging and storing multiple nuclear power plant spare parts according to claim 6 or 7, wherein the management terminal further obtains historical spare part availability data of all nuclear power plants in the virtual combined storage power plant group, and processes the aggregated spare part inventory data, reserved data, forward order data and historical spare part availability data by using an MRP algorithm to obtain MRP parameters of the spare parts.
CN202010911195.0A 2020-09-02 2020-09-02 Multi-core power plant spare part overall planning and combined storage system Pending CN112132417A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010911195.0A CN112132417A (en) 2020-09-02 2020-09-02 Multi-core power plant spare part overall planning and combined storage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010911195.0A CN112132417A (en) 2020-09-02 2020-09-02 Multi-core power plant spare part overall planning and combined storage system

Publications (1)

Publication Number Publication Date
CN112132417A true CN112132417A (en) 2020-12-25

Family

ID=73848790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010911195.0A Pending CN112132417A (en) 2020-09-02 2020-09-02 Multi-core power plant spare part overall planning and combined storage system

Country Status (1)

Country Link
CN (1) CN112132417A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112766850A (en) * 2021-01-20 2021-05-07 浙江浙能电力股份有限公司 Material combined storage management platform
CN112766849A (en) * 2021-01-20 2021-05-07 浙江浙能电力股份有限公司 Method and system for managing digital tags of full life cycles of associated storage materials
CN112819298A (en) * 2021-01-20 2021-05-18 浙江浙能电力股份有限公司 Combined storage and resource multi-factory balance interest storage method and system
CN113723905A (en) * 2021-08-05 2021-11-30 中核武汉核电运行技术股份有限公司 Nuclear power plant system selection display method, device, equipment and readable storage medium
CN113793102A (en) * 2021-09-18 2021-12-14 中广核风电有限公司 Inventory management method and device based on platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106951974A (en) * 2016-01-07 2017-07-14 周敏慧 Method and system for optimizing stock
CN108960741A (en) * 2018-07-26 2018-12-07 中广核核电运营有限公司 A kind of nuclear power station group factory Spare Parts Inventory Management System
CN109523226A (en) * 2018-10-16 2019-03-26 中广核核电运营有限公司 Spares reserve strategy setting system is shared by a kind of nuclear power station group factory
CN111429284A (en) * 2020-04-14 2020-07-17 青海绿能数据有限公司 New forms of energy fan spare part allies oneself with stores up transaction platform system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106951974A (en) * 2016-01-07 2017-07-14 周敏慧 Method and system for optimizing stock
CN108960741A (en) * 2018-07-26 2018-12-07 中广核核电运营有限公司 A kind of nuclear power station group factory Spare Parts Inventory Management System
CN109523226A (en) * 2018-10-16 2019-03-26 中广核核电运营有限公司 Spares reserve strategy setting system is shared by a kind of nuclear power station group factory
CN111429284A (en) * 2020-04-14 2020-07-17 青海绿能数据有限公司 New forms of energy fan spare part allies oneself with stores up transaction platform system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周伟;: "核电站备品备件的联合储备管理模式分析", 发电设备, no. 05, 15 September 2009 (2009-09-15) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112766850A (en) * 2021-01-20 2021-05-07 浙江浙能电力股份有限公司 Material combined storage management platform
CN112766849A (en) * 2021-01-20 2021-05-07 浙江浙能电力股份有限公司 Method and system for managing digital tags of full life cycles of associated storage materials
CN112819298A (en) * 2021-01-20 2021-05-18 浙江浙能电力股份有限公司 Combined storage and resource multi-factory balance interest storage method and system
CN113723905A (en) * 2021-08-05 2021-11-30 中核武汉核电运行技术股份有限公司 Nuclear power plant system selection display method, device, equipment and readable storage medium
CN113793102A (en) * 2021-09-18 2021-12-14 中广核风电有限公司 Inventory management method and device based on platform

Similar Documents

Publication Publication Date Title
CN112132417A (en) Multi-core power plant spare part overall planning and combined storage system
CN109711778B (en) Inventory allocation method, device and storage medium of warehouse network
CN109872064B (en) Airport resource allocation method, device, equipment and medium
JP4736651B2 (en) Production planning method and production planning system for mixed orders and expected production
CN108108933B (en) Storage position distribution method and device
CN115600774B (en) Multi-target production scheduling optimization method for assembly type building component production line
CN112396371B (en) Multi-target material allocation method and device based on GIS
CN108022445A (en) A kind of method, system and the server of definite parking lot information
CN110276568A (en) It is put in storage resource allocation methods, device and computer system
CN111985862A (en) Method and apparatus for locating inventory items
CN111047140A (en) Processing method, device and equipment
CN115775124A (en) Event network-based spare part inventory management method and device and electronic equipment
US20200175462A1 (en) Method and system for two-echelon balanced inventory allocation
US20200175531A1 (en) Method and system for reserving stock in a regional distribution center
CN115564359B (en) Method, apparatus and storage medium for predicting inventory of after-market spare parts of automobile
CN109711596B (en) Multi-objective evolutionary logistics distribution center site selection optimization method and system
WO2023071374A1 (en) Method and apparatus for processing data of goods
CN115187117A (en) Order distribution system and method based on component structure tree
CN115375024A (en) Method and system for predicting and reminding purchasing based on bom material loss
CN113935673A (en) Warehouse network optimization method and device based on inventory, computer equipment and storage medium
JP2007128368A (en) Production plan drafting apparatus
JP2006244470A (en) Delivery date reply system, delivery date reply method, and delivery date reply program
CN111047354A (en) Time-sharing pricing implementation method and device, electronic equipment and storage medium
CN110648090A (en) Logistics process node management method and system
CN110163402A (en) Determine the method and device of keeper unit in order

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination